Written Answers. - Departmental Projects.

Bernard Allen

Question:

176 Mr. Allen asked the Minister for Defence the working groups, reports, studies and consultancies commissioned by his Department since taking office; the estimated cost of each, where applicable; the date the report of each was received or is scheduled to be received; and whether each has or will be published. [15762/98]

The relevant reports, etc., commissioned since my appointment to Defence were as follows:—

Working Groups, Reports, Studies, Consultancies

Cost £

Completion Dates

Publication status

Steering group to oversee and direct the military board examining the Reserve Defence Forces

£10,000 (estimated)

End of 1998

Not applicable

Provision of career change/outplacement counselling services for members of Permanent Defence Forces availing of Voluntary Early Retirement Scheme.

Not possible to estimate cost which will depend on the scale of uptake.

Ongoing

Not applicable

Analysis and design of a fishery control system to enable the Naval Service to meet its obligations under new fishery regulations

£500,000 inclusive of VAT (estimated)

September 1998

No

Steel inspection quality assurance services on new fishery protection vessel.

Stg £49,000 (estimated)

Weekly up to May 1999

No

(1) Oil tanks-report and survey (naval base)

(1) Survey and Report = £48,400 VAT inclusive;

Survey in progress

No

(2) Design and supervision of repairs to oil tanks

(2) Design and Supervision = 5 per cent of contract value under £500,000;

4 per cent of contract value over £500,000;

Overall contract value not known at this stage

Project report and contract design/supervision for fire suppression/detection system Casement Aerodrome, Baldonnel.

Project Report = £10,825 VAT inclusive Contract design/supervision = 8 per cent of estimated contract cost of £427,000 plus VAT.

May 1998

No

Swimming pool — Curragh Camp survey and status report.

£6,000 VAT inclusive

May 1998

No

Design and supervise alteration and upgrading of fueling installation, Casement Aerodrome, Baldonnel.

7 per cent of estimated project cost of £360,000 plus VAT

Survey in progress

No

Land inspection and ground water survey at Curragh Camp.

£6,087 plus VAT

Ongoing

No