Trevor Sargent
Question:94 Mr. Sargent asked the Minister for Finance the basis for the reported comment by him in The Irish Times of 8 May 1996 that the Dublin Port Tunnel and the third line of the three line core light rail transit system cannot be built simultaneously. [11623/96]