Written Answers. - Harbours and Piers.

Alan M. Dukes

Question:

104 Mr. Dukes asked the Minister for the Marine and Natural Resources the grants given for onshore facilities at fishing ports, together with the total estimated cost of the project in each case for each of the years 1998, 1999 and 2000. [9507/01]

The grants allocated for fishery harbour projects in each of the years 1998, 1999 and 2000 are as follows. It should be noted that apart from expenditure on the five fishery harbour centres, the grant-aid element represents 75% of total cost. A total of 25% is contributed by the relevant local authority.

Fishery Harbour Works Undertaken in 1998

Location

Project

Grant Paid(£'s)

Total Cost(£'s)

Cork

Castletownbere

New slipway, for Bere island, powerpoints, upgrade Auction Hall, resurfacing, syncrolift inspection, minor harbour works

572,732.00

572,732.00

Ardgroom

Pier development

Ballycotton

Dredging

64,500.00

86,000.00

Crosshaven

Completion of pier development

76,561.79

102,082.38

Kealbeg

Safety works

3,055.67

4,074.23

Donegal

Killybegs

Upgrade Auction Hall, Syncrolift inspection, studies/investigations, general maintenance and upgrading works

644,776.00

644,776.00

Burtonport

Dredging of approach channel

177,149.08

236,198.77

Carrickaroary

Pier reconstruction

113,521.50

151,362.00

Greencastle

Quay reconstruction

104,657.75

139,543.66

Kerrykeel

Pier development

49,467.75

65,957.00

Portaleen

Pier development

41,250.00

55,000.00

Port Arthur/ Magheragallen

General repairs

10,644.00

14,192.00

Kerry

Cromane

Site investigation

34,725.75

46,301.00

Dingle

Pier extension

162,344.76

216,459.68

Portmagee

Completion of works

7,103.84

9,471.78

Sneem

Resurfacing of parking area

2,300.00

3,067.00

Blackwater

Resurfacing and provision of public lighting

13,100.00

17,467.00

Corvagillagh

Repairs to ramp and provide access at all tides

6,750.00

9,000.00

Knightstown

Remove obstruction at pier head

1,500.00

2,000.00

Cooncrone

Improve access, provide concrete decking

6,000.00

8,000.00

Coonanna

Repair damage at pier head

6,000.00

8,000.00

Louth

Carlingford

Completion of pier reconstruction

40,426.43

53,901.90

Wexford

Kilmore Quay

Dredge rock at Harbour entrance

38,749.81

51,666.41

Galway

Rossaveel

Minor harbour works and renewals

61,022.60

81,363.46

Cleggan

Pier repairs

741,348

142,696.00

Rossadilisk

Pier repairs

10,780.00

14,373.00

Killeany

General maintenance works

36,458.00

48,611.00

Dublin

Howth

Minor works and renewals, security system, syncrolift inspection

72,763.00

72,763.00

Other

Galway Bay to Foyle

Study

1,769.15

1,769.15

Piers, Lights and Beacons

Various locations nationally

27,501.00

27,501.00

Fishery Harbour Works Undertaken in 1999

Location

Project

Grant Paid(£'s)

Total Cost(£'s)

Wexford

Kilmore Quay

Dredge rock at harbour entrance

25,131.48

33,508.64

Courtown

Repairs to pier wall

84,000.00

112,000.00

Cahore

Repair of slipway

15,750.00

21,000.00

Cork

Castletownbere

Complete new slipway for Bere Island, S.I. for new pier on Dinish Island, Syncrolift carriages, minor harbour works, power points, security cameras, road rehabilitation, etc.

745,734.00

745,734.00

Ballycotton

Repairs to breakwater

29,620.88

39,494.51

Knockadoon

Extension to slipway

4,774.13

6,365.51

Durrus

Extension of working area

90,428.00

120,570.00

Lough Beal (Pontoon)

Navigation mark at entrance

8,214.31

10,952.00

Ballycrovane

Pier development works

39,573.00

52,764.00

Keelbeg (Union Hall)

Landscaping and surfacing entrance

30,469.00

40,625.00

Gerahies

Pier extension/development works

53,336.00

71,114.00

Cape Clear (North Harbour)

Repairs to outer breakwater

75,394.00

100,525.00

Cunnamore

Pier improvements

168,281.00

336,562.00

Colla

Pier improvements

3,649.00

7,298.00

Goleen

Pier improvements

40,955.00

54,606.00

Kerry

Dingle

Pier development works

334,721.00

334,721.00

Cromane

Site investigations

12,478.89

16,638.52

Reen (Ballinskelligs)

Widen root of pier/provide slipway

33,741.75

44,989.00

Portmagee

Improve access and decking

19,305.29

25,740.38

Ballykissane

Rebuild pier head/provide lighting and water

26,306.25

35,075.00

Rossdohan

New pier and water supply

23.329.00

31,105.00

Knightstown

New berthing wall/repairs

38,031.00

50,708.00

Callinafercy

Pointing and repairs

2,270.00

3,026.66

Kilmackilogue

Slipway, lifting gear & storage area

21,979.52

29,306.26

Clare

Doonbeg

Design new pier and site investigation

38,231.00

50,975.00

Liscannor

Completion of decking of pier

59,946.00

79,928.00

Seafield

Stormwall and widen causeway

73,854.46

98,472.62

Galway

Rossaveal

Provision of hardstanding and drying wall, surfacing of compound, general maintenance, car park extension and surfacing

321,830.00

321,830.00

Killary Harbour

Design and site investigation

6,579.00

8,773.00

Torrea Pier, Kinvara

Repair to pier/provide slipway

6,361.06

8,481.41

Spiddal Pier

Repairs

18,750.00

25,000.00

Caladh Thaigh

Repairs

28,295.00

37,727.00

Tramvarraderry (Rossaveal)

Repairs

22,277.95

29,703.93

Ballinakill (Derryinver)

Land facility

3,242.00

4,323.00

Cleggan

Pier repairs

3,159.33

6,318.66

Killeany Beacon

Beacon repairs and decking

26,484.00

35,312.00

Rossadilisk

Pier repairs

17,646.00

23,528.00

Mayo

Darby's Point

Redecking of old pier (Design)

30,754.27

41,005.69

Roigh Pier

Parking/service area, Repairs to pier

75,000.00

100,000.00

Porturlin

Dredge inner basin/provide mooring piles

45,000.00

60,000.00

Kilalla

Dredge channel/silt transportation study

56,000.00

74,667.00

Kilcummin

Remove boulders from berthage/ pier head

9,000.00

12,000.00

Newport

Repairs to quay wall

75,000.00

100,000.00

Camport, Dooega

Repairs to storm wall

37,500.00

50,000.00

Sligo

Mullaghmore

Repairs

31,880.00

42,507.00

Raghly Pier

Improve access

56,000.00

74,667.00

Donegal

Killybegs

Pile repairs, ongoing engineering and maintenance, site investigations, pier design, new slipway, Syncrolift carriages.

1,600,738.00

1,600,738.00

Greencastle

Repairs to pier

376,381.52

501,842.03

Port na Blagh

Dredging and pier furnishing

113,172.00

150,896.00

Woodquarter

Extend and strengthen pier

176,301.54

235,068.72

Bruckless

Replacement of furnishings/step repairs

13,239.72

17,652.96

Ballysaggart

Reconstruct pier/breakwater and repair wall

114,003.74

152,005.03

Maugheragallen

Extend pier – facilitate ferry and half deckers

84,969.00

113,292.00

Portmore

Provide slipway

78,590.67

104,787.56

Portronan

Repairs

37,145.25

49,527.00

Bunagee

New winch/associated works including slipway

112,666.50

150,222.00

Moville

Pier reconstruction/improvement

22,500.00

30.000.00

Buncrana

Dredging works

33,040.50

44,054.00

Carrickaroary

Pier repair

126,945.00

169,260.00

Kerrykeel

Slipway

87,655.50

116,874.00

Waterford

Dunmore East

Rehabilitation of quay structure, including remedial works to South Pier walls and east Pier stability investigation, safety, hygiene and preventative maintenance works, Shandoon cliff stabilisation study, resurfacing of harbour entrance, minor works

360,230.00

360,230.00

Ardmore

Pier improvements

17,125.00

22,833.00

Dublin

Howth

Resurfacing damaged areas, Provision of toilets, retaining wall stabilisation, extra carriages for Syncrolift, revetment repair, replace water mains, minor works and renewals

572,623.00

572,623.00

Other

Piers, Lights and Beacons

Various locations nationally

10,712.00

10,712.00

Fishery Harbour Works Undertaken in 2000

Location

Project

Grant Paid(£'s)

Total Cost(£'s)

Cork

Castletownbere

Effluent treatment facility upgrade, Dinish Bridge remedial works, Dinish Wharf Ext. and Auction Hall, mainland quay rehabilitation, security cameras, safety and maintenance works, Syncrolift carriages

737,032.20

737,032.20

Keelbeg

Safety works

43,488.53

57,984.71

Ballycotton

Repairs to breakwater

83,184.65

110,912.86

Ballycrovane

Pier development

2,931.23

3,908.31

Colla

Pier improvements

80,035.70

160,071.50

Cunnamore

Pier improvements

52,488.88

104,977.75

Durrus

Extension of working area

86,254.96

115,006.61

Gerahies

Pier ext./dev. works

39,328.41

52,437.88

Goleen

Pier improvements

64,547.99

86,063.99

Goleen

Slipway

13,500.00

18,000.00

Lough Beal

Navigation mark at entrance

2,014.29

2,685.73

Cape Clear

Repairs to outer breakwater

51,548.35

68,731.13

Waterford

Dunmore East

Cliff stabilisation works Phase 1 and 2, resurfacing of harbour entrance road, foul berth rehabilitation and Easr Pier investigation, safety and maintenance works

401,206.14

401,206.14

Ardmore

Pier improvements

84,159.48

112,212.64

Tramore (Lady Elizabeth's Cove)

Repairs to seawall

29,893.41

39,857.88

Dublin

Howth

Watermains revetment, refurbishment of old canteen, extra carriages for Syncrolift, safety and maintenance works

393,467.24

393,467.24

Donegal

Killybegs

Steel pile repairs, new slipway, new pier development, safety and maintenance works, refurbishment of Harbour Master's residence

2,189,344.40

2,189,344.40

Greencastle

Harbour development

17,512.65

23,350.20

Ballysaggart

Repairs

36,143.58

48,191.44

Buncrana

Dredging and RNLI Berthing facility

210,776.25

281,035.00

Moville

Pier improvements

108,341.00

144,455.00

Portmore

Slipway/Site Investigation

88,554.00

118,072.00

Portnablagh

Dredging

53,928.00

71,904.00

Bunagee

New winch/associated works including slipway

39,380.25

52,507.00

Kerrykeel

Slipway

8.789.00

11,719.00

Portsalon

Pier maintenance

28,450.00

37,933.00

Lenan

Site Investigation

44,358.00

59,144.00

Mountcharles

Repointing/lighting/ dredging

187,957.00

250,609.00

Portronan

Repairs

67,767.75

90,357.00

Bundoran

Rock removal

151,812.75

202,417.00

Woodquarter

Extend & strengthen pier

13,347.44

17,796.58

Bruckless

Replacement of furnishings, step repairs

1,901.58

2,535.44

Galway

Rossaveel

Safety and maintenance works, harbour feasibility study

72,947.30

72,947.30

Inishboffin

Repairs of fenders and safety works

27,651.77

36,869.00

Spiddal

Pier repairs

35,529.00

47,372.00

Torrea Pier

Repairs, provide slipway

87,696.94

116,929.24

Lynch's Pier

Slipway

1,637.37

1,637.37

Eanach Mheain

Survey

5,000.00

5,000.00

Ceibh na hAirde

Survey

1,828.43

1,828.43

Trá Bán

Pier and slipway

4,991.25

4,991.25

Cleggan

Improve slipway/outer breakwater, provide boat repair/hardstanding, access to outer breakwater, dredging

54,581.00

72,774.64

Louth

Clogherhead

Maintenance and safety works

88,022.36

117,363.15

Kerry

Cromane

Site Investigation

147,332.14

196,442.84

Dingle

Pier Development Works

2,756,135.04

2,756,135.04

Dingle

Pesca project

88,370.00

88,370.00

Dingle

Resurfacing-Pontoons

69,987.50

69,987.50

Kilmackillogue

Slipway, lifting gear and onshore storage area

60,788.39

81,051.16

Wexford

Kilmore Quay

Dredging

397,018.59

529,358.12

Clare

Seafield

Provide stormwall, widen causeway and construct slipway

154,103.41

205,471.21

Doonbeg

Pier design work

113,250.00

151,000.00

Liscannor

Pierhead widening to include steps

54,493.00

72,657.00

Mayo

Darby's Point

Redecking of old pier

408,949.96

545,266.62

Killala

Provision of slipway

7,526.81

10,035.74

Newport Quay Wall

Safety barriers, power point, fresh water. etc.

2,598.00

3,464.00

Sligo

Mullaghmore

Pier repairs

43,120.00

57,493.00

Strandhill

Design work for slipway

18,150.00

24,200.00

Other

Piers, Lights and Beacons

Various locations nationally

78,659.00

78,659.00