asked the Minister for Agriculture and Fisheries if he will increase the grant for a farm training centre in line with increasing costs of building and equipment.
Ceisteanna—Questions. Oral Answers. - Farm Training Centres.
34.
The grant covers the full approved cost up to a maximum of £15,000 and I do not propose to increase this figure at present.
Would the Parliamentary Secretary tell me when the maximum of £15,000 was settled?
It was settled when the scheme was introduced in September, 1970.