151 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Cahergal national school, County Galway; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24906/02]

Olwyn Enright

Question:

152 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at S.N. Aird Mhóir, County Galway; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24908/02]

Olwyn Enright

Question:

153 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Scoil Chaomhain, Inis Oirr, Contae na Gaillimhe; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of delay there will be; and if he will make a statement on the matter. [24909/02]

Olwyn Enright

Question:

154 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Gaelscoil Cill Dara; when the work will commence; when he expects to have work completed; the expected delay due the cut in the Estimates; the length of delay there will be; and if he will make a statement on the matter. [24910/02]

Olwyn Enright

Question:

155 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Scoil Chloca Naofa; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24911/02]

Olwyn Enright

Question:

156 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Scoil Mhuire, Ballymore Eustace; when the work will commence; when he expects to have work completed; the expected delay, due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24912/02]

Olwyn Enright

Question:

157 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at St. Brigid's national school, Ballysax, County Kildare; when the work will commence; when he expects to have work completed; the expected delay, due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24913/02]

Olwyn Enright

Question:

158 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Slatefield (Moyglass) national school, County Galway; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24914/02]

Olwyn Enright

Question:

159 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Cleggan national school, Cleggan, County Galway; when the work will commence; when he expects to have work completed; the expected delay, due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24919/02]

Olwyn Enright

Question:

161 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Rathmore national school, County Kerry; when the work will commence; when he expects to have work completed; the expected delay, due to the cut in the Estimates; the length of delay there will be; and if he will make a statement on the matter. [24921/02]

Olwyn Enright

Question:

162 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Scoil an Ghleanna, An Daingean, Contae Chiarraí; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24922/02]

Olwyn Enright

Question:

164 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at St. Michael's BNS, Mohill, County Leitrim; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24925/02]

Olwyn Enright

Question:

166 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Pallaskenry national school, Pallaskenry, County Limerick; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24927/02]

Olwyn Enright

Question:

167 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Gaelscoil Sáirséal, County Limerick; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24928/02]

Olwyn Enright

Question:

168 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Muchgrange national school, County Louth; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24929/02]

Olwyn Enright

Question:

169 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Tullyallen national school, County Louth; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24930/02]

Olwyn Enright

Question:

172 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Bellewstown national school, Drogheda, County Louth; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24933/02]

Olwyn Enright

Question:

173 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Barnatra national school, Ballina; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24934/02]

Olwyn Enright

Question:

174 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at St. Nicholas's special school, Convent Hill, Ballina; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24935/02]

Olwyn Enright

Question:

175 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Gaelscoil Uileog De Búrca, County Mayo; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24936/02]

Olwyn Enright

Question:

179 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Cooneal national school, Ballina; when the work will commence; when he expects to have work completed; the expected delay due to the cut in Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24940/02]

Olwyn Enright

Question:

180 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Curnanool national school, Castlebar; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24941/02]

Olwyn Enright

Question:

184 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Scoil Bhríde, Drumslide, County Mayo; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24945/02]

Olwyn Enright

Question:

185 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Ardagh Crossmolina, County Mayo; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24946/02]

Olwyn Enright

Question:

186 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Scoil Realt na Mara, Mulranny, County Mayo; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24947/02]

I propose to take Questions Nos. 151 to 159, inclusive, 161, 162, 164, 166 to 169, inclusive, 172 to 175 inclusive, 179 to 186, inclusive, together.

An extensive primary school building programme was published earlier this year and details may be obtained on my Department's website www.education.ie. I will be announcing my Department's expenditure proposals for primary school buildings in the new year. It is not possible at this point to give any indication as to when architectural planning or construction will commence on individual projects.

Olwyn Enright

Question:

160 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Brownsgrove national school, Tuam, County Galway; when the work will commence; when he expects to have work completed; the expected delay, due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24920/02]

Olwyn Enright

Question:

163 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at The Rower national school, County Kilkenny; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24924/02]

Olwyn Enright

Question:

165 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Kilfinane national school, Kilfinane, County Limerick; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24926/02]

Olwyn Enright

Question:

170 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at St. Mary's Church of Ireland national school, Ardee, County Louth; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24931/02]

Olwyn Enright

Question:

171 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Scoil Mhuire Fatima, Drogheda, County Louth; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24932/02]

Olwyn Enright

Question:

176 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at St. Anthony's special school, Castlebar; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24937/02]

Olwyn Enright

Question:

177 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Valley national school, Achill, County Mayo; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24938/02]

Olwyn Enright

Question:

178 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Tavneena national school; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24939/02]

Olwyn Enright

Question:

181 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at An Coill Mhór, Westport, County Mayo; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24942/02]

Olwyn Enright

Question:

182 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Meelickmore national school, Claremorris, County Mayo; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24943/02]

Olwyn Enright

Question:

183 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at St. Mary's national school, Aughamore, County Mayo; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24944/02]

Olwyn Enright

Question:

187 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Yellowfurze national school, Navan, County Meath; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24948/02]

Olwyn Enright

Question:

188 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at St. Patrick's boys national school, Strokestown, County Roscommon; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24949/02]

Olwyn Enright

Question:

189 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Ballyleague national school, Ballyleague, County Roscommon; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24950/02]

Olwyn Enright

Question:

196 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Bishop Harty national school, Ballinree, Nenagh; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24957/02]

Olwyn Enright

Question:

200 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Cahir boys national school, County Tipperary; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24961/02]

Olwyn Enright

Question:

201 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Kilkeary national school, Nenagh, County Tipperary; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24962/02]

Olwyn Enright

Question:

203 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Cappoquin Convent and boys national school, County Waterford; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24964/02]

Olwyn Enright

Question:

205 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Gainstown national school, Gainstown, Mullingar, County Westmeath; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24966/02]

Olwyn Enright

Question:

207 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at St. Fechin's national school, Fore, County Westmeath; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24968/02]

Olwyn Enright

Question:

209 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Lacken national school, County Wicklow; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24970/02]

Olwyn Enright

Question:

210 Ms Enright asked the Minister for Education and Science the stage the refurbishment of Scoil Eoin Pól in County Offaly is at; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24971/02]

Olwyn Enright

Question:

211 Ms Enright asked the Minister for Education and Science the position in respect of the refurbishment at Scoil Mhuire, Tullamore, County Offaly; when the work will be commence; when he expects to have the work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24972/02]

Olwyn Enright

Question:

212 Ms Enright asked the Minister for Education and Science the position regarding the approval for tenders at Scoil Bhríde, Tullamore, County Offaly; when the work will commence; when he expects to have the work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24973/02]

Olwyn Enright

Question:

216 Ms Enright asked the Minister for Education and Science the situation in respect of proposals for refurbishment of Scoil Chartaigh Naoifa, Tullamore, County Offaly; when the work will commence; when he expects to have the work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24977/02]

I propose to take Questions Nos. 160, 163, 165, 170, 171, 176, 177, 178, 181, 182, 183, 187, 188, 189, 196, 200, 201, 203, 205, 207, 209, 210, 211, 212 and 216 together.

An extensive primary school building programme was published earlier this year and details may be obtained on my Department's website at www.education.ie. I will be announcing my Department's expenditure proposals for primary school buildings in the new year. It is not possible at this point to give any indication as to when architectural planning or construction will commence on individual projects.

Questions Nos. 161 and 162 answered with Question No. 151.

Question No. 163 answered with Question No. 160.

Question No. 164 answered with Question No. 151.

Question No. 165 answered with Question No. 160.

Questions Nos. 166 to 169, inclusive, answered with Question No. 151.

Questions Nos. 170 and 171 answered with Question No. 160.

Questions Nos. 172 to 175, inclusive, answered with Question No. 151.

Questions Nos. 176 to 178, inclusive, answered with Question No. 160.

Questions Nos. 179 and 180 answered with Question No. 151.

Questions Nos. 181, 182 and 183 answered with Question No. 160.

Questions Nos. 184 to 186, inclusive, answered with Question No. 151.

Questions Nos. 187 to 189, inclusive, answered with Question No. 160.

Olwyn Enright

Question:

190 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Aughrim national school, Hillstreet, Carrick-on-Shannon, County Roscommon; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24951/02]

Olwyn Enright

Question:

191 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Roxboro national school, County Roscommon; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24952/02]

Olwyn Enright

Question:

192 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Ardkeeran national school, County Sligo; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24953/02]

Olwyn Enright

Question:

193 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at St. Joseph's national school, Banada, Tourlestrane County Sligo; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24954/02]

Olwyn Enright

Question:

194 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Gaelscoil Chluain Meala, Cluain Meala; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24955/02]

Olwyn Enright

Question:

195 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Littleton national school, Thurles; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24956/02]

Olwyn Enright

Question:

197 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Naomh Pádraig SN, Rocklow Road, Fethard, County Tipperary; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24958/02]

Olwyn Enright

Question:

198 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at St. Joseph's national school, Templemore, County Tipperary; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24959/02]

Olwyn Enright

Question:

199 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Gaelscoil Bhríde, Thurles, County Tipperary; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24960/02]

Olwyn Enright

Question:

202 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Lismore national school, County Waterford; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24963/02]

Olwyn Enright

Question:

204 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Fews national school, Kilmacthomas, County Waterford; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24965/02]

Olwyn Enright

Question:

206 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Dysart national school, Dysart, Mullingar; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24967/02]

Olwyn Enright

Question:

213 Ms Enright asked the Minister for Education and Science the position in respect of the refurbishment at Scoil Mhuire, Pullough, Tullamore, County Offaly; when the work will commence when he expects to have the work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24974/02]

Olwyn Enright

Question:

214 Ms Enright asked the Minister for Education and Science the situation in respect of proposals for refurbishment of Kinnitty national school, Kinnitty, Birr, County Offaly; when the work will commence; when he expects to have the work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24975/02]

Olwyn Enright

Question:

215 Ms Enright asked the Minister for Education and Science the situation in respect of proposals for refurbishment of Daingean national school, Daingean, County Offaly; when the work will commence; when he expects to have the work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24976/02]

Olwyn Enright

Question:

217 Ms Enright asked the Minister for Education and Science the situation in respect of proposals for refurbishment of Lumcloon national school, Lumcloon, Cloghan, County Offaly; when the work will commence; when he expects to have the work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24978/02]

Olwyn Enright

Question:

221 Ms Enright asked the Minister for Education and Science the situation in respect of proposals for refurbishment of St. Kieran's, Broughal, Kilcormac, Birr, County Offaly; when the work will commence; when he expects to have the work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24982/02]

Olwyn Enright

Question:

222 Ms Enright asked the Minister for Education and Science the position regarding the proposed extension for Camross national school, County Laois; and if he will make a statement on the matter. [24983/02]

Olwyn Enright

Question:

223 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at St. Felim's national school, County Cavan; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of delay there will be; and if he will make a statement on the matter. [24984/02]

Olwyn Enright

Question:

224 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Scoil Naomh Mhaodóg, County Cavan; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of delay there will be; and if he will make a statement on the matter. [24985/02]

Olwyn Enright

Question:

225 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Clifferna national school, County Cavan; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of delay there will be; and if he will make a statement on the matter. [24986/02]

Olwyn Enright

Question:

226 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Greagrahan national school, County Cavan; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of delay there will be; and if he will make a statement on the matter. [24987/02]

Olwyn Enright

Question:

227 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Dernakesh national school, County Cavan; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of delay there will be; and if he will make a statement on the matter. [24988/02]

Olwyn Enright

Question:

228 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Scoil Mhuire, Lacken, County Cavan; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of delay there will be; and if he will make a statement on the matter. [24989/02]

Olwyn Enright

Question:

229 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at Castletara, Ballyhaise, County Cavan; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of delay there will be; and if he will make a statement on the matter. [24990/02]

I propose to take Questions Nos. 190 to 195, inclusive, 197 to 199, inclusive, 202, 204, 213 to 215, inclusive, 217 and 221 to 229, inclusive, together.

An extensive primary school building programme was published earlier this year and details may be obtained on my Department's website at www.education.ie.

I will announce my Department's expenditure proposals for primary school buildings in the new year. It is not possible at this point to give any indication as to when architectural planning or construction will commence on individual projects.

Question No. 196 answered with Question No. 160.

Questions Nos. 197 to 199, inclusive, answered with Question No. 190.

Questions Nos. 200 and 201 answered with Question No. 160.
Question No. 202 answered with Question No. 190.
Question No. 203 answered with Question No. 160.
Question No. 204 answered with Question No. 190.
Question No. 205 answered with Question No. 160.
Question No. 206 answered with Question No. 190.
Question No. 207 answered with Question No. 160.

Olwyn Enright

Question:

208 Ms Enright asked the Minister for Education and Science his plans to provide proper educational facilities at New Ross CBS, New Ross, County Wexford; when the work will commence; when he expects to have work completed; the expected delay due to the cut in the Estimates; the length of a delay there will be; and if he will make a statement on the matter. [24969/02]

As the Deputy will be aware, my Department decided to examine post-primary provision in the New Ross area with a view to possible rationalisation. This decision was taken in light of capital grant applications received from all five post-primary schools in the centre, including the CBS. It was also decided to extend the scope of this examination to include the five primary schools in the area.

In view of the extent of this examination, it was decided to appoint a facilitator, Dr. Tom McCarthy, to consult with the local providers with a view to identifying the key issues in relation to primary and post-primary school provision in the area. Dr. McCarthy's report has now been received and is currently under examination in the planning and building unit of my Department. It is intended to decide how best to respond to the issues identified in the light of available resources and the competing demands of other schools.

In the interim, the planning and building unit of my Department is addressing any health and safety issues at New Ross CBS and is currently awaiting details of the works involved and the estimated cost of same from the school authorities. Upon receipt of this information the matter will receive further attention.

Questions Nos. 209 to 212, inclusive, answered with Question No. 160.