Written Answers. - County Galway Schools Plans.

636.

asked the Minister for Education the total number of plans, specifications, designs, etc., being considered by her Department for extensions, additions or proposed new buildings in first level, second level or third level schools in County Galway; the location of each under consideration; the up-to-date position of each individual school proposal; the number to be completed in 1984; the number to be completed in 1985; and if she will make a statement on the matter.

The information available in relation to the various projects follows:

Primary Schools, County Galway

Under construction

New school:

Gort Boys.

Extensions:

Galway Parochial, Creagh.

At Planning Stage

New schools:

Craughwell*

Ballygar*

Oughterard

Athenry Boys

Kilcoona

Tyrellan Heights

Portumna

Clifden

Ballybane Special

Clonbur

Extensions:

Fohenagh*

St. Annin's, Roscahill*

Oranmore Boys*

Derroe*

Salerna, Indreabháin

Ballinderreen

Kilconly

Oranmore Convent

Killeeneen

Killimore

Gardenfield

Gurrane

Kilconnell

St. Brendan's Eyrescourt

Williamstown

Milltown

St. Colman's, Corofin

Kilronan

Lavally

Annaghdown

St. Brendan's Loughrea

Ballinderry

Leitir Mór

Belclare

Carnaun (new school or extension)

Spiddal Boys and Girls.

*Indicates projects which have reached detail design stage.

School Building Projects, second and third level in County Galway

1. (a)Pre-Planning i.e. application for accommodation being considered.

(b)Planning Stages:

1. Site Report;

2. Outline Sketch Scheme;

3. Developed Sketch Scheme;

4. Working Drawings;

5. Bill of Quantities;

6. Tender;

7, 8 and 9. Post Contract Cost Control and Final Account.

2. (a) Second Level—

(i) St. Joseph's Garbally Park, Ballinasloe, Stage 4;

Coláiste Iognáid, Galway, Completed 1984;

Coláiste Einde, Galway, Completed 1984;

Our Lady's College, Gort, Pre-Planning;

St. Joseph's, Gort, Pre-Planning;

Seamount College, Kinvara, Pre-Planning;

Holy Rosary, Mountbellew, Stages 1 and 2;

St. Paul's Oughterard, Pre-Planning;

St. Molaises, Portumna, Stage 6;

St. Jarlath's Tuam, Stage 4;

Convent of Mercy, Tuam, Under Construction;

Our Lady of Mercy, Woodford, Stage 2;

Athenry VS, Pre-Planning;

Ballinasloe VS, Stage 3;

Gort VS, Stage 3;

Indreabháin VS, Stages 1 and 2;

Loughrea VS, Completed 1984;

Portumna VS, Stage 3;

New Inn VS, Stage 3;

Tuam VS, Stage 3;

Fr. Griffin Road, VS, Pre-Planning;

Ros Muc VS, Under Construction;

Corr na Móna VS, Under Construction;

Glenamaddy VS, Under Construction;

Community School, Clifden, Planning of a Physical Education Hall will begin shortly;

Community School, Carna, Stage 2.

(ii) Seven projects will be completed in 1984. Six projects will be completed in 1985.

(b) Third Level—

(i) UCG: Extension to Library, Under Construction, expected to be completed in 1984;

(ii) RTC Galway: Alterations, etc., Ongoing.