Skip to main content
Normal View

Dáil Éireann debate -
Wednesday, 8 Jul 2009

Vol. 687 No. 4

Written Answers.

The following are questions tabled by Members for written response and the ministerial replies as received on the day from the Departments [unrevised].
Questions Nos. 1 to 7, inclusive, answered orally.
Questions Nos. 8 to 19, inclusive, resubmitted.
Question No. 20 withdrawn.
Questions Nos. 21 and 22 resubmitted.
Question No. 23 withdrawn.
Question No. 24 resubmitted.
Questions Nos. 25 to 33, inclusive, answered orally.

Budgetary Strategy.

Martin Ferris

Question:

34 Deputy Martin Ferris asked the Minister for Finance when he will circulate his budget strategy memo. [27281/09]

Joe Costello

Question:

37 Deputy Joe Costello asked the Minister for Finance the level of fiscal consolidation he expects to carry out in budget 2010; the approximate balance between tax and expenditure measures; the projected negative tax buoyancy and negative growth impact of this consolidation exercise on the economy in 2010; and if he will make a statement on the matter. [27990/09]

I propose to take Questions Nos. 34 and 37 together.

The Supplementary Budget set out a multi-annual plan to bring the General Government deficit to 3% of GDP by end-2013. As part of this plan, measures on expenditure and tax revenue amounting to up to €4 billion in 2010 and 2011 are required if we are to restore the public finances to sustainability. The economic and fiscal forecasts as published in the Supplementary Budget have factored in the broad impact of these aggregate measures.

As I have already mentioned here today, the Commission on Taxation, which is expected to complete its work shortly, and the Special Group on Public Service Numbers and Expenditure, which is due to report to me imminently, will have important roles to play in identifying measures that will improve the budgetary position in future years. In this context, I have previously outlined that the majority of future adjustments will have to be borne on the spending side as the scope for further increasing income taxes is limited. I have also stated that I view the revenue raising taxation measures as set out in the Supplementary Budget as the maximum that can be obtained and the expenditure adjustments as the minimum that will be raised.

Also, as I outlined in my response to a Priority Question earlier, it is intended that the Pre-Budget Outlook will be published in mid to late October, setting out the pre-budget position in more detail based on the latest available data. This will provide the House with the most up-to-date information on a pre-budget basis and will assist in informing the debate in the run up to the presentation of Budget 2010. I will then set out the details of Budget 2010 in my address on Budget Day in early December and the Budget will set out further information in relation to the medium term economic and fiscal projections.

Restoring sustainability to the public finances is vital to the renewal of the economy and we are committed to taking the necessary measures in this regard. We recognise that these measures are difficult but equally we know that they are essential. The corrective measures taken up to this point and our commitment to taking further action will help to ensure the confidence of investors in Ireland, provide greater consumer confidence and place us in a position to benefit from the upturn in the international economy when it occurs.

As is the usual practise, I intend to bring the Budget Strategy Memorandum to Government in the coming weeks. In line with the rules governing Cabinet confidentiality, I will not comment on the contents of the Budget Strategy Memorandum. However, as the Deputy will be aware, the recent Supplementary Budget set out, for the first time, the broad outline of the budgetary strategy for the medium term.

Tax Code.

Michael D'Arcy

Question:

35 Deputy Michael D’Arcy asked the Minister for Finance if a decision has been made on the publication dates of the McCarthy review and the Commission on Taxation; and if he will make a statement on the matter. [27902/09]

The report of the Commission on Taxation is due to be presented to me shortly and will be published following Government approval. The Special Group on Public Service Numbers and Expenditure Programmes, under the chairmanship of Mr Colm McCarthy, has completed its deliberations and I expect to receive their report imminently. I intend bringing the Special Group's report to Government and it is in that context that the decision on publication will be made.

House Repossessions.

Noel Coonan

Question:

36 Deputy Noel J. Coonan asked the Minister for Finance his plans to obtain the agreement of other financial institutions to the 12 month moratorium on repossessions agreed by the two major banks. [27892/09]

It is a particular priority of the Government to ensure as much as possible that difficulties in relation to mortgage arrears do not result in legal proceedings for home repossession. Home repossession should be and generally is the last resort for the lender and the preferred method of dealing with arrears cases should be early intervention.

The Recapitalisation Programme announced on 11 February 2009 includes a new Code of Conduct for Mortgage Arrears, which has been issued by the Financial Regulator and came into force on the 27 February 2009. The new Code applies to mortgage lending activities to consumers in respect of their principal private residence in the State and is mandatory for all mortgage lenders registered with the Financial Regulator including so-called "sub-prime lenders". Under the mortgage arrears code where a borrower is in difficulty the lender shall make every reasonable effort to agree an alternative repayment schedule. Under the Code consideration should be given on a case-by-case basis to alternatives such as deferral of payments, extending the term of the mortgage, changing type of mortgage, or capitalising arrears and interest. Obviously cases will arise where the arrears situations persist despite newly agreed changes in repayment schedules. The Code provides that where the arrears situation persists, the lender may reserve the right to enforce the mortgage agreement. However, it must wait at least six months from the time arrears first arise before applying to the courts to commence enforcement of any legal action on repossession of a borrower's primary residence.

The Financial Regulator's Consumer Protection Code also sets out requirements that a regulated entity must contact the consumer as soon as it becomes aware that a mortgage account is in arrears and that it must have in place a procedure for handling accounts in arrears.

The Irish Banking Federation and the Money Advice and Budgeting Service recently agreed an Operational Protocol on consumer debt. The Operational Protocol will enable MABS and the IBF continue to work together effectively when dealing with debt problems of personal debtors who approach the MABS Service for assistance.

The number of residential properties taken into possession by Irish Banking Federation Members in 2008 was 96. This compares with the UK equivalent number of approximately 40,000.

I therefore have no plans to obtain the agreement of other financial institutions to the 12 month moratorium on repossessions agreed by the two major banks as I am satisfied that the managements currently in place are sufficient to safeguard the interests of borrowers who experience difficulty in meeting their mortgage repayments. I will of course be keeping the situation under close review.

Question No. 37 answered with Question No. 34.

Economic Outlook.

Pat Rabbitte

Question:

38 Deputy Pat Rabbitte asked the Minister for Finance his views on the most recent quarterly national accounts of the Central Statistics Office which showed a decline of 8.5% of GDP, and a decline of 12% of GNP, in the first three months of 2009 compared to the same period in 2008; and if he will make a statement on the matter. [27985/09]

The Central Statistics Office published quarterly national accounts data for the first quarter of 2009 last week. These show that GDP and GNP for this period declined by 8½ and 12 per cent, respectively, compared with the corresponding period last year.

In terms of the detail of the first quarter figures, the sharp declines in housing output and in personal spending were the main reasons for the contraction in the first quarter. The one positive that we can take from the data is that the rate of export decline is not as large as in many other export-oriented economies and given the significant fall in imports means that there is a positive contribution from net trade.

In overall terms, the first quarter figures are clearly exceptionally weak but we must be very careful not to double-count: the figures relate to the first quarter and previously published data had indicated a very poor performance in this period. In other words, we already knew that conditions had deteriorated significantly in the first quarter on an annual basis.

Moreover, while my Department does not produce economic forecasts for each quarter, there are tentative indications that the rate of deterioration may have slowed in the second quarter. Retail sales, industrial production, consumer confidence and purchasing manager's indices data are all consistent with this. Indeed, most economic commentators are now of the view that the rate of decline may be slowing.

Based on the information available at the end of March, my Department published its macroeconomic forecasts in the Supplementary Budget. My Department forecasts that GDP would decline by 7¾ per cent and that GNP would fall by 8 per cent. The first quarter GDP data along with the available data for the second quarter suggests that the Department's forecast is still appropriate.

In relation to the very weak first quarter GNP data caution must be used when interpreting these figures as quarterly GNP is highly volatile. Nonetheless, this figure is considerably weaker than previously expected and will need to be carefully monitored.

Finally, I want to assure the Deputy that the Government is not complacent — activity is still clearly declining and unemployment rising. Reversing these developments requires further measures and the Government will not be found wanting in this regard.

Banking Sector.

Arthur Morgan

Question:

39 Deputy Arthur Morgan asked the Minister for Finance his views on whether the recent estimation by the International Monetary Fund that losses faced by Irish banks could reach €35 billion by the end of 2010 is correct; and the implications it will it have on the economy here. [27276/09]

The IMF has said that losses could be about €35 billion, or about 20 percent of GDP. It is, however, important to point out that the IMF figure was not based on a very detailed analysis of individual bank data. Also, this figure does not take into account the countervailing effect of bank earnings — in that sense it is a gross rather than a net figure.

The Deputy will be aware from my previous reports to the House that PWC has carried out detailed reviews of the loan books and the capital position of six of the covered institutions. Since then, additional due diligence reviews of Anglo Irish Bank, Allied Irish Banks and Bank of Ireland have been carried out, building on the assessments carried out by PWC.

As I have previously stated, I am not in a position to release information contained in these reviews, other than what has been released to date, because of the commercially sensitive nature of the information.

As regards the economy, the banking system is unique and its proper functioning is critical to the smooth running of the overall economy. Therefore, it must be protected by the Government. I have already said that the objective behind NAMA is to ensure that the financial institutions are freed up to allow them to lend to the real economy and the IMF has said that we are right to focus on the restructuring of property development loans as our priority in the area of bank stress. Our approach will facilitate a sustained flow of credit on a commercial basis to individuals, households and businesses in the real economy.

Consumer Debt.

Róisín Shortall

Question:

40 Deputy Róisín Shortall asked the Minister for Finance his views on the most recent statistics on private sector and consumer debt here and, in particular, on the newly emerging trend which sees declining outstanding mortgage debt as repayments outstrip new mortgage lending, the first time that such a trend has been in evidence since records began; and if he will make a statement on the matter. [27978/09]

The Deputy will be aware that the Irish economy is experiencing a profound economic adjustment. This is impacting in particular in the housing market and is demonstrated in certain Bank statistics referred to in the Deputy's question. A key issue is therefore, notwithstanding, the adverse economic environment the steps the Government is taking to ensure the availability of mortgage finance, in particular to first time buyers. The Deputy will recognise that it is essential that in view of the stresses on the banking sector that this form of credit is maintained to support our economic recovery.

As regards mortgage debt the Deputy will be aware that in December 2008 AIB and Bank of Ireland to provide an additional 30% capacity to first time buyers in 2009. They also committed to public campaigns to actively promote their lending to this sector.

These commitments were reconfirmed in the Government announcement on 11 February 2009 on the recapitalisation of Allied Irish Banks and the Bank of Ireland. Progress on implementing the commitments is to be made to the Financial Regulator every quarter. The first quarterly reports from the banks to the Financial Regulator report that they are "open for business "as evidenced by their promotional and advertising material.

The latest May 09 edition of the IBF/PWC Mortgage Market Profile provides a more granular picture of mortgage market conditions overall

Net lending continues to grow — but at reduced levels

First-time buyers (FTBs) increased, for the fourth successive quarter, their share of the overall market — albeit a smaller market. Their share by volume now stands at a record 21.4%, reflecting the relative resilience of this segment.

Affordability continues to improve for FTBs through lower interest rates and house prices as well as for existing borrowers — with IBF calculating that the monthly repayment on an average loan has fallen by €479 or 38% since Sept '08.

The Profile showed that nearly 11,000 new mortgages to the value of some €2 billion were issued during the first quarter of 2009. While this shows that the rate of mortgage credit growth has eased significantly, at 4% the Irish market is still experiencing growth in net lending which contrasts with negative net lending in the UK, for example.

Proposed Legislation.

Frank Feighan

Question:

41 Deputy Frank Feighan asked the Minister for Finance the nature of Houses of the Oireachtas oversight which he plans for the National Asset Management Agency. [27913/09]

The Deputy will be aware that the legislation for NAMA is still at the drafting stage with a view to the publication of a Bill at end July. I can assure the Deputy that there will be appropriate Oireachtas oversight of NAMA and that NAMA accounts will be subject to audit by the Comptroller and Auditor General.

Banking Sector.

Lucinda Creighton

Question:

42 Deputy Lucinda Creighton asked the Minister for Finance the action which he will take to ensure that the flow of credit to small and medium sized business will increase; and if he will make a statement on the matter. [27954/09]

Lucinda Creighton

Question:

59 Deputy Lucinda Creighton asked the Minister for Finance if the flow of credit to small and medium sized business has increased as a result of the bank guarantee and the National Asset Management Agency proposals; and if he will make a statement on the matter. [27953/09]

I propose to take Questions Nos. 42 and 59 together.

A core Government objective is to free up lending on a commercial basis into the economy to support economic growth and a number of actions have been taken to achieve this objective. In the context of the bank guarantee scheme and recapitalisation the banks have made important commitments to support business lending.

An independent review of credit availability was agreed in the context of the recapitalisation of AIB and Bank of Ireland. The purpose of the review was to ascertain the position on credit availability to SMEs in Ireland. The Steering Group for the review consisted of representatives of the Departments of Finance and Enterprise, Trade and Employment, Forfás, Enterprise Ireland, the Irish Banking Federation and the six main banks involved in lending to SMEs, business representatives from ISME, Chambers Ireland and Small Firms Association. The final report of the Review of Lending to SMEs has just now been received. The report is quite extensive, running to almost 100 pages plus appendices. It will be considered by the Cabinet Committee on Economic Renewal which is meeting this afternoon. The intention is that it will be published shortly.

A Code of Conduct for Business Lending to Small and Medium Enterprises was published by the Financial Regulator on 13 February and took effect on 13 March. This code applies to all regulated banks and building societies and will facilitate access to credit, promote fairness and transparency and ensure that banks will assist borrowers in meeting their obligations, or otherwise deal with an arrears situation in an orderly and appropriate manner. The business lending code includes a requirement for banks to offer their business customers annual review meetings, to inform customers of the basis for decisions made and to have written procedures for the proper handling of complaints. Where a customer gets into difficulty the banks will give the customer reasonable time and seek to agree an approach to resolve problems and to provide appropriate advice. This is a statutory code and banks will be required to demonstrate compliance.

In addition, as part of the recapitalisation package announced on 11 February, Allied Irish Bank and Bank of Ireland reconfirmed their December commitment to increase lending capacity to small and medium enterprises (SMEs) by 10% and to provide an additional 30% capacity for lending to first time buyers in 2009. If the mortgage lending is not taken up, then the extra capacity will be available to SMEs. AIB and Bank of Ireland have also committed to public campaigns to actively promote small business lending at competitive rates with increased transparency on the criteria to be met. Compliance with this commitment is being monitored by the Financial Regulator. Officials from my Department are also in regular contact with the banks concerned in relation to their progress on implementing these measures.

My colleague the Tánaiste and Minister for Enterprise, Trade and Employment has recently set up a Clearing Group including representatives from the main banks, business interests and state agencies, which is chaired by the Department of Enterprise, Trade and Employment. The purpose of the group is to identify specific patterns of events or cases where the flow of credit to viable businesses appears to be blocked and to seek to identify credit supply solutions. Any questions on the clearing group should be directed to my colleague the Tánaiste and Minister for Enterprise, Trade and Employment.

The banks report that they are "open for business" as evidenced by their promotional and advertising material. The banks state that they have funds available for lending to businesses and have provided details on approval levels and amounts drawn down. They report a slowdown in certain areas which they say reflects a reduced level of demand. The review of credit availability has considered this point. The most recent Central Bank Monthly Statistics for May 2009 show that credit to non-financial corporates actually increased by €225m month-on-month after two months of substantial falls. While care is always to be taken when reading monthly data, this could be a positive indicator of credit actively being fed through the real economy and businesses.

You may also be aware that my colleague, the Minister of State for Trade and Commerce, Mr Billy Kelleher TD has commenced a series of regional meetings to discuss access to bank credit with key local stakeholders.

With regard to the National Asset Management Agency (NAMA), its objective is to strengthen the banks' balance sheets, to considerably reduce uncertainty over bad debts and as a consequence ensure the flow of credit on a commercial basis to the real economy, to protect and grow employment while also maximising and protecting the interest of taxpayers. It is expected that legislation establishing NAMA will be published later this month.

Proposed Legislation.

Kieran O'Donnell

Question:

43 Deputy Kieran O’Donnell asked the Minister for Finance the position regarding the National Asset Management Agency; when he expects that the NAMA legislation will be published and brought before Dáil Éireann; and when and the way if will free up credit facilities for small businesses. [27952/09]

As the Deputy will be aware the establishment of NAMA and the interim preparations, including the drafting of legislation, are being overseen by a NAMA Steering Group established by me. The Group comprises representatives of my Department, the NTMA and the Attorney General.

I can confirm that it is my intention to publish legislation later this month. I can also confirm that the Oireachtas will be given adequate time to debate the important issues arising from this legislation and I expect that it will be before the Dáil in September.

The establishment of NAMA will deal with the uncertainty surrounding the riskiest assets on the balance sheets of the Irish banks, which were preventing them from lending into the economy, including to small businesses. The removal of these risky assets will provide assurance for international investors and providers of long-term capital for banks that the problem of balance sheet impairment has been comprehensively addressed.

NAMA will purchase the assets through the issue to the banks of Government bonds and the institutions concerned can then use these bonds to avail of ECB funding. In order to provide credit more freely, banks need access to funds, adequate capital and market support. The package of measures of support provided to the banking system, including the guarantee, capitalisation and NAMA, are aimed at ensuring the stability of the banking system and its ability to support the credit needs of the economy.

Heritage Sites.

Olivia Mitchell

Question:

44 Deputy Olivia Mitchell asked the Minister for Finance the restrictions surrounding staffing levels and opening times of visitor attraction sites under the remit of the Office of Public Works for 2009 in comparison to 2008; and if he will make a statement on the matter. [27641/09]

All the operations, including opening hours and staffing levels, were reviewed in the light of budgetary considerations for 2009. As a result, opening dates at many centres were brought back to Easter, and closing dates rescheduled at the shoulder of the season. Staffing numbers were rationalised, where possible. It should be pointed out that in 2008, St. Patrick's Day and the Easter Bank Holiday were contiguous, with Good Friday falling on 21 March. Many sites, therefore, opened earlier than normal around St. Patrick's Day.

In 2009, Good Friday fell on 10 April, and opening times for these sites reverted to the normal Easter opening period. All centres are open and adequately staffed during the main tourist season.

Banking Sector.

Simon Coveney

Question:

45 Deputy Simon Coveney asked the Minister for Finance the value of the charge made in respect of the bank guarantee in the most recent quarter for which he has returns; the rate per cent of covered liabilities which it entails; and if all covered institution are paying at the same rate. [27893/09]

The purpose of the charge is to cover the long-term costs of borrowing to the Exchequer that arise out of the provision of the Guarantee to the covered institutions. These additional costs initially were estimated to be about €1 billion.

We have received payments from all the institutions for three quarters to date. As of 24 April, there is just over €295 million (€295,585,719.67) in the mandated account which is held in the Central Bank. The institutions are presently in the process of placing the fourth quarter payment in the mandated account.

There are two reasons why the fees paid to date have been less than originally estimated:

The charging model for recouping these costs was based on covered liabilities of circa €450bn. However, as I have pointed out previously, about €90bn of that amount is covered by the enhanced Deposit Protection Scheme. The covered institutions do not pay the quarterly charge on liabilities covered by this scheme.

Furthermore, the total of covered liabilities will naturally adjust over time as bank balance sheets change in the normal course of business

However, the application of the guarantee charging model is presently being reviewed by my Department and other stakeholders to ensure the recovery of the aggregate cost borne by the State as a consequence of the provision of the guarantee, and to ensure that the overall objectives of the Act are achieved. I would like to assure the Deputy that I will utilise fully the powers given to me under the Scheme to safeguard financial stability and ensure that the long term interests of the taxpayers are protected.

With regard to the rate the institutions are paying for the provision of the Guarantee, I can confirm that the rates are differentiated to reflect relative risk position but owing to the commercial sensitivity of this information, I will not disclose these rates.

Tax Code.

Dinny McGinley

Question:

46 Deputy Dinny McGinley asked the Minister for Finance his latest assessment of tax changes in the USA which might adversely affect Irish interests; the initiatives he has taken to try to pre-empt such moves; and if he will make a statement on the matter. [27936/09]

I think it is important to understand that the proposals announced earlier this year by the US Administration amount to changes to the existing system of deferral rather than abolishing it completely. Furthermore, because the proposals would represent a significant change to the current system for US multinationals operating overseas, they will be subject to detailed discussion and debate in Congress over the coming months.

My Department in conjunction with the Department of Enterprise, Trade and Employment and the IDA are working in close collaboration with the Embassy in seeking to address the various policy proposals. Issues that may have implications for Ireland are the subject of focussed discussion with US policymakers within the overall framework of a shared commitment to promoting the consolidation and growth of our economic relationship. Our Embassy in Washington is continuing to engage with the Administration and with Congress with a view to ensuring that our very positive experience of substantive investment by US companies competing in Europe and globally using Ireland as a base feeds into consideration of this issue by the Administration and by Congress. The Embassy is being assisted in that regard by the deployment of a senior IDA executive to Washington to engage with the issue.

Public Procurement.

Michael Creed

Question:

47 Deputy Michael Creed asked the Minister for Finance the value of savings realised from the procurement review; the make-up of these savings; and his plans to make areas of public service delivery contestable by outside providers. [27897/09]

The National Public Procurement Operations Unit was established in the Office of Public Works earlier this year. It has been actively examining the means by which reductions in all contracts for goods and services over €100,000 can be achieved. To that end, it has requested all Departments, Offices, Agencies, Local Authorities and Third Level Education bodies to supply it with details of such contracts which are in place at present and, furthermore, to seek reductions of up to 8% on all the contracts involved. The process of negotiating these reductions has commenced. Due to the substantial number of contracts to be dealt with by the over 600 organisations involved, it is not possible at this early stage to quantify the definitive savings which will be achieved.

In regard to public service delivery, Towards 2016 recognised that there can be situations where, without affecting the essential ethos of the public service, work can be carried out or services delivered more effectively and efficiently, by contracting work to the private sector or outsourcing it to other public service bodies, or a combination thereof. Any such developments would be the subject of discussions with the relevant unions. Developments in this area will take account of the report of the Special Group on Public Service Numbers and Expenditure Programmes and the report of the Task Force on the Public Service.

Tax Code.

Mary Upton

Question:

48 Deputy Mary Upton asked the Minister for Finance the proposals he has brought forward to tax on-line gambling for the purposes of meeting the funding shortfall for the horse and greyhound fund; and if he will make a statement on the matter. [22716/09]

During the Finance Bill, I indicated that discussions would commence as to how best betting duty might be applied in the future, in the context of the 2010 Budget including looking at the UK's gross profit tax model. A number of different proposals in that regard have been received from various sectors of the industry. I also indicated that it is my intention to widen if possible the tax base on which betting duty would be applied. My officials are continuing to explore all options on an ongoing basis.

In exploring options for widening the tax base on which betting duty could be applied, my aim is to generate revenue to fund public expenditure generally, rather than to fund one specific item of expenditure. The Deputy will be aware the 2009 Budget publications announced that arrangements would end whereby the annual payment to the Horse and Greyhound Racing Fund would be automatically calculated by reference to the previous year's betting duty or the contribution to the Fund in the year 2000 adjusted for inflation.

Social Welfare Benefits.

Kathleen Lynch

Question:

49 Deputy Kathleen Lynch asked the Minister for Finance his views on whether welfare recipients have a higher marginal propensity to consume than persons on higher incomes and that cutting welfare rates would thus more severely impact on demand within the economy than other expenditure cuts; his further views on whether welfare dependants are less likely to have benefited from falling interest rates than those on higher incomes and that the HICP measure of inflation is therefore more appropriate than the CPI measure in determining their changing cost of living; if he will commit to maintaining welfare rates in budget 2010; and if he will make a statement on the matter. [27958/09]

It is generally acknowledged that as income levels rise, the marginal propensity to consume declines. Therefore, I would tend to agree that the marginal propensity to consume of welfare recipients is higher than for those on higher incomes. However, the overall impact on aggregate demand is far less certain given the high degree of import intensity in Ireland.

As I have pointed on many occasions, expenditure adjustments are required in order to maintain the public finances on a sustainable path, as we are currently borrowing €214 million per week to fund the gap between day to day spending from day-to-day revenues. In terms of the specifics, announcements will be made in the context of the Budget, and I will not comment on the relative merits or otherwise of the various approaches at this stage.

In terms of the appropriate price index, interest rates go up as well as down. So while mortgage holders have benefited more than non-mortgage holders from the recent reductions in interest rates, the opposite was the case in the past. Reductions in interest rates have a beneficial effect on the disposable income of all those facing extra pressures at this time.

Banking Sector.

Dan Neville

Question:

50 Deputy Dan Neville asked the Minister for Finance if he is monitoring charges made to bank customers over inter-bank rates set by the European Central Bank; and if he will make a statement on the matter. [27942/09]

The decision on pass through of ECB rate reductions to variable rate mortgages is a commercial decision for the financial institution concerned. This decision will reflect a range of different factors including funding costs, market conditions, profitability and business strategy as well as the competitive environment overall. The Deputy will appreciate it is a core function of the Board and senior management of each institution to assess where the appropriate balance lies between these competing objectives particularly in ensuring the financial health and commercial viability of the relevant institution. It is not an appropriate role for the Minister for Finance to seek to determine this decision making by financial institutions operating under competitive market conditions.

In view of its statutory consumer protection mandate, the Financial Regulator will continue to monitor interest rates charged by financial institutions.

Financial Services Regulation.

Shane McEntee

Question:

51 Deputy Shane McEntee asked the Minister for Finance his plans to make institutional changes in the arrangements for financial regulation; if he will publish an assessment of issues in advance of presenting proposals to Government; and if he will present the heads of any legislative Bill to the committees of the Houses of the Oireachtas which are investigating regulatory failure for early consideration of reform proposals. [27933/09]

Emmet Stagg

Question:

54 Deputy Emmet Stagg asked the Minister for Finance his plans for the consumer protection function of the Financial Regulator; if it is envisaged that it will remain under the aegis of his Department; if a new agency is envisaged, amalgamating the National Consumer Agency, the Competition Authority and the consumer protection function of the Financial Regulator; and if he will make a statement on the matter. [27979/09]

Michael D. Higgins

Question:

69 Deputy Michael D. Higgins asked the Minister for Finance his views on the recently published annual report of the Bank of International Settlements; his further views on whether there are lessons to be learned in the context of the imminent redesign of the financial regulatory architecture here; his proposals to enforce the comprehensive application of enhanced prudential standards that integrate a system wide perspective at Irish credit institutions; and if he will make a statement on the matter. [27987/09]

I propose to take Questions Nos. 51, 54 and 69 together.

I announced on 18 June last that the Government had agreed a range of reforms of the regulatory structures for financial regulation. A new single fully integrated regulatory institution, the Central Bank of Ireland, will be established, replacing the current two pillar structure of the Central Bank and the Financial Services Regulatory Authority, comprising the Central Bank and Financial Services Authority of Ireland, to achieve the highest performance standards for the new organisation. The new Central Bank Commission will be chaired by the Governor of the Central Bank and will be responsible for both the supervision of individual firms and the stability of the financial system generally, combining micro-prudential and macro-prudential supervision in the one institution.

Within the new regulatory structures, the consumer information and education role, currently carried out within the Consumer Directorate in the Financial Regulator will be re-assigned to the National Consumer Agency (NCA) which is being amalgamated with the Competition Authority. The functions to be merged in the new body are highly complementary and share a common goal of enhancing consumer welfare. Regulation for consumer protection, including the development and enforcement of codes of practice, remains within the new Commission as an integral part of conduct of business regulation.

There is growing and extensive international literature on the causes of the financial crisis and identification of supervisory issues that need to be addressed. This includes the report of the de Larosière Group to the European Commission and the annual report of the Bank of International Settlements. Both these reports highlight the importance of a macro-prudential orientation for regulation, focusing on the stability of the system as a whole as well as the viability of individual institutions. The range of reforms announced will underpin a much more effective and efficient financial services regulatory system aligned with best international practice. The approach taken closely reflects arrangements proposed at EU level and will ensure a cohesive approach between the two critical elements of effective financial regulation.

Banking Sector.

Ciaran Lynch

Question:

52 Deputy Ciarán Lynch asked the Minister for Finance his views on whether the imposition of a smaller mark down on assets transferred to the National Asset Management Agency in order to avoid having to inject capital into the banking system once the asset transfer has been completed to ensure the banks meet the regulatory capital requirements is appropriate; and if he will make a statement on the matter. [27962/09]

Loans will be transferred to NAMA at an appropriate written down value which will ensure value for money for the taxpayer and take into account the risk being transferred to the State.

The NTMA has engaged experts to assist the interim Managing Director of NAMA in the development of an appropriate valuation methodology, which will be fair and independent. The valuation methodology will have to be agreed with the European Commission, which published guidance on the treatment of impaired assets last February. The Commission has indicated that in the absence of a market value, a transfer value reflecting the underlying longer-term economic value of the assets would be an acceptable benchmark as a basis of valuation methodology.

I have previously indicated that, following completion of the transfer of assets to NAMA, the capital position of the institutions involved would be reviewed on a case by case basis.

Economic Outlook.

Bernard J. Durkan

Question:

53 Deputy Bernard J. Durkan asked the Minister for Finance the extent to which the various budgets he has produced in the past 12 months have proven to be on target in terms of accurately projecting revenue from the various forms or taxation, economic growth, job losses or gains and the housing market; if he is satisfied that current projections are likely to be sufficiently accurate to address in full the current and expected economic situation; and if he will make a statement on the matter. [27867/09]

Eamon Gilmore

Question:

71 Deputy Eamon Gilmore asked the Minister for Finance his most up to date forecast budget deficit for the year to 31 December 2009, including projected capital injections into the banking system; and if he will make a statement on the matter. [27967/09]

Liz McManus

Question:

86 Deputy Liz McManus asked the Minister for Finance his views on the June 2009 Exchequer figures; the way the June 2009 figures compare to profiles forecast; if he is confident that tax revenue will amount to €34.4 billion for 2009; if he expects a significant amount of net emigration over the 2009 to 2010 period; the way he expects emigration trends to impact on tax revenues over this period; and if he will make a statement on the matter. [27963/09]

I propose to take Questions Nos. 53, 71 and 86 together.

The Supplementary Budget forecast that total tax revenue for the year would amount to €34.4 billion. Monthly profiles for individual tax-heads were published at the end of April.

The end-June Exchequer Returns showed that in the first half of the year total tax revenues of €15.8 billion were collected. At this stage, tax revenues are broadly on target with the Supplementary Budget forecast of €34.4 billion while expenditure is running approximately €500 million behind profile. Overall, taxes are €188 million or 1.2 per cent below profile. While this is close to target, significant sums remained to be collected in the second half of the year and the performance of Income Tax and VAT receipts in particular, will need to be monitored closely.

The Supplementary Budget forecast an Exchequer deficit of €20.35 billion. This figure allowed for a €3 billion front-loading of 2009 and 2010's contributions to the National Pension Reserve Fund, as part of the bank recapitalisation programme. In addition, the Government has since agreed a capital injection of up to €4 billion into Anglo Irish Bank, €3 billion of which was paid in June. Allowing for the full €4 billion capital injection increases the Exchequer deficit to a sum of almost €24.5 billion. However, while the injections of capital into the banking system will impact upon the forecast Exchequer Balance, they do not impact upon the General Government Balance as the investment is considered a financial transaction and does not count as expenditure under GGB accounting rules. Hence, the forecast 2009 General Government Deficit of €18.4 billion that was published in the Supplementary Budget is still valid.

In the supplementary Budget, my Department projected that GDP would contract by 7.7 per cent this year, that employment would fall by 7.8 per cent and that unemployment would average 12.6 per cent. These forecasts have been acknowledged as being robust and realistic by external commentators and are largely in line with the current market consensus. In addition, the data which have been published since the April Budget are broadly in line with these forecasts.

Net outward migration is, for the most part, due to the deterioration in the labour market. The main channels through which migration impacts on tax revenue are through the labour market and consumption. In addition, outward migration is one of the reasons why overall consumption levels are projected to decline both this year and next, which has negative implications for VAT and excise receipts. The Supplementary Budget tax projections factor in a reduction in consumption and an employment loss of 7.8 per cent this year and 4.6 per cent next year. My Department is assuming net outward migration for both this year and next, and quarterly national household survey data published at the end of June provide some evidence that this is indeed the case.

At the half-way point in the year, both expenditure and revenue are still broadly on profile. However, the Supplementary Budget targets for the second half of 2009 remain challenging and the performance of both will have to be monitored extremely closely in the coming months.

My Department will publish updated economic and fiscal forecasts in the Pre-Budget Outlook in the autumn.

Question No. 54 answered with Question No. 51.

Public Service Staff.

Deirdre Clune

Question:

55 Deputy Deirdre Clune asked the Minister for Finance the impact on public service employment of the embargo effective from the end of March 2009. [27888/09]

On the 27 March 2009, I announced a moratorium on recruitment and promotion in the public service with certain exceptions in the health and education sectors. The information to hand indicates that, by the end of June, the Department of Finance had received approximately 620 applications for the filling of specific posts comprehended by the moratorium, of which, the filling of 191 have been sanctioned. Of these Civil Service full-time posts accounted for 103 applications of which sanctions was conveyed in 69 cases. The filling of Public Service posts accounts for some 517 posts and sanction has been conveyed in 122 cases.

Banking Sector.

Jimmy Deenihan

Question:

56 Deputy Jimmy Deenihan asked the Minister for Finance his proposals for recapitalising Anglo Irish Bank; his assessment of the funds involved; his plans for sourcing these funds; and his views on the adequacy of the strategic plan of the bank. [27905/09]

As the Deputy will be aware the Government decided to provide up to €4bn by way of capital injection to Anglo Irish Bank. €3bn of this amount was provided from the Central Fund to the Bank for capital purposes on the 29 June 2009. The balance of up to €1bn will be provided subject to agreement on a proposed buy-back of Anglo debt aimed at improving the Bank's Core Tier 1 capital position.

The future capital needs of the Bank are not clear. This depends on a number of factors. The picture will become clearer when arrangements on the transfer of assets to NAMA are finalised. The economic climate, the performance of the remaining loan book will also be determinants of the future capital requirements of the Bank.

As already indicated the capital injection in May was made directly from the Central Fund. Since nationalisation Anglo Irish Bank shares are no longer trading in regulated markets and as a result the Bank has ceased, by definition, to be a "listed credit institution" for the purposes of the Investment of the National Pensions [No. 7.] Reserve Fund and Miscellaneous Provisions Act 2009. It follows, therefore, that the National Pensions Reserve Fund is not an appropriate vehicle for the transfer of funds to the Bank.

The Board of the Bank have not, as yet, finalised their Business plan. As part of the EU Commission State Aid approval for the injection of capital, the Bank has to prepare and submit a detailed restructuring plan. This will be done in consultation with my Department and the Financial Regulator and EU approval will also be needed.

Financial Services Regulation.

Joanna Tuffy

Question:

57 Deputy Joanna Tuffy asked the Minister for Finance his views on the concerns of the acting Financial Regulator with respect to banking staff, management or board members who may be over extended in terms of borrowings from their institution and who may be in a compromising position in relation to decisions on the transfer of assets to the National Asset Management Agency or the management and administration of such assets; and if he will make a statement on the matter. [27982/09]

The Financial Regulator has the statutory authority and responsibility to regulate and supervise credit institutions. The Financial Regulator recently carried out a review of loans to directors in financial institutions and is imposing conditions on banks and building societies following this review.

With regard to staff, the Financial Regulator has informed me that it expects the Board and management of financial institutions to ensure that proper controls and procedures are in place in relation to staff lending. In a situation where the Regulator became aware of staff in senior positions who may be, or may be seen to be, compromised because of borrowings from that institution, the Regulator would seek to ensure that the position was rectified.

Unemployment Levels.

Pat Rabbitte

Question:

58 Deputy Pat Rabbitte asked the Minister for Finance his views on the June 2009 live register figures and the latest quarterly national household survey; if he will provide revised estimates in respect of unemployment figures for year end 2009 end 2010; the way these trends and estimates are expected to impact on the general Government balance for both 2009 and 2010; the way these trends and forecasts compare to those provided at the supplementary budget of 7 April 2009; and if he will make a statement on the matter. [27986/09]

In June of this year, the seasonally-adjusted number on the Live Register was 413,500 resulting in a standardised unemployment rate of 11.9 per cent. The monthly increase in June was the lowest since September last year. In other words, the rate of labour market deterioration is not as bad as in the first quarter of this year.

The latest quarterly national household survey relates to the first quarter of this year, and shows that total employment fell at an annual rate of 7.5 per cent — the equivalent of 158,500 jobs — in the first quarter. The unemployment rate was 10.2 per cent.

These trends in both the Live Register and the quarterly national household survey are in line with labour market projections made by my Department in the April Supplementary Budget, so that revisions are not necessary. The budgetary arithmetic is based on employment falling by 7.8 per cent on average this year and by 4.6 per cent next year. Unemployment is forecast to average 12.6 per cent this year and 15.5 per cent next year. The number on the Live Register is projected to average 440,000 this year, which unfortunately implies breaching the 500,000 mark by end-year.

Therefore, the trajectory for the public finances — specifically the general government position — over this year and next is unaffected by the publication of labour market data since the Budget was formulated.

Falling employment and rising unemployment is the most worrying aspect of the economic downturn. The Government is working to improve the competitiveness of the economy so that we are in a position to exploit the global recovery when it emerges, thereby providing support to the labour market.

We are also investing in the smart economy, maintaining high levels of capital spending and directing that into labour intensive areas. For example, I announced the establishment of a Stabilisation Fund of €100m over two years to support vulnerable but viable enterprises and an R&D target of 2.5 per cent of GNP by 2013. In addition, I announced in the recent Supplementary Budget a further range of labour market activation initiatives.

Question No. 59 answered with Question No. 42.

Tax Code.

Caoimhghín Ó Caoláin

Question:

60 Deputy Caoimhghín Ó Caoláin asked the Minister for Finance his plans to tax child benefit. [27279/09]

Jan O'Sullivan

Question:

77 Deputy Jan O’Sullivan asked the Minister for Finance his preference for means testing or for taxing child benefit; and if he will make a statement on the matter. [27970/09]

I propose to take Questions Nos. 60 and 77 together.

The position in relation to Child Benefit is as set out in my Supplementary Budget on 7 April 2009. The Government does not believe that it is fair to pay the same level of benefit irrespective of the level of income of the recipient. In times of scarce resources the Government believes support should be targeted at those most in need. My Department, together with the Department of Social and Family Affairs and the Revenue Commissioners are considering how best to achieve this policy objective. The tax treatment of child benefit is also being considered by the Commission on Taxation. I will be informed by its proposals on this matter.

Banking Sector.

Willie Penrose

Question:

61 Deputy Willie Penrose asked the Minister for Finance the expected State capital injection into Anglo Irish Bank over the 2009 to 2012 period; if he proposes to fund such capital injections from the National Pensions Reserve Fund, from the central fund or from other resources; the amount of capital which has been injected by the State to date in 2009; and if he will make a statement on the matter. [27959/09]

As the Deputy will be aware the Government decided to provide up to €4bn by way of capital injection to Anglo Irish Bank. €3bn of this amount was provided from the Central Fund to the Bank for capital purposes on the 29 June 2009. The balance of up to €1bn will be provided subject to agreement on a proposed buy-back of Anglo debt aimed at improving the Bank's Core Tier 1 capital position.

The future capital needs of the Bank are not clear. This depends on a number of factors. The picture will become clearer when arrangements on the transfer of assets to NAMA are finalised. The economic climate and the performance of the remaining loan book will also be determinants of the future capital requirements of the Bank.

As already indicated the capital injection in May was made directly from the Central Fund. Since nationalisation Anglo Irish Bank shares are no longer trading in regulated markets and as a result the Bank has ceased, by definition, to be a "listed credit institution" for the purposes of the Investment of the National Pensions [No. 7.] Reserve Fund and Miscellaneous Provisions Act 2009. It follows, therefore, that the National Pensions Reserve Fund is not an appropriate vehicle for the transfer of funds to the Bank.

Tax Yield.

George Lee

Question:

62 Deputy George Lee asked the Minister for Finance the yield from the air travel tax in the months from April to June 2009; and the number of journeys subjected to the tax. [27930/09]

I am informed by the Revenue Commissioners that the air travel tax arising from travel undertaken in any month is payable by the 23rd of the following month. The yields from the air travel tax received in May and June 2009 were €9.6 million and €11.5 million respectively, in respect of travel undertaken during the months of April and May 2009.

The tax due for travel undertaken during June 2009 is not payable until 23 July 2009, and therefore the yield in question is not yet available.

In addition to the monthly payments of the tax, each airline operator is required to furnish a detailed annual return to the Revenue Commissioners, which will include details of the number of departures liable at each rate of the tax. The first such annual returns, covering the period 30 March to 31 December 2009, are due to be provided by 23 February 2010. Consequently it is not possible as this time to provide details of the number of journeys subjected to air travel tax in the period April to June 2009.

Tax Code.

Aengus Ó Snodaigh

Question:

63 Deputy Aengus Ó Snodaigh asked the Minister for Finance if he will introduce a property tax on first homes; and the possible level of property tax. [27277/09]

All taxes and potential taxation measures continue to be reviewed on an ongoing basis. However, as the Deputy will be aware, it is not customary for the Minister of Finance to comment on possible tax and expenditure changes in advance of the Budget.

Unemployment Levels.

Sean Sherlock

Question:

64 Deputy Seán Sherlock asked the Minister for Finance his views on the latest quarterly national household survey which indicates a 104% year on year rise in unemployment to the end of March 2009 and that the seasonally adjusted unemployment rate is at its highest level since 1997; and if he will make a statement on the matter. [27976/09]

Quarterly national household survey data show that in the first quarter of this year, economy-wide employment fell by 158,500 on an annual basis, a fall of 7.5 per cent. Seasonally adjusted unemployment was 223,000 in the first quarter, compared with 110,000 in the same period last year. The unemployment rate stood at 10.2 per cent in the first quarter.

There is no question that the deterioration in the labour market is of major concern. As I have said before, the most worrying aspect of the current economic difficulties is the rapid rise in unemployment.

In this regard, the Government is continuing to pursue policies that will limit the loss in employment and position the economy to take advantage of the upturn in world growth. For instance, we have brought in additional fiscal measures in order to maintain the public finances on a sustainable path. This will help restore international confidence in Ireland as a place to invest. We are working to improve competitiveness, through investing in infrastructure and in education and skills, maintaining the pro-enterprise tax system and research and development supports, thereby preparing the climate for future activity. The Government has also taken measures to get credit flowing, while we are ensuring that those losing their jobs have access to re-training.

Public Service Staff.

Ruairí Quinn

Question:

65 Deputy Ruairí Quinn asked the Minister for Finance the expected Exchequer saving for 2009 and 2010, respectively, resulting from the incentivised career break and incentivised early retirement schemes for public servants; and if he will make a statement on the matter. [27972/09]

In the April 2009 Supplementary Budget, I announced a range of initiatives which are intended to lead to savings in the public service pay bill. The Government has decided to offer an Incentivised Scheme of Early Retirement in the public service to reduce the public service pay bill and facilitate a permanent, structural reduction in the numbers of staff serving in the civil service, local authorities, the health sector, non-commercial state bodies and certain other areas of the public service. The Scheme is open to applications from 1 May 2009 until 1 September 2009.

The Government has also decided to implement two new work-life balance initiatives, the Special Civil Service Incentive Career Break Scheme to facilitate civil servants in taking a career break for 3 years, as well as the Shorter Working Year Scheme which replaces the existing Term Time Scheme.

I included a tentative estimate in the April Budget of savings of up to €150m in 2009 and €300m in a full year. Achieving these savings is entirely dependent on take up, which is not certain at this stage.

Pre-Budget Submissions.

Martin Ferris

Question:

66 Deputy Martin Ferris asked the Minister for Finance if he will pursue a different approach to preparing for budget 2010; and if he will include the Opposition parties in discussions regarding cuts to spending. [27282/09]

As I have already outlined in my response to a Priority Question today, the broad parameters for Budget 2010 were set out in the Supplementary Budget which for the first time set out a multi-annual plan which will achieve a General Government deficit of 3% of GDP by end-2013. In terms of the next two years, the Supplementary Budget set out the indicative split between the necessary further expenditure and tax revenue adjustments required, amounting to up to €4 billion in 2010 and 2011. At the time I indicated that the expenditure targets were a minimum and the taxation targets were a maximum and I have since elaborated on this to indicate that the scope for further income tax increases is limited. This will mean that other measures that broaden the tax base and further improve the expenditure position are central to the ongoing fiscal consolidation process.

The Commission on Taxation, which is expected to complete its work shortly, and the Special Group on Public Service Numbers and Expenditure, which is due to report to me imminently, will have an important role to play in identifying measures that will achieve the required adjustments for 2010 and subsequent years, as set out in the Supplementary Budget.

The report of the Special Group will assist the Government to identify economies which can be made on the scale necessary to ensure that the public finances are returned to a sustainable path in the near future. The Special Group's conclusions will accordingly be considered on an ongoing basis in the context of preparing the allocation of expenditure for 2010.

In relation to the Commission on Taxation, its terms of reference are far reaching and broadly defined and allow for consideration of all aspects of the Irish taxation system. The work of the Commission will help establish the framework within which tax policy will be set for the next decade at least. I expect to receive the report of the Commission shortly and I will be bringing it to Government for consideration at that stage.

It is intended the Pre-Budget Outlook will be published in mid to late October, setting out the pre-budget position in more detail based on the latest available data. In this context, my Department will produce updated macroeconomic projections which will inform the decision making process for my December Budget. The Pre-Budget Outlook will assist the House by informing the debate in the run up to the presentation of the Budget. I will then set out the details of Budget 2010 in my address on Budget Day in early December and the Budget will also contain updates to the medium term economic and fiscal projections.

As the Deputy is aware there is ongoing engagement with both Houses of the Oireachtas, as well as the various Committees, in relation to economic and fiscal matters. I have no reason to believe that the situation will be any different in the lead-up to the presentation of Budget 2010.

Freedom of Information.

Ciaran Lynch

Question:

67 Deputy Ciarán Lynch asked the Minister for Finance if he will extend the scope of the Freedom of Information Act 1997 to cover the Central Bank, the Financial Regulator, the State Claims Agency, the National Treasury Management Agency, including the National Pension Reserve Fund and the National Asset Management Agency, as recommended by the Information Commissioner; if he will bring forward amending legislation to this effect; and if he will make a statement on the matter. [27961/09]

Given the significant pressure on the Central Bank and Financial Services Authority of Ireland (CBFSAI) at this time, arising from the financial crisis and the operation of the Bank Guarantee Scheme, and the significant change in the financial regulatory framework as proposed by Government, it is not considered that this would be the most appropriate time to consider the possible extension of the FOI Act to that organisation. Also significant issues relating to the confidential and commercial sensitivity of much of the information within the possession of that organisation, the international framework of its operations and its role in maintaining and protecting the financial stability of the State would have to taken on board in any such consideration of this matter.

With regard to the National Treasury Management Agency and the National Pensions Reserve Fund Commission I do not propose to extend FOI to these bodies for reasons of commercial sensitivity. In relation to the Agency's role as the State Claims Agency, most of its work is covered by legal privilege and it is considered that a partial application of FOI to the State Claims Agency would not be warranted.

In the case of the National Asset Management Agency (NAMA), it is not yet established as a statutory body although it is my intention to publish legislation later this month. It will of course be necessary to bear in mind that NAMA will have a commercial mandate to obtain maximum value for the taxpayer and, to achieve this objective it will be required to enter into complex commercial negotiations with financial institutions and developers, the nature of which will require in many instances a high degree of commercial confidentiality.

Banking Sector.

Kathleen Lynch

Question:

68 Deputy Kathleen Lynch asked the Minister for Finance the position regarding the ease of access to lending, particularly working capital, for small, medium and large businesses here; if he will take further steps to ensure that viable businesses are not forced to close as a result of avoidable liquidity difficulties; and if he will make a statement on the matter. [27957/09]

A core Government objective is to free up lending on a commercial basis into the economy to support economic growth and a number of actions have been taken to achieve this objective. In the context of the bank guarantee scheme and recapitalisation the banks have made important commitments to support business lending.

An independent review of credit availability was agreed in the context of the recapitalisation of AIB and Bank of Ireland. The purpose of the review was to ascertain the position on credit availability to SMEs in Ireland. The Steering Group for the review consisted of representatives of the Departments of Finance and Enterprise, Trade and Employment, Forfás, Enterprise Ireland, the Irish Banking Federation and the six main banks involved in lending to SMEs, business representatives from ISME, Chambers Ireland and Small Firms Association. The final report of the Review of Lending to SMEs has just now been received. The report is quite extensive, running to almost 100 pages plus appendices. It will be considered by the Cabinet Committee on Economic Renewal which is meeting this afternoon. The intention is that it will be published shortly.

A Code of Conduct for Business Lending to Small and Medium Enterprises was published by the Financial Regulator on 13 February and took effect on 13 March. This code applies to all regulated banks and building societies and will facilitate access to credit, promote fairness and transparency and ensure that banks will assist borrowers in meeting their obligations, or otherwise deal with an arrears situation in an orderly and appropriate manner. The business lending code includes a requirement for banks to offer their business customers annual review meetings, to inform customers of the basis for decisions made and to have written procedures for the proper handling of complaints. Where a customer gets into difficulty the banks will give the customer reasonable time and seek to agree an approach to resolve problems and to provide appropriate advice. This is a statutory code and banks will be required to demonstrate compliance.

In addition, as part of the recapitalisation package announced on 11 February, Allied Irish Bank and Bank of Ireland reconfirmed their December commitment to increase lending capacity to small and medium enterprises (SMEs) by 10% and to provide an additional 30% capacity for lending to first time buyers in 2009. If the mortgage lending is not taken up, then the extra capacity will be available to SMEs. AIB and Bank of Ireland have also committed to public campaigns to actively promote small business lending at competitive rates with increased transparency on the criteria to be met. Compliance with this commitment is being monitored by the Financial Regulator. Officials from my Department are also in regular contact with the banks concerned in relation to their progress on implementing these measures.

My colleague the Tánaiste and Minister for Enterprise, Trade and Employment has recently set up a Clearing Group including representatives from the main banks, business interests and state agencies, which is chaired by the Department of Enterprise, Trade and Employment. The purpose of the group is to identify specific patterns of events or cases where the flow of credit to viable businesses appears to be blocked and to seek to identify credit supply solutions. Any questions on the clearing group should be directed to my colleague the Tánaiste and Minister for Enterprise, Trade and Employment.

The banks report that they are "open for business" as evidenced by their promotional and advertising material. The banks state that they have funds available for lending to businesses and have provided details on approval levels and amounts drawn down. They report a slowdown in certain areas which they say reflects a reduced level of demand. The review of credit availability has considered this point. The most recent Central Bank Monthly Statistics for May 2009 show that credit to non-financial corporates actually increased by €225m month-on-month after two months of substantial falls. While care is always to be taken when reading monthly data, this could be a positive indicator of credit actively being fed through the real economy and businesses.

You may also be aware that my colleague, the Minister of State for Trade and Commerce, Mr Billy Kelleher TD has commenced a series of regional meetings to discuss access to bank credit with key local stakeholders.

Question No. 69 answered with Question No. 51.

Financial Services.

Denis Naughten

Question:

70 Deputy Denis Naughten asked the Minister for Finance the steps he is taking to address the cost of sub-prime mortgages; the discussions he has had with the Irish Financial Regulatory Services Authority on the issue. [27640/09]

The decision on the interest rate to be charged by lending institutions for mortgages is a commercial decision for the financial institution concerned. This decision will reflect a range of different factors including funding costs, market conditions, profitability and business strategy as well as the competitive environment overall. The Deputy will appreciate it is a core function of the Board and senior management of each institution to assess where the appropriate balance lies between these competing objectives particularly in ensuring the financial health and commercial viability of the relevant institution. It is not an appropriate role for the Minister for Finance to seek to determine this decision making by financial institutions operating under competitive market conditions.

The Government took steps in October 2007 via an amendment to the Central Bank Act, 1997, to provide for an appropriate system of authorisation and supervision of retail credit firms by the Financial Regulator engaged in specialist or so-called sub-prime lending. Such lenders were not previously subject to financial regulation in respect of lending activities. The primary purpose of this amendment was to extend to customers of these firms the benefit of the consumer protections provided for in the Financial Regulator's Consumer Protection Code. This regulatory regime has been in place since 1 February 2008 and is being implemented by the Financial Regulator. Consumer credit, including sub-prime lending, is also regulated in Ireland under the Consumer Credit Act 1995. The Act makes detailed provision for the form and content of loan agreements and for advertising of consumer credit.

Some non deposit-taking mortgage lenders are required to notify charges under Section 149 of the Consumer Credit Act, 1995 (as amended) to the Financial Regulator for approval. However interest rates are excluded from this requirement. Also, legal fees tend to be imposed by 3rd parties and then passed on directly by the institution to the consumer. In general these do not require approval. When approving fees, the Financial Regulator takes the following criteria into consideration:

promotion of fair competition;

commercial justification;

passing on any costs to customers; and

the effect on customers or a group of customers.

In view of its statutory consumer protection mandate, the Financial Regulator will continue to monitor interest rates charged by financial institutions.

Question No. 71 answered with Question No. 53.

Banking Sector.

Mary Upton

Question:

72 Deputy Mary Upton asked the Minister for Finance his views on the evolution of the deposit base of Irish banks since the beginning of 2009; the borrowing by Irish banks from the European Central Bank; and if he will make a statement on the matter. [27983/09]

I refer to my answer to Question No. 121 of 13 May 2009.

As I set out in that answer, data on the deposit base of bank offices resident in Ireland is published in the Monthly Statistics and Quarterly Bulletins of the Central Bank and Financial Services Authority of Ireland (CBFSAI).

The latest available monthly statistics (May 2009) indicates that total deposits held in credit institutions reporting to the CBFSAI for statistical purposes is €276.2 billion (includes a total of €170.4 billion in deposits held by Irish residents). The aggregate level of deposits has declined by approximately €13 billion from the end of December 2008 to the end of May 2009, over half of which is accounted for by non-resident deposits. In May, overnight and short-term deposits increased whereas deposits for a longer maturity (i.e. up to two years) declined.

Credit institutions located in the State may avail of liquidity funding from the European Central Bank and as at 29 May 2009 a total of €118.1 billion in liquidity was borrowed by credit institutions reporting to the CBFSAI. While the monthly level of borrowing increased from January to March, it decreased in April and May. The Deputy will note that this data relates to all credit institutions reporting to the CBFSAI for statistical purposes so includes foreign owned institutions, including those based in the IFSC, as well as Irish-owned institutions.

Tax Code.

Aengus Ó Snodaigh

Question:

73 Deputy Aengus Ó Snodaigh asked the Minister for Finance when the report from the Commission on Taxation will be put before the Houses of the Oireachtas. [27278/09]

The report of the Commission on Taxation is due to be presented to me shortly and will be published following Government approval.

Proposed Legislation.

Joan Burton

Question:

74 Deputy Joan Burton asked the Minister for Finance if he will provide for the extension of the range of assets eligible for transfer to the National Asset Management Agency to include commercial debt, residential mortgages, or other consumer debt; if the NAMA legislation will include a ceiling on the value of assets eligible for transfer; and if he will make a statement on the matter. [27992/09]

The objective behind the establishment of NAMA was to deal with the riskiest assets on the balance sheets of Irish banks, which were preventing banks from lending into the economy and thereby supporting economic recovery. In that regard, all land and development loans and certain associated exposures of each eligible institution will be considered for transfer to NAMA.

There are no plans to extend NAMA beyond development property related loans and associated exposures.

Banking Sector.

Terence Flanagan

Question:

75 Deputy Terence Flanagan asked the Minister for Finance if he has drafted a scheme for the extension of the guarantee scheme beyond 2010; if the premium to be charged will differ from that under the existing guarantee; and his plans to present the scheme to the Houses of the Oireachtas. [27918/09]

As I announced in my Supplementary Budget Statement on 7 April 2009, it is the Government's intention to put a State guarantee in place for the future issuance of debt securities with a maximum maturity of up to five years.

Following the enactment of the Financial Measures (Miscellaneous Provisions) Act at the end of June which provides a power to extend the guarantee by order beyond its current expiry date of 29 September 2010, work is continuing on the drafting of a Scheme, the introduction of which requires EU State aid approval.

Access to longer-term funding in line with the mainstream approach in the EU and is expected to contribute significantly to supporting the funding needs of the banks and to securing their continued stability. The extended scheme must be approved in accordance with EU State aid rules and discussions are continuing in this regard with the European Commission.

Jack Wall

Question:

76 Deputy Jack Wall asked the Minister for Finance his views on the recent International Monetary Fund forecast that losses in the banking sector here are expected to total €35 billion by end 2010 and that the Exchequer cost is expected to fall in the 12 to 15% range; and if he will make a statement on the matter. [27974/09]

The IMF has said that losses could be about €35 billion, or about 20 percent of GDP. It is, however, important to point out that the IMF figure was not based on a very detailed analysis of individual bank data. Also, this figure does not take into account the countervailing effect of bank earnings — in that sense it is a gross rather than a net figure.

The Deputy will be aware from my previous reports to the House that PWC has carried out detailed reviews of the loan books and the capital position of six of the covered institutions. Since then, additional due diligence reviews of Anglo Irish Bank, Allied Irish Banks and Bank of Ireland have been carried out, building on the assessments carried out by PWC.

As I have previously stated, I am not in a position to release information contained in these reviews, other than what has been released to date, because of the commercially sensitive nature of the information.

Arising from our assessment of the initial reviews of the loan books, the Government decided to establish the National Asset Management Agency to ensure that the financial institutions were freed up to allow them to lend to the real economy. As I announced in early April, the potential book value of loans that will be transferred to NAMA is in the region of €80 to €90 billion. However, the amount paid by NAMA will be considerably less than this since loans will only be transferred at an appropriate written down value. Where banks and borrowers have made losses, they will have to recognise such losses before the transfer of loans to NAMA. NAMA will operate on a full commercial basis and will be determined to recover monies owed to it to the fullest extent possible.

Question No. 77 answered with Question No. 60.

Bernard J. Durkan

Question:

78 Deputy Bernard J. Durkan asked the Minister for Finance if he has carried out a sufficient audit of the banking sector with a view to identifying precisely the full extent of assets and lending; the degree to which this information, if available, is expected to impact on future corrective action within the banking sector and Government regulation; the steps he will take to address the cause in departures from good banking and lending practices over the past number of years; the further steps he will take to address these issues in the future; and if he will make a statement on the matter. [27866/09]

The PriceWaterhouseCoopers (PWC) Report commissioned by the Financial Regulator, provided a comprehensive analysis of the loan books of the covered institutions. This analysis informed the series of moves which have been taken to stabilise the Irish banking sector. The contents of the PWC reports are however, highly market sensitive and will not be published.

Work has begun at an international level on forging a new model to govern the conduct and behaviour of the financial sector. Ireland will play its part internationally and particularly at EU level in seeking to ensure that the re-design of the financial system and in particular of financial regulation is consistent with the objectives highlighted in the Guarantee Scheme.

The regulation of lending practices of Irish financial institutions is the responsibility of the Financial Regulator. In response to the financial turbulence of last year, the Financial Regulator instigated a series of new regulatory measures to take account of the changed environment, including an increased focus on the management of credit and liquidity risks of the banks. Among the actions the Financial Regulator has taken are the following:

the recruitment of 20 senior supervisory staff with banking experience to monitor developments in domestic credit institutions. An additional 20 positions were advertised in June 2009 for specific expertise across a range of areas. The competition closed in late June and the short listing of candidates from this competition is underway; and

enhanced reporting obligations in relation to capital, asset quality and individual large loans to supplement daily liquidity reporting requirements.

More recently however, I announced the Government's intention to establish a single fully integrated regulatory institution, the Central Bank of Ireland Commission. This new structure will replace the current board structure of the Central Bank and the Financial Services Regulatory Authority to achieve the highest performance standards for the new organisation.

The new Central Bank Commission will be chaired by the Governor of the Central Bank and will be responsible for both the supervision of individual firms and the stability of the financial system generally. This range of reforms will underpin a much more effective and efficient financial services regulatory system aligned with best international practice.

In the legislation which will underpin the new structures, the Government will seek to enhance the accountability of the new regulatory structures to the Oireachtas and to strengthen evaluation and quality assurance of regulatory performance.

National Archives.

David Stanton

Question:

79 Deputy David Stanton asked the Minister for Finance his plans to upgrade the National Archives; the cost to the Office of Public Works for off-site storage of records since October 2008 to date in 2009; and if he will make a statement on the matter. [27868/09]

The Land Commission is currently accommodated in the National Archives premises in Bishop Street, Dublin 8. The Office of Public Works is in the process of relocating the Land Commission personnel and their records from Bishop Street to Portlaoise, and will allocate the space freed up by this move to the National Archives for storage purposes.

The Office of Public Works has made arrangements for the provision of additional off-site storage for the National Archives and the cost associated with this storage from October 2008 is €10,114.50.

House Repossessions.

Joan Burton

Question:

80 Deputy Joan Burton asked the Minister for Finance the steps he will take to ensure that there is not a surge in home repossessions upon the expiration of the 12 month moratorium agreed with Allied Irish Banks and another bank (details supplied) as part of their recapitalisation schemes; his views on the level of mortgage arrears here and its evolution; and if he will make a statement on the matter. [27991/09]

My Department continues to monitor the situation in general, and especially with the recapitalised banks and the banks under the Guarantee. The Government has the objective of ensuring that the rate of home repossessions should remain at its present very low levels and will seek to achieve this through the terms of the Statutory Code of Conduct, specific commitments under the recapitalisation scheme, the direct financial supports under the Supplementary Welfare Allowance scheme and the support of the Money Advice and Budgetary Service.

The Code of Conduct on Mortgage Arrears published on 13 February 2009 builds on the existing voluntary Code of Practice issued by the Irish Banking Federation and incorporates a requirement for the lender to wait at least six months from the time arrears arise before taking legal action. Bank of Ireland and AIB have each committed that they will not commence court proceedings for repossession of a principal private residence until after twelve months of arrears appearing, where the customer continues to cooperate reasonably and honestly with the bank. It should be noted that the twelve months commences when the arrears first appear and is not limited to the dates of the recapitalisation. Under the Code of Conduct, a lender may not seek repossession until every reasonable effort has been made to agree an alternative repayment schedule with the borrower. The Code is monitored by the Financial Regulator.

I must stress however that there are no indications that such a surge in on the way.

Economic Outlook.

Jan O'Sullivan

Question:

81 Deputy Jan O’Sullivan asked the Minister for Finance his views on the latest OECD economic outlook and its forecast that Irish GDP is set to decline 9.8% in 2009 with the budget deficit set to hit 11.5% of GDP; and if he will make a statement on the matter. [27969/09]

With regard to the latest OECD Economic Outlook, released June 24th, I note that the OECD's projections indicate that the global contraction is slowing, and for the first time in a while they are more optimistic regarding a global upturn than their last outlook. Of particular importance to Ireland are the signs of impending recovery in the US.

I note that the OECD forecast that the Irish economy will contract by -9¾ per cent this year. Since the OECD forecasts were published, first quarter national accounts data have become available which show that GDP contracted by 8½ per cent year-on-year in the first quarter. Moreover, many commentators are now of the view that the rate of deterioration may be slowing. Available data are consistent with this. Therefore, my Department's forecast of a 7¾ per cent contraction remains valid at this stage. Whatever the actual outturn, we all acknowledge that we are in a difficult economic situation and that Ireland is expected to suffer a 13% contraction in output over the period 2008-2010, before resuming some modest growth thereafter.

The OECD forecast a General Government Balance in 2009 of -11.5% of GDP and -13.6% of GDP in 2010; this compares to the Supplementary Budget forecast of -10¾% of GDP in both 2009 and 2010.

While the difference in the forecasts can partly be explained by the difference in economic growth forecasts, it also reflects the fact that the OECD forecast is based on existing specified policy. This means that they do not include the commitment contained in the Supplementary Budget to make further budgetary adjustments of the order of over 2% of GDP in 2010.

The recent Supplementary Budget set out a multi-annual consolidation plan for the public finances which will bring the General Government Balance to -3% of GDP by end-2013. I welcome the OECD's assessment that it is appropriate that fiscal consolidation has begun in Ireland given the severe pressures on the public finances.

Ministerial Appointments.

Michael D. Higgins

Question:

82 Deputy Michael D. Higgins asked the Minister for Finance when he will announce the identity of the next governor of the Irish Central Bank; if he has prepared a shortlist of potential candidates; if he has approached potential candidates regarding the position; if he will appoint a candidate with a blend of theoretical and practical, market knowledge of the banking sector; and if he will make a statement on the matter. [27988/09]

As I announced previously, the current Governor of the Central Bank, Mr John Hurley, was requested to continue in office for a short period past the completion of his current term, in order to ensure continuity and leadership during the disruption in financial markets. He has agreed to remain for a period of additional months to facilitate the smooth transition to the new regulatory arrangements.

It is proposed that the Government will consider of a wide pool of qualified candidates, including from abroad, to ensure that the Governor Hurley's successor will have the necessary reputation, experience, abilities and expertise to take over responsibility for leading the reform of the regulatory structures.

Financial Services.

Thomas P. Broughan

Question:

83 Deputy Thomas P. Broughan asked the Minister for Finance his proposals to improve the flow of credit in respect of vehicle purchases when customers with good jobs, a reliable credit history and a significant equity in a vehicle purchase are having difficulty in accessing credit; and if he will make a statement on the matter. [27955/09]

In general, the decision on whether an institution operating in Ireland approves a loan application from an individual is a commercial decision for the institution concerned.

The Deputy will appreciate that a balance must be achieved by Government between influencing private banks through the bank guarantee scheme and other financial support incentives while at the same time being seen to have a hands-off approach to the day to day running of these institutions which must operate on a strictly commercial basis. In this regard, Government action to date has focussed on SME and mortgage markets rather than consumer lending of various types.

Financial Institutions Support Scheme.

Jack Wall

Question:

84 Deputy Jack Wall asked the Minister for Finance the findings of the first six month review of the functioning of the bank guarantee; if he will publish this review; if he is satisfied that the guarantee has secured the liquidity situation of the banking system here; and if he will make a statement on the matter. [27973/09]

Under paragraph 8 of the Credit Institutions (Financial Support) Scheme, the Minister for Finance may review and vary the terms and conditions of the Scheme to ensure that it is achieving the purposes of the Credit Institutions (Financial Support) Act 2008. The Scheme states that at such a review, the Minister shall consider, inter alia, the continued requirement for the provision of financial support under the Scheme with regard to its objectives and section 2(1) of the Act. This review has been provided to the European Commission as required under the Scheme.

As I announced in my Supplementary Budget Statement on 7 April 2009, it is the Government's intention to put a State guarantee in place for the future issuance of debt securities with a maximum maturity of up to five years.

Following the enactment of the Financial Measures (Miscellaneous Provisions) Act at the end of June which provides a power to extend the guarantee by order beyond its current expiry date of 29 September 2010, work is continuing on the drafting of a Scheme, the introduction of which requires EU State aid approval.

Access to longer-term funding in line with the mainstream approach in the EU and is expected to contribute significantly to supporting the funding needs of the banks and to securing their continued stability. The extended scheme must be approved in accordance with EU State aid rules and discussions are continuing in this regard with the European Commission.

Banking Sector.

Brian O'Shea

Question:

85 Deputy Brian O’Shea asked the Minister for Finance his views on the recent court action initiated by a bank (details supplied) to recover some €60 million owed to it; his views on whether further such legal actions are unlikely to be initiated by credit institutions in advance of the establishment of the National Asset Management Agency and that credit institutions should await the establishment of NAMA before initiating such legal actions; and if he will make a statement on the matter. [27968/09]

The Deputy will be aware that substantial progress has been made in the practical preparations for the establishment of NAMA in tandem with the drafting of legislation to establish the Agency on a statutory basis, and that it is my intention to publish the NAMA Bill before the end of July.

Pending the establishment of NAMA, institutions will be expected to manage loan assets in accordance with normal commercial practice. This includes the management of non-performing or impaired loans. The specific action referred to by the Deputy is a commercial matter for the institution concerned.

Question No. 86 answered with Question No. 53.

Ministerial Appointments.

Thomas P. Broughan

Question:

87 Deputy Thomas P. Broughan asked the Minister for Finance the progress regarding the recruitment of a new head of financial supervision to act under the auspices of the new Central Bank commission; and if he will make a statement on the matter. [27956/09]

A key aspect of the proposed reform of the regulatory structures is the appointment of a Director of Financial Supervision, who will be an ex officio member of the new Central Bank of Ireland Commission and will report to the Commission on the regulatory and supervisory functions and objectives of the new structure.

The process of recruiting this new Director of Financial Supervision is already underway, under the auspices of the Central Bank and Financial Regulator, in close consultation with my Department. Sir Andrew Large, former Deputy Governor of the Bank of England and former member of the UK Monetary Policy Committee is also advising on the recruitment process. The position was advertised nationally and internationally last week. The search being undertaken is wide-ranging to ensure that the successful candidate has the necessary calibre, reputation, experience and expertise to lead the reform of the regulatory and supervisory structures.

Banking Sector.

Sean Sherlock

Question:

88 Deputy Seán Sherlock asked the Minister for Finance his views on the recent reiteration by the International Monetary Fund of its recommendation that temporary nationalisation of the Irish banks should be pursued in conjunction with the National Asset Management Agency in order to restructure the banking sector and to mitigate difficulties in appropriately pricing assets being transferred to NAMA; and if he will make a statement on the matter. [27975/09]

The IMF did not recommend nationalisation of the Irish banks. It did suggest that there can be circumstances in which a nationalisation is necessary. In this regard, the Deputy is aware of the nationalisation of Anglo Irish Bank, where circumstances were such that the Government believed a nationalisation was required.

The Government does not accept that nationalisation of the whole of the Irish banking system will be the short term panacea that some — but not the IMF — suggest. We believe that it is important, where possible, that the banking sector has a market presence and that it operates within market disciplines and constraints. A commercially focused banking system operating within market disciplines and constraints is best equipped to achieve the Government's aim of ensuring that the lending needs of the real economy are met.

I should note that the IMF Directors commended the response of the Irish authorities, welcomed the actions taken so far to safeguard financial stability and supported the NAMA initiative.

Proposed Legislation.

Arthur Morgan

Question:

89 Deputy Arthur Morgan asked the Minister for Finance the person he is consulting with in drawing up the National Asset Management Agency legislation. [27275/09]

The Deputy will be aware that the establishment of NAMA and the interim preparations, including the drafting of legislation, are being overseen by a NAMA Steering Group established by me. The Group comprises representatives of my Department, the NTMA and the Attorney General.

To date, the interim NAMA has managed three tender competitions covering (i) banking and financial advice, (ii) tax advisory services and (iii) legal advice. Future tender competitions will be advised on the NAMA website www.nama.ie. While the drafting of the NAMA legislation is being overseen by the Steering Group, the expert advice of the three companies appointed to advise NAMA will feed into the process.

I also would add that many constructive observations, comments and advices have been independently offered. These have been referred to the Steering Group and the interim Managing Director of NAMA for consideration.

Banking Sector.

Willie Penrose

Question:

90 Deputy Willie Penrose asked the Minister for Finance when he will introduce a revised bank guarantee scheme for consideration by Dáil Éireann; if he will narrow the scope of the guarantee for periods beyond 30 September 2010; if, in particular, he will remove dated subordinated debt from the scope of the guarantee under any proposed extension; and if he will make a statement on the matter. [27960/09]

As I announced in my Supplementary Budget Statement on 7 April 2009, it is the Government's intention to put a State guarantee in place for the future issuance of debt securities with a maximum maturity of up to five years.

The enactment of the Financial Measures (Miscellaneous Provisions) Act at the end of June provides a power to extend the guarantee by order beyond its current expiry date of 29 September 2010. As I mentioned during the debate on this Bill it is my intention to provide in any new Scheme that dated subordinated debt will not be part of any such extension. Work is continuing on the drafting of a Scheme, the introduction of which requires EU State aid approval.

Access to longer-term funding in line with the mainstream approach in the EU and is expected to contribute significantly to supporting the funding needs of the banks and to securing their continued stability. The extended scheme must be approved in accordance with EU State aid rules and discussions are continuing in this regard with the European Commission.

Debt Levels.

Joe Costello

Question:

91 Deputy Joe Costello asked the Minister for Finance his views on the spread on recently raised Irish sovereign debt above the benchmark German bonds; if he expects these spreads to ease or to become more pronounced over the 2009 to 2010 period; the expected impact of elevated bond spreads on the cost of financing the national debt in 2009 and 2010; the expected cost in nominal terms and as a proportion of GDP for 2009 and 2010, with comparative figures for 2007 and 2008; and if he will make a statement on the matter. [27989/09]

The spread in the cost of funding that Ireland must pay over the German benchmark rate began to increase towards the end of 2008 and rose sharply in January 2009 as a result of a number of global and domestic factors. These included international concerns about the prospect for continued economic contraction in Ireland and internationally, the deterioration in the public finances, and uncertainty about the cost to the Exchequer of restructuring the Irish banking sector. While spreads have fallen from the peak levels, they remain volatile. The National Treasury Management Agency advise that it is not possible to disentangle the precise effects of the different factors behind these spread moves or to quantify them. For illustrative purposes, the NTMA have estimated that an increase of 10 basis points in the spread would increase the cost of funding the overall 2009 borrowing requirement by around €29 million in a full year.

While, as outlined above, a number of factors have impacted on the spread in the cost of funding, the Government is taking the necessary corrective actions to address the deterioration in the public finances and ensure the stabilisation of the financial sector. It is expected that these actions will assist in restoring the confidence of international investors and will have an impact on the longer term debt servicing costs.

The Supplementary Budget forecasts as advised by the NTMA for 2009 and 2010 for debt servicing costs, in nominal terms and as a proportion of GDP, along with comparative figures for 2007 and 2008 are set out as follows:

Outturn

Outturn

Forecast

Forecast

2007

2008

2009

2010

Debt Service Cost

€2.1 billion

€2.1 billion

€3.9 billion

€5.8 billion

As a % of GDP

1.1%

1.1%

2.3%

3.5%

Tax Collection.

Jim O'Keeffe

Question:

92 Deputy Jim O’Keeffe asked the Minister for Finance his views on loss of revenue to the Exchequer, estimated to be in the region of €400 million annually, arising from the illegal smuggling of cigarettes; and the steps he is taking by way of legislation, enforcement and prevention to stem this loss. [27637/09]

I am informed by the Revenue Commissioners that they are not in a position to confirm the Deputy's estimate of tax loss from cigarette smuggling, as there is no reliable method for determining such a figure. However, a tentative estimate was given by Revenue earlier this year that about 20% of cigarettes consumed in Ireland may be untaxed, but it is important to emphasise that this includes both legitimate cross- border purchases for personal consumption and contraband and counterfeit cigarettes. Cigarette clearances on payment of tax for the first five months of 2009 are broadly in line with the same period in 2008.

Approximately 42m cigarettes with a retail value of €17.5m have been seized in the first six months of 2009. The efforts that are being made by Revenue to tackle cigarette smuggling include a continuous review of resource deployment both at points of importation and inland with a view to increasing the number of seizures and prosecutions, the procurement of a second Mobile Container Scanner that is expected to be completed this year, continued liaison with An Garda Síochána and where appropriate, the mounting of multi-agency international operations. In addition, Revenue will continue to liaise closely with the legitimate tobacco manufacturers and the Office of Tobacco Control, and will also maintain close contact with the authorities in other Member States and the European Anti-Fraud Office.

With regard to legislation, I can inform the Deputy that existing enforcement legislation is considered adequate for tackling cigarette smuggling. Current penalties on summary conviction for evasion of duties are €5,000 and/or a term of imprisonment not exceeding twelve months. These reflect the maximum statutory penalties that can be imposed by the District Courts. The penalty for conviction on indictment is currently €12,695 or treble the duty paid value of the goods, whichever is the greater, and/or a term of imprisonment not exceeding five years.

Banking Sector.

Caoimhghín Ó Caoláin

Question:

93 Deputy Caoimhghín Ó Caoláin asked the Minister for Finance if he has received reports from the banks covered under the guarantee scheme with regard to their lending to small businesses. [27280/09]

As part of the recapitalisation package announced on 11 February, Allied Irish Bank and Bank of Ireland reconfirmed their December commitment to increase lending capacity to small and medium enterprises (SMEs) by 10% and to provide an additional 30% capacity for lending to first time buyers in 2009. If the mortgage lending is not taken up, then the extra capacity will be available to SMEs. Compliance with this commitment is monitored by the Financial Regulator. The banks make quarterly reports to ensure compliance and the first reports to end March 2009 were received in a timely manner.

Additionally, an independent review of credit availability was agreed in the context of the recapitalisation of AIB and Bank of Ireland. The purpose of the review was to ascertain the position on credit availability to SMEs in Ireland. The Steering Group for the review consisted of representatives of the Departments of Finance and Enterprise, Trade and Employment, Forfás, Enterprise Ireland, the Irish Banking Federation and the six main banks involved in lending to SMEs, business representatives from ISME, Chambers Ireland and Small Firms Association. The final report of the Review of Lending to SMEs has just now been received. The report is quite extensive, running to almost 100 pages plus appendices. It will be considered by the Cabinet Committee on Economic Renewal which is meeting this afternoon. The intention is that it will be published shortly.

Public Service Contracts.

Jim O'Keeffe

Question:

94 Deputy Jim O’Keeffe asked the Minister for Finance if the procurement process for the acquisition of a second mobile scanner needed to combat cigarette smuggling has been completed; and the expected date when it will be operational. [27636/09]

I am informed by the Revenue Commissioners that the procurement process for the acquisition of a second mobile scanner is progressing. The tenders have been evaluated, the project team responsible for procurement have decided on a supplier and have commenced the contract stage of the procurement process. The project plan envisages that the new scanner will be deployed by the end of this year.

Banking Sector.

Liz McManus

Question:

95 Deputy Liz McManus asked the Minister for Finance the lending by the European Central Bank and by the Irish Central Bank respectively to financial institutions covered by the bank guarantee; and if he will make a statement on the matter. [27964/09]

The Central Bank do not publish separate figures for the guaranteed banks but do publish figures which cover all banks operating in Ireland, including the IFSC banks. The total aggregate balance sheet of these institutions is €1,392,046 million of which €118,087 million represents ECB lending. These figures for individual banks are highly market sensitive and are not published.

Financial Services.

Denis Naughten

Question:

96 Deputy Denis Naughten asked the Minister for Finance the steps he is taking to address the cost of fixed rate mortgages; the discussions he has had with the Irish Financial Services Regulatory Authority on the issue; and if he will make a statement on the matter. [27639/09]

The Deputy's question refers to the commitment I gave in this House on 26 March 2009 to request the Consumer Director in the Financial Regulator — which has a statutory mandate to safeguard customers' interests — to examine the level of redemption fees charged by banks to customers wishing to exit from fixed rate mortgages. My Department received a copy of the Financial Regulator's report on this matter on 29 June 2009.

The report sets out that the Financial Regulator requested specific information from 26 lenders on how early redemption fees quoted to customers are calculated. Of the 26 lenders, 25 confirmed to the FR that they did not impose any fees in respect of the early redemption of a fixed rate home loan other than those which would arise in the context of a normal redemption of any mortgage. In one case a €95 fee approved under the Consumer Credit Act, 1995 is charged by the lender for breaking a fixed rate mortgage.

The FR's report states that independent actuarial confirmation was also sought from all of the lenders to substantiate the case that the formulae applied by them to calculate redemption fees were restricted to the recovery cost of the funding of particular fixed rate mortgage arrangements in place.

On the basis of the information supplied by the lenders including worked examples and the actuarial confirmations submitted, the FR concluded and has confirmed to my Department that its analysis indicates that the early redemption fee calculation in all cases appears to seek to recover the costs; and lenders do not generally apply additional fees in the case of early redemption.

The Financial Regulator has advised my Department in its report that since its findings are based on a review of material provided by lending institutions rather than verification by means of on-site inspections it intends to carry out at least six on-site inspections on this issue.

Lenders do not therefore seem to be applying financial penalties in order to dissuade borrowers from early redemption of fixed rate mortgages. However, if the additional work to be undertaken by the Financial Regulator brings to light any information that does not support the findings and the conclusions contained in its report, the Financial Regulator has confirmed that this information will be made available in the public domain.

Departmental Expenditure.

David Stanton

Question:

97 Deputy David Stanton asked the Minister for Finance the way he proposes to make savings and reduce expenditure associated with the Office of Public Works; and if he will make a statement on the matter. [27869/09]

The Revised Estimates Volume contains details on the financial provision for the Office of Public Works for 2009. The efficient and effective application of that provision is a matter for that Office. With regard to the impact of the general budgetary situation on the funds that may be provided for the OPW in 2010, that is a matter for decision in the context of the 2010 budget. The recommendations of the Special Group on Public Service Numbers and Expenditure Programmes will form an input to that process.

Economic Competitiveness.

Brian O'Shea

Question:

98 Deputy Brian O’Shea asked the Minister for Finance his views on the International Monetary Fund’s recent assertion that the economic distress currently facing Ireland is the most severe facing an advanced economy since World War II; the way he expects businesses and families here to be able to cope with the crisis and the reduced incomes it entails; the measures he will introduce to alleviate these financial pressures; and if he will make a statement on the matter. [27965/09]

The IMF is projecting that the Irish economy will contract by 13.5% between 2008 and 2010. This is of similar magnitude to the forecast made by my Department in the April supplementary budget. This is a very sharp rate of contraction in both international and historical terms. However, as I have pointed out before, the IMF report commends the Government for its actions to resolve the difficulties.

The Government is acutely aware that businesses, families and almost everyone in our society is being affected by the deterioration in economic conditions. What we are attempting to do is to ensure that the burden of adjustment is spread evenly. Income reductions — which are inevitable — must also be seen in the context of declining prices.

Improving competitiveness and safeguarding our pro-enterprise economy, putting our public finances and our banking system on a sustainable footing while returning to export-led growth are the appropriate policies and will ensure that we achieve sustainable increases in employment in the future. In this context, the Government's approach to dealing with the present significant economic downturn is to ensure that the economy is in a position to be able to take advantage of the global recovery when it emerges.

Financial Services.

Ruairí Quinn

Question:

99 Deputy Ruairí Quinn asked the Minister for Finance if his attention has been drawn to the fact that consumers in stable employment and with a reliable credit history are having difficulties in accessing mortgage finance; his proposals to improve this situation; and if he will make a statement on the matter. [27971/09]

While I cannot comment on individual cases, I would however point out that in response to the issue of access to mortgage finance, as part of the terms of the recapitalisation of AIB and Bank of Ireland, the banks agreed to provide an additional 30% capacity for lending to first time buyers in 2009. The banks have also committed to actively promote mortgage lending at competitive rates, with increased transparency on the criteria to be met.

In general, the decision on whether an institution operating in Ireland approves a mortgage application from individuals is a commercial decision for the institution concerned. The Deputy will appreciate that a balance must be achieved by Government between influencing private banks through the bank guarantee scheme and other financial support incentives while at the same time being seen to have a hands-off approach to the day to day running of these institutions which must operate on a strictly commercial basis.

Agriculture Sector.

Arthur Morgan

Question:

100 Deputy Arthur Morgan asked the Taoiseach the number of people currently employed in the agrifood sector; the number of people employed in the agrifood sector in each of the past ten years; the breakdown of the sector into those currently employed in primary agriculture and those employed in the food processing industry; the further breakdown of the sector into those employed in primary agriculture and those employed in the food processing industry in each of the past ten years; and if he will make a statement on the matter. [28183/09]

Arthur Morgan

Question:

102 Deputy Arthur Morgan asked the Taoiseach the number of people who have left employment in agriculture in all counties since 1998 to date in 2009; the breakdown of employment in each sector since 1998; the type of employments most people have moved into; and if he will make a statement on the matter. [28185/09]

Arthur Morgan

Question:

103 Deputy Arthur Morgan asked the Taoiseach the numbers employed in the agrifood sector of the past ten years; the breakdown of the employment in the sector into constituent parts; the major procedures in each sector; and if he will make a statement on the matter. [28186/09]

I propose to take Questions 100, 102 and 103 together.

The actual information requested by the Deputy is not available. Information on the numbers employed in Agriculture (NACE Rev. 1.1) at 2 digit level for the years 1999 to 2009 by NUTS 3 region are contained in the following table. This is the most detailed information available from the CSO Quarterly National Household Survey (QNHS).

Numbers employed in Agriculture classified by region

Region

Q1 1999

Q1 2000

Q1 2001

Q1 2002

Q1 2003

Q1 2004

Q1 2005

Q1 2006

Q1 2007

Q1 2008

Q1 2009

Border

19.1

17.1

16.9

17.1

16.8

17.8

18.8

17.6

16.3

17.1

13.5

Midland

11.3

10.3

9.4

9.9

9.8

9.0

7.4

8.3

9.5

10.0

7.9

West

27.1

27.8

24.0

22.9

20.1

19.9

18.1

19.5

17.2

19.2

17.5

Dublin

3.4

3.6

3.5

2.8

3.3

1.8

1.7

2.5

2.4

2.8

2.2

Mid-East

13.2

11.8

10.3

10.1

9.7

9.8

11.0

12.1

11.3

15.6

12.7

Mid-West

14.9

14.6

13.5

14.1

12.0

13.8

13.5

13.9

11.8

12.7

11.1

South-East

20.9

20.9

22.1

20.8

18.8

20.0

17.6

17.5

20.1

21.1

18.7

South-West

24.2

23.1

18.8

20.3

20.2

20.4

20.3

20.3

20.2

20.6

19.7

State

134.0

129.2

118.5

118.0

110.8

112.4

108.5

111.7

108.6

119.1

103.3

Table is based on the EU NACE Rev 1.1 (Nomenclature generale des activities economique dans les Communautes europeennes) classification.

Source: CSO Quarterly National Household Survey.

Arthur Morgan

Question:

101 Deputy Arthur Morgan asked the Taoiseach the number of people who have left farming in all counties since 1998 to date in 2009; the type of employment most people have moved into; and if he will make a statement on the matter. [28184/09]

A comparison of census figures on the number of persons in employment by sector in 1996 and 2006 gives an indication of net changes in employment by sector. However, this comparison between points in time does not allow any conclusion to be drawn on exits from farming and entries to other sectors of employment in the intervening period, as such an analysis would require a micro-level longitudinal study.

The following table shows the number of persons at work in 1996 and 2006, distinguishing the Agriculture, Industry and Services sectors, for all counties.

Persons at work in Agriculture, Industry and Services, by county — 1996 and 2006

County

Years

Broad Industry Groups

Other Industries or

Total

Agriculture

Industry

Services

Industry Not Stated

Carlow

1996

13,608

2,038

4,436

7,084

50

2006

22,075

1,413

6,435

12,209

2,018

1996 to 2006 change

8,467

-625

1,999

5,125

1,968

Dublin City

1996

184,097

709

39,339

135,829

8,220

2006

245,007

640

36,051

181,890

26,426

1996 to 2006 change

60,910

-69

-3,288

46,061

18,206

Dún Laoghaire-Rathdown

1996

76,271

332

13,131

61,407

1,401

2006

87,815

427

11,782

70,673

4,933

1996 to 2006 change

11,544

95

-1,349

9,266

3,532

Fingal

1996

65,807

1,384

14,074

49,019

1,330

2006

120,794

1,437

22,483

87,899

8,975

1996 to 2006 change

54,987

53

8,409

38,880

7,645

South Dublin

1996

82,978

367

22,869

58,219

1,523

2006

119,280

483

24,641

83,567

10,589

1996 to 2006 change

36,302

116

1,772

25,348

9,066

Kildare

1996

51,299

3,633

15,052

32,087

527

2006

91,581

3,048

24,506

57,822

6,205

1996 to 2006 change

40,282

-585

9,454

25,735

5,678

Kilkenny

1996

26,789

4,681

7,294

14,175

639

2006

39,809

3,247

10,496

23,877

2,189

1996 to 2006 change

13,020

-1,434

3,202

9,702

1,550

Laoighis

1996

18,120

3,527

4,783

9,613

197

2006

30,219

2,293

8,170

17,647

2,109

1996 to 2006 change

12,099

-1,234

3,387

8,034

1912

Longford

1996

10,154

2,187

2,939

4,895

133

2006

14,527

1,176

4,461

7,681

1,209

1996 to 2006 change

4,373

-1,011

1,522

2,786

1,076

Louth

1996

31,461

1,906

11,665

17,508

382

2006

48,129

1,331

12,983

30,912

2,903

1996 to 2006 change

16,668

-575

1,318

13,404

2,521

Meath

1996

40,475

5,146

12,768

21,920

641

2006

78,437

3,674

22,407

47,910

4,446

1996 to 2006 change

37,962

-1,472

9,639

25,990

3,805

Offaly

1996

20,006

3,259

7,489

9,094

164

2006

31,231

2,152

10,418

16,460

2,201

1996 to 2006 change

11,225

-1,107

2,929

7,366

2,037

Westmeath

1996

22,328

2,856

6,570

12,510

392

2006

35,469

1,824

9,755

21,200

2,690

1996 to 2006 change

13,141

-1,032

3,185

8,690

2,298

Wexford

1996

35,321

6,250

10,007

18,640

424

2006

56,011

4,216

16,700

32,934

2,161

1996 to 2006 change

20,690

-2,034

6,693

14,294

1,737

Wicklow

1996

36,423

3,097

9,673

22,964

689

2006

57,326

2,294

13,840

37,443

3,749

1996 to 2006 change

20,903

-803

4,167

14,479

3,060

Clare

1996

34,572

5,571

10,672

17,699

630

2006

50,607

3,213

14,332

29,308

3,754

1996 to 2006 change

16,035

-2,358

3,660

11,609

3,124

Cork City

1996

41,169

291

11,518

28,274

1,086

2006

48,892

199

11,641

32,841

4,211

1996 to 2006 change

7,723

-92

123

4,567

3,125

Cork County

1996

107,219

17,239

31,221

57,206

1,553

2006

167,092

12,042

48,749

97,245

9,056

1996 to 2006 change

59,873

-5,197

17,528

40,039

7,503

Kerry

1996

42,909

8,052

10,077

23,492

1,288

2006

60,810

5,040

15,524

35,696

4,550

1996 to 2006 change

17,901

-3,012

5,447

12,204

3,262

Limerick City

1996

17,168

79

5,706

11,095

288

2006

20,911

58

5,856

13,980

1,017

1996 to 2006 change

3,743

-21

150

2,885

729

Limerick County

1996

41,454

6,508

13,065

21,291

590

2006

59,614

4,103

18,641

33,829

3,041

1996 to 2006 change

18,160

-2,405

5,576

12,538

2,451

North Tipperary

1996

20,769

4,097

5,899

10,547

226

2006

29,355

2,822

8,302

16,678

1,553

1996 to 2006 change

8,586

-1,275

2,403

6,131

1327

South Tipperary

1996

25,886

5,043

7,935

12,410

498

2006

35,828

3,962

10,809

19,307

1,750

1996 to 2006 change

9,942

-1,081

2,874

6,897

1,252

Waterford City

1996

14,718

131

5,815

8,564

208

2006

19,389

135

5,821

11,579

1,854

1996 to 2006 change

4,671

4

6

3,015

1,646

Waterford County

1996

18,296

3,542

5,875

8,588

291

2006

26,869

2,589

8,454

14,813

1,013

1996 to 2006 change

8,573

-953

2,579

6,225

722

Galway City

1996

21,563

263

4,959

15,827

514

2006

33,878

219

8,094

23,231

2,334

1996 to 2006 change

12,315

-44

3,135

7,404

1820

Galway County

1996

45,934

10,124

12,217

22,590

1,003

2006

70,617

5,749

21,439

39,276

4,153

1996 to 2006 change

24,683

-4,375

9,222

16,686

3,150

Leitrim

1996

8,518

1,993

2,342

4,017

166

2006

12,669

1,173

3,552

7,442

502

1996 to 2006 change

4,151

-820

1,210

3,425

336

Mayo

1996

36,583

7,963

9,883

18,207

530

2006

52,277

4,754

15,109

29,773

2,641

1996 to 2006 change

15,694

-3,209

5,226

11,566

2,111

Roscommon

1996

18,559

4,529

4,799

8,916

315

2006

25,829

2,606

7,284

14,956

983

1996 to 2006 change

7,270

-1,923

2,485

6,040

668

Sligo

1996

20,204

2,934

5,339

11,647

284

2006

27,328

1,795

7,026

17,281

1,226

1996 to 2006 change

7,124

-1,139

1,687

5,634

942

Cavan

1996

18,593

4,760

5,287

8,350

196

2006

28,319

2,740

8,795

14,584

2,200

1996 to 2006 change

9,726

-2,020

3,508

6,234

2,004

Donegal

1996

39,811

5,427

13,782

20,085

517

2006

56,670

3,796

14,948

35,304

2,622

1996 to 2006 change

16,859

-1,631

1,166

15,219

2,105

Monaghan

1996

18,174

4,051

5,586

8,383

154

2006

25,378

2,627

7,903

13,201

1,647

1996 to 2006 change

7,204

-1,424

2,317

4,818

1,493

State

1996

1,307,236

133,969

354,066

792,152

27,049

2006

1,930,042

89,277

477,407

1,230,448

132,910

1996 to 2006 change

622,806

-44,692

123,341

438,296

105,861

*Includes Forestry and Fishing.

Questions Nos. 102 and 103 answered with Question No. 100.

Departmental Expenditure.

Denis Naughten

Question:

104 Deputy Denis Naughten asked the Taoiseach the cost of public advertising funded by his Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of his Department; and if he will make a statement on the matter. [28425/09]

The following tables detail the expenditure by my Department and the Bodies under the aegis of my Department on public advertising from 1 January to the end of June 2009.

Departmental spend January-June 2009

Statutory Advertising

Non-Statutory Advertising

Dept. of the Taoiseach

€1,765.00

€9,076.05

Spend by Bodies under the Aegis of the Department

Body

Statutory Advertising

Non-Statutory Advertising

National Economic and Social Development Office

Nil

€8,296.92

National Forum on Europe

Nil

€1,768.74

Leo Varadkar

Question:

105 Deputy Leo Varadkar asked the Taoiseach the amount spent by his Department on legal fees directly to lawyers or through the States solicitor’s office for each of the years 2006, 2007 and 2008; and if he will make a statement on the matter. [28473/09]

The following table details the total expenditure by my Department on legal fees for the years 2006, 2007 and 2008:

Year

Amount

2006

60,846

2007

12,197

2008

159,677*

*159,377 of this expenditure relates to costs from the Independent Commission of Inquiry.

It should be noted that payments in respect of the Moriarty Tribunal are not included.

Economic Competitiveness.

Bernard J. Durkan

Question:

106 Deputy Bernard J. Durkan asked the Tánaiste and Minister for Enterprise, Trade and Employment the degree to which she has carried out an assessment of costs in the private sector in respect of both manufacturing and service; the degree to which such costs have fluctuated in the past 12 months; and if she will make a statement on the matter. [28218/09]

The National Competitiveness Council (NCC) regularly produces reports assessing the quality of Ireland's business environment including our relative cost competitiveness.

The recently launched NCC Report ‘ Getting Fit Again; The Short Term Priorities to Restore Competitiveness’ (June 2009) reported that Ireland’s current price competitiveness has improved. The recession and the strength of the euro (as imports become cheaper) is resulting in a fall in price levels in Ireland. Inflation fell significantly across most goods and services groups in 2009. Housing and utilities experienced the most dramatic fall from increases of 6.9% p.a. in 2005-2008 to -4.5% in 2009 Q1. We are also witnessing significant falls in house prices and a weakening in wage growth.

The NCC recommend that in the medium term, policies need to facilitate the convergence of Irish costs, charges, professional fees, rents and incomes/ wages towards the levels of our trading partners.

Under the Framework for Economic Renewal we are taking a number of measures across Government to improve our competitiveness. Improving our cost competitiveness is a priority and we are already seeing results as noted by the NCC. We will continue to exert further pressure on costs, including reviewing those recommendations of the Competition Authority which have most effect on competitiveness, particularly in the non-traded sectors. We are working to ease costs to enterprise in administered sectors of the economy under state control such as local authority charges. We are also easing the administrative burden that regulations can create.

With regard to energy costs for businesses, in recent months, the trend of energy prices has been downward with a 10% drop in electricity prices for residents and small and medium enterprises from 1 May, while gas prices have reduced by an average of 12%. These reductions will result in a further easing of cost pressures for businesses.

Workforce Statistics.

Arthur Morgan

Question:

107 Deputy Arthur Morgan asked the Tánaiste and Minister for Enterprise, Trade and Employment the educational profile of the workforce in each county for 2009; the educational profile of the workforce in each county for each of the past ten years; and if she will make a statement on the matter. [28332/09]

The educational profile of the labour force is measured by the Quarterly National Household Survey or QNHS and published by the Central Statistics Office. The most recent data on educational levels of the labour force for the last seven years (on a year on year quarterly basis) is set out in the table. This data is not available by county level and backdated data for this series, in its current format, is available to 2003 only. Prior to 2003 data was collected using different criteria and is, therefore, not directly comparable.

Highest education level attained

2009

2008

2007

2006

2005

2004

2003

Primary or below

155.1

178.2

189.4

196.0

204.2

207.4

209.0

Lower secondary

301.0

330.3

327.2

335.8

337.0

330.3

324.8

Higher secondary

591.7

612.8

594.0

574.5

546.0

524.2

491.9

Post leaving certificate

223.6

229.0

235.8

228.5

218.4

208.2

227.5

Third level non degree

268.9

250.7

239.9

231.6

222.3

215.3

197.4

Third level degree or above

528.5

505.8

473.0

432.2

379.9

367.1

348.2

Other

74.9

80.2

84.7

65.4

56.9

33.6

34.0

Total persons aged 15 to 64

2,143.7

2,187.0

2,144.0

2,063.9

1,964.8

1,886.0

1,832.8

Source: CSO, Quarterly National Household Survey, Q1 2009 (January-March 2009).

The educational profile of the labour force has increased significantly since 2003. Over 528,000 people now have a third level degree or above in Quarter 1 2009, an increase of 180,300 since 2003. The Government is committed to developing our economy into one of the world's leading knowledge based economies. That is why last December, in response to the much more challenging economic environment, the Government introduced a Framework for Sustainable Economic Renewal, called "Building Ireland's Smart Economy" which provides us with the necessary roadmap to guide our development over this turbulent period. Ireland continues to possess a pro-business environment, which is characterised by a highly skilled, educated and flexible labour force. The Government actively promotes Ireland as having a highly educated workforce to attract foreign direct investment.

Employment Support Services.

Enda Kenny

Question:

108 Deputy Enda Kenny asked the Tánaiste and Minister for Enterprise, Trade and Employment further to Parliamentary Questions Nos. 1 and 2 of 30 June 2009, in regard to the conditions of the temporary employment subsidy scheme, if a firm is currently manufacturing; if it is a condition that it also be exporting; the conditions of assessment that determine viability in the medium term in the context of this scheme; the nature and extent of restructuring that has to take place for eligibility; and if she will make a statement on the matter. [28357/09]

The Government is proposing to introduce a Temporary Employment Subsidy Scheme. The purpose of this scheme will be to help the economy to retain its productive capacity and help employers to retain the labour, knowledge and skills of the workforce, thereby supporting a faster return to sustainable growth; help employees to retain their jobs, and ensure that economic and fiscal stability is promoted by avoiding the costs of unemployment including statutory redundancy payments and the longer-term cost of social welfare.

It is proposed that the Temporary Employment Subsidy Scheme will apply to companies in the manufacturing or internationally traded service sectors that are currently engaged in exporting. In addition in order to qualify for support it is intended that a company must not have been in difficulty on 1 July 2008, and a financial assessment must establish that it is now facing such difficulties as a result of the global and financial economic crisis that redundancies are likely to have to be considered within 12 months. It is also intended that a company must also be judged to be viable and capable of growth in the medium term in order to receive support under the scheme. Enterprise Ireland will be administering the scheme and they will determine whether a company meets the eligibility criteria of the scheme.

It is intended that a National Steering Committee will be established to oversee the implementation of the scheme and it would consist of representatives of the relevant Government Departments and the Social Partners. The Government will continue discussions with the social partners with a view to implementing the Temporary Employment Subsidy Scheme over the coming period. It is intended to have the scheme in operation with the first tranche of payments being made to companies after the summer.

Community Employment Schemes.

Aengus Ó Snodaigh

Question:

109 Deputy Aengus Ó Snodaigh asked the Tánaiste and Minister for Enterprise, Trade and Employment if his attention has been drawn to the fact that it is proposed to cut community employment schemes programme funding by 40%; and if she will make a statement on the matter. [28617/09]

Community Employment (CE) is an active labour market programme designed to provide eligible long term unemployed people and other disadvantaged persons with an opportunity to engage in useful work within their communities on a fixed term basis. CE helps unemployed people to re-enter the active workforce by breaking their experience of unemployment through a return to work routine and to assist them to enhance/develop both their technical and personal skills.

The aim of CE still remains as an active labour market programme with the emphasis on progression into employment. The programme is managed within this context, with consideration to the availability of resources and the needs of participants and the community.

The overall budget for community employment in 2009 has been increased by €6.4 million from that allocated in 2008. In addition, there has been an increase of 400 places in the allocated places available on the Community Employment Programme.

Visitor Centres.

Brendan Kenneally

Question:

110 Deputy Brendan Kenneally asked the Tánaiste and Minister for Enterprise, Trade and Employment the status at a centre (details supplied) in County Waterford; and the efforts being made to secure jobs at the facility. [28141/09]

My Department and the agencies under the aegis of my Department do not operate any schemes for providing assistance to visitor centres. However, I understand from the Minister for Arts, Sport and Tourism that Fáilte Ireland has provided marketing assistance to the centre in question but has not received a request for financial assistance from the operators of the centre.

Employment Support Services.

Brendan Kenneally

Question:

111 Deputy Brendan Kenneally asked the Tánaiste and Minister for Enterprise, Trade and Employment the status of efforts to secure replacement manufacturing jobs at a plant (details supplied) in County Waterford. [28142/09]

A private equity firm in the United States has agreed to take over the assets of the company in question and retain a number of jobs in Waterford. The sale of the company in Waterford to the US company was completed on 26 March 2009. Under a transitional service agreement due to expire in September 2009, the company continues to operate as a going concern and employs approximately 200 people in Waterford both on back office duties and in the Visitors Centre. However, all crystal production has ceased pending a decision on the future of the plant by its new owner. In the meantime, Waterford City Council has established a Waterford Crystal Forum to deal with the situation following the manufacturing job losses. The Enterprise Development agencies under the aegis of my Department are actively involved with the Forum.

Brendan Kenneally

Question:

112 Deputy Brendan Kenneally asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of companies brought to County Waterford by the Industrial Development Authority per year over the past ten years and the number of jobs provided by each company; and if she will make a statement on the matter. [28143/09]

In the past 10 years (1999 to 2008) a total of 15 IDA supported companies set up in Waterford.

The Forfás Annual Employment Survey reports on job gains and losses in companies that are supported by the industrial development agencies. Data is compiled on an annualised basis and is aggregated at county level. The information is provided by companies on a confidential basis for statistical purposes only. It is therefore not possible to provide information at company level or for individual locations throughout the country.

The following tabular statement shows the number of new jobs created in IDA assisted companies in the same period. While IDA Ireland seeks to influence the selection of location, the final decision on location is taken in all cases by the promoting company.

Table showing the number of new jobs created in IDA assisted companies in the period 1999 to 2008.

Year

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

Jobs Created

279

350

545

575

561

253

351

711

370

176

FÁS Training Programmes.

Brendan Kenneally

Question:

113 Deputy Brendan Kenneally asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of people in County Waterford to whom FÁS is providing training or other services. [28144/09]

Brendan Kenneally

Question:

114 Deputy Brendan Kenneally asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of people in Waterford who have received training or other services from FÁS to date in 2009 and separately in every other year over the past five years. [28145/09]

I propose to take Questions Nos. 113 and 114 together.

It is not readily possible to provide a breakdown of numbers between Waterford City and County. The following table below shows the number of people in County Waterford, including Waterford City, who have received training or another service from FÁS over each of the past five years, and also in 2009 year-to-date.

Year

Yearly Total

2009 year-to-date

3,718

2008

5,349

2007

3,744

2006

4,207

2005

3,942

2004

3,481

Brendan Kenneally

Question:

115 Deputy Brendan Kenneally asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of people currently listed as professional apprentices; and the regional breakdown of these figures by county. [28147/09]

There are currently 23,656 apprentices registered with FÁS. Of these 18,278 are currently employed and there is a cumulative total of 5,378 redundant apprentices in the period 1 January 2007 to 7 July 2009.

The further information requested by the Deputy is contained in the following tabular statement.

Apprentices

County

Redundant

Currently with Employers

Armagh

6

24

Carlow

60

263

Cavan

49

316

Clare

89

480

Cork City

295

923

Cork County

358

1,291

Donegal

146

286

Dublin

1,740

4,729

Galway City

65

194

Galway County

217

709

Kerry

113

619

Kildare

246

754

Kilkenny

126

442

Laois

83

224

Leitrim

36

127

Limerick City

76

328

Limerick County

137

603

Longford

47

94

Louth

116

374

Mayo

161

478

Meath

229

871

Monaghan

41

338

Offaly

72

333

Roscommon

64

188

Sligo

81

253

Tipperary (North Riding)

61

267

Tipperary (South Riding)

78

664

Waterford City

59

401

Waterford County

100

407

Westmeath

73

288

Wexford

200

683

Wicklow

154

327

TOTAL

5,378

18,278

Brendan Kenneally

Question:

116 Deputy Brendan Kenneally asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of professional apprentices who have completed their apprenticeships every year for the past five years; the number who are expected to complete their apprenticeships in 2009; and the breakdown on these figures by county. [28148/09]

The information requested by the Deputy is contained in the following tabular statement.

Apprentices Certified by year

County

2004

2005

2006

2007

2008

Projection 2009

Armagh

7

Carlow

98

68

94

88

66

39

Cavan

87

76

65

83

88

48

Clare

171

120

115

117

144

99

Cork

800

692

583

703

687

382

Donegal

104

93

83

104

97

49

Dublin

1,281

1,285

1,144

1,073

1,093

859

Fermanagh

2

Galway

328

318

295

309

300

169

Kerry

167

156

152

181

213

107

Kildare

208

194

230

204

223

102

Kilkenny

140

122

121

119

118

66

Laois

161

97

76

73

94

37

Leitrim

27

26

34

40

48

19

Limerick

308

239

266

282

264

167

Longford

43

38

48

35

43

12

Louth

111

103

93

104

101

77

Mayo

165

117

129

143

161

80

Meath

211

193

167

172

202

194

Monaghan

69

70

84

72

76

70

Offaly

133

48

80

87

74

59

Roscommon

69

60

57

58

73

37

Sligo

70

71

87

74

81

45

Tipperary

167

169

191

204

223

167

Tyrone

1

Waterford

243

221

214

206

196

136

Westmeath

76

73

76

94

87

44

Wexford

157

178

163

170

186

107

Wicklow

125

120

111

122

119

32

Total

5,519

4,948

4,760

4,917

5,057

3,210

Brendan Kenneally

Question:

117 Deputy Brendan Kenneally asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of people who have had their professional apprenticeships halted after being let go during the past 12 months. [28149/09]

The number of apprentices who have been notified to FÁS as redundant for the period 1 July, 2008, to 30 June, 2009, is 3,827.

FÁS has put in place a number of measures to assist apprentices who have been made redundant in progressing their apprenticeship. Over 4,000 places will be provided under the various measures outlined below.

The Department of Social and Family Affairs immediately refers redundant apprentices to FÁS for assistance.

Following this immediate referral, the FÁS Employment Services and FÁS Services to Business divisions work in collaboration to provide guidance and support in sourcing a new employer and in considering further options. Referred apprentices are provided with guidance in relation to preparation for a re-sit of their outstanding off-the-job modular assessments.

FÁS has amended the scheduling rules for off-the-job training to permit redundant apprentices to progress to their next off-the-job training, at phase 2, phase 4 and phase 6, in accordance with the existing scheduling criteria. The number of apprentices who have been scheduled to off-the-job training at phase 2, phase 4 and phase 6 in 2008 was 619. The number of redundant apprentices provided with off-the-job training in the year to the end of June 2009 is 1507, and it is expected that up to a further 900 will be provided with off-the-job training phases before the end-year.

FÁS introduced an Employer Based Redundant Apprentice Rotation Scheme to provide support for employers to provide on-the-job training for up to 500 redundant apprentices during 2009. This scheme assists them in taking on redundant apprentices when they have released their own apprentices to a scheduled phase 4 and phase 6 off-the-job training phase in the Institutes of Technology. There are currently 197 apprentices participating on the scheme and 49 apprentices have completed their period of rotation and their performance has been assessed. Employers will be requested during the June and September 2009 rotation periods to provide redundant apprentices with on-the-job training with assessments.

Léargas has provided funding under the EU's Leonardo da Vinci programme to support the placement of 37 redundant apprentices with overseas employers to complete their phase 7 on-the-job training with assessments. Recently 19 redundant apprentices returned from Germany having completed a phase 7 placement with employers, and 12 apprentices are due to travel on 5 August 2009 for a placement in Germany. Léargas has recently provided additional funding to support the placement of an additional 60 apprentices with overseas employers.

ESB Networks have agreed a programme with FÁS to provide on-the-job training to eligible redundant electrical apprentices at phase 5 and phase 7. This programme will provide up to 400 places over a period of 18 months and will be funded by ESB Networks. There are currently 100 previously redundant electrical apprentices in employment with ESB Networks, 25 redundant electrical apprentices have completed their off-the-job training with assessments and a further 75 redundant electrical apprentices will be provided with an opportunity to complete their on-the-job training before the end of December 2009.

Redundant apprentices may also avail of existing specific skills training courses, which are trade related to enhance their employable skills. Redundant apprentices may also avail of the range of trade related night courses, which are available in FÁS Training Centres.

The Institutes of Technology are providing 700 places per annum on an 11-week certified training programme for those redundant apprentices who have completed their phase 4 training but where an on or off-the-job training opportunity is not currently available for them. The programme is divided into Construction and Engineering streams and provides redundant apprentices with education and training support in a number of relevant trade's areas. The programme is expected to commence in September 2009.

FÁS will be providing redundant apprentices in the autumn with an opportunity to undertake phase 7 assessments where an on-the-job assessment opportunity is not currently available.

FÁS will also be providing in the autumn a facility for redundant apprentices who have reached the minimum qualifying standard in all phases 1-7 inclusive and who have not completed the minimum duration in employment as an apprentice to make an application for consideration under Recognition of Prior Learning for the Award of an Advanced Craft Certificate.

Community Employment Schemes.

Brendan Kenneally

Question:

118 Deputy Brendan Kenneally asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of people in County Waterford currently under the community employment scheme; and the number who have been employed in these schemes every year for the past five years. [28173/09]

I am advised by FÁS that there are currently 680 participants in community employment schemes in County Waterford.

Details of the number of people employed on Community Employment projects in County Waterford in each the years 2003-2008 are as follows:

2003 — 681;

2004 — 772;

2005 — 760;

2006 — 650;

2008 — 659.

State Agencies.

Arthur Morgan

Question:

119 Deputy Arthur Morgan asked the Tánaiste and Minister for Enterprise, Trade and Employment the budget for Enterprise Ireland in each of the past five years; the amount of that budget spent on administration; the amount used for training and upskilling; the amount used on consultancy; the amount spent on contributions to enterprises which are specifically increasing the workforce; and if she will make a statement on the matter. [28175/09]

It has not been possible in the time available to complete the detailed information sought for each of the past five years. I have arranged for my Department to prepare the data in the form requested and I will forward it to the Deputy as soon as possible.

County Enterprise Boards.

Arthur Morgan

Question:

120 Deputy Arthur Morgan asked the Tánaiste and Minister for Enterprise, Trade and Employment the budget for county enterprise boards in each of the past five years; the amount of that budget spent on administration; the amount used for training and upskilling; the amount used on consultancy; the amount spent on contributions to enterprises which are specifically increasing the workforce; and if she will make a statement on the matter. [28176/09]

The County Enterprise Boards (CEBs) provide support for micro-enterprises (ten or less employees) in the start-up and expansion phases, promote and develop indigenous micro-enterprise potential and stimulate economic activity and entrepreneurship at local level. The CEBs deliver a series of Programmes to underpin this role. The costs associated with the operations of the CEBs are incurred in the delivery of a wide range of both financial and non-financial supports to the micro-enterprise sector across the Country.

The forms of financial assistance which are available, subject to certain eligibility criteria, include Capital Grants, Employment Grants and Feasibility Study Grants. The non-financial assistance can take the form of a wide range of Programmes such as Start Your Own Business Programmes, Management Capability Training and Development Programmes, Mentoring, E-commerce, Enterprise Education, and Women in Business networks. The primary objective of many of these Programmes is to upskill owner/managers to enable them to both sustain and grow their businesses. These activities are considerably more labour intensive than processing grant applications and a significant portion of CEB staff time is taken up with the delivery of such activities. In addition, CEB staff would be engaged on a daily basis in the provision of an informal information and advisory service to local entrepreneurs and aspiring entrepreneurs. The availability of both financial and non-financial support from the CEB Network contributes positively to greater levels of entrepreneurial activity and enterprise creation, which in turn leads to employment creation in a broader context. Expenditure details are outlined in the following table:

Year

Total CEB Budget

Administration Costs*

Expenditure on Financial Supports**

Expenditure on Training & Upskilling Measures

€000

€000

€000

€000

2004

28,571

11,580

10,550 (2,218 on employment grants

6,484

2005

33,330

12,189

10,809 (2,068 on employment grants)

7,411

2006

36,363

12,779

10,622 (1,885 on employment grants)

9,212

2007

33,900

13,492

12,372 (2,367 on employment grants)

11,272

2008

33,291

13,713

11,648 (2,173 on employment grants)

9,895

*The total estimated expenditure on consultancy over the past five years is €671,757 across the CEB Network. This includes costs relating to IT, Audit Fees, Accountancy and costs associated with the preparation of Strategic Plans etc.

**Please note that in addition to the annual allocation that a CEB receive the CEBs also use repaid grants at their disposal to disperse further grant aid to eligible micro-enterprises. In addition please note that employment grants are paid to a business in two moieties, which may cross over two years.

State Agencies.

Arthur Morgan

Question:

121 Deputy Arthur Morgan asked the Tánaiste and Minister for Enterprise, Trade and Employment the amount of grant aid awarded by Enterprise Ireland to enterprises for research and development purposes in each of the past five years; and if she will make a statement on the matter. [28177/09]

From 2004-2008, €130,861,000 has been grant aided by Enterprise Ireland under the initiatives below in order to help companies engage in R&D.

Total yearly breakdown:

2004: €17,596,000

2005: €19,802,000

2006: €21,698,000

2007: €30,356,000

2008: €41,409,000

Enterprise Ireland operates three primary mechanisms aimed at helping companies to engage in R&D both within the company and in collaboration with third level institutions, namely: the research and development fund, through which funding goes directly to companies and the Innovation Voucher and Innovation Partnership initiatives, through which funding goes to third level Institutions to undertake work on a firm's behalf.

The Enterprise Ireland research and development fund is designed to provide support for research, development and technological innovation relevant at all stages of company development, and which will enable companies to progress from undertaking an initial research project to higher level innovation and R&D activities. The Fund is allied with a strong awareness campaign which seeks to promote the benefits of R&D. From 2004-2008 €103,937,000 has been grant aided directly to enterprise through this initiative and its predecessor (The Research, Technology and Innovation, or RTI, Fund) in order to help them to undertake specific R&D projects and to increase their R&D capabilities.

R&D (RTI) Fund yearly breakdown:

2004: € 15,704,000

2005: € 16,882,000

2006: € 17,180,000

2007: € 21,898,000

2008: € 32,273,000

EI's Innovation Voucher Initiative, launched in 2007, provides vouchers worth €5,000 to small businesses to introduce them to innovation by linking them with a network of 38 knowledge providers, North and South of the Border. A simple application process and facilitation support from Enterprise Ireland can help small companies who have never engaged in R&D to engage high skilled researchers to address key company needs and provide innovative solutions to business problems. To date over 370 projects have been completed, among them the first cross-border projects. In 2007 and 2008 €1,569,000 has been funded to colleges to help them to undertake R&D projects and provide innovative solutions to companies.

Innovation Voucher yearly breakdown:

2007: €168,000

2008: €1,401,000

The Innovation Partnership Initiative helps industry firms to access innovative "know how" and R&D solutions in the Third level system. By providing key funding Enterprise Ireland can help to reduce both the cost and the risk associated with larger collaborative research projects. The programme enables companies to engage in collaborative research projects with Irish universities and Institutes of Technology to develop new products and services. From 2004-2008 €25,355,000 has been funded to colleges to undertake Research and Development work with industry partners.

Innovation Partnership yearly breakdown:

2004: €1,892,000

2005: €2,920,000

2006: €4,518,000

2007: €8,290,000

2008: €7,735,000

Research and Development and Innovation (R&D&I) and the application of knowledge are critical drivers for the future success of Irish enterprise. It is therefore imperative that Ireland focuses on promoting the level, quality and commercial applicability of the R&D&I undertaken, ensuring that industry leads the response to rapid changes in customer needs.

Arthur Morgan

Question:

122 Deputy Arthur Morgan asked the Tánaiste and Minister for Enterprise, Trade and Employment the amount of grant aid awarded by the Industrial Development Authority to enterprises for research and development purposes in each of the past five years; and if she will make a statement on the matter. [28178/09]

The amount of grants awarded by the Industrial Development Authority to enterprises for research and development purposes from 2005 to date in 2009 are shown on the following tabular statement. It is important to note that grants paid in a particular year do not necessarily refer to approvals in the same year.

The global business community now sees Ireland as a prime location for Research Development and Innovation (RD&I) functions. Government policies such as the Strategy for Science, Technology and Innovation (SSTI) have played a key role in establishing this competitive advantage for Ireland. In 2008, IDA supported clients announced 56 RD&I projects with a projected investment of circa €420m. IDA Ireland will continue to target high value investments in keeping with the Government's current strategy outlined in the recent framework document "Building Ireland’s Smart Economy”. The amount of grants awarded by the Industrial Development Authority to enterprises for research and development purposes from 2005 to date in 2009

Year

2005

2006

2007

2008

2009

R&D Grants Paid

€8.348m

€26.899m

€40.687m

€45.627m

€16.417m

Arthur Morgan

Question:

123 Deputy Arthur Morgan asked the Tánaiste and Minister for Enterprise, Trade and Employment the amount of grant aid awarded by the county enterprise boards to enterprises for research and development purposes in each of the past five years; and if she will make a statement on the matter. [28179/09]

The County Enterprise Boards (CEBs) were set up in 1993 to provide support for micro-enterprises (ten or less employees) in the start-up and expansion phases, to promote and develop indigenous micro-enterprise potential and to stimulate economic activity and entrepreneurship at local level. The CEBs deliver a series of Programmes to underpin this role and they can provide both financial and non-financial assistance to a project promoter.

The forms of financial assistance, which are available, subject to certain restrictions, include Capital Grants, Employment Grants and Feasibility Study Grants. While CEBs do not award grants under the specific heading of Research and Development, the Feasibility Study Grant may assist with the cost of necessary pre-start up studies carried out for the purpose of assessing market interest in and demand for a proposed new product or service, the appropriateness of the associated funding plans and the general viability and sustainability of the venture.

During the past five years CEBs have provided approximately €3 million for such Feasibility Studies. While the obtaining of a feasibility study grant is not linked to the direct creation of a job in the enterprise or proposed enterprise the availability of these grants can contribute to greater enterprise creation which leads to employment creation in a broader context.

Job Creation.

Arthur Morgan

Question:

124 Deputy Arthur Morgan asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of jobs funded or part-funded by her for research and development in each of the past five years; the breakdown of the jobs created into the relevant sectors; and if she will make a statement on the matter. [28180/09]

The Government is very much aware that supporting enterprise, innovation and research and development is of critical importance to our economy. The way forward is to stay competitive and maintain an edge over our competition by developing new products and processes. In this regard, funding is provided to the Enterprise Development agencies as part of the Government's Estimates process. While I may give general policy guidelines to the agencies from time to time, and indeed, they are very much aware of the vital role that research and development plays, the application of the funding provided is a day to day operational matter for the agencies and I do not have any role in such matters. I can say that support levels would be tied to an assessment of strategic objectives, in conjunction with commercial and technical assessments rather than to job numbers. In any event, information on job numbers would be provided by companies on a confidential basis.

Grant Payments.

Denis Naughten

Question:

125 Deputy Denis Naughten asked the Tánaiste and Minister for Enterprise, Trade and Employment further to Parliamentary Question No. 211 of 21 October 2008, the funds that have been repaid; and if she will make a statement on the matter. [28251/09]

Payment and repayment of grants are day-to-day operational matters for the Industrial Development agencies.

While I do not have any role in the day-to-day operations of the agencies, I understand from Enterprise Ireland that grants are approved on foot of a business proposal ahead of the investment taking place. Grant payments subsequently follow the actual expenditure undertaken consistent with that business plan. Grants are usually paid on an instalment basis, and in most cases the company has a contingent liability to repay the grant for the term of the grant agreement, i.e. the company may be liable to repay the grant if it is in breach of the grant agreement. The term of a grant agreement is usually, and was in this case, five years from the date of payment of the last instalment of the grant.

In this particular case the company received approximately €370,000 in grant aid for the Ballaghadereen site during the past ten years. The grant agreements relating to this amount expired prior to the closure of the Ballaghadereen facility. For this reason there is no outstanding liability in respect of the grants paid.

Forfás Report.

Denis Naughten

Question:

126 Deputy Denis Naughten asked the Tánaiste and Minister for Enterprise, Trade and Employment the steps which have been taken to implement the recommendations in the Forfás report of the overview of the main infrastructure issues for enterprise; and if she will make a statement on the matter. [28252/09]

Forfás compiles a report "Overview of Main Infrastructure Issues for Enterprise". The latest publication of this report was in May 2008.

This report acknowledged that significant progress had been made in addressing Ireland's infrastructure deficits, but also indicated that there were still a number of areas requiring continued investment to ensure the availability of cost competitive world class infrastructure. The main areas in which such action is required are telecoms, energy, waste, water and transport. Policy responsibility for these areas of infrastructure are a matter for my colleagues, the Minister for Communications, Energy and Natural Resources; the Minister for the Environment, Heritage and Local Government; and the Minister for Transport.

Redundancy Payments.

John McGuinness

Question:

127 Deputy John McGuinness asked the Tánaiste and Minister for Enterprise, Trade and Employment if a claim against a company (details supplied) under the redundancy payments acts will be struck out in view of the fact that the company ceased trading some years ago and was not notified of the action; and if she will expedite a positive response given the circumstances of this case. [28277/09]

It is up to the employer in the first instance to pay statutory redundancy entitlement to employees. When an employer does so, he is entitled to claim a rebate of 60% from the Social Insurance Fund. If the employer is unable to pay the statutory amount, then the employee can, ultimately, be paid directly by my Department from the Fund. In such cases, 40% of each statutory redundancy lump sum paid is recoverable from the assets of the employer by the Department for the Fund.

This statutory Redundancy Recoveries function is provided for in sections 42 and 43 of the Redundancy Payments Act, 1967 (as subsequently amended). Section 42 of the Redundancy Payments Acts 1967-2007 confers on the Minister, preferential creditor status in a winding-up situation in recovering amounts paid from the Social Insurance Fund. Thus, a redundancy lump sum (or part thereof) is made a priority debt under section 285 of the Companies Act, 1963, in cases of winding-up, and a priority debt under section 81 of the Bankruptcy Act 1988, in cases of a bankrupt or arranging debtor. Section 43 of the 1967 Act also makes general provision whereby all moneys due to the Fund (whether in a winding-up situation or not) are debts, which can be recovered in any court of competent jurisdiction.

In the present case, my Department paid a statutory redundancy lump sum in favour of a former employee of the company from the Social Insurance Fund and the Department was involved in written communication with the company at the time. The company was also advised of the fact that given that the payment was made directly from the Social Insurance Fund, the Minister, in line with the provisions of the Redundancy Payments Acts referred to, had preferential creditor status.

The Minister has no discretion with regard to the 40% due to the Social Insurance Fund in terms of any legal powers to divert, from the Social Insurance Fund, monies which may be recovered from the assets of the company at some future point and the Minister is not in a position to strike off the outstanding liability to the Social Insurance Fund.

Employment Support Services.

Catherine Byrne

Question:

128 Deputy Catherine Byrne asked the Tánaiste and Minister for Enterprise, Trade and Employment the steps she will take to protect small businesses here which are being hit hard by the economic downturn; her plans for incentives to small businesses who will create employment and bring revenue here; and if she will make a statement on the matter. [28279/09]

The banks' recapitalisation package was about securing the long-term health of the economy and about enabling our banks to get back to the business of lending to viable projects and about saving jobs. The package includes many supports for SMEs, including:

The recapitalised banks have committed to increasing their lending capacity to SMEs by 10% over 2008. This should ensure that sound businesses will receive support from their banks.

A €100 million environmental and clean energy innovation fund is also being established by each bank as well as a further €15m each to new or existing seed capital funds. Much of this funding will flow to small and medium enterprises

SMEs are also covered by the Code of Conduct on Business Lending to SMEs. This code which was published by the Financial Regulator came into effect from 13 March 2009. The application of the code will promote fairness and transparency in the treatment of SMEs by the banks and should facilitate access to credit for sustainable and productive business propositions.

Allied Irish Bank, Bank of Ireland and Ulster Bank will also provide funding for SMEs on foot of €300m facilities provided by the European Investment Bank to assist developing SMEs.

The recapitalised banks agreed to pay for and co-operate with the carrying out of an Independent Review of Bank Lending to SMEs. Additional banks have now participated in this Review with the result that the 5 major lending banks are now included. The purpose of the review is to ascertain the position on credit availability to SMEs here and to recommend appropriate action to improve credit availability. The independent review has now been submitted to the Minister for Finance, and will be published shortly. I welcome the completion of this review as it should allow all stakeholders have an objective view of the state of lending from the banks to SMEs and provide some clarity on the level of credit being declined.

Arising from the Recapitalisation Package, the Minister for Finance, and the Tánaiste also established a Credit Supply Clearing Group with bank, business (including ISME and SFA) and State representation. This group is responsible for identifying patterns of events where the flow of credit to viable businesses appears to be blocked and for seeking to identify credit supply solutions relating to these patterns. The group is however, not an appeals mechanism for cases where credit has been refused by the banks. Individual business decisions remain the responsibility of the banks. The Credit Supply Clearing Group is being chaired by the Department of Enterprise, Trade and Employment and will work to provide a clear picture of any emerging lending patterns while facilitating direct discussion by all the relevant interests in addressing problems.

To assist and complement the work of the Credit Supply Clearing Group, I have held seven regional meetings beginning in Cork on Monday 29 June to discuss with representatives of business, banks and the State sector, their experience of gaining access to bank credit at local and regional level. To date, meetings have been held in Cork, Waterford, Dublin, Bundoran, Shannon, Galway and Athlone. The last meeting will be held in Dundalk on Monday next 13 July. In the course of these meetings, I met with local representatives of the major banks, business representatives from local Chambers of Commerce, ISME, SFA, IFA and the Irish Hotels Federation. Local representatives from the various State Agencies such as Enterprise Ireland, City and County Enterprise Boards and Fáilte Ireland, also attended. The outcome of theses meetings should facilitate a greater understanding of the issue at both regional and national levels.

Outside of the banking sphere, the Department's continuous support for enterprises arises through maintaining a positive business environment and through particular interventions from the State development agencies such as Enterprise Ireland, FÁS and the County and City Enterprise Boards. The significant allocations in my Department's Estimates for 2009 for the development agencies ensures that we can continue to build on this strategy for the future.

The Government has also introduced formal arrangements to reduce the payment period by central Government Departments to their business suppliers from 30 to 15 calendar days. This commitment has effect on all valid invoices received on and from 15 June 2009 and should help ease cash flow difficulties for SMEs.

In addition to the above package of measures to assist the SME sector, the Government is proposing to introduce a Temporary Employment Subsidy Scheme. The purpose of this scheme will be to help the economy to retain its productive capacity and help employers to retain the labour, knowledge and skills of the workforce, thereby supporting a faster return to sustainable growth; help employees to retain their jobs, and ensure that economic and fiscal stability is promoted by avoiding the costs of unemployment including statutory redundancy payments and the longer-term cost of social welfare.

It is proposed that the Temporary Employment Subsidy Scheme will apply to companies in the manufacturing or internationally traded service sectors that are currently engaged in exporting. In addition, in order to qualify for support it is intended that a company must not have been in difficulty on 1 July 2008, and a financial assessment must establish that it is now facing such difficulties as a result of the global and financial economic crisis that redundancies are likely to have to be considered within 12 months. It is also intended that a company must also be judged to be viable and capable of growth in the medium term in order to receive support under the Scheme. Enterprise Ireland will be administering the Scheme and they will determine whether a company meets the eligibility criteria of the scheme.

It is intended that a National Steering Committee will be established to oversee the implementation of the Scheme and it would consist of representatives of the relevant Government Departments and the Social Partners. The Government will continue discussions with the Social Partners with a view to implementing the Temporary Employment Subsidy Scheme over the coming period. It is intended to have the scheme in operation with the first tranche of payments being made to companies after the summer.

Employment Rights.

John McGuinness

Question:

129 Deputy John McGuinness asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of inspectors employed by the National Employment Rights Authority; if this number is to be increased over the coming months in 2009; if all of the inspectors are on contract or employed under the usual terms and conditions of the Civil Service; if the inspectors are entitled to subsistence and other expenses; the cost to date in 2009 of all of those employed in this category; the number of premises visited in each region here; the number of cases prosecuted through the courts; the number of prosecutions or cases pending; the type of breaches being discovered; and if she will make a statement on the matter. [28283/09]

The National Employment Rights Authority (NERA) currently has in place a team of 77 Inspectors. They are all employed under the standard terms and conditions governing civil servants in general. Inspectors are entitled to receive travel and subsistence in respect of expenses necessarily incurred in the performance of their official duties.

There are no proposals at present to increase the number of Inspectors. The Minister for Finance has recently introduced a moratorium on the filling of vacancies in the public service until the end of 2010, which will impact on NERA in common with all other public bodies.

The total costs, comprising pay and travel and subsistence costs, in relation to activities and operations of NERA's Inspection Services are set out in Table 1. It has not been possible, in the time available, to apportion other non-pay costs between the different services within NERA.

Data in relation to inspection activity is currently maintained on a case basis and information in relation to the number of unique employers visited is not readily available. The data provided in Table 2 below represents an indicative estimate by NERA of the number of employers visited. The inspection process includes calls, visits and inspections in respect of each case. In 2008 a total of 27,900 were carried out. The figure to date in 2009 is 10,445. NERA Inspectors have an enforcement role under aspects of the following legislation:

Industrial Relations Acts 1946-2004 — (1) Employment Regulation Orders (Joint Labour Committee system) and (2) Registered Employment Agreement system;

The National Minimum Wage Act 2000;

Protection of Young Persons (Employment) Act 1996;

Organisation of Working Time Act 1997;

Payment of Wages Act 1991 — statement of wages aspect only;

Carer's Leave Act 2001;

Employment Agency Act 1971;

Protection of Employment Act 1977;

Protection of Employees (Employers' Insolvency) Acts 1984 to 2003;

Parental Leave Act 1998 (Department of Justice, Equality and Law Reform);

Employees (Provision of Information and Consultation) Act 2006.

NERA will shortly be commencing inspections under the Employment Permits Acts 2003 and 2006. In the course of 2008, prosecution proceedings were initiated by NERA in 70 cases. Proceedings were concluded in 88 cases, which included cases initiated in 2007. Convictions were obtained in 41 cases while in the balance of 47 cases the breaches were rectified before the Court hearing or the cases were withdrawn or struck out.

In the course of 2009 to date prosecution proceedings have been initiated by NERA in 29 cases. Proceedings were concluded in 59 cases. Convictions were obtained in 13 cases while in the balance of 46 cases the breaches were rectified before the Court hearing or the cases were withdrawn or struck out.

NERA inspections indicate a very broad variance in the level of compliance with employment legislation. The level of compliance ranges from over 90% in Protection of Young Persons and National Minimum Wage to 55% in respect of Organisation of Working Time Act and is as low as 15% in relation to compliance with some Employment Regulation Orders. It would appear the higher the level of awareness the higher the compliance level. This supports the view that most employers want to comply with employment law. Some of the more serious illegal practices NERA has uncovered include:

Failure to pay the appropriate rate;

Falsifying records including payslips and timesheets;

Paying employees for significantly fewer hours than they actually worked;

Making unlawful deductions from employees wages;

Failure to keep records;

Failing to produce any records for inspection;

Not providing employees with payslips/statement of wages;

Providing documentation that purports to show arrears of wages have been paid to employees when this is not the case;

Inadequate public holiday/annual leave provision.

Table 1: NERA Inspection Services Costs, 2008 and 2009 (to end June)

Category

2008

2009 (to end June)

€000s

€000s

Pay

4,813

2,430

Travel & Subsistence

914

243

Total

5,727

2,673

Table 2: Estimate of Number of Employers visited by NERA in 2008 and 2009 (to end June)

No. of Employers Visited

Region

Regional HQ

2008

2009 (to end June)

South East

Carlow

3,287

1,230

South

Cork

1,339

372

North East

Dublin

3,080

894

West

Shannon

1,318

827

North West

Sligo

1,065

239

Totals

10,089

3,562

Employment Support Services.

Noel Coonan

Question:

130 Deputy Noel J. Coonan asked the Tánaiste and Minister for Enterprise, Trade and Employment the assistance she will provide to a company (details supplied) in County Tipperary to ensure the continuation of employment for the workforce there; and if she will make a statement on the matter. [28303/09]

Eltex of Sweden AB was a private family owned company established in Sweden in 1964, manufacturing electronic yarn control equipment for textile machines. Over the years the company added many products to its portfolio to include temperature control systems.

The Irish operation was established in Templemore, County. Tipperary in 1976 to manufacture stop control systems for textile looms. This detects yarn breakage and switches off the machine. There are currently 24 people employed in Ireland.

In June 2007, Eltex was taken over by three former employees and renamed Eltex Global Holdings Limited. This company is registered and headquartered in Ireland. Each owner holds one third of the company. There are three operations in this group, in Sweden, Ireland and the US.

Due to the downturn in the sector, the Irish operation is working on a two day week. The operation in the US has been reduced to two people and the Swedish operation (its R & D centre) has been reduced to 12 people. There are now 38 people employed in the group, down from 50 people in June 2008.

In June 2008, the IDA approved a feasibility grant for the company, to develop a computerised test system to manage its yarn sensors and improve and streamline the testing processes. This project has been put on hold by the company due to the downturn in the industry.

Departmental Programmes.

Arthur Morgan

Question:

131 Deputy Arthur Morgan asked the Tánaiste and Minister for Enterprise, Trade and Employment the steps she has taken to solve the problem of graduate retention in the western region; the partnerships that are in place between his Department, third level institutions and enterprise groups to promote graduate retention; and if she will make a statement on the matter. [28335/09]

My Department works closely with many other Government Departments and State Agencies in ensuring the provision of appropriate courses and training which match, the known and future, needs of employers and of students.

My Department, the Department of Social and Family Affairs and FÁS are co-operating in relation to the Work Placement Programme which was jointly launched by the Minister for Social and Family Affairs, Deputy Mary Hanafin, and I on 27 May last. The Work Placement Programme is a six-month work experience programme for an initial 2,000 individuals who are currently unemployed. Under this programme there are two streams each consisting of an initial 1,000 places of 6 months duration. The first stream is for graduates who before this year have attained a full award at level seven or above on the National Framework of Qualifications and who have been receiving Job Seeker's Allowance for the last six months. This scheme will provide invaluable work experience to graduates, including graduates in the western region, who have just left college or have very limited experience of the workplace.

Employment Support Services.

Olwyn Enright

Question:

132 Deputy Olwyn Enright asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of Industrial Development Authority supported jobs in existence in a county (details supplied); and if she will make a statement on the matter. [28366/09]

Olwyn Enright

Question:

136 Deputy Olwyn Enright asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of Industrial Development Authority supported jobs created in a county (details supplied) each year for the past five years and to date in 2009; and if she will make a statement on the matter. [28370/09]

I propose to take Questions Nos. 132 and 136 together.

The Forfás Annual Employment Survey reports on job gains and losses in companies that are clients of the industrial development agencies. Information is collected on an annualised basis and is aggregated at county level. Figures for 2009 will not be available until early 2010.

As at the end of 2008, there were 129 persons in permanent employment in IDA supported companies in County Laois. The number of jobs created by IDA supported companies in County Laois in each year of the five year period 2004-2008 are shown on the following tabular statement. Table showing the number of jobs created by IDA supported companies in County Laois in each year 2004– 2008 inclusive.

Year

2004

2005

2006

2007

2008

Number of New Jobs Created

18

12

18

9

0

Olwyn Enright

Question:

133 Deputy Olwyn Enright asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of Industrial Development Authority supported jobs in existence in a county (details supplied); and if she will make a statement on the matter. [28367/09]

Olwyn Enright

Question:

137 Deputy Olwyn Enright asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of Industrial Development Authority supported jobs created in a county (details supplied) each year for the past five years and to date in 2009; and if she will make a statement on the matter. [28371/09]

I propose to take Questions Nos. 133 and 137 together.

The Forfás Annual Employment Survey reports on job gains and losses in companies that are clients of the industrial development agencies. Information is collected on an annualised basis and is aggregated at county level. Figures for 2009 will not be available until early 2010.

As at the end of 2008, there were 1,109 persons in permanent employment in IDA supported companies in County Offaly. The number of new jobs created by IDA supported companies in County Offaly in each year of the five year period 2004 –2008 are shown on the following tabular statement. Table showing the number of new jobs created by IDA supported companies in County Offaly in each year 2004-2008 inclusive.

Year

2004

2005

2006

2007

2008

Number of New Jobs Created

71

56

81

47

24

Olwyn Enright

Question:

134 Deputy Olwyn Enright asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of Enterprise Ireland supported jobs in existence in a county (details supplied); and if she will make a statement on the matter. [28368/09]

Olwyn Enright

Question:

138 Deputy Olwyn Enright asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of Enterprise Ireland supported jobs created in a county (details supplied) each year for the past five years and to date in 2009; and if she will make a statement on the matter. [28372/09]

I propose to take Questions Nos. 134 and 138 together.

The Forfás Annual Employment Survey reports on job gains and losses in companies that are clients of the industrial development agencies. Information is collected on an annualised basis and is aggregated at county level. Figures for 2009 will not be available until early 2010.

The numbers of new jobs created by EI supported companies in County Laois in each year of the five-year period 2004-2008 are shown on the following tabular statement. Table showing the number of jobs in Enterprise Ireland supported companies in County Laois over the five year period 2004-2008

Laois

2004

2005

2006

2007

2008

Full Time Jobs in existence

2,646

2,495

2,614

2,522

2,362

Jobs created

177

161

267

194

151

Source: Forfás Employment Survey 2008.

Olwyn Enright

Question:

135 Deputy Olwyn Enright asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of Enterprise Ireland supported jobs in existence in a county (details supplied); and if she will make a statement on the matter. [28369/09]

Olwyn Enright

Question:

139 Deputy Olwyn Enright asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of Enterprise Ireland supported jobs created in a county (details supplied) each year for the past five years and to date in 2009; and if she will make a statement on the matter. [28373/09]

I propose to take Questions Nos. 135 and 139 together.

The Forfás Annual Employment Survey reports on job gains and losses in companies that are clients of the industrial development agencies. Information is collected on an annualised basis and is aggregated at county level. Figures for 2009 will not be available until early 2010.

The numbers of new jobs created by EI supported companies in County Offaly in each year of the five-year period 2004-2008 are shown on the following tabular statement.

Table showing the number of jobs in Enterprise Ireland supported companies in County Offaly over the five year period 2004-2008

Offaly

2004

2005

2006

2007

2008

Full Time Jobs in existence

2,778

2,925

3,159

3,167

3,035

Jobs created

276

205

358

270

285

Source: Forfás Employment Survey 2008.

Question No. 136 answered with Question No. 132.
Question No. 137 answered with Question No. 133.
Question No. 138 answered with Question No. 134.
Question No. 139 answered with Question No. 135.

Departmental Expenditure.

Denis Naughten

Question:

140 Deputy Denis Naughten asked the Tánaiste and Minister for Enterprise, Trade and Employment the cost of public advertising funded by her Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of her Department; and if she will make a statement on the matter. [28418/09]

In the time available, it has not been possible to compile the information requested by the Deputy. This information is currently being compiled in relation to my Department and the Offices of my Department and I will be in touch with the Deputy shortly about the matter. I would, however, point out that the information in respect of the State Agencies falls within the day-to-day administration of the State Agencies concerned and I have asked them to respond directly to the Deputy.

Leo Varadkar

Question:

141 Deputy Leo Varadkar asked the Tánaiste and Minister for Enterprise, Trade and Employment the amount spent by her Department on legal fees directly to lawyers or through the State solicitor’s office for each of the years 2006 to 2008, inclusive; and if she will make a statement on the matter. [28466/09]

The information requested by the Deputy in respect of annual expenditure on legal fees paid directly by my Department to lawyers for the years in question is set out below. However, my Department does not have access to complete data on fees paid through the State Solicitor's Office as the CSSO is independent of my Department.

Year

Costs

2006

803,753

2007

1,189,773

2008

812,811

Public Service Contracts.

Noel Ahern

Question:

142 Deputy Noel Ahern asked the Tánaiste and Minister for Enterprise, Trade and Employment if she will clarify the situation concerning complaints from the printing industry regarding the level of Government agency work, on behalf of the Office of Public Works, being awarded to companies outside the State; if same can be quantified in value terms; the efforts that have been made to retain the work in Ireland; and if she will make a statement on the matter (details supplied). [28745/09]

The Office of Public Works (OPW) does not come under the remit of my Department and it would not be appropriate for me to respond to the Parliamentary Question on behalf of the OPW. I note that the Deputy has put down an identical question to the Minister for Finance who would be the appropriate Minister to respond on behalf of the OPW.

Insurance Industry.

Charlie O'Connor

Question:

143 Deputy Charlie O’Connor asked the Minister for Finance if his attention has been drawn to the situation in which a company (details supplied) is apparently refusing to take business from customers in certain parts of Dublin; if his further attention has been drawn to the widespread anger being generated by this issue; his views on the need to protect the image of these areas which could be affected by the decision; and if he will make a statement on the matter. [28123/09]

At the outset, the Deputy should note that in my role as the Minister for Finance I have responsibility for the development of the legal framework governing financial regulation. The day to day responsibility for the supervision of financial institutions is a matter for the Financial Regulator which is statutorily independent in the exercise of its regulatory functions.

I am aware of the reports referred to by the Deputy. The Financial Regulator has informed me that it cannot compel insurers to quote for business. The decision to provide any specific form of insurance cover and the price at which it is offered is a commercial matter based on the assessment an insurer will make of the risks involved.

The Financial Regulator has also indicated that it has no role in relation to issues of pricing or the scope of cover provided by insurance companies. In addition, the Consumer Protection Code does not address the issue of the non-provision of insurance services based on an insurer's commercial assessment.

There are however, some options open to persons who find themselves in this position. Firstly, they can contact the Irish Insurance Federation (IIF) which administers a Declined Cases Agreement. This is adhered to by all motor insurers in Ireland. Under the agreement, the insurance market will not refuse to provide insurance to an individual seeking insurance, if he/she has approached at least three insurers and has not been able to obtain cover from them. Details of this scheme can be found on the IIF website. The second option open to consumers in such circumstances is to refer any unresolved complaint to the Financial Services Ombudsman for investigation and adjudication.

Flood Relief.

Noel Coonan

Question:

144 Deputy Noel J. Coonan asked the Minister for Finance his plans to alleviate flooding in an area (details supplied) in County Tipperary; and if he will make a statement on the matter. [28304/09]

The Office of Public Works held the statutory Public Exhibition for the proposed River Mall (Templemore) Drainage Scheme, which I opened in the presence of the Deputy and other local public representatives in January of this year, as required under the Arterial Drainage Acts. OPW officials are at present assessing the observations, which were received following the Exhibition. Once the Exhibition Report has been considered, a decision will be made on the progress of the proposed Scheme.

Feachtais Gaeilge.

Aengus Ó Snodaigh

Question:

145 D’fhiafraigh Deputy Aengus Ó Snodaigh den Aire Airgeadais cén dul chun cinn atá déanta maidir leis an bhfeachtas ag duine (sonraí tugtha) chun an leagan Béarla coimrithe d’ainm na tíre (IRL) atá ar chláruimhreacha na gcarranna anseo a athrú ar ais go dtí an leagan Gaeilge coimrithe (ÉIR), a bhí ar ghluaisteáin go dtí 1962 sular athraíodh faoin Acht um Thrácht ar Bhóithre 1961 é, i gcás carranna a chláraítear in Éirinn ó Eanáir 2009 ar aghaidh; agus an ndéanfaidh sé ráiteas ina thaobh. [28452/09]

Caoimhghín Ó Caoláin

Question:

149 D’fhiafraigh Deputy Caoimhghín Ó Caoláin den Aire Airgeadais cén dul chun cinn atá déanta maidir leis an bhfeachtas ag duine (sonraí tugtha) chun an leagan Béarla coimrithe d’ainm na tíre (IRL) atá ar chláruimhreacha na gcarranna anseo a athrú ar ais go dtí an leagan Gaeilge coimrithe (ÉIR), a bhí ar ghluaisteáin go dtí 1962 sular athraíodh faoin Acht um Thrácht ar Bhóithre 1961 é, i gcás carranna a chláraítear in Éirinn ó Eanáir 2009 ar aghaidh; agus an ndéanfaidh sé ráiteas ina thaobh. [28339/09]

Tá sé beartaithe agam Ceisteanna 145 agus 149 a thógáíl le chéile.

Tá curtha in iúl dom ag na Coimisinéirí Ioncaim go bhfuil foráil le hAlt 141 san Acht Airgeadais 1992 do na Coimisinéirí le rialacháin a dhéanamh mar is cuí nó is dóigh leo gur gá le bainistiú, fáil agus bailiú a dhéanamh ar cháin chláraithe feithiclí (VRT) sa Stát. Maidir leis sin forordaíonn Ionstraim Reachtúil Uimh. 318 de 1992 (Na Rialacháin um Chlárú Feithiclí agus Cánachas 1992 (arna leasú)) formáid, toisí agus sonraíocht theicniúil plátaí cláraithe a léireofar ar fheithiclí a chláraítear sa Stát.

Is eol don Teachta go bhfuil freagracht ar na Coimisinéirí Ioncaim maidir le nithe a bhaineann le formáid plátaí cláraithe sa Stát ó tugadh isteach VRT an 1 Eanáir 1993 agus roimhe sin gur bhain nithe a bhain le formáid plátaí cláraithe le dualgas na Roinne Comhshaoil mar a bhí.

Ar bhonn idirnáisiúnta bíonn difríochtaí idir plátaí cheadúnais thíortha éagsúla trí chód tíre breise do phlátaí ceadúnais. Tá sainitheoir na tíre seo léirithe i mbloc dubh láidir ceannlitreacha ar phláta beag bán ubhchruthach nó greamán ar chúl na feithicle in aice leis an bpláta uimhreacha. Ba Choinbhinsiún de chuid na Náisiún Aontaithe ar Thrácht Bóthair a dháil na sainitheoirí ar dtús sa Ghinéiv in 1949.

Tugadh an cód trí litreach "IRL" d'Éirinn in 1962 agus tá úsáid á bhaint as ó shin. Tugadh isteach pláta cláraithe fhormáid choiteanta an AE le Rialachán AE Uimh. 2411/98 ón AE ar fud an AE an 11 Samhain 1998. Tá an Rialachán sin athraithe isteach ag Éirinn sa reachtaíocht náisiúnta VRT agus comhlíonann an pláta cláraithe atá ann faoi láthair an fhormáid a éilíonn an AE. Ba chóir a thabhairt ar aird nach bhfuil gá an greamán ubhchruthach leis an sainitheoir tíre idirnáisiúnta a léiriú i gcás feithiclí a bhíonn ag taisteal laistigh den AE ar an gcoinníoll go bhfuil an pláta uimhreacha de réir ghnáth-Chaighdeán an AE.

B'fhéidir gur thug an Teachta faoi deara nár baineadh leas riamh as an tsiombail "ÉIR" mar shiombail náisiúnta na hÉireann ar phlátaí cláraithe in Éirinn. Sannadh an sainitheoir "EIR" do Cho. Uíbh Fhailí áfach le hIonstraim Reachtúil Uimh. 46 de 1960 — Na Rialacháin um Fheithiclí Bóthair (Marcanna Innéacs) (Leasú), 1960. Tá sé deimhnithe ag na Coimisinéirí Ioncaim nach bhfuil athbhreithniú á dhéanamh ó thaobh aon athrú a dhéanamh ar an tsiombail náisiúnta atá ann "IRL" agus in aon iarracht chun an tsiombail sin a athrú go gcaithfí leasú a dhéanamh ar chód tíre sannta na Náisiún Aontaithe don Stát agus ar an Iarscríbhinn chuí a ghabhann le Rialachán AE Uimh. 2411/98 ón gComhairle.

Tax Yield.

Thomas P. Broughan

Question:

146 Deputy Thomas P. Broughan asked the Minister for Finance the initiatives being undertaken to address the problem of millions of euro worth of cigarettes being smuggled through ports in Ireland; and if he will make a statement on the matter. [28582/09]

Thomas P. Broughan

Question:

165 Deputy Thomas P. Broughan asked the Minister for Finance if up to 25% of cigarettes smoked in Ireland have been imported and sold illegally; if the illegal sale of cigarettes is costing retailers here approximately €496 million in lost sales turnover; if the forecasted loss to the Exchequer in 2010 for the illegal importation and sale of cigarettes is set to reach €528 million; if he will report on the illegal importation of cigarettes from the USA; his views on the allegation that a certain percentage of cigarettes are produced in the US for illegal sale abroad; the efforts being taken to address this problem; and if he will make a statement on the matter. [28581/09]

I propose taking Parliamentary Questions Nos. 146 and 164 together.

I am informed by the Revenue Commissioners that they are not in a position to confirm the Deputy's various estimates of tax loss from cigarette smuggling or to attempt to forecast the tax loss on cigarettes in 2010, as there is no reliable method for determining such figures. However, a tentative estimate was given by Revenue earlier this year that about 20% of cigarettes consumed in Ireland may be untaxed, but it is important to emphasise that this includes both legitimate cross- border purchases for personal consumption and contraband and counterfeit cigarettes. Cigarette clearances on payment of tax for the first five months of 2009 are broadly in line with the same period in 2008.

As regards the illegal importation of cigarettes from the USA, I am informed that this illicit traffic was detected by Revenue some years ago and these detections resulted in the European Anti-Fraud Office, (OLAF), opening an international investigation that involved several Member States and the US Authorities. This investigation has culminated in the arrest of a US national who is due to go on trial in Florida on 3 August 2009 on a number of indictments relating to the shipment of cigarettes to several Member States including Ireland. However, none of the cigarettes in question were manufactured in the USA but Florida was used as the transit route into Europe.

Approximately 42m cigarettes with a retail value of €17.5m have been seized in the first six months of 2009. The efforts that are being made by Revenue to tackle cigarette smuggling include a continuous review of resource deployment both at points of importation and inland with a view to increasing the number of seizures and prosecutions, the procurement of a second Mobile Container Scanner that is expected to be completed this year, continued liaison with An Garda Síochána and where appropriate, the mounting of multi-agency international operations. In addition, Revenue will continue to liaise closely with the legitimate tobacco manufacturers and the Office of Tobacco Control, and will also maintain close contact with the authorities in other Member States and OLAF.

With regard to legislation, I can inform the Deputy that existing enforcement legislation is considered adequate for tackling cigarette smuggling. Current penalties on summary conviction for evasion of duties are €5,000 and/or a term of imprisonment not exceeding twelve months. These reflect the maximum statutory penalties that can be imposed by the District Courts. The penalty for conviction on indictment is currently €12,695 or treble the duty paid value of the goods, whichever is the greater, and/or a term of imprisonment not exceeding five years.

Customs Service.

Charles Flanagan

Question:

147 Deputy Charles Flanagan asked the Minister for Finance the annual funding provided to the customs service to directly tackle drugs since 2002 to date in 2009; his plans to provide them with greater resources; and if he will make a statement on the matter. [28669/09]

Revenue's Customs Service has primary responsibility for the prevention, detection, interception and seizure of controlled drugs at importation. This Service has particular responsibility for implementing import and export controls at all points of entry/exit to/from Ireland, including ports and airports.

I am advised by the Revenue Commissioners that it is not possible to provide the figures requested by the Deputy. This is because most enforcement personnel and equipment are not solely involved with illicit drug importation, but also carry out a wide range of other enforcement functions. In addition, the funding can vary from year to year depending on the expenditure on capital equipment. Nevertheless, estimated figures recently compiled suggest that the overall cost of the Revenue resource employed on drug prevention activities was of the order of €15 million in 2008.

I have been assured by the Revenue Commissioners that they are fully committed to providing an effective level of protection against drug smuggling by systematically applying controls commensurate with the levels of risk identified. In this regard, Revenue is continuously engaged in analysis and evaluation of seizure trends, routes and smuggling risks and resource deployment is adjusted accordingly. Furthermore, an additional Revenue cutter is due for delivery later this year, and the procurement process is underway for an additional x-ray scanner.

Flood Relief.

Finian McGrath

Question:

148 Deputy Finian McGrath asked the Minister for Finance if he will provide funding for anti-flood measures in areas (details supplied) in County Dublin. [28685/09]

The Office of Public Works are aware that the areas of Clanmoyle Road, Donnycarney, Dublin 5, Elm Mount Avenue, Beaumont, Dublin 3, Lower Fairview Avenue, Dublin 3 and Clontarf, Dublin 3 were affected by the stormwaters of 2 July of this year, having been previously affected last August.

The OPW are awaiting the completion of the report by Dublin City Council, which will outline some options for dealing with the flood risk in this area. A meeting has been scheduled between the OPW and DCC to plan how best to proceed.

Question No. 149 answered with Question No. 145.

Tax Yield.

Brendan Kenneally

Question:

150 Deputy Brendan Kenneally asked the Minister for Finance the amount of income tax contributed by people on professional apprenticeships every year for the past five years; and the amount that the Exchequer expects to receive during the course of the coming year. [28150/09]

I am informed by the Revenue Commissioners that information on income tax receipts is not captured in such a way as to provide a basis for compiling the information sought by the Deputy.

Garda Stations.

Michael Creed

Question:

151 Deputy Michael Creed asked the Minister for Finance the position regarding the proposed development of a new Garda station (details supplied) in County Cork; and if he will make a statement on the matter. [28298/09]

The revised tender documents, which are to comply with the "New Conditions of Contract for Public Works Contracts", are at an advanced stage of preparation and the tender process is to commence shortly. The award of a contract will be subject to the availability of funding.

Pension Provisions.

Sean Sherlock

Question:

152 Deputy Seán Sherlock asked the Minister for Finance if a person (details supplied) in County Cork is entitled to a tax free allowance having paid into a private pension fund; and if he will make a statement on the matter. [28324/09]

I have been advised by the Revenue Commissioners that as the individual in question is already a member of an Occupational Pension Scheme, he is not entitled to income tax relief in respect of PRSA contributions. The person in question was advised of this on 27th May 2009.

If further clarification is needed, the individual may contact Mr. Pearse Penney, Revenue House, Blackpool, Cork (Tel 021-6027266).

Banking Sector.

Joe Costello

Question:

153 Deputy Joe Costello asked the Minister for Finance the steps he will take to address the failure of the banks to provide a flow of credit to Irish business, particularly, the small business sector; and if he will make a statement on the matter. [28348/09]

A core Government objective is to free up lending on a commercial basis into the economy to support economic growth and a number of actions have been taken to achieve this objective. In the context of the bank guarantee scheme and recapitalisation the banks have made important commitments to support business lending.

An independent review of credit availability was agreed in the context of the recapitalisation of AIB and Bank of Ireland. The purpose of the review was to ascertain the position on credit availability to SMEs in Ireland. The Steering Group for the review consisted of representatives of the Departments of Finance and Enterprise, Trade and Employment, Forfás, Enterprise Ireland, the Irish Banking Federation and the six main banks involved in lending to SMEs, business representatives from ISME, Chambers Ireland and Small Firms Association. The final report of the Review of Lending to SMEs has just now been received. The report is quite extensive, running to almost 100 pages plus appendices. It will be considered by the Cabinet Committee on Economic Renewal which is meeting this afternoon. The intention is that it will be published shortly.

A Code of Conduct for Business Lending to Small and Medium Enterprises was published by the Financial Regulator on 13 February and took effect on 13 March. This code applies to all regulated banks and building societies and will facilitate access to credit, promote fairness and transparency and ensure that banks will assist borrowers in meeting their obligations, or otherwise deal with an arrears situation in an orderly and appropriate manner. The business lending code includes a requirement for banks to offer their business customers annual review meetings, to inform customers of the basis for decisions made and to have written procedures for the proper handling of complaints. Where a customer gets into difficulty the banks will give the customer reasonable time and seek to agree an approach to resolve problems and to provide appropriate advice. This is a statutory code and banks will be required to demonstrate compliance.

In addition, as part of the recapitalisation package announced on 11 February, Allied Irish Bank and Bank of Ireland reconfirmed their December commitment to increase lending capacity to small and medium enterprises (SMEs) by 10% and to provide an additional 30% capacity for lending to first time buyers in 2009. If the mortgage lending is not taken up, then the extra capacity will be available to SMEs. AIB and Bank of Ireland have also committed to public campaigns to actively promote small business lending at competitive rates with increased transparency on the criteria to be met. Compliance with this commitment is being monitored by the Financial Regulator. Officials from my Department are also in regular contact with the banks concerned in relation to their progress on implementing these measures.

My colleague the Tánaiste and Minister for Enterprise, Trade and Employment has recently set up a Clearing Group including representatives from the main banks, business interests and state agencies, which is chaired by the Department of Enterprise, Trade and Employment. The purpose of the group is to identify specific patterns of events or cases where the flow of credit to viable businesses appears to be blocked and to seek to identify credit supply solutions. Any questions on the clearing group should be directed to my colleague the Tánaiste and Minister for Enterprise, Trade and Employment.

The banks report that they are "open for business" as evidenced by their promotional and advertising material. The banks state that they have funds available for lending to businesses and have provided details on approval levels and amounts drawn down. They report a slowdown in certain areas which they say reflects a reduced level of demand. The review of credit availability has considered this point. The most recent Central Bank Monthly Statistics for May 2009 show that credit to non-financial corporates actually increased by €225m month-on-month after two months of substantial falls. While care is always to be taken when reading monthly data, this could be a positive indicator of credit actively being fed through the real economy and businesses.

You may also be aware that my colleague, the Minister of State for Trade and Commerce, Mr Billy Kelleher TD has commenced a series of regional meetings to discuss access to bank credit with key local stakeholders.

Departmental Expenditure.

Denis Naughten

Question:

154 Deputy Denis Naughten asked the Minister for Finance the cost of public advertising funded by his Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of his Department; and if he will make a statement on the matter. [28420/09]

The following table sets out the cost of public advertising paid for by my Department and the offices under its aegis year to date in 2009.

Office

Statutory Advertising

Non-statutory Advertising

Total

Office of the Minister for Finance

Nil

27,476

27,476

Office of the Revenue Commissioners

93,841

389,861

483,702

The State Laboratory

Nil

Nil

Nil

The Valuation Office

Nil

Nil

Nil

The Public Appointments Service

Nil

120,392

120,392

Office of the Commission for Public Service Appointments

1,406

3,038

4,444

Office of the Appeals Commissioner

Nil

Nil

Nil

In the time available, the Office of Public Works was unable to collate the information sought. I have asked that office to communicate the relevant information direct to the Deputy.

Banking Sector Regulation.

Bernard J. Durkan

Question:

155 Deputy Bernard J. Durkan asked the Minister for Finance the steps he will take to prevent a recurrence of the departure from good banking and lending practice throughout the sector for the past ten years; and if he will make a statement on the matter. [28436/09]

Bernard J. Durkan

Question:

156 Deputy Bernard J. Durkan asked the Minister for Finance if it has been possible to identify with accuracy the exact cause or causes of the departure from good banking practice throughout the sector in the past ten years; and if he will make a statement on the matter. [28437/09]

Bernard J. Durkan

Question:

157 Deputy Bernard J. Durkan asked the Minister for Finance if instruction, leave or any other indication was given to the banking sectors in the past ten years which might cause an understanding that deviation from good banking practice might be acceptable; and if he will make a statement on the matter. [28438/09]

Bernard J. Durkan

Question:

158 Deputy Bernard J. Durkan asked the Minister for Finance the reprimands, restrictions or impositions of a financial or disciplinary nature imposed on the banking sectors when departure from good banking or lending practice has been identified; and if he will make a statement on the matter. [28439/09]

I propose to take Questions Nos. 155 to 158, inclusive, together.

It is important at the outset to highlight that the problems currently being experienced in the Irish banking sector are part of a wider international phenomenon. The causes of the current financial crisis have been extensively analysed and reported on internationally by various international bodies. Within the EU, the Report of the High Level Group on Financial Supervision in the EU, chaired by Mr. Jacques de Larosière, identifies a number of areas where financial services regulatory reform is required.

The de Larosière Report makes a number of recommendations to strengthen risk management on both a micro- and macro-prudential levels, including improvements in risk management in individual firms; improved systemic shock absorbers; reductions in pro-cyclical amplifiers; strengthening transparency; and improvements in the incentives in financial markets and in directors' remuneration.

Separately, EU Finance Ministers and the G20 have each recognised that the Basel II capital adequacy framework, which is implemented in the EU through the Capital Requirements Directive, should be strengthened with regard to risk management on both a micro- and macro-prudential levels. The Basel Committee on Banking Supervision and the European Commission are currently developing proposals to address these various recommendations, which can be expected to be implemented over the coming years.

The impact of the crisis on the banking system in Ireland has emphasised the importance to the wider economy of the framework for financial regulation as well as the links between financial regulation and functions of central banks. The reform of regulatory structures which I announced on 18 June last will underpin a much more effective and efficient financial services regulatory system. In particular, the reforms will see the establishment of a single fully integrated institution, the Central Bank of Ireland Commission, with responsibility for both the supervision of individual firms and the stability of the financial system generally.

At domestic level, the Government has increased the disclosure requirements for directors of banks, through the recent Companies (Amendment) Act 2009. This Act improves the disclosure requirements for loans made by banks to their directors and to persons connected with them. The Act also increases the powers available to the Director of Corporate Enforcement to enforce compliance with company law. These powers will apply to all companies and not just financial institutions.

In relation to the reprimands, restrictions or impositions of a financial or disciplinary nature imposed on the banking sectors when departure from good banking or lending practice has been identified, the Deputy will be aware that in my role as Minister for Finance, I set out the legislative framework within which offences and penalties are contained. I am satisfied that such offences and penalties are in line with international best practice. The Financial Regulator is empowered under the Central Bank Acts to initiate administrative sanctions procedures where it suspects, on reasonable grounds, that a prescribed contravention may have been committed by a regulated financial service provider. The following sanctions may be imposed:

Caution or reprimand;

Direction to refund or withhold all or part of an amount of money charged or paid, or to be charged or paid, for the provision of a financial service;

Monetary penalty (not exceeding €5,000,000 in the case of a corporate and unincorporated body, not exceeding €500,000 in the case of a person);

Direction disqualifying a person from being concerned in the management of a regulated financial service provider;

Direction to cease the contravention if it is found the contravention is continuing;

Direction to pay all or part of the costs of the investigation and inquiry.

Obviously, it is important that where offence and penalty provisions are provided for in law that they are properly enforced. In this regard, the Financial Regulator has taken 18 enforcement actions (16 administrative sanctions procedures and 2 market abuse actions) since these powers became available to it in 2004. Seven individuals have been disqualified from working in the financial services industry (for various periods of time). There have been five breaches of the Consumer Protection Code, two breaches of Market Abuse Regulations and eleven breaches of other codes of conduct (five prudential and six consumer breaches). There have been twelve fines imposed, one of €3,250,000, one of €200,000, 1 of €80,000, 1 of €50,000, 1 of €45,000, 2 of €20,000, 2 of €10,000, and 3 of €5,000, which totals €3,700,000.

To date, one credit institution has been reprimanded and subject to a monetary penalty of €50,000.

By way of concluding, I would not accept any suggestion that an instruction, leave or any other indication was given to the banking sector in the past 10 years which might cause any understanding that deviation from good banking practice might be acceptable. While it is not my role as Minister for Finance to seek to intervene in the decision-making of individual financial institutions, I would repeat my desire that the sector provides prudent and responsible lending that is in the interest of the financial institutions, the borrower and the wider economy.

Economic Competitiveness.

Bernard J. Durkan

Question:

159 Deputy Bernard J. Durkan asked the Minister for Finance the steps he will take to reduce costs in both the public and private sectors with a view to improving economic performance; the targets set; and if he will make a statement on the matter. [28440/09]

Since the early years of this decade Ireland has lost competitiveness. Up until last year, prices grew faster than those in the euro area, while wages grew at a rate greater than productivity would justify. These developments have left Ireland exposed in the midst of the collapse in global demand. Nonetheless, consumer prices have adjusted quickly downwards in the last six months. In addition, we are also seeing the benefits of our labour market flexibility: all available evidence points to recent downward pressure on wages economy-wide. The European Commission forecasts that Ireland's unit labour costs will fall by -4% this year, against a rise of 3% in the rest of the euro area.

In relation to public sector pay, the recently-introduced public service pension-related deduction decreases the net cost to the Exchequer of the public sector paybill. It is currently estimated that receipts from the deduction will come to just under €940 million in 2009 and over €1.1 billion in 2010. This reduction in public service net pay is likely to have a demonstration effect on private sector wages too.

On indirect costs, the Government spends over €1 billion annually on a range of professional services across all Departments. In view of the need for an equitable sharing of the burden of the adjustment to address the deterioration in the public finances, the Government is pursuing a general 8% reduction on fees to legal, medical, veterinary and other professionals engaged by the public service. This will raise €80 million in a full year. This process is being done by engaging in consultations through appropriate channels.

Regulated energy costs to private households also decreased this year, with piped gas falling by 12% from the 1st of May and electricity by 10% on the same date. Overall, my Department expects a small but significant fall in consumer prices this year which will go some way to addressing cost pressures that exist economy-wide.

Fiscal Policy.

Bernard J. Durkan

Question:

160 Deputy Bernard J. Durkan asked the Minister for Finance the extent to which the various budgetary cutbacks proposed in the context of recent reviews of public spending have been tested for likely negative impacts on the economy; the way these issues will be addressed; and if he will make a statement on the matter. [28441/09]

In the normal course of events, the macro-economic implications of various fiscal measures are considered in the context of the budgetary process. In that regard in the recent Supplementary Budget the macro-economic impact of the 2009 measures was set out.

Regarding the additional aggregate annual consolidation measures for the later years, the overall macro-economic impact was incorporated within the medium term economic and fiscal forecasts.

Therefore, all the specific measures that will be brought forward in terms of both expenditure and taxation will be considered in the context of the estimates / budgetary process in the normal manner and the economic and social impact of the specific budgetary package will be considered then.

Economic Competitiveness.

Bernard J. Durkan

Question:

161 Deputy Bernard J. Durkan asked the Minister for Finance when his attention was drawn to the fact that some sectors in the economy were suffering from or creating costs which were likely to affect the competitiveness of the economy; the steps he will take to address the issues; and if he will make a statement on the matter. [28442/09]

Since becoming Minister for Finance my specific attention has been drawn to the fact that Ireland has been losing competitiveness for some time. In fact the loss of competitiveness and the need to improve it is one that is a constant theme of the Government in recent years. Up until last year, prices grew faster than those in the euro area, while wages grew at a rate greater than productivity would justify in some cases. These developments have left Ireland vulnerable in our international markets in the midst of the collapse in global demand. Nonetheless, consumer prices have adjusted quickly downwards over the last six months. In addition, we are also seeing the benefits of our labour market flexibility: all available evidence points to recent downward pressure on wages in the economy.

The European Commission forecasts that Ireland's unit labour costs will fall by -4 per cent this year, against a rise of 3 per cent in the rest of the euro area. Our economy is rapidly adapting to changed circumstances as we witness prices and wages falling. A substantial improvement in Ireland's competitiveness will place us on a much better footing for when global growth resumes.

Bernard J. Durkan

Question:

162 Deputy Bernard J. Durkan asked the Minister for Finance if he has satisfied himself regarding the adequacy of the resources available to his Department to carry out the necessary evaluation of performance and cost in both the public and private sectors with a view to improving competitiveness in the economy; and if he will make a statement on the matter. [28443/09]

My Department must, as is the case for all Departments, operate within available resources, both in respect of staffing and other provisions. However, I am satisfied that the resources available to enable my Department to carry out the necessary evaluation of performance and cost in both the public and private sectors with a view to improving competitiveness in the economy are appropriate. The Department continually keeps under the review the prioritisation of resources.

Tax Code.

Noel Ahern

Question:

163 Deputy Noel Ahern asked the Minister for Finance if he will clarify the revenue refund due to a person (details supplied) in respect of rebate on employee’s redundancy payment. [28444/09]

I wish to draw to the Deputy's attention that rebates on employee's redundancy payments are a matter for the Department of Enterprise, Trade and Employment.

Departmental Expenditure.

Leo Varadkar

Question:

164 Deputy Leo Varadkar asked the Minister for Finance the amount spent by his Department on legal fees directly to lawyers or through the State solicitor’s office for each of the years 2006, 2007 and 2008; and if he will make a statement on the matter. [28468/09]

In general, my department uses the services of the Office of the Attorney General and the Office of the Chief State Solicitor, and seeks outside legal advisors in circumstances requiring legal services of a specific nature. The costs associated with the Office of the Attorney General and the Office of the Chief State Solicitor are borne by the respective Votes and are not charged back to my Department.

The following table sets out expenditure in the years 2006 to 2008 on contracts for legal services by my department and the related offices.

Name of Office

2006

2007

2008

€,000

€,000

€,000

Office of Public Works

1,047

1,167

518

State Laboratory

103

Valuation Office

125

20

139

Public Appointments Service

17

Office of the Commission for Public Service Appointments

63

130

115

Office of the Minister for Finance

654

403

1,876

Office of the Revenue Commissioners

6,090

5,690

6,970

In addition the Office of the Revenue Commissioners incurred expenditure in respect of cases where they petition the courts for the liquidation of a company. These payments mainly comprise professional fees for Liquidators and their legal teams and totalled €1.7m in 2006, €2.5m in 2007. A breakdown isolating legal fees from within this total spend is not readily available for 2006 or 2007. The legal fees element for 2008 is included in the figures quoted above.

Question No. 165 answered with Question No. 146.

Departmental Properties.

Thomas P. Broughan

Question:

166 Deputy Thomas P. Broughan asked the Minister for Finance the gross cost, including fee and all related items, per square foot for the combined social welfare and Garda station buildings recently constructed in Ballymun, Dublin; the way this compares to other similar buildings constructed in 2008; his views on whether this level of cost is justified and if effective cost management was applied to the building project; and if he will make a statement on the matter. [28585/09]

Thomas P. Broughan

Question:

167 Deputy Thomas P. Broughan asked the Minister for Finance the number and value of all extra costs paid to the contractor, additional to the contract sum agreed at the commencement of the construction contract for the social welfare and Garda station building in Ballymun, Dublin; his views on whether these costs would have been avoided if the contract had been a fixed-price contract; and if he will make a statement on the matter. [28586/09]

I propose to take Questions Nos. 166 and 167 together.

The development in Ballymun comprised a new Divisional Headquarters for An Garda Síochána, offices for the Department of Social and Family Affairs, including accommodation for the Money Advice and Budgeting Service, together with facilities for the Probation Service.

It is anticipated that the final account for the project will be completed in the next few weeks. I would be in a position at that stage to provide the Deputy with confirmation of the cost per square foot and other information requested, relating to the financial aspects of the project. I can, however, assure the Deputy that cost effective management was applied to the project, as is the case with all such projects undertaken by the Office of Public Works.

Details of the nature and value of additional works carried out under the contract would also be available when the final account has been agreed. I am advised that the additional works were requested by the public bodies concerned, and were deemed necessary, in order that they could deliver satisfactorily in relation to their statutory / operational functions, or were necessitated to address project critical issues that arose during the course of the contract.

Fiscal Policy.

Bernard J. Durkan

Question:

168 Deputy Bernard J. Durkan asked the Minister for Finance if he has sufficient resources to undertake the necessary research to ensure that budgetary projections are accurately based; and if he will make a statement on the matter. [28587/09]

Bernard J. Durkan

Question:

169 Deputy Bernard J. Durkan asked the Minister for Finance the degree to which VAT, income tax and stamp duty targets identified in the various budgets over the past 12 months have been realised in the half yearly returns; the areas requiring attention; the action to be taken; and if he will make a statement on the matter. [28588/09]

Bernard J. Durkan

Question:

170 Deputy Bernard J. Durkan asked the Minister for Finance the degree to which tax returns for the first six months of 2009 are in accordance with budgetary projections; the action taken or expected to be taken to address issues arising therefrom; and if he will make a statement on the matter. [28589/09]

I propose to take Questions Nos. 168 to 170, inclusive, together.

The Supplementary Budget forecast that total tax revenue for the year would amount to €34.4 billion. Monthly profiles for individual tax-heads were published at the end of April.

The end of June Exchequer Returns showed that €15.8 billion in tax receipts were collected in the first half of 2009. Income Tax receipts were €113 million or 2.0% below target, VAT receipts were €202 million or 3.5% behind profile and Stamp Duty receipts were €40 million or 10.3% down on target. Against this, other taxes, namely Corporation Tax and Excise Duties, were ahead of target. Overall, total taxes were €188 million or 1.2% below profile. While this is very close to target, significant sums remained to be collected in the second half of the year and the performance of Income Tax and VAT receipts in particular, will need to be monitored closely.

Economic and fiscal forecasting, at the best of times, is not an exact science. In the extraordinary circumstances prevailing over the last twelve months, it has proven to be extremely difficult for all forecasters to accurately predict short-term economic trends. In this context, the economic and tax projections were revised during the course of the year. My Department works closely with the Revenue Commissioners on an ongoing basis to ensure the highest quality tax forecasts are delivered to Government.

Last year my Department published a report produced by a group specifically established to examine the tax forecasting methodologies used by the Department. The Tax Forecasting Methodology Review Group comprised of experts from the Department of Finance, the ESRI, the Revenue Commissioners, and the Central Bank and had input from the EU Commission.

In terms of its findings, while the Group suggested that the Department of Finance displays a prudent bias in tax forecasting, it did not suggest any major structural recommendations to the way the Department forecasts tax revenue. However, it did recommend a number of adjustments which the Department is currently implementing. Furthermore, the Group's report also indicated that the Department's methods were not out of line internationally. A copy of the Group's report was laid in the Dáil library and is available on the Department of Finance website at www.finance.gov.ie.

As I have stated many times, I am satisfied that my Department as currently resourced is fully capable of providing the necessary economic analysis and advice to myself and to Government.

National Development Plan.

Aengus Ó Snodaigh

Question:

171 Deputy Aengus Ó Snodaigh asked the Minister for Finance if his attention has been drawn to the fact that the European Commission has sent a reasoned opinion to the Government to the effect that the National Development Plan 2007 to 2013, containing Transport 21, is in breach of EU law, as it has not been subject to strategic environmental assessment under the SEA directive; and his response to the Commission. [28643/09]

Aengus Ó Snodaigh

Question:

172 Deputy Aengus Ó Snodaigh asked the Minister for Finance the reason he continues to perform strategic environmental assessments on the national development plan and Transport 21. [28644/09]

I propose to take Questions Numbers 171 and 172 together.

To my knowledge, no reasoned opinion on this issue has been received from the European Commission by Ireland.

During the preparation of the NDP, the question of undertaking a Strategic Environment Assessment (SEA) was considered by the Government. The outcome of this consideration, which included taking legal advice, was that an SEA was not required.

In 2007, the European commission sent a Letter of Formal Notice seeking information on the NDP and its status as it was their opinion that the NDP appeared to be a plan or programme subject to the SEA Directive. A reply was sent to the Commission setting out our position that the NDP is not subject to the aforementioned Directive.

The Commission sent a revised Letter of Formal Notice in 2008. Ireland's response confirmed our considered opinion that the NDP is not subject to the SEA Directive. Issues relating to Transport 21 are a matter, in the first instance, for the Minister for Transport.

Tax Yield.

Noel Ahern

Question:

173 Deputy Noel Ahern asked the Minister for Finance the level of taxation on cigarettes; the various taxation increases over the past 15 years; if this revenue is ring-fenced for health spending; if some of the extra taxation in recent years was ring-fenced, for example the 50 pence levy in the mid 1990s; the health spending on illnesses specifically related to tobacco products; and if he will make a statement on the matter. [28733/09]

Based on cigarettes costing €8.35 per pack of 20, following the most recent increase of 25 cent from midnight on 7 April, 2009, the price includes a total of €6.67 in taxation (€5.19 excise duty and €1.48 VAT). The increases in excise, inclusive of VAT, made over the past 15 years are set out in the following table.

In accordance with section 3 of the Appropriation Act, 1999, the Revenue Commissioners made payments each year of certain excise duties on tobacco products as an appropriation-in-aid to the Department of Health and Children. These payments, which are spread over the year, amount to €167.605 million per annum.

It is not the normal practice of the Government to ring-fence individual tax receipts for particular purposes. The receipts from taxation are paid to the Exchequer and used to finance the general provisions of public services.

As the Deputy may be aware smoking is the greatest single cause of preventable illness and premature death in Ireland, causing the deaths of over 6,500 people a year. The impact of smoking on costs in the health service in terms of treatment services for cancer, cardiovascular disease and respiratory diseases is significant. Between them, these diseases account for a very significant element of hospital admissions and hospital bed occupancy.

Increases in Excise Duty, inclusive of VAT

Budget

Amount of Duty Increase, inclusive of VAT, per pack of 20 cigarettes

1994

10 cent

1995

15 cent

1996

13 cent

1997

9 cent

1998

13 cent

1999

6 cent

2000

63 cent

2001

4 cent

2002

13 cent

2003

50 cent

2004

25 cent

2005

No increase

2006

No increase

2007

50 cent

2008

30 cent

2009

50 cent

Supplementary Budget April 2009

25 cent

Public Service Contracts.

Noel Ahern

Question:

174 Deputy Noel Ahern asked the Minister for Finance if he will clarify the situation concerning complaints from the printing industry regarding the level of Government agency work, on behalf of the Office of Public Works, being awarded to companies outside the State; if same can be quantified in value terms; the efforts that have been made to retain the work in Ireland; and if he will make a statement on the matter (details supplied). [28746/09]

Up to recently, the Government Supplies Agency (GSA), a Business Unit of the Office of Public Works, has provided a centralised procurement service to Government Departments, Offices and Agencies for a range of goods and services, including printing. This service is provided principally by means of drawdown contracts, which sets out prices, terms and conditions under which supplies are delivered. The various Departments, Offices and Agencies can purchase, as required, from the appointed contractors. These contracts are generally of two to three years duration — this has proven to be a reasonable period, having regard to factors, such as the protracted timescale involved in organising tender competitions, the requirement for a reasonable degree of certainty and stability (including price stability) for customers, the needs for contracts to be of sufficient duration for suppliers to achieve an adequate return on investment, and the desire of unsuccessful tenderers to have new opportunities to compete for the business.

Contracts are awarded on the basis of the most economically advantageous tender, determined on the basis of criteria detailed in the tender documents. There is no advantage to non-Irish companies in assessing tender prices — comparisons are made on the basis of prices excluding VAT.

The expenditure on GSA contracts for printing and binding services for the past three years is as follows:

2006

2007

2008

Printing and Binding Services

9,374,092

11,157,120

10,874,780

Cost of items printed outside the State

193,160

1,267,915

1,294,808

Of the contracts for printing and binding services, the proportion delivered by Irish printers under these contracts was 97.9% in 2006, 88.6% in 2007 and 88.1% in 2008.

All public procurement is subject to the fundamental EU Treaty principles of non-discrimination, transparency, freedom of movement and freedom to provide goods and services. The OPW is not permitted to discriminate on the grounds of nationality in its assessment of tenders.

The function of the Government Supplies Agency have now been subsumed by the National Public Procurement Operations Unit (NPPOU), a new Business Unit within OPW. This new Unit will provide procurement services to a much larger range of customers across the entire public sector. Before entering into any new contracts or agreements, the NPPOU will analyse both the supply markets and the level of demand for the various products and services, and will develop appropriate procurement strategies for each individual market. This may entail changes in the nature and duration of the contractual arrangements, which currently apply. The NPPOU have been in regular consultation with the Print and Packaging Forum to explore measures, which could be adopted to meet the challenges faced by the Irish Print Industry into the future. The NPPOU will encourage greater participation of SME's in public procurement, by providing guidance on how to compete more effectively for future tenders, and also encouraging partnerships between SME's (where appropriate) to bid for the larger print contracts. Through meaningful effective supplier interaction, the NPPOU will support the Print Industry to meet the challenges and opportunities provided for in these national print contracts into the future.

Tax Code.

Noel Ahern

Question:

175 Deputy Noel Ahern asked the Minister for Finance the approved VAT ranges that are allowed by the EU; if it is open to a member state to only use one VAT rate if they so decide; the VAT take from each of the rates in 2009; his views on the suggestion that Ireland should follow the UK and reduce our normal rate to 15% and increase the lower rate to 15%; if such an increase would substitute for the reduction; the loss to the Revenue Commissioners if the above change are made here; and if he will make a statement on the matter. [28755/09]

EU VAT law requires Member States to apply a single standard rate of VAT of not lower than 15%, and there is also political agreement that the standard rate applying in each Member State does not exceed 25%. Member States may also apply up to two reduced rates of VAT of no less than 5% and not more than 15% on those goods and services listed in Annex III of the EU VAT Directive. In addition, Member States may apply a reduced rate or a zero rate of VAT to goods and services not listed in Annex III in certain circumstances where a reduced or zero rate applied to those on 1 January 1991.

It is open to Member States to use a single rate of VAT, so long as it falls within the rules for the standard rate of VAT as outlined above.

I am informed by the Revenue Commissioners that the yield from the reduced and standard rates of VAT of 13.5% and 21.5% is estimated at €3,690 million and €7,730 million respectively in 2009.

Consolidating our existing reduced and standard rates of VAT into a single rate of 15% may simplify the VAT system and increase our competitiveness with the UK, however such a measure would be far too costly. It is estimated that while an increase from 13.5% to 15% in the reduced rate of VAT would yield an additional €410 million in a full year, however a decrease in the standard rate of VAT from 21.5% to 15% would cost €2,340 million in a full year; resulting in an overall loss to the Exchequer of around €1,930 million in a full year.

It should also be noted that in Ireland we apply the reduced VAT rate to a relatively large number of goods and services, and therefore consolidating our VAT rates to 15%, would result in a VAT increase for almost 40% of goods and services. The services involved include labour intensive services, residential housing, commercial construction and electricity, gas and domestic fuels. These increases would fall disproportionately on the less well off leading to significant public opposition to such a change.

Many of the items charged at 13.5% in Ireland are at the parked rate of VAT which applies in the case of such goods and services that are not included in Annex III of the EU VAT Directive but which were charged at a reduced rate on 1 January 1991. Such items include fuel used for heat or light and certain housing and construction. If the VAT rates are re-aligned into a new single standard rate, it would not be possible in the future under EU VAT law to revert these parked items back to the reduced rate.

Health Repayment Scheme.

Finian McGrath

Question:

176 Deputy Finian McGrath asked the Minister for Health and Children the position regarding a matter (details supplied). [28687/09]

Finian McGrath

Question:

177 Deputy Finian McGrath asked the Minister for Health and Children the position regarding a matter (details supplied). [28688/09]

The Health Service Executive (HSE) has responsibility for administering the Health Repayment Scheme in conjunction with the appointed Scheme Administrator KPMG/McCann Fitzgerald.

The Health (Repayment Scheme) Act 2006 provides a clear legal framework to repay recoverable health charges for publicly funded long-term residential care including contract beds in private institutions. Recoverable health charges are charges which were imposed on persons with full eligibility under the Health (Charges for In-patient Services) Regulations 1976 as amended in 1987 or charges for in-patient services only, raised under the Institutional Assistance Regulations 1954 as amended in 1965.

All applications from or in respect of persons with an intellectual disability who were admitted to long-stay residences are assessed within this legal framework and only the specific charges outlined above are repayable under the Health Repayment Scheme. The closing date for receipt of applications under the Scheme was 31 December 2007.

Child Care Services.

Ulick Burke

Question:

178 Deputy Ulick Burke asked the Minister for Health and Children the position regarding the provision of preschool for children as announced in budget 2009; if her projections and targets will be achieved; the total financial provision announced; if there is a cut in this provision; and the total number of children for which that provision will cater for. [28761/09]

As the Deputy will be aware, I have responsibility for the implementation of the new scheme to provide a free Preschool in Early Childhood Care and Education (ECCE), which will be implemented from January 2010.

The scheme will be funded from resources re-directed from the Early Childcare Supplement (ECS) which is being abolished from the end of this year. The proposed funding allocation for the scheme in 2010 is in the region of €170 million and I am not aware of any proposal to reduce this provision.

As part of the preparations for introducing the new scheme, the Childcare Directorate of my Office recently wrote to almost 5,000 private and voluntary preschool service providers in the State, inviting them to participate. These included preschool service providers who are notified to the Health Service Executive (HSE) or registered with the Irish Montessori Education Board (IMEB) and a number of other persons who have expressed an interest in establishing a preschool service and participating in the scheme. Application forms and other relevant information regarding the scheme were included in this correspondence and applicants are now returning forms to their local City or County Childcare Committees.

The closing date for response is 10 July 2009 and to date nearly 2,500 applications have been received from preschool services which will secure more than 43,000 preschool year places. It is estimated that up to 60,000 preschool year places could be required in January 2010 and I am confident that this will be achieved. It is expected that the application process will be completed by the end of September 2010 and following this a list of all participating services will be available to parents through the City and County Childcare Committees.

Pharmacy Regulations.

Joe McHugh

Question:

179 Deputy Joe McHugh asked the Minister for Health and Children her views that a reduction of 34% to pharmacists is fair and proportionate; her plans to negotiate this with pharmacists; and if she will make a statement on the matter. [28873/09]

James Reilly

Question:

180 Deputy James Reilly asked the Minister for Health and Children if she will negotiate with pharmacists to try and prevent their withdrawal from the community drugs scheme from 1 August 2009; and if she will make a statement on the matter. [28821/09]

Joe McHugh

Question:

181 Deputy Joe McHugh asked the Minister for Health and Children her contingency plans in the event of a withdrawal of pharmacists from the community drugs scheme from 1 August 2009; and if she will make a statement on the matter. [28921/09]

Joe McHugh

Question:

182 Deputy Joe McHugh asked the Minister for Health and Children her plans negotiate with pharmacists to try to prevent their withdrawal from the community drugs scheme from 1 August 2009; and if she will make a statement on the matter. [28922/09]

James Reilly

Question:

183 Deputy James Reilly asked the Minister for Health and Children the contingency plans she has put in place in the event of a withdrawal of pharmacists from the community drugs scheme from 1 August 2009; and if she will make a statement on the matter. [28820/09]

Charlie O'Connor

Question:

185 Deputy Charlie O’Connor asked the Minister for Health and Children the contingency plans to deal with the situation in which pharmacies have given notice of terminating services from 1 August 2009; if her attention has been drawn to the concern of the general public in this regard; and if she will make a statement on the matter. [28122/09]

John O'Mahony

Question:

202 Deputy John O’Mahony asked the Minister for Health and Children the plans she has put in place following the withdrawal of pharmacists contracts with the Health Service Executive which will affect medical card patients and many others using the drug payments scheme; her plans and those of the Health Service Executive to ensure the continued supply of medication to patients; and if she will make a statement on the matter. [28216/09]

Denis Naughten

Question:

203 Deputy Denis Naughten asked the Minister for Health and Children the action taken by Health Service Executive on payments to pharmacists; if an assessment has been completed on the impact that this will have in smaller towns; and if she will make a statement on the matter. [28254/09]

Noel Coonan

Question:

210 Deputy Noel J. Coonan asked the Minister for Health and Children the position regarding reducing margins given to pharmacists, provided for under the Financial Emergency Measures in the Public Interest Act 2009, taking into account pharmacists’ plans to discontinue providing services if the plans proceed; her plans to rescind this issue; and if she will make a statement on the matter. [28302/09]

Olwyn Enright

Question:

227 Deputy Olwyn Enright asked the Minister for Health and Children her views on whether the reduction of 34% to pharmacists is fair and proportionate; her plans to negotiate same with pharmacists; and if she will make a statement on the matter. [28435/09]

Olwyn Enright

Question:

233 Deputy Olwyn Enright asked the Minister for Health and Children the contingency plans she has in place in the event of a withdrawal of pharmacists from the community drugs scheme from 1 August 2009; and if she will make a statement on the matter. [28475/09]

Olwyn Enright

Question:

234 Deputy Olwyn Enright asked the Minister for Health and Children if she will negotiate with pharmacists to prevent their withdrawal from the community drugs scheme from 1 August 2009; and if she will make a statement on the matter. [28476/09]

I propose to take Questions Nos. 179 to 183, inclusive, 185, 202, 203, 210, 227, 233 and 234 together.

I am aware that a number of community pharmacists have indicated that they may withdraw from participation in the GMS and community drugs schemes in the light of my decision to reduce certain payments under the Financial Emergency Measures in the Public Interest Act 2009.

The Health Service Executive (HSE) has written to all 1,600 community pharmacy contractors to clarify whether they intend to continue the provision of services under the GMS and community drugs schemes.

A contingency plan is being put in place by the HSE, and will be implemented if required, to ensure that supplies of medicines to patients under the GMS and community drugs schemes will continue in the event of discontinuation of services by community pharmacists.

I believe that threats of withdrawal from the community pharmacy contract are unjustified and not in patients' interests. There can be no grounds for causing upset or anxiety about the supply of prescriptions to patients.

The decisions I have made on the reduction in payments to community pharmacists under the Act will reduce their income from the Health Service Executive (HSE) by €133m in a full year, from a total of approximately €550m. This is a reduction of 24% and not 34% as representatives of the Irish Pharmacy Union (IPU) have claimed. My decisions followed a public consultation process conducted under that Act. All interested stakeholders were invited to make submissions on the matter. The IPU made both a written and an oral submission to my Department. In addition, 104 other written submissions were received largely from community pharmacists. These submissions were analysed and considered before I made my decision to reduce payments.

Reductions are absolutely necessary for two reasons. Firstly, the cost of the community drugs schemes has doubled since 2002 to over €1.6 billion in 2008: and fees and other income earned by pharmacists have doubled accordingly. Secondly, it cost an exorbitant €640 million to get €1 billion of drugs from the factory gate to the patient in the community in 2008. This level of expenditure on delivery and dispensing is no longer sustainable, given the current financial circumstances of the country and the other priorities for spending in the health sector.

Savings from the measures have been estimated at €55 million for the remainder of this year and €133 million on a full year basis. This is almost exactly what would have been saved if I had imposed an across the board 8% reduction in fees and retail mark-ups and re-imposed the reduction in wholesale mark-up to 8%, as attempted by the HSE last year. However, I have decided to achieve broadly the same level of reduction through a revised common fee structure for dispensing, a reduced retail mark-up, removal of the special payment for over-70s dispensing and reduction in the wholesale mark-up to 10%.

In its submissions, the IPU indicated that it was prepared to consider yielding savings in an amount equivalent to 8% of dispensing fees only, which it calculated would save €21m in a full year. This would imply that their earnings from the HSE were just €260m in 2008. However, this is far from the case. In addition to dispensing fees, pharmacists also received a retail mark-up of 50% on items dispensed under the Drug Payments and Long Term Illness Schemes and special payments in respect of dispensing to persons aged 70 years and over. These payments brought their income from the HSE in 2008 to €440m. In addition pharmacists have benefitted from approximately half the €200m value of the wholesale margin. For the reasons outlined earlier, savings of €21m as proposed by the IPU would not have been an adequate response to the financial problems that we face in the pharmacy sector.

The IPU also suggested that savings of €30m could be obtained through generic substitution and €33.7m through a combination of changes in the High Tech Scheme, implementation of the Barry Report and the IPHA agreement. These are matters that are being pursued by my Department and the HSE. Any savings that arise under these headings will be additional to, and not a substitution for, the reductions in payments to pharmacists that I have announced.

Care of the Elderly.

Michael D'Arcy

Question:

184 Deputy Michael D’Arcy asked the Minister for Health and Children if the agreement still stands whereby the health care costs of pensioners living here who have paid national insurance in the UK while living and working here are covered and then reimbursed by the British Government; and if she will make a statement on the matter. [28118/09]

Regulation (EC) 1408/71 co-ordinates health and social security arrangements among EU member states (it also applies in the remaining EEA member states and Switzerland). Under these provisions, people who are insured with (covered by) the healthcare system of one EU member state are entitled to receive healthcare in the public system of another member state in certain circumstances, at the cost of the member state in which they are insured.

Ireland operates a bilateral healthcare reimbursement agreement with the United Kingdom, arising from the application of Regulation (EC) 1408/71. The agreement comprehends such persons as temporary visitors between the two countries; pensioners of one country residing in the other country and their dependants; and the dependants residing in one country of people who are employed in the other country. The amount due is the net difference between the costs to the Irish health services of providing care to those with UK entitlements and the cost to the UK health services of providing services to those with Irish entitlements. Allowance is also made for those with dual entitlements in both jurisdictions.

Under the terms of the agreement net liability between the two countries is calculated on a lump sum basis rather than an individual basis. Officials from my Department liaise regularly with their UK counterparts in discussions on the application of the agreement and I can confirm to the Deputy that the bilateral agreement continues to operate.

Question No. 185 answered with Question No. 179.

Pharmacy Statistics.

Chris Andrews

Question:

186 Deputy Chris Andrews asked the Minister for Health and Children the number of pharmacists in existence on 1 March 2008; and the number on 1 March 2009. [28124/09]

According to the Pharmaceutical Society of Ireland (PSI) records the number of Retail Pharmacy Businesses that were notified to the PSI on 1 March 2008 was 1571 and on 1 March 2009 was 1599.

Care of the Elderly.

Lucinda Creighton

Question:

187 Deputy Lucinda Creighton asked the Minister for Health and Children the funding schemes available to a voluntary organisation being set up in the Dublin inner city area to provide voluntary care to the elderly in the Meath Street area; and if she will make a statement on the matter. [28137/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply.

Departmental Investigations.

Billy Timmins

Question:

188 Deputy Billy Timmins asked the Minister for Health and Children the breakdown of the €2.1 million cost into the inquiry involving Leas Cross Nursing Home; and the person who was in receipt of €2.1 million. [28139/09]

On 24 April 2007, the Government announced its decision to establish a commission of investigation into the management, ownership, and operation of Leas Cross Nursing Home. The Commission of Investigation (Leas Cross Nursing Home) was established on 6 June 2007, under section 3 of the Commissions of Investigation Act 2004. Mr Diarmuid P. O'Donovan, S.C., was appointed as the Sole Member of this Commission. It formally commenced its work in September 2007. The final report was received in June 2009.

Mr O'Donovan was assisted in his work by one solicitor, five barristers at different time intervals, and three clerical / secretarial staff. The total cost for the Commission is expected to be in the region of €2.1 million and includes staffing, accommodation, equipment and third-party legal costs. Invoices paid to 26 March 2009 totalled €1.423 million. This consisted of staffing and associated costs for the Commission of €1.270 million and accommodation and ICT costs of €0.153 million. A number of invoices were received towards the end of the Commission's lifetime which were subject to query before payment. Consequently, a final breakdown of the costs is not yet available. The remaining expenditure will consist mainly of third party legal fees, staffing costs and administration and ICT expenses.

Hospitals Building Programme.

Brendan Kenneally

Question:

189 Deputy Brendan Kenneally asked the Minister for Health and Children the status of the proposed new 50 bed unit for St. Patrick’s Hospital, Waterford; and if she will make a statement on the matter. [28157/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply.

Hospital Procedures.

Brendan Kenneally

Question:

190 Deputy Brendan Kenneally asked the Minister for Health and Children the number of angiograms conducted in Waterford Regional Hospital in 2009; and the number conducted every year for the past five years per year. [28158/09]

Brendan Kenneally

Question:

191 Deputy Brendan Kenneally asked the Minister for Health and Children the number of patients over the past five years who have received an angiogram in Waterford Regional Hospital and went on to receive further follow up treatment locally, broken down by year to date in 2009. [28159/09]

Brendan Kenneally

Question:

192 Deputy Brendan Kenneally asked the Minister for Health and Children the number of patients who were treated for an angiogram in hospitals other than Waterford Regional Hospital after having initially been diagnosed in Waterford Regional Hospital in the past five years with a breakdown of these figures by year; and the cost of treating these patients per year. [28160/09]

Brendan Kenneally

Question:

193 Deputy Brendan Kenneally asked the Minister for Health and Children the estimated cost of running a full time angiogram service in Waterford Regional Hospital. [28161/09]

Brendan Kenneally

Question:

194 Deputy Brendan Kenneally asked the Minister for Health and Children the number of days the angiogram service operates in Waterford Regional Hospital per week; the number of days it has been in operation in 2006, 2007, 2008 and to date in 2009. [28162/09]

Brendan Kenneally

Question:

195 Deputy Brendan Kenneally asked the Minister for Health and Children the efforts made to operate the angiogram service in Waterford Regional Hospital on a full time basis; and if she will make a statement on the matter. [28163/09]

I propose to take Questions Nos. 190 to 195, inclusive, together.

As these are service matters, they have been referred to the HSE for direct reply.

Hospital Services.

Brendan Kenneally

Question:

196 Deputy Brendan Kenneally asked the Minister for Health and Children the different departments that are currently in operation in Waterford Regional Hospital. [28164/09]

As this is a service matter, it has been referred to the HSE for direct reply.

Health Services.

Ned O'Keeffe

Question:

197 Deputy Edward O’Keeffe asked the Minister for Health and Children if she will ensure that funding is maintained in respect of an organisation (details supplied) in County Cork. [28197/09]

As the Deputy's question relates to service matters I have arranged for the question to be referred to the Health Service Executive for direct reply.

Medical Cards.

Ned O'Keeffe

Question:

198 Deputy Edward O’Keeffe asked the Minister for Health and Children the position regarding an application for renewal of a medical card by a person (details supplied) in County Cork. [28198/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply to the Deputy.

Preschool Services.

Richard Bruton

Question:

199 Deputy Richard Bruton asked the Minister for Health and Children her views on providing schools participating in the free preschool scheme a higher capitation grant if they employ teachers with higher educational qualifications; and if she will make a statement on the matter. [28204/09]

As the Deputy will be aware, I have responsibility for the implementation of the new Early Childhood Care and Education scheme which provides a free preschool year to eligible children and which will be introduced in January 2010.

The scheme is open to private and voluntary preschool services including both sessional playschools and creche facilities. Sessional playschools will, normally, participate in the scheme by providing the preschool year for 3 hours a day, 5 days a week over 38 weeks while full or part-time creche facilities will, normally, participate by providing the preschool year for 2 hours, 15 minutes a day, 5 days a week over 50 weeks.

An annual capitation fee of over €2,400 will be paid to participating services in return for the provision of a free pre-school year to each child. This is equivalent to approximately €276 per month where a service is participating for 38 weeks and approximately €207 per month where it participates for 50 weeks. Services may, however, charge parents for additional services provided these are clearly optional to parents and provided appropriate programme based activities continue to be provided to children not availing of such services during the pre-school year hours.

While there is no requirement in relation to the qualifications of staff under the Child Care (Preschool Services) (No. 2) Regulations 2006, it is a requirement of the ECCE scheme that pre-school year leaders in services participating in the scheme hold a qualification in childcare which is equivalent to FETAC Level 5. It is proposed to increase this requirement to a qualification in childcare equivalent of FETAC Level 6 over time. The capitation fee which is provided for applies to all services which choose to participate and additional funding is not provided where the requirements of the scheme are exceeded.

Health Services.

Catherine Byrne

Question:

200 Deputy Catherine Byrne asked the Minister for Health and Children if she will grant speech and language therapy for a person (details supplied) in Dublin 12; if her attention has been drawn to the fact that this person is waiting a long time and their condition could deteriorate further unless they receive treatment now; and if she will make a statement on the matter. [28211/09]

The Health Service Executive advised this Department that there is a high demand for Speech and Language Therapy Services in Crumlin and the surrounding areas. The Local Health Office has in recent weeks received approval to recruit a Speech and Language Therapist. The HSE LHO Manager has advised that his office will be in a better position in the near future to give a firm indication as to when Hugo will be seen for assessment. As the Deputy's question relates to service matters I have arranged for the question to be referred to the Health Service Executive for direct reply.

Catherine Byrne

Question:

201 Deputy Catherine Byrne asked the Minister for Health and Children the number of speech therapists who currently operate from a health centre (details supplied) in Dublin 12 and their working hours; if there are vacancies for speech therapists at this health centre; when these vacancies will be filled; and if she will make a statement on the matter. [28212/09]

Subject to overall parameters set by Government, the Health Service Executive has the responsibility for determining the composition of its staffing complement. In that regard, it is a matter for the Executive to manage and deploy its human resources to best meet the requirements of its Annual Service Plan for the delivery of health and personal social services to the public. As this is a service matter it has been referred to the HSE for direct reply.

Questions Nos. 202 and 203 answered with Question No. 179.

Denis Naughten

Question:

204 Deputy Denis Naughten asked the Minister for Health and Children, further to Parliamentary Question No. 169 of 28 January 2009, if all agencies under her authority have now furnished a full response; and if she will make a statement on the matter. [28258/09]

I refer the Deputy to my reply to Question No.94 of 5 March 2009 on this matter. My Department has contacted the HSE and the other agencies once more and requested again that they reply to the Deputy as a matter of urgency.

Finian McGrath

Question:

205 Deputy Finian McGrath asked the Minister for Health and Children if he will support the case of a person (details supplied) in Dublin 11. [28267/09]

As this is a service matter it has been referred to the HSE for direct reply.

Medical Cards.

John McGuinness

Question:

206 Deputy John McGuinness asked the Minister for Health and Children if a medical card will be issued in the case of a person (details supplied) in County Kilkenny who is in need of ongoing medical treatment; and if she will expedite the matter. [28276/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply to the Deputy.

Health Services.

Olivia Mitchell

Question:

207 Deputy Olivia Mitchell asked the Minister for Health and Children if she will ensure that a follow-on day service will be made available to a person (details supplied) in Dublin 12; and if she will make a statement on the matter. [28289/09]

As the Deputy's question relates to service matters I have arranged for the question to be referred to the Health Service Executive for direct reply.

Olivia Mitchell

Question:

208 Deputy Olivia Mitchell asked the Minister for Health and Children if she will ensure that a follow-on day service will be made available to a person (details supplied) in County Wicklow; and if she will make a statement on the matter. [28290/09]

As the Deputy's question relates to service matters I have arranged for the question to be referred to the Health Service Executive for direct reply.

Hospital Waiting Lists.

John McGuinness

Question:

209 Deputy John McGuinness asked the Minister for Health and Children the reason a person (details supplied) in County Kilkenny has to wait 18 months for a scan at Waterford Regional Hospital; and if he will expedite a response. [28293/09]

The management of waiting lists generally is a matter for the HSE and the individual hospitals concerned. I have, therefore, referred the Deputy's question to the Executive for direct reply.

Question No. 210 answered with Question No. 179.

Health Service Expenditure.

Mattie McGrath

Question:

211 Deputy Mattie McGrath asked the Minister for Health and Children the amount of money paid out by the Health Service Executive in 2005, 2006, 2007, 2008 and to date in 2009 for the services of public relations companies, consultants and special advisers who are not in direct employment of the HSE or her Department; and if she will make a statement on the matter. [28307/09]

As this is a matter for the HSE, it has been referred to the Executive for attention and direct reply to the Deputy.

Care of the Elderly.

Caoimhghín Ó Caoláin

Question:

212 Deputy Caoimhghín Ó Caoláin asked the Minister for Health and Children her plans to avert the closure of the six bed acute psychiatric unit for older people at Portlaoise General Hospital and the closure of beds at St. Brigid’s Hospital, Shaen, Portlaoise; and if she will make a statement on the matter. [28312/09]

As this is a service matter the question has been referred to the HSE for direct reply.

Medical Cards.

Paul Connaughton

Question:

213 Deputy Paul Connaughton asked the Minister for Health and Children the reason a person (details supplied) in County Galway has been deemed not to be eligible for an over 70s medical card; and if she will make a statement on the matter. [28321/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply to the Deputy.

Cancer Screening Programme.

Dinny McGinley

Question:

214 Deputy Dinny McGinley asked the Minister for Health and Children if she has had a meeting with an organisation (details supplied); the persons who were present at the meeting; the matters discussed; the steps she will take in regard to same; and if she will make a statement on the matter. [28351/09]

I met a delegation from Co-operating for Cancer Care NorthWest on 29 June. A senior official from the Department's Cancer Policy Unit was also present. A wide range of issues was discussed in relation to cancer services for the people of the North West. These included, in particular, cross-border co-operation in radiotherapy services and the roll-out of the BreastCheck programme to Donegal and other remaining counties. In regard to the provision of cross-border radiotherapy services, I advised that discussions are ongoing between officials from my Department and their counterparts in Northern Ireland following the announcement of Minister McGimpsey of the Department of Health, Social Services and Public Safety, Northern Ireland of the provision of a satellite radiotherapy centre, linked to Belfast City Hospital, at Altnagelvin. I told the group that the facility is expected to be operational by 2015 and that I am committed to providing appropriate funding for the project.

In regard to the roll-out of BreastCheck in Clare, Donegal and Leitrim, I confirmed that the consent process for women in Clare is underway. The consent process in Donegal will begin in the second half of September with screening commencing in October, while the consent process will commence in Leitrim in October. A wide range of other issues was also discussed at the meeting including cancer screening and preventative initiatives, cross-border funding for health projects, services at Letterkenny General Hospital and transport for cancer patients. The discussion enabled me to understand the concerns of the CCC(NW) group and also to outline to them my Department's position in relation to these issues. I understand that the interim Director of the National Cancer Control Programme will meet this group in the near future.

Health Services.

Enda Kenny

Question:

215 Deputy Enda Kenny asked the Minister for Health and Children the level of genetic services provided from the National Centre for Medical Genetics as of June 2009; the reduction in laboratory staff at the NCMG since September 2008; the number of requests for tests that have been placed by doctors; if she will confirm that these tests are being sent to commercial laboratories in the UK, France and other locations and that the cost of these tests is being borne by the Health Service Executive; the number of staff let go from these laboratories since September 2008; the number of those staff who are signing on for social welfare; and if she will make a statement on the matter. [28358/09]

Enda Kenny

Question:

216 Deputy Enda Kenny asked the Minister for Health and Children her views on the validity of results of genetic tests from commercial laboratories; the number of tests carried out by some commercial genetic laboratories that have been incorrect and that have had to be repeated in the past two years; if she will confirm that many genetic tests need expert interpretation and that such interpretation is often at times not available at a commercial laboratory requiring the Health Service Executive to pay substantial amounts for the tests in the first instance and that the results are often so ambiguous and unclear that the genetics consultant has to have such tests repeated at the National Centre for Medical Genetics in order to have a reliable diagnosis before advising a patient of a family; and if she will make a statement on the matter. [28359/09]

Enda Kenny

Question:

217 Deputy Enda Kenny asked the Minister for Health and Children the waiting time for patients who require a genetic service from genetic consultants; and if she will make a statement on the matter. [28360/09]

Enda Kenny

Question:

218 Deputy Enda Kenny asked the Minister for Health and Children her plans to expand the genetics service based on current levels of demand; and if she will make a statement on the matter. [28361/09]

Enda Kenny

Question:

219 Deputy Enda Kenny asked the Minister for Health and Children if she has carried out a cost benefit analysis on the efficiency of having genetics tests paid for by the Health Service Executive being sent abroad and the consequence of letting trained scientists and technologists who have unique skills in laboratory genetics being made redundant; if she will publish the results of such cost benefit analysis; and if she will make a statement on the matter. [28362/09]

I propose to take Questions Nos. 215 to 219, inclusive, together.

As these are service issues, they have been referred to the HSE for direct reply.

Seán Ó Fearghaíl

Question:

220 Deputy Seán Ó Fearghaíl asked the Minister for Health and Children her views on the fact that some general medical practitioners and consultants have continued to increase their fees to non-medical card patients, despite the changed economic climate; her plans to discourage this trend; and if she will make a statement on the matter. [28363/09]

Consultation fees charged to private patients by general practitioners and consultants are a matter of private contract between the doctor and the patient. While I have no role in relation to such fees, I would expect Consultants and General Practitioners to have regard to the overall economic situation in setting their fees. I should add that General Practitioners who hold General Medical Services contracts with the Health Service Executive must not seek or accept money from medical card or GP visit card holders in respect of routine treatment.

Departmental Expenditure.

Denis Naughten

Question:

221 Deputy Denis Naughten asked the Minister for Health and Children the cost of public advertising funded by her Department in 2009; the breakdown between statutory and non-statutory advertising; the corresponding figure for each agency under the control of her Department; and if she will make a statement on the matter. [28422/09]

In 2009, my Department spent €103,091.73 on public advertising. Some €58,467.11 had a statutory basis and €44,624.62 a non-statutory basis. The expenditure on public advertising by agencies under the aegis of my Department, other than the HSE, is being collated and will be forwarded directly to the Deputy as soon as it is available. The question of advertising costs incurred by the HSE has been referred to the Executive for direct reply to the Deputy.

Health Services.

Olwyn Enright

Question:

222 Deputy Olwyn Enright asked the Minister for Health and Children the savings and the changes made to the 2009 Health Service Executive budget in the Laois-Offaly area by item in tabular form; the services that have been reduced or varied; and if she will make a statement on the matter. [28430/09]

Olwyn Enright

Question:

223 Deputy Olwyn Enright asked the Minister for Health and Children the savings and the changes made to the 2009 Health Service Executive budget in respect of each hospital and each hospital department in the Laois-Offaly area by item in tabular form; the services that have been reduced or varied; and if she will make a statement on the matter. [28431/09]

Olwyn Enright

Question:

224 Deputy Olwyn Enright asked the Minister for Health and Children the contracts that have not been renewed in the Health Service Executive in the Laois-Offaly area since 1 January 2009; the further contracts that will not be renewed for the remainder of 2009; and if she will make a statement on the matter. [28432/09]

Olwyn Enright

Question:

236 Deputy Olwyn Enright asked the Minister for Health and Children the service reviews currently being carried out by the Health Service Executive in Laois and Offaly; the purpose of these reviews; when they were initiated; and if she will make a statement on the matter. [28478/09]

I propose to take Questions Nos. 222 to 224, inclusive, and Question No. 236 together.

As the Deputy is aware, the National Service Plan 2009 which I approved in December contained a number of economic and cost avoidance measures for 2009 (in addition to a continuation of value for money measures from 2008). Subsequently a range of potential exposures (some of which were identified in the National Service Plan) materialised. Based on the best information available, a figure of €540 million was arrived at following intensive discussions and a detailed examination by the HSE and my Department.

The Government made significant decisions on spending, revenue raising and employment control in the Supplementary Budget. The approach agreed as part of the Supplementary Budget when combined with the €133 million in measures previously identified by the HSE and not affecting the National Service Plan left a potential shortfall of €147 million to be addressed. In April I approved a series of measures to address this potential shortfall and obviate the need to amend the National Service Plan. The HSE is now implementing these measures in order to deliver the Service Plan within its existing allocation. The level of service originally planned by the HSE and set out in the 2009 Service Plan is continuing to be delivered. Indeed, in a number of areas planned service levels have been exceeded so far this year. Maintaining this level of performance will demand close attention to value for money and ongoing modernisation of service delivery in line with best practice. With regard to specific issues relating to the Laois-Offaly area, I have referred the matter to the HSE for direct reply.

Health Service Staff.

Olwyn Enright

Question:

225 Deputy Olwyn Enright asked the Minister for Health and Children the number of staff in the Laois-Offaly area on maternity leave whose positions have not been filled in their absence in 2009; the grades and areas that these staff are in; and if she will make a statement on the matter. [28433/09]

As this is a service matter, it has been referred to the HSE for attention and direct reply to the Deputy.

Olwyn Enright

Question:

226 Deputy Olwyn Enright asked the Minister for Health and Children the number of staff in the Laois-Offaly area on sick leave of more than one weeks duration whose positions have not been filled in their absence in 2009; the grades and areas these staff are in; and if she will make a statement on the matter. [28434/09]

As this is a service matter, it has been referred to the HSE for attention and direct reply to the Deputy.

Question No. 227 answered with Question No. 179.

Services for People with Disabilities.

Noel Ahern

Question:

228 Deputy Noel Ahern asked the Minister for Health and Children the position regarding persons with an intellectual disability and a person (details supplied) in Dublin 5; if all existing funded schemes in this area are being maintained; the reason the person was told there will be no service for them from September 2009 unless additional funds are provided; and if she will provide same. [28447/09]

As the Deputy's question relates to service matters I have arranged for the question to be referred to the Health Service Executive for direct reply.

Preschool Services.

Jan O'Sullivan

Question:

229 Deputy Jan O’Sullivan asked the Minister for Health and Children the basis, with regard to the early childhood care and education scheme, on which the cut-off age of four years and ten months on 1 January 2010 was chosen; if it will be waived in the case of a family whose child is a year from starting school but is slightly too old to qualify; and if she will make a statement on the matter. [28456/09]

As the Deputy will be aware, I have responsibility for the implementation of the new Early Childhood Care and Education scheme which provides a free Pre-School year to eligible children and which will be introduced in January 2010.

Under the scheme, eligible children will be able to avail of a pre-school year prior to commencing primary school. Children will be eligible where they are aged between 3 years 3 months and 4 years 6 months on 1 September each year. The scheme is being introduced in January 2010 and children aged between 3 years 7 months and 4 years 10 months on the 1st January 2010 will be eligible to avail of the free pre-school provision.

To provide additional flexibility for parents, for the purposes of this scheme children will qualify where they have not yet reached the age of 4 years 7 months during the month of September each year. This provision will also apply to children entering the scheme in January 2010 and those who have not reached the age of 4 years and 11 months during the month of January will be eligible.

The majority of children who participate in the scheme would be expected to commence primary school between the age of 4 years 3 months and 5 years 6 months and the age range for eligibility is designed to give flexibility to parents to access the scheme at the most appropriate time for their children prior to commencing school.

Health Services.

Jan O'Sullivan

Question:

230 Deputy Jan O’Sullivan asked the Minister for Health and Children the reason a contract to provide renal dialysis with an Irish company (details supplied) was not renewed by the Health Service Executive and was instead awarded to a non-Irish company; if she will ensure that the decision is re-visited; and if she will make a statement on the matter. [28458/09]

As this is a service issue, it has been referred to the HSE for direct reply.

Medical Cards.

Jan O'Sullivan

Question:

231 Deputy Jan O’Sullivan asked the Minister for Health and Children when a person (details supplied) in County Kerry who applied for renewal of their medical card in October 2008 will receive a decision; and if she will make a statement on the matter. [28459/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply to the Deputy.

Departmental Expenditure.

Leo Varadkar

Question:

232 Deputy Leo Varadkar asked the Minister for Health and Children the amount spent by her Department on legal fees directly to lawyers or through the State Solicitor’s Office for each of the years 2006, 2007 and 2008; and if she will make a statement on the matter. [28470/09]

Payments made by my Department in respect of legal fees, the legal costs associated with awards/settlements and similar payments made on behalf of the Hepatitis C and HIV Compensation Tribunal in the years 2006 to 2008 are set out in tabular form below.

2006

2007

2008

€m

€m

€m

Department of Health and Children

3.931

4.412

4.711

Hepatitis C and HIV Compensation Tribunal

11.962

8.345

9.372

Questions Nos. 233 and 234 answered with Question No. 179.

Hospital Services.

Olwyn Enright

Question:

235 Deputy Olwyn Enright asked the Minister for Health and Children the number of beds in each hospital and nursing unit in Laois and Offaly of all types that have been closed or are currently not open in tabular form; and if she will make a statement on the matter. [28477/09]

Olwyn Enright

Question:

240 Deputy Olwyn Enright asked the Minister for Health and Children if she will itemise in tabular form the number of people waiting to receive a service or therapy under each category of service in the hospital inpatient and outpatient section of Laois-Offaly Health Service Executive; the average length of wait in each category; and if she will make a statement on the matter. [28482/09]

I propose to take Questions Nos. 235 and 240 together.

As the issues raised relate to service matters, they have been referred to the Health Service Executive for direct reply.

Question No. 236 answered with Question No. 222.

Health Service Staff.

Olwyn Enright

Question:

237 Deputy Olwyn Enright asked the Minister for Health and Children the number of speech and language therapists who were to be employed under the Laois-Offaly service plan; the number in place; the number whose contracts have not been renewed or who are on leave whose posts have not been filled; the number of unfilled vacancies; and if she will make a statement on the matter. [28479/09]

Subject to overall parameters set by Government, the Health Service Executive has the responsibility for determining the composition of its staffing complement. In that regard, it is a matter for the Executive to manage and deploy its human resources to best meet the requirements of its Annual Service Plan for the delivery of health and personal social services to the public. As this is a service matter it has been referred to the HSE for direct reply.

Health Services.

Olwyn Enright

Question:

238 Deputy Olwyn Enright asked the Minister for Health and Children the number of hours of speech and language therapy delivered in Laois and Offaly in the first six months of 2008 and of 2009; and if she will make a statement on the matter. [28480/09]

As the Deputy's question relates to service matters I have arranged for the question to be referred to the Health Service Executive for direct reply.

Olwyn Enright

Question:

239 Deputy Olwyn Enright asked the Minister for Health and Children if she will itemise in tabular form the number of people waiting to receive a service or therapy under each category of service in the community care section of Laois-Offaly Health Service Executive; the average length of wait in each category; and if she will make a statement on the matter. [28481/09]

As the Deputy's question relates to service matters it has been referred to the Health Service Executive for direct reply.

Question No. 240 answered with Question No. 235.

Patient Advocacy.

Aengus Ó Snodaigh

Question:

241 Deputy Aengus Ó Snodaigh asked the Minister for Health and Children the hospitals here which have a patients’ council or a patient advocate and their contact details. [28618/09]

As this is a service matter, it has been referred to the HSE for direct reply.

Aengus Ó Snodaigh

Question:

242 Deputy Aengus Ó Snodaigh asked the Minister for Health and Children the reason patients at Cherry Orchard Hospital, Dublin, do not have a patient advocate. [28619/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply.

Health Services.

Aengus Ó Snodaigh

Question:

243 Deputy Aengus Ó Snodaigh asked the Minister for Health and Children the cost saving involved in closing down the respite bed unit in Cherry Orchard Hospital, Dublin 10; the cost of outsourcing private nursing homes beds for some of the current users of the beds in the hospital; and the duration that the unit will be closed. [28620/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply.

Aengus Ó Snodaigh

Question:

244 Deputy Aengus Ó Snodaigh asked the Minister for Health and Children when the new mental health centre to replace the Ballyfermot mental health centre, Dublin, will be completed; if she will confirm that funding for the centre which had been secured from the sale of other Health Service Executive properties is not affected by the HSE’s savings plan; and the details of what will be included in the new centre in the grounds of Cherry Orchard Hospital. [28621/09]

As this is a service matter the question has been referred to the HSE for direct reply.

Finian McGrath

Question:

245 Deputy Finian McGrath asked the Minister for Health and Children the position regarding a matter (details supplied). [28686/09]

As this is a service issue, it has been referred to the HSE for direct reply.

Michael Ring

Question:

246 Deputy Michael Ring asked the Minister for Health and Children when a person (details supplied) in County Mayo will be called for treatment at a hospital in view of the hardship the delay is causing them. [28703/09]

The matter raised by the Deputy relates to the provision of healthcare services and accordingly, I have asked the HSE to respond directly to him.

Ambulance Service.

Pat Breen

Question:

247 Deputy Pat Breen asked the Minister for Health and Children if she will report on the level of ambulance cover 24 hours a day seven days a week at a station (details supplied) in County Clare; and if she will make a statement on the matter. [28714/09]

As this is a service matter, it has been referred to the HSE for direct reply.

Health Services.

Paul Nicholas Gogarty

Question:

248 Deputy Paul Gogarty asked the Minister for Health and Children if the decision to close long term respite facilities at Cherry Orchard Hospital, Dublin and move the services into a roll-over respite service unit will result in savings to the HSE; if the benefit of savings made is outweighed by the moving of patients from a long-stay care ward into a roll-over respite service unit outside the area and the difficulties that this may cause for patients and their families; and if she will make a statement on the matter. [28716/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply.

Fergus O'Dowd

Question:

249 Deputy Fergus O’Dowd asked the Minister for Health and Children if she will respond to correspondence (details supplied); and if she will make a statement on the matter. [28731/09]

As this is a service matter it has been referred to the HSE for direct reply.

Medical Cards.

Noel Ahern

Question:

250 Deputy Noel Ahern asked the Minister for Health and Children if he will clarify the position in relation to the legislation passed restricting the automatic right to medical cards for persons over 70; the agreed provision to take place with renewal of medical cards after March 2009; if it was agreed at the passing of the legislation that existing card holders would be subject to a full means test system on renewal of their card or if it was to be a simplified process; if she is satisfied that the Health Service Executive is operating the system in accordance with the legislation; and if she will make a statement on the matter. [28732/09]

Under the Health Act 2008, automatic entitlement to a medical card for persons aged 70 and over ended on 31st December 2008. With effect from 1st January, 2009, the income thresholds for entitlement to a medical card for those aged 70 and over are €700 (gross) per week (€36,500 per year) for a single person and €1,400 (gross) per week (€73,000 per year) for a couple.

In early January 2009, the HSE wrote to persons aged 70 and over who were medical card holders on 31st December 2008, informing them that either they would continue to hold their card or, if they considered that they were over the income thresholds, they should advise the HSE by 2nd March 2009, after which date their medical card was no longer valid.

A medical card holder aged 70 or over, who continues to hold a card will, of course, be subject to review on a regular basis, as is the case with all other medical card holders. However, under the new arrangements, a much simplified system of assessment for eligibility was introduced in respect of persons aged 70 and over, based on gross income rather than net income, as applies otherwise for means-testing of eligibility for medical cards.

Health Services.

Noel Ahern

Question:

251 Deputy Noel Ahern asked the Minister for Health and Children the counselling or advisory services available from her Department or agencies under the aegis of her Department for women who have lost a baby through death or miscarriage; if there is a service provided by maternity hospitals; if this is available for a significant period thereafter; if women in such a crisis are referred on by maternity hospitals; the structure, organisation and availability of such services; the relevant routes to access such services; and if she will make a statement on the matter. [28735/09]

I am aware that counselling and other services are provided by the HSE for parents and families who have lost a child through death or miscarriage in maternity hospitals, and in some cases, these services are provided by volunteer organisations such as the Irish Stillbirth and Neonatal Death Society (ISANDS) and the Miscarriage Association of Ireland.

Since the Deputy has raised a number of specific questions in relation to the services being provided, they have been referred to the Health Service Executive for direct reply.

Noel Ahern

Question:

252 Deputy Noel Ahern asked the Minister for Health and Children if she will arrange to have the case of a person (details supplied) in Dublin 5 attended to; and if she will make a statement on the matter. [28738/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply.

Noel Ahern

Question:

253 Deputy Noel Ahern asked the Minister for Health and Children the cost of taxis used by the Health Service Executive each year; the criteria used or categories of patients who qualify; the change made in 2009, when persons with illness, mobility and age problems are no longer provided with a taxi service when going to and from a hospital; if she will clarify the changes in the case of a person (details supplied) in Dublin 5; and if she will make a statement on the matter. [28749/09]

As this is a service matter, it has been referred to the HSE for direct reply.

Accident and Emergency Services.

Noel Ahern

Question:

254 Deputy Noel Ahern asked the Minister for Health and Children her plans to improve the accident and emergency units in the Mater and Beaumont Hospitals, Dublin; when same and improved general organisation, particularly at weekends, will be expedited; if she will report on the case of a person (details supplied) in Dublin 9; if this case can be examined; and if she will make a statement on the matter. [28752/09]

As this is a service issue, it has been referred to the HSE for direct reply.

Medical Cards.

Noel Ahern

Question:

255 Deputy Noel Ahern asked the Minister for Health and Children the current target timescale for the processing of medical card applications; and if she will respond to the case of persons (details supplied) in Dublin 5. [28753/09]

Up to the start of this year, medical card and GP visit card applications were processed in the 32 local health areas. However, under the Health Service Executive's 2009 Service Plan, the processing of all medical card and GP visit card applications will transfer to the Executive's Primary Care Reimbursement Service (PCRS) in Dublin. The change is being implemented on a phased basis and has commenced with the PCRS processing all medical card applications for persons aged 70 or over.

Under the new arrangements, the HSE will be aiming for a turnaround time of 15 days or less for all medical card applications. Emergency applications will be dealt with immediately with a card issuing within 24 hours. People whose income exceeds the income guidelines but have a case to be considered on medical or hardship grounds will continue to have their application considered by the PCRS. Since medical card applications will all be processed centrally, this will result in a more consistent and transparent approach being applied.

This is an example of the type of innovation signalled in the Transforming Public Services Programme announced by the Taoiseach last November. It demonstrates how improved services can be delivered within the more limited resources available in a way which meets the needs of citizens in a modern society. As the Deputy's question refers specifically to an individual, my Department has requested the Parliamentary Affairs Division of the Executive to arrange to address this matter, and to have a reply issued directly to the Deputy.

Nursing Home Subventions.

Noel Ahern

Question:

256 Deputy Noel Ahern asked the Minister for Health and Children the date of the commencement of the nursing home fair deal scheme, that was passed in the Houses of the Oireachtas; if a person (details supplied) in Dublin 9 will be eligible under the terms of the scheme; if they will receive a subvention to continue in a private nursing home or be moved to a Health Service Executive Nursing home; if she will provide this Deputy with the arrangements for this person. [28754/09]

The Nursing Homes Support Scheme Act 2009 was signed into law by the President on the 1st July. The Minister intends to implement the scheme in the final quarter of this year.

Under the scheme, existing nursing home residents in public or approved private nursing homes, and new entrants to public and approved private nursing homes, will be able to apply for financial support. In order to become approved for the purposes of the scheme, a private nursing home must: be registered under the Health (Nursing Homes) Act 1990 at present and, in the future, under the Health Act 2007 (once the relevant sections are commenced), have agreed a price for the purposes of the scheme with the National Treatment Purchase Fund (NTPF), and hold a valid tax clearance certificate.

Existing nursing home residents in approved private nursing homes who are in receipt of subvention can choose to transfer to the new scheme or can remain on the subvention scheme. As such, the individual referred to by the Deputy may remain on subvention or may apply to transfer to the new scheme subject to their nursing homes being approved for that purpose, according to their particular wishes.

Departmental Expenditure.

Ulick Burke

Question:

257 Deputy Ulick Burke asked the Minister for Health and Children in view of the current financial shortfall to the Health Service Executive, if she will stop all unnecessary expenditure on reports and leaflets for a period of time, while there is a need for urgent funding in the delivery of front line services and community services in view of the stated cost to the HSE of such items; and the details of this expenditure in each of the years 2006, 2007, 2008 and to date in 2009 for each HSE area and at departmental level. [28762/09]

My Department is making increasing use of electronic and online publishing in order to reduce costs in this area, with hard copies being produced only where it is considered necessary. The printing costs in respect of my Department for the years mentioned are: 2006 — €880,579.60; 2007 — €901,950.60; 2008 — €555,370.00; 2009 — €211,401.10. My Department is asking the HSE to reply directly to the Deputy regarding printing costs incurred by the Executive.

Ulick Burke

Question:

258 Deputy Ulick Burke asked the Minister for Health and Children the total amount spent by the Health Service Executive in public relations consultancy for each of the years 2007, 2008 and to date in 2009; the areas of greatest cost of such expenditure in each HSE area and at departmental level; and if she will make a statement on the matter. [28763/09]

My Department has requested the Parliamentary Affairs Division of the HSE to have a reply issued directly to the Deputy on this matter.

Hospital Accommodation.

Ulick Burke

Question:

259 Deputy Ulick Burke asked the Minister for Health and Children the number of beds and wards currently out of use at hospitals (details supplied); the number of beds and wards to be closed on a seasonal basis; the start date and proposed reopening date of these beds; and if she will make a statement on the matter. [28765/09]

As this is a service matter, it has been referred to the HSE for direct reply.

Public Transport.

Fergus O'Dowd

Question:

260 Deputy Fergus O’Dowd asked the Minister for Transport if he will respond to issues raised in correspondence (details supplied); and if he will make a statement on the matter. [28641/09]

I have replied directly to the letter from the Lord Mayor of Cork, Cllr Dara Murphy, to which the Deputy refers. The issues referred to by the Lord Mayor in his letter are a matter for Iarnród Éireann in the first instance. I understand from Iarnród Éireann that the Kent Station project is dependent on developer funding, and that this is no longer available. For this reason, the company cannot progress the project at this time.

Iarnród Éireann has informed me that for operational reasons it plans to develop Kilbarry and Blarney stations in a similar timeframe with Kilbarry to be developed first. In the current economic circumstances, where there are inevitable restrictions on funding, it has been necessary for Iarnród Éireann to prioritise projects and, in that context, the company has decided to defer the development of these stations. The construction of Kilbarry and Blarney stations will be considered again when priorities are being examined for funding in 2010.

Regional Airports.

Brendan Kenneally

Question:

261 Deputy Brendan Kenneally asked the Minister for Transport the position regarding funding which was approved for the runway extension at Waterford Airport. [28140/09]

In February 2007 the Government approved a programme of capital grants amounting to €86 million from within the Transport 21 envelope for specific projects at the six regional airports, including Waterford, under a new Capital Expenditure Grant Scheme covering the period until the end of 2010. The approved programme comprised €39 million at the 90% rate for safety and security improvements and €47 million at the 75% rate for developmental projects aimed at increasing capacity in the sector.

Under this scheme, Waterford Airport was allocated grants totalling €22.33 million, including €3.63 million in respect of a runway extension and widening project to facilitate the airport's business development plans. Because of the current difficulties with the public finances, it has been decided that until the end of 2009, expenditure under the scheme at all of the airports should be focused on projects and project elements where the individual airports had already entered into contractual commitments by 23 July 2008. Decisions on expenditure in subsequent years must await the outcome of the Value for Money review of exchequer expenditure on regional airports being undertaken within my Department, which is due for completion in the autumn.

Light Rail Project.

Brendan Kenneally

Question:

262 Deputy Brendan Kenneally asked the Minister for Transport his proposals to undertake a feasibility study into providing a light rail system for Waterford city; when this feasibility study will be completed; and if he will make a statement on the matter. [28172/09]

In line with a commitment in the Programme for Government, my Department is funding a study into the feasibility of light rail in Waterford, as well as similar studies in other regional cities. I have asked that these studies also consider the feasibility of bus rapid transit. I understand from Waterford City Council that significant progress has been made in the examination of the feasibility of light rail and bus rapid transit. I am advised that the final report from the study in Waterford is now due for completion in September. Following its completion, the study will be published by the City Council.

Taxi Regulations.

Eamon Scanlon

Question:

263 Deputy Eamon Scanlon asked the Minister for Transport the number of taxi plates currently issued here; the way this compares to 2006, 2007 & 2008; if he will provide this information on a local authority basis in tabular form; and if he will make a statement on the matter. [28200/09]

The issue of taxi licences, under Section 34 of the Taxi Regulation Act, 2003, is a matter for the Commission for Taxi Regulation. I have asked to Commission to compile and forward the information requested by the Deputy.

Road Network.

Christy O'Sullivan

Question:

264 Deputy Christy O’Sullivan asked the Minister for Transport the reason landowners along the R572 between Glengarriff and Castletownbere in County Cork are still awaiting payment for land acquisition by Cork County Council in order to facilitate road improvement and that these same landowners are awaiting accommodating works and fencing for their property; and the further reason no works are currently underway on this stretch of road which has a temporary surface which poses a serious health and safety risk to road users. [28207/09]

The improvement and maintenance of regional and local roads, in its area, is a statutory function of each individual local authority to be funded from its own resources supplemented by State road grants paid by my Department.

Cork County Council was allocated a total of €43,880,723 in regional and local road grants in 2009. Included in this overall allocation is a grant of €400,000 towards the R572 Road. Progression of the project is a matter for the Council.

Rail Network.

Olivia Mitchell

Question:

265 Deputy Olivia Mitchell asked the Minister for Transport if Iarnród Éireann has examined the possibility of reopening the Limerick to Foynes port railway for the carriage of freight; their cost estimate for same; if not, if he will request Iarnród Éireann to examine the feasibility of same; and if he will make a statement on the matter. [28287/09]

I am informed by Irish Rail that no rail freight traffic has operated on the Foynes branch line since December 2000. In the years prior to that, I understand that Iarnród Éireann provided a service for 3 companies transporting fertiliser, animal feeds and molasses. However, the combined revenue from the 3 traffics fell far short of the operating costs involved. Despite working very hard with Foynes Port, Iarnród Éireann was unable to attract sufficient viable rail traffic to justify keeping the line open. Since that time the line has been maintained on a care and maintenance basis and substantial investment would now be required before the line could be considered for re-opening. Nevertheless, Iarnród Éireann advise that the Foynes line could be brought back into service if a sufficiently high volume of viable freight traffic were to emerge in the future.

Road Safety.

Jim O'Keeffe

Question:

266 Deputy Jim O’Keeffe asked the Minister for Transport his plans to introduce legislation to make it compulsory for cyclists to wear bicycle helmets, in order to at least provide protection against minor injuries. [28313/09]

Under the Road Safety Authority Act 2006 (Conferral of Functions) Order 2006 (S.I. No. 477 of 2006) this is now a matter for the Road Safety Authority.

Air Services.

Pat Breen

Question:

267 Deputy Pat Breen asked the Minister for Transport if, following the recent passage of the Aviation (Preclearance) Bill 2009, all scheduled airlines carrying passengers from Ireland to the US will process their passengers through this facility when it is operational at Shannon Airport from July 2009; the efforts he will make to encourage airlines to use this facility; and if he will make a statement on the matter. [28314/09]

As Deputies will be aware the Aviation (Preclearance) Bill 2009 was passed by both Houses of the Oireachtas last week and is due to be signed into law by the President this week.

My officials are working closely with the U.S. authorities on the final aspects of the operating procedures between the two administrations to ensure that preclearance will work to the benefit of both countries. My objective is that these collaborative efforts with the U.S. will allow preclearance to be inaugurated in Shannon before the end of July. I understand that three airlines will be using the service. Preclearance is voluntary and airlines can chose to sign up for it or not. I understand from Aer Lingus that the airline would face severe logistical difficulties in a situation where their ex Shannon flights would be precleared and their ex Dublin flights would not. Accordingly I understand that they have taken a decision to postpone using preclearance for their flights until the service is available both in Dublin and Shannon.

Two new daily British Airways services are due to use Preclearance services once they become operational at Shannon and I hope that more airlines will follow this example. It is important that Shannon Airport and local stakeholders vigorously market preclearance so that the service can be maximised for the benefit of Shannon and the Mid West Region.

Duty Free Sales.

Pat Breen

Question:

268 Deputy Pat Breen asked the Minister for Transport if he will report on his recent discussions with the US Homeland Security Secretary regarding the US customs and border preclearance facilities; if outstanding issues have been resolved, namely in relation to duty free purchases in view of the fact that airlines flying to the US will be classed as domestic flights; and if he will make a statement on the matter. [28315/09]

As the Deputy will be aware I recently met with Ms. Janet Napolitano, United States Secretary of Homeland Security to discuss the introduction of Preclearance at Shannon and Dublin.

In the course of these discussions Secretary Napolitano confirmed that precleared flights will be able to land at domestic airports and domestic terminals and that, despite the recent downturn in traffic at Shannon, the United States remained committed to preclearance.

Preclearance will have no impact on the purchase of duty free goods at Shannon Airport for U.S. based passengers as the U.S. rules governing duty free goods in preclearance will be the same as they are today in post-clearance. However the U.S. authorities do have difficulties with the sale of duty free goods after passengers have been cleared for entry into the U.S. There are several issues remaining that are the subject of on-going discussions between Irish officials and the United States Department of Homeland Security which I am optimistic can be resolved before Preclearance becomes operational on 29 July 2009.

Rail Services.

Dinny McGinley

Question:

269 Deputy Dinny McGinley asked the Minister for Transport if surveys or studies have been carried out in relation to a railway link between Derry and Sligo, through County Donegal; if such a link is being considered; and if he will make a statement on the matter. [28349/09]

The Strategic Rail Review (SRR), which was completed in 2003, set out priorities for future rail investment which fed into the development of Transport 21, my Department's ten-year investment framework, which runs from 2006 to 2015. While the SRR considered possible developments in Donegal, in particular a proposed Derry-Letterkenny rail link, which could, potentially be extended to Sligo, the SRR did not include this as a priority in its recommendations. As a consequence, no capital provision for rail developments in County Donegal was included in Transport 21.

Taxi Regulations.

Lucinda Creighton

Question:

270 Deputy Lucinda Creighton asked the Minister for Transport his plans to empower the Taxi Regulator or other bodies, to regulate issues such as noise pollution caused by taxis in ranks. [28355/09]

The regulation of taxi ranks, including their location, is a matter for the relevant local authority in conjunction with the Gardaí.

The general position in regard to vehicle engine noise is that vehicle in-service standards are specified in the Road Traffic (Construction, Equipment and Use of Vehicle) Regulations 1963, which requires vehicles to be fitted with a silencer or other device to reduce to a reasonable level the noise caused by the escape of exhaust gases from the engine. Article 85 of these Regulations prohibits the use in a public place of a vehicle which causes excessive noise.

In addition, it is understood from the Road Safety Authority that it is the intention under the next national car testing contract that there will be checks on vehicles in relation to noisy exhaust systems.

Departmental Expenditure.

Denis Naughten

Question:

271 Deputy Denis Naughten asked the Minister for Transport the cost of public advertising funded by his Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of his Department; and if he will make a statement on the matter. [28426/09]

The cost of public advertising to date in 2009 for statutory and non-statutory are as follows. Statutory — €54,967.50; Non-statutory — €107,374.71. The figure for agencies is a matter for the agencies themselves.

Motor Insurance.

Noel Ahern

Question:

272 Deputy Noel Ahern asked the Minister for Transport if he will clarify the position in relation to the operation of motor insurers; if there are agreed rules or criteria in relation to premiums, cancellations, transfer fees and refunds paid whether in full or part; and if he will make a statement on the matter in relation to general agreed criteria and specifically in relation to the case of a person (details supplied) in Dublin 5. [28446/09]

Under the Road Traffic Acts, third party liability motor insurance is compulsory for the use of a mechanically propelled vehicle in a public place. The contract for motor insurance is a private contract between the policyholder and the motor insurance company. Motor insurance is provided by private companies in an open and competitive market where consumer interests can exert influence by seeking quotes and comparing costs, before purchasing. As in any free market, the best advice to consumers is to shop around to get the best value for the particular drivers requirements.

Insurance companies are controlled by the Financial Regulator who has a role in relation to the protection of consumers of financial services. The Agency set up to deal with complaints specifically in financial services is the Financial Services Ombudsman. The Financial Services Ombudsman is a statutory officer who deals independently with unresolved complaints from consumers about their individual dealings with all financial service providers. Both of these services operate under the aegis of my colleague, the Minister for Finance.

Departmental Expenditure.

Leo Varadkar

Question:

273 Deputy Leo Varadkar asked the Minister for Transport the amount spent by his Department on legal fees directly to lawyers or through the State Solicitor’s Office for each of the years 2006, 2007 and 2008; and if he will make a statement on the matter. [28474/09]

The table sets out the amount spent by my Department on legal fees directly to lawyers or through the State Solicitor's office for the year's 2006, 2007 and 2008.

2008

2007

2006

€859,512.91

€1,315,809

€187,296.77

Road Network.

Aengus Ó Snodaigh

Question:

274 Deputy Aengus Ó Snodaigh asked the Minister for Transport his views on the consequences if UNESCO tells the Government to move the M3, the Dublin-Navan railway and the electrical connector; and if he has received advice on whether his proposal to run power lines along the M3 requires a new EIA. [28648/09]

The nomination of sites for consideration as UNESCO World Heritage sites is a matter for my colleague the Minister for the Environment, Heritage and Local Government. The position on this matter is as set out in the Minister for the Environment, Heritage and Local Government's response today to a Question from the Deputy on this subject.

As Minister for Transport, I have responsibility for overall policy and funding in relation to the national roads programme element of Transport 21. The construction, improvement and maintenance of individual national roads projects, including the M3, is a matter for the National Roads Authority (NRA) under section 17 of the Roads Act, 1993, as amended by the Roads Act 2007, in conjunction with the local authorities concerned. Work on the M3 motorway is well underway and is expected to be complete in 2010.

With regard to the proposed Dublin to Navan railway line, the preferred route for the line follows the existing disused railway track bed between Clonsilla (junction with the Maynooth line) and Navan. This route is approximately 7km to the west of Tara. This project will be the subject of an application to An Bord Pleanála for a railway order, and all relevant environmental and other issues will be addressed in its consideration of that application. Issues relating to the north south electrical connector are a matter for my colleague the Minister for Communications, Energy and Natural Resources.

Aengus Ó Snodaigh

Question:

275 Deputy Aengus Ó Snodaigh asked the Minister for Transport the reason, regarding the current case being brought by the European Commission against Ireland, in the European Court of Justice, for failure to implement the EIA Directive, he did not order the National Roads Authority to halt works on the M3, in the Tara area, when the European Commission put the Government on notice that an EIA was required; the amount spent on outside legal counsel to defend this action in the ECJ; the consequences for the M3 motorway if the ECJ finds against Ireland; the consequences for the National Monuments Act 1930 and the NRA codes of practice, if the ECJ finds against Ireland; the consequences for transport projects, already underway, if the ECJ finds against Ireland; and the person who bears the costs if the EC orders a new EIA on the M3. [28649/09]

As Minister for Transport, I have responsibility for overall policy and funding in relation to the national roads programme element of Transport 21. The construction, improvement and maintenance of individual national roads projects, including the M3, is a matter for the National Roads Authority (NRA) under section 17 of the Roads Act, 1993, as amended by the Roads Act 2007, in conjunction with the local authorities concerned.

The allocation of funding to individual national road projects, including the M3, is a matter for the NRA under section 19 of the Roads Act, 1993, as amended by the Roads Act 2007. Ireland has been referred to the European Court of Justice (ECJ) by the EU Commission concerning Ireland's alleged failure to properly transpose and implement certain provisions of Council Directive 85/337/EEC on the assessment of the effects of certain public and private projects on the environment.

This is a matter for my colleague the Minister for Environment, Heritage and Local Government. Ireland is strongly contesting the Commission's assertions and lodged a comprehensive defence in this case on 27 April 2009. The legal costs of contesting this case are a matter for the Office of the Attorney General. The Court's decision is not expected for some time. It is not expected to have any implications for the M3 motorway, work on which is well underway and is expected to be complete in 2010.

I am not prepared to speculate on the impacts (if any) of the Court's judgement until its detailed decision has been published and carefully considered by the Irish authorities.

Ulick Burke

Question:

276 Deputy Ulick Burke asked the Minister for Transport the consequences of his most recent proposals whereby the National Roads Authority would have further responsibility for roads other than national, primary and secondary roads; if this has been negotiated with local authorities throughout the country; if he will make a statement on the reason for such a change. [28757/09]

In agreement with the National Roads Authority, I propose, from 1st September 2009, to assign responsibility to the Authority for the management of the State funded regional and local road investment programme. As Minister, I intend however to retain responsibility for policy and the allocation of grants for the programme. Details of the new arrangements will be notified to local authorities in advance of any changes.

Illegal Immigrants.

Ciarán Cuffe

Question:

277 Deputy Ciarán Cuffe asked the Minister for Justice, Equality and Law Reform further to section 70 of the Immigration, Residence and Protection Bill 2008, if he will amend the provision allowing an immigration officer, when it is not practicable to issue a protection application entry permit on arrival, to arrest and detain an applicant for the purpose of issuing a protection application; and if he will make a statement on the matter. [28114/09]

As was indicated at Dail Committee Stage by my colleague, Minister of State John Moloney, T.D., the provision referred to by the Deputy is under consideration in my Department in consultation with the Office of the Attorney General. The matter is one that has, in addition to the debate at Committee Stage, been brought to my attention by the Irish Human Rights Commission and indeed by the Deputy himself. I will inform the House of my response, as soon as possible, in the context of my proposals for amendments to the Bill at Report Stage.

Equality Issues.

Tom Hayes

Question:

278 Deputy Tom Hayes asked the Minister for Justice, Equality and Law Reform if the review of the equality for women measure access to employment has been completed; if funding will soon be reached; and if he will make a statement on the matter. [28130/09]

I refer the Deputy to my reply to his Question No. 93 of 14 May 2009. The position remains that the decision taken on each of the applications made under the Equality for Women Measure will be made known in the near future.

Garda Deployment.

Brendan Kenneally

Question:

279 Deputy Brendan Kenneally asked the Minister for Justice, Equality and Law Reform the number of gardaí stationed at Waterford City Station at present and every year for the past five years. [28170/09]

I am informed by the Garda authorities that the personnel strength in Waterford Garda Station as at 31 December 2004-2008 and as at the 31 May, the latest date in 2009 for which figures are readily available, was as set out in the table:

2004

2005

2006

2007

2008

2009

135

134

149

161

170

171

Citizenship Applications.

Jimmy Deenihan

Question:

280 Deputy Jimmy Deenihan asked the Minister for Justice, Equality and Law Reform the position regarding the application for naturalisation by a person (details supplied) in County Kerry; and if he will make a statement on the matter. [28199/09]

An application for a certificate of naturalisation from the person referred to in the Deputy's Question was received in the Citizenship Division of my Department in August 2007.

The average processing time from application to decision is now at 23 months. The Citizenship Division has commenced further processing of this application. More complicated cases can at times take more than the current average while an element of straight forward cases are now being dealt with in less than that time scale. There is a limit to the reduction in the processing time that can be achieved as applications for naturalisation must be processed in a way which preserves the necessary checks and balances to ensure that the status of citizenship is not undervalued and is only given to persons who genuinely satisfy the necessary qualifying criteria.

Denis Naughten

Question:

281 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process applications for a certificate of naturalisation; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28219/09]

There are currently 17,744 applications for naturalisation with the Citizenship Division of my Department that are awaiting a decision. This is primarily due to the significant increase in the volume of applications received in the last number of years. In 2002 there were 3,500 applications whereas in 2009 10,599 applications have been received up to the end of June, of which 5,023 were valid applications. This upward trend seems set to continue and it is anticipated that applications for naturalisation will increase to over 18,000 in the present year. In the past twelve months 4,734 applications have been approved, 800 applications were refused and 2,167 applications were deemed ineligible.

Substantial increased resources have been made available to this Department from mid 2008 in order to deal with the increasing volumes of applications and provide a better quality service to all applicants. This has resulted in a considerable improvement in processing times over the past year, even though the number of applications for a certificate of naturalisation has continued to see significant growth. The average processing time from application to decision for the generality of valid applications for certificates of naturalisation is now at twenty three months. The Citizenship Division is currently commencing further processing of applications received in early 2008.

The length of time taken to process each application should not be classified as a delay, as the length of time taken for any application to be decided is purely a function of the time taken to carry out necessary checks and the time taken waiting for resources to become available to perform those checks.

Upon receipt, an initial examination of each application is carried out to determine that the application form is completed fully and correctly and that all requested supporting documentation has been submitted. Passports and other documentation are then examined in detail and enquiries with the Garda National Immigration Bureau may also be necessary to determine if the applicant meets the statutory residency criteria as set out in the Irish Nationality and Citizenship Act, 1956, as amended. A significant number of applications are initially found to be invalid for a variety of reasons and these are now being dealt with and returned to the applicant within a week.

Further processing takes place at a later stage and involves assessing an applicant's financial status in respect of their ability to support themselves in the State. Enquiries with the Revenue Commissioners and the Department of Social and Family Affairs may be necessary in this regard. Investigations are also undertaken to determine if the applicant can be considered to be of good character. Depending on the complexity of any given case, these processes can take a lengthy time to complete. Once all enquiries are completed, the file is referred to me for a decision.

I am sure that the Deputy will appreciate that a certificate of naturalisation is an exceptional and important document that facilitates a non-Irish national becoming a citizen of Ireland. Therefore, there is a limit to the reduction in the processing time that can be achieved, as applications for naturalisation must be processed in a way which preserves the necessary checks and balances to ensure that the status of Citizenship is not undervalued, and is only given to persons who genuinely satisfy the necessary qualifying criteria. The procedures involved have been developed and refined over a number of years and I am satisfied that they are necessary to maintain the integrity of the naturalisation process.

Visa Applications.

Denis Naughten

Question:

282 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process renewal of temporary leave to remain in the State under the Irish born child 2005 scheme; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28220/09]

I wish to inform the Deputy that 14,254 applications for renewal of permission to remain in the State under the IBC/05 Scheme have been received in my Department since 1 January, 2007. To date 97 of these applications were refused, 18 are currently outstanding as further investigation is required, and the remainder have been granted renewed permission to remain in the State for a 3 year period.

I should add that as the closing date for receipt of applications for leave to remain under the IBC/05 Scheme was 31 March, 2005 and given that permission to remain under that scheme was initially granted for a period of two years, the majority of the applications for renewal were processed before end December, 2007. Applications were generally processed within three weeks of receipt of an application.

Precise figures for the number of renewal applications dealt with by my Department in the past 12 months are not readily available, but I would point out that such applications represent a small proportion of the overall figure received.

Denis Naughten

Question:

283 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process renewal of temporary leave to remain in the State under section 3 of the Immigration Act 1999, as amended; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28221/09]

Applications for renewal of Leave to Remain in the State are founded on the provisions of Section 3 of the Immigration Act 1999 (as amended). Under these provisions, persons who have been residing in the State under Section 3 of the Immigration Act 1999 (as amended) are required to apply to the Minister for renewal of such permission before their current period of permission expires.

All such applications for renewal of Leave to Remain have to be considered on their individual merits in order to ascertain whether the person has complied with the conditions of their Leave to Remain. This includes the necessary checks with outside agencies. The average waiting time for the processing of such applications is 1 to 3 months. Given that outside checks are necessary during this process the time frame involved in processing such applications is considered to be reasonable.

The Deputy can be assured that strenuous efforts have been and continue to be made to ensure that applications in respect of this matter are processed as promptly as possible. Additional staff have been deployed to the area and considerable investment has been made in the development of technology required to support the processing of such applications. The Deputy might wish to note that statistical data is not available for the renewal of Leave to Remain in the State, primarily as it is recorded electronically as a further grant of leave to remain and therefore cannot be recorded as a stand alone procedure.

Denis Naughten

Question:

284 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process applications for temporary leave to remain in the State under section 3 of the Immigration Act 1999, as amended; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28222/09]

Applications for leave to remain in the State are considered on their individual merits under the eleven separate headings set out in Section 3(6) of the Immigration Act, 1999 (as amended).

Each case is considered individually and regardless of whether or not written representations are submitted by, or on behalf of, the applicant. Following a detailed examination of each individual case, including a consideration having regard to Section 5 of the Refugee Act, 1996 (as amended) on the prohibition of refoulement, a recommendation is made as to whether a Deportation Order should be issued or temporary Leave to Remain in the State granted.

At present, 14,131 such cases are recorded as awaiting decision. However, this figure includes around 3,158 cases where applications for Subsidiary Protection in the State have been submitted by the same persons. Where an application for Subsidiary Protection in the State has been submitted in addition to an application for leave to remain, the Subsidiary Protection application must first be considered.

Indications are that many of those whose cases are still awaiting decision may already have left the State without notifying my Department of their having done so while others will have submitted other applications for residency e.g. applications for permission to remain in the State on the basis of their marriage to an Irish or EU National. Decisions on these applications must be finalised before their applications for leave to remain in the State can be finalised.

The Deputy will appreciate that the consideration of applications for leave to remain in the State is a resource intensive process. It is not, however, possible to provide an average waiting time for the processing of such applications, primarily because no two applications will be the same in terms of their complexity. The Deputy can be assured that strenuous efforts have been and continue to be made to ensure that applications are processed as promptly as possible. Additional staff have been deployed to the area and considerable investment has been made in the development of technology required to support the processing of such applications. The following table sets out the other statistical information requested by the Deputy.

Month

Leave to Remain Granted

Deportation Order Signed

2008

June

182

59

July

189

83

August

110

49

September

85

93

October

69

110

November

58

93

December

64

43

2009

January

80

65

February

49

97

March

60

119

April

49

102

May

84

61

Totals

1,079

974

Deportation Orders.

Denis Naughten

Question:

285 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process applications for revocation of deportation orders under section 3 of the Immigration Act 1999, as amended; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28223/09]

The revocation of a Deportation Order may be sought pursuant to the provisions of Section 3(11) of the Immigration Act, 1999, as amended. However such an application would require substantial and compelling new grounds in order to be successful.

The average waiting time for the processing of such applications is four to six weeks, which due to the complexity of the issues involved in each individual application is considered to be reasonable. The Deputy can be assured that strenuous efforts have been and continue to be made to ensure that applications in respect of this matter are processed as promptly as possible. Additional staff have been deployed to the area and considerable investment has been made in the development of technology required to support the processing of such applications.

The Deputy might wish to note that statistical records of the number of Section 3(11) applications on hand on a monthly basis are not available. However, I can give a breakdown on the number of decisions made on such applications. The table sets them out.

Month

Section 3(11) applications approved

Section 3(11) applications rejected

2008

June

0

0

July

0

0

August

0

24

September

0

19

October

16

31

November

4

December

2

2009

January

8

18

February

11

23

March

2

34

April

2

60

May

4

25

Total

49

234

Asylum Applications.

Denis Naughten

Question:

286 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process applications for subsidiary protection in accordance with the European Communities (Eligibility for Protection) Regulations; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28224/09]

Subsidiary Protection under the provisions of the European Communities (Eligibility for Protection) Regulations 2006 is a form of international protection offered to those persons who do not meet the criteria for recognition as a refugee but who nonetheless claim a risk of serious harm in their country of origin if repatriated there. Each application for Subsidiary Protection in the State is considered on the basis of its individual merits, having regard for the claims made by the applicant and measured against objective, reputable, up to date information relating to the applicant's country of origin. The Deputy will therefore appreciate that the consideration of applications for Subsidiary Protection in the State is a resource intensive process. The average waiting time for the processing of such applications is 211 days. However, due to the huge numbers of applications and of the fact that no two applications will be the same in terms of their complexity the processing times will vary on a case to case basis.

The Deputy can be assured that strenuous efforts have been and continue to be made to ensure that applications in respect of this matter are processed as promptly as possible. Additional staff have been deployed to the area and considerable investment has been made in the development of technology required to support the processing of such applications.

The Deputy might wish to note that as there is a constant turnaround of applications it is not possible to give an accurate breakdown of the number of Subsidiary Protection applications on hand on a monthly basis. However, there are currently 3158 Subsidiary Protection applications on hand. The table sets out the other statistical information requested by the Deputy.

Month

SP applications received

SP applications approved

SP applications rejected

2008

June

117

0

75

July

146

0

51

August

135

1

29

September

133

0

48

October

179

1

47

November

125

1

45

December

133

1

15

2009

January

103

0

36

February

188

1

6

March

183

3

4

April

207

1

44

May

206

1

24

Total

1,855

10

424

Denis Naughten

Question:

287 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process applications in accordance with section 4(2) of the European Communities (Eligibility for Protection) Regulations for admittance into the subsidiary protection process; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28225/09]

Section 4(2) of the European Communities (Eligibility for Protection) Regulations — Statutory Instrument No. 518 of 2006 essentially relates to my discretion to accept and consider an application for Subsidiary Protection from persons, who do not have an automatic right to apply for Subsidiary Protection (i.e. are persons for whom Deportation Orders were signed before the coming into force of the Regulations on 10 October, 2006). In such cases, I may exercise discretion pursuant to Regulation 4(2) of the European Communities (Eligibility for Protection) Regulations, 2006 S.I. No. 518 to accept and consider an application for Subsidiary Protection where an individual has identified new facts or circumstances which demonstrate a change of position from that which pertained at the time the Deportation Order was made.

The average waiting time for the processing of such applications is four to six weeks, which due to the complexity of the issues involved in each individual application is considered to be reasonable. The Deputy can be assured that strenuous efforts have been and continue to be made to ensure that applications in respect of this matter are processed as promptly as possible. Additional staff have been deployed to the area and considerable investment has been made in the development of technology required to support the processing of such applications.

The Deputy might wish to note that statistical records of the number of Section 4(2) applications on hand on a monthly basis are not available. However, I can give a breakdown on the number of decisions made on such applications. The table sets them out.

Month

Section 4(2) applications approved

Section 4(2) applications rejected

2008

June

0

0

July

0

0

August

1

1

September

1

3

October

2

10

November

1

1

December

4

11

2009

January

2

6

February

0

2

March

1

2

April

5

9

May

5

5

Total

22

50

Denis Naughten

Question:

288 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process applications for readmittance to the asylum process under section 17(7) of the Refugee Act 1996, as amended; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28226/09]

The average processing time for applications for readmittance to the asylum process under Section 17(7) of the Refugee Act 1996, is four weeks, from the date of receipt of all relevant information. From June 2008 to June 2009, 128 applications were considered, of which 34 applicants where readmitted to the asylum process and 86 applicants where unsuccessful. There are 8 cases on hands awaiting processing.

Visa Applications.

Denis Naughten

Question:

289 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process visas; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28227/09]

Visa applications are processed as speedily as possible having regard to the numbers on hand and the resources available to process them. Although the INIS website states that visa applications are processed in six to eight weeks, in fact most applications are processed much faster than that. In our dedicated overseas offices, visa applications are processed typically in two to three weeks. Currently applications referred to Dublin are generally being turned around within ten to fifteen working days of receipt in Dublin.

In 2008, over 72,000 visas were granted. In the first five months of 2009, provisional figures indicate that over 26,000 visas were granted for travel to Ireland. In 2008, fewer than 14,000 visas were refused. In the first five months of 2009, provisional figures indicate that fewer than 4,600 visas were refused.

Denis Naughten

Question:

290 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process re-entry visas; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28228/09]

Applicants who call to the Public Office in person for re-entry visas are dealt with on a same day basis. Alternatively a postal application for a re-entry visa can be made and such applications are dealt with within four working days. In the past twelve months 60,455 re-entry visa applications were received and approved.

Residency Permits.

Denis Naughten

Question:

291 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process EU Treaty Rights, applications for residence by non-EEA family members of EU or EEA citizens, EU Directive 2004/38/EC and SI 656/2006 refers; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28229/09]

I am informed by the Irish Naturalisation & Immigration Service (INIS) of my Department that applications for residence in the State based on EU Treaty Rights are currently being processed within the six month statutory time frame allowed by Directive 2004/38/EC and S.I. 656/2006 as amended.

The EU Treaty Rights statistics requested by the Deputy in respect of the previous 12 months (July 2008 to June 2009) are set out in the table. The total approval figure is inclusive of 1395 applications which were reviewed under the provisions of Directive 2004/38/EC conducted as a result of the European Court of Justice ruling in "Metock" of 25 July 2008. The total refusal figure includes 529 applications also reviewed as a result of the European Court of Justice ruling.

EU Treaty Rights applications July 2008-June 2009

Applications received

2,506

Applications approved

2,978*

1,395 Metock review

Applications refused

1,216*

529 Metock review

Applications pending

1,123

Denis Naughten

Question:

292 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process married to an Irish national applications from non EEA national spouses of Irish nationals for residence here on the sole basis of their marriage; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28230/09]

While marriage to an Irish national by a non EU national does not grant any automatic right to reside in the State, if a non EU national spouse of an Irish national was already legally resident in the State prior to the marriage, then he or she can make a request to the local Registration Officer for a change of their immigration status to reflect their marriage to that Irish national.

If, however, the non EU national has no legal status or is an asylum seeker in the State at the time of the marriage, he or she may make an application to the Spouse of Irish National Unit, Immigration Services Section, Irish Naturalisation & Immigration Service, 13/14 Burgh Quay, Dublin 2 seeking permission to reside in the State on that basis. I am informed by the Immigration Services Section of the Irish Naturalisation and Immigration Service that applications of this type are currently taking 6 — 7 months to process. The processing time for dealing with such applications can vary depending on the particular circumstances of each individual case and the nature of the investigation required. This processing time meets our current expectations and in fact in the High Court Case of K M & D G -v- The Minister for Justice, Equality and Law Reform (2007 No. 321 J.R.) Justice John Edwards held that a period of between 9 and 12 months was reasonable for the making of such decisions.

At the end of June 2009 there were 122 applications on hand. In all instances processing arrangements are kept under ongoing review and steps are taken to ensure that applications are dealt with as quickly as possible having regard to overall resources across the full range of services provided by the Irish Naturalisation and Immigration Service. The following table outlines the figures for the past 12 months in respect of applications processed by the Marriage to Irish National Unit.

Month

Received

Approved

Refused

July 2008

28

19

0

August 2008

15

40

8

September 2008

31

50

9

October 2008

49

50

9

November 2008

24

31

12

December 2008

31

28

1

January 2009

24

42

9

February 2009

38

38

1

March 2009

47

70

1

April 2009

32

38

5

May 2009

44

28

4

June 2009

37

43

7

Overall

400

477

66

Denis Naughten

Question:

293 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process business permission applications from non EEA nationals for permission to reside in the State for the purposes of establishing and operating a commercial business; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28231/09]

I am informed by the Immigration Services Section of the Irish Naturalisation and Immigration Service that applications for Business Permission are currently taking 5-6 weeks to process on receipt of fully completed applications.

In all instances, processing arrangements are kept under ongoing review and steps are taken to ensure that applications are dealt with as quickly as possible having regard to overall resources across the full range of services provided by the Irish Naturalisation and Immigration Service. At the end of June 2009 there were 10 applications on hand awaiting decision. The following table outlines the figures for the past 12 months in respect of applications processed by the Business Permission Unit.

Month

Received

Approved

Refused

July 2008

14

3

6

August 2008

12

3

12

September 2008

11

3

16

October 2008

6

2

5

November 2008

10

4

11

December 2008

0

0

1

January 2009

7

7

6

February 2009

15

11

7

March 2009

18

2

17

April 2009

21

9

20

May 2009

18

7

11

June 2009

9

4

12

Overall

141

55

124

Refugee Status.

Denis Naughten

Question:

294 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process travel documents, 1951 convention travel document, issued to persons granted a declaration of refugee status in the State under section 17(1) Refugee Act 1996 and programme refugees, temporary travel document, which may issue in specific emergency circumstances; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28232/09]

I am informed by the Immigration Services Section of the Irish Naturalisation and Immigration Service that applications for Travel Documents are currently taking 5 — 6 weeks to process on receipt of fully completed applications. In all instances processing arrangements are kept under ongoing review and steps are taken to ensure that applications are dealt with as quickly as possible having regard to overall resources across the full range of services provided by the Irish Naturalisation and Immigration Service. At the end of June 2009 there were 505 applications on hand awaiting decision.

The following table outlines the figures for the past 12 months in respect of applications processed by the Travel Document Unit.

Month

Received

Approved

Refused

UN Convention

Temporary

UN Convention

Temporary

UN Convention

Temporary

Jul 2008

461

193

587

253

1

25

Aug 2008

181

85

326

154

1

20

Sep 2008

80

153

238

67

0

27

Oct 2008

320

170

347

101

0

75

Nov 2008

361

117

339

60

0

87

Dec 2008

258

39

262

33

1

43

Jan 2009

284

128

296

55

0

54

Feb 2009

315

161

267

60

0

85

Mar 2009

447

117

407

40

0

65

Apr 2009

505

195

574

25

1

177

May 2009

495

99

330

23

0

82

Jun 2009

619

217

513

105

3

19

Overall

4,326

1,674

4,486

976

7

759

Foreign Adoptions.

Denis Naughten

Question:

295 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process foreign adoption, immigration clearance letter issued in respect of approved foreign adoption; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28233/09]

I am informed by the Immigration Services Section of the Irish Naturalisation and Immigration Service that applications for an Immigration Clearance Letter in respect of a Foreign Adoption are currently taking 5 working days to process on receipt of fully completed applications.

In all instances processing arrangements are kept under ongoing review and steps are taken to ensure that applications are dealt with as quickly as possible having regard to overall resources across the full range of services provided by the Irish Naturalisation and Immigration Service. At the end of June 2009 there were 2 applications on hand awaiting decision. The following table outlines the figures for the past 12 months in respect of applications processed by the Foreign Adoption Unit.

Month

Received

Approved

Refused

July 2008

84

84

0

August 2008

61

61

0

September 2008

45

45

0

October 2008

73

73

0

November 2008

69

69

0

December 2008

39

39

0

January 2009

79

79

0

February 2009

81

67

0

March 2009

86

98

0

April 2009

63

65

0

May 2009

61

61

0

June 2009

49

47

0

Overall

790

788

0

Residency Permits.

Denis Naughten

Question:

296 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process Irish born child pre-2003, family dependants, applications made by non-EEA nationals granted residence under pre 2003 conditions for residence in the State for specified minor family dependants; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28234/09]

Following the decision of the Supreme Court in the case of Fajujonu v. Minister for Justice [1990] 2 IR 151, and in view of the state of the law as expressed in that judgment, previous Ministers adopted a policy of generally granting permission to remain in the State to non- national parents of Irish citizen children. Applications were refused in cases where Ministers deemed that the requirements of the common good necessitated a refusal. Approximately 10,500 non- EEA nationals were granted permission to remain on the basis of parentage of an Irish citizen child between 1996 and February 2003. Following the case of L and O v. Minister for Justice [2003] 1 IR 1, judgment in which was delivered by the Supreme Court on 23 January, 2003, the policy referred to was reviewed. It was decided that the separate procedures for the consideration of residency applications based solely on parentage of an Irish citizen child should cease with effect from 19 February, 2003.

Persons whose applications were processed under the pre-2003 arrangements were generally granted permission to remain in the State for an initial period of twelve months. Any subsequent renewals of this permission are dealt with by the Garda National Immigration Bureau without the necessity of recourse to my Department.

The dependent children of such applicants are automatically granted permission to remain in the State in line with that granted to their parent(s). Upon reaching the age of sixteen such children are required to write to my Department in order that they may obtain permission to remain in the State in their own right. Such applications are dealt with immediately on receipt by officials within my Department.

Denis Naughten

Question:

297 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process change of status, non-EEA national granted a particular permission to remain here and seeking an alternative residency status; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28235/09]

I am informed by the Irish Naturalisation and Immigration Service (INIS) that the statistics requested by the Deputy regarding applications made by non-EEA nationals seeking a change of status are outlined in the following table.

Change of Status

Processing time of application

Approximately 12 months

Number of applications received in the past 12 months

330

Number of applications awaiting decision

340

Number of applications approved in the last 12 months

97

Number of applications rejected in the last 12 months

46

As the Deputy will appreciate, the processing time for dealing with such applications can vary depending on the type of application involved and the particular circumstances of the individual concerned. In all instances, processing arrangements are kept under ongoing review and steps are taken to ensure that applications are dealt with as quickly as possible having regard to overall resources across the full range of services provided by the Irish Naturalisation and Immigration Service.

Denis Naughten

Question:

298 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process non-EEA national in a relationship with an Irish or non-EEA national and seeking permission to remain here on that basis; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28236/09]

I am informed by the Irish Naturalisation and Immigration Service (INIS) that the statistics requested by the Deputy regarding non-EEA nationals who are in a relationship with an Irish or a non- EEA national and seeking permission to remain on that basis are outlined in the following table.

De-facto relationship with Irish National

De-facto relationship with Non-EEA National

Processing time of application

1 to 2 weeks

1 to 2 weeks

No. of applications received in past 12 months

324

6

No. of applications awaiting decision

60

6

No. of applications approved in past 12 months

249

9

No. of applications rejected in past 12 months

21

14

Applications for de-facto relationships are dealt with once they are received in the General Immigration Division, and a decision is made once the division receives the appropriate documentation supporting the relationship.

Denis Naughten

Question:

299 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process non-EEA national previously granted permission to study seeking extension of student conditions; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28237/09]

I am informed by the Irish Naturalisation and Immigration Service (INIS) that the statistics requested by the Deputy regarding applications made by non-EEA nationals seeking an extension of student conditions are outlined in the following table.

Extension of student conditions

Processing time of application

Approximately 12 months

Number of applications received in the past 12 months

206

Number of applications awaiting decision

263

Number of applications approved in the last 12 months

36

Number of applications rejected in the last 12 months

34

As the Deputy will appreciate, the processing time for dealing with such applications can vary depending on the type of application involved and the particular circumstances of the individual concerned. In all instances, processing arrangements are kept under ongoing review and steps are taken to ensure that applications are dealt with as quickly as possible having regard to overall resources across the full range of services provided by the Irish Naturalisation and Immigration Service.

Denis Naughten

Question:

300 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process non-EEA national previously granted permission to remain here as a visitor seeking extension of those conditions; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28238/09]

I am informed by the Irish Naturalisation and Immigration Service (INIS) that the statistics requested by the Deputy regarding applications made by non-EEA nationals seeking an extension of visitor conditions are outlined in the following table.

Extension of visitor conditions

Processing time of application

Approximately 6-12 months

Number of applications received in the past 12 months

482

Number of applications awaiting decision

283

Number of applications approved in the past 12 months

190

Number of applications rejected in the past 12 months

175

As the Deputy will appreciate, the processing time for dealing with such applications can vary depending on the type of application involved and the particular circumstances of the individual concerned. In all instances, processing arrangements are kept under ongoing review and steps are taken to ensure that applications are dealt with as quickly as possible having regard to overall resources across the full range of services provided by the Irish Naturalisation and Immigration Service.

Denis Naughten

Question:

301 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process non-EEA national previously granted permission to remain here on work permit conditions seeking extension of those conditions; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28239/09]

I am informed by the Irish Naturalisation and Immigration Service (INIS) that the statistics requested by the Deputy regarding applications made by non-EEA nationals seeking an extension of their permission to remain in order to apply for a work permit or an extension of their work permit are outlined in the following table.

Extension of work permit conditions

Processing time of application

Approximately 12 months

Number of applications received in the past 12 months

293

Number of applications awaiting decision

202

Number of applications approved in the past 12 months

225

Number of applications rejected in the past 12 months

29

As the Deputy will appreciate, the processing time for dealing with such applications can vary depending on the type of application involved and the particular circumstances of the individual concerned. In all instances, processing arrangements are kept under ongoing review and steps are taken to ensure that applications are dealt with as quickly as possible having regard to overall resources across the full range of services provided by the Irish Naturalisation and Immigration Service.

Denis Naughten

Question:

302 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process persons admitted here for various reasons and subsequently seeking permission to remain for medical treatment; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28240/09]

I am informed by the Irish Naturalisation and Immigration Service (INIS) that the statistics requested by the Deputy regarding applications made by non-EEA nationals seeking permission to remain for medical treatment are outlined in the following table.

Permission to remain for medical treatment

Processing time of application

Approximately 6 months

Number of applications received in the past 12 months

3

Number of applications awaiting decision

15

Number of applications approved in the past 12 months

4

Number of applications rejected in the past 12 months

2

As the Deputy will appreciate, the processing time for dealing with such applications can vary depending on the type of application involved and the particular circumstances of the individual concerned. In all instances, processing arrangements are kept under ongoing review and steps are taken to ensure that applications are dealt with as quickly as possible having regard to overall resources across the full range of services provided by the Irish Naturalisation and Immigration Service.

Denis Naughten

Question:

303 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process persons admitted here for various reasons and subsequently seeking permission to remain as a temporary registered doctor; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28241/09]

I am informed by the Irish Naturalisation and Immigration Service (INIS) that the statistics requested by the Deputy regarding applications made by non-EEA nationals seeking permission to remain as temporary registered doctors are outlined in the following table.

Temporary Registered Doctors

Processing time of application

1/2 weeks depending on documentation received

Number of applications received in the past 12 months

56

Number of applications awaiting decision

20

Number of applications approved in the past 12 months

41

Number of applications rejected in the past 12 months

7

Applications for temporary registered doctors are dealt with once they are received in the General Immigration Division, and a decision is made once the division receives the appropriate documentation.

Denis Naughten

Question:

304 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process Turkish nationals seeking permission to remain here pursuant to the Turkish association agreement; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28242/09]

I am informed by the Irish Naturalisation and Immigration Service (INIS) that the statistics requested by the Deputy regarding applications made by Turkish nationals seeking permission to remain pursuant to the Turkish Association Agreement are outlined in the following table.

Turkish Association Agreement

Processing time of application

2/3 weeks depending on documentation received

Number of applications received in the past 12 months

37

Number of applications awaiting decision

12

Number of applications approved in the last 12 months

26

Number of applications rejected in the last 12 months

3

Applications pursuant to the Turkish Association Agreement are processed on receipt by General Immigration Division and a decision is made once the division receives the appropriate documentation.

Denis Naughten

Question:

305 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process non-EEA nationals who have completed 60 months legal residency here on work permit, work visa or work authorisation conditions and seeking permission to remain under the administrative long-term residency scheme; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28243/09]

There are currently 8,180 applications for long-term residency that are still awaiting a decision. This is primarily due to the significant increase in the volume of applications received in the last number of years. In the past twelve months the Long-Term Residency Section of my Department has received 4,109 applications. In that period, 2,812 applications have been approved, 628 refused and 344 applications deemed abandoned. In the coming weeks increased resources will be made available to this Section in order to reduce backlogs and provide a better quality service to all applicants. This will also have a positive impact on processing times. The average processing time from application to decision for the generality of valid applications for long-term residency is now at approximately twenty-two months. The Section is currently commencing further processing of applications received in October 2007. The length of time taken to process each application should not be classified as a delay, as the length of time taken for any application to be decided is purely a function of the time taken to carry out necessary checks.

Denis Naughten

Question:

306 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the average waiting time to process persons granted refugee status here seeking family reunification for other family members; the number of applications awaiting a decision; the number received, approved and rejected in the past 12 months; the steps he is taking to speed up the processing time; and if he will make a statement on the matter. [28244/09]

I am informed by the Irish Naturalisation and Immigration Service (INIS) that applications from refugees for Family Reunification take approximately 24 months to complete. The number of applications received, approved, rejected in the last 12 months and the number of applications on hand are contained in the table.

Family Reunification

Number of applications received in the past 12 months

884

Number of applications approved in the past 12 months

749

Number of applications refused in the past 12 months

706

Number of applications on hand

1,595

Additional resources have been assigned to the Family Reunification Unit in the last 12 month period. This has made a positive impact in reducing the arrears of applications.

English Language Schools.

Denis Naughten

Question:

307 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform further to Parliamentary Question No. 285 of 23 June 2009, his plans to review the conditions for stamp 2A students; when he will have completed the review; the type of educational establishments referred to which have damaged the reputation of the sector; and if he will make a statement on the matter. [28247/09]

As I have previously indicated, my Department is currently engaged in a review of the immigration regime for full time non-EEA students. The purpose of the review is two fold. First, there is a need for greater coherence in the way we deal with non-EEA students via a transparent system that is consistent with Irish immigration policy generally. Secondly, it is generally accepted that there is a need for greater regulation in the student area.

The review does not concentrate on specific immigration stamps but rather on the regime for students as a whole. It is a question of establishing the policy first and then seeing what stamps are appropriate for its implementation rather than reviewing the conditions for Stamp 2A holders.

The provision of educational services to non-Irish nationals is an important niche of the Irish economy with considerable growth potential. At the same time it must be recognised that immigration permission is a hugely valuable commodity, particularly when it carries with it a right to work. The sort of establishments which cause a problem, and these are a minority, are those whose primary purpose is to act as a procedural device or vehicle for students to enter the labour market as opposed to the delivery of a quality educational service.

It is anticipated that the internal aspect of the review will be completed shortly. Ultimately it is envisaged that all relevant stakeholders will be afforded the opportunity to make submissions on the draft proposals and on student immigration issues more generally before any final proposals are settled.

Immigration Statistics.

Denis Naughten

Question:

308 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the number of non-EEA nationals registered with the Garda National Immigration Bureau as being resident here; the number who are on student visas; the number with refugee status; and if he will make a statement on the matter. [28253/09]

I am informed that as of the 31st May 2009, there were a total of 149,203 non-EEA nationals recorded on the Register of non-nationals maintained by An Garda Síochána. This includes 38,547 who were registered as students. I have also been informed that persons who have been granted refugee status are registered with Stamp 4 status as are many other non-nationals. As of the 31st May 2009 there were 62,381 non-nationals registered with Stamp 4. It is not possible to provide a breakdown of those with refugee status in this group.

Departmental Expenditure.

Denis Naughten

Question:

309 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the cost of public advertising funded by his Department in 2008; the breakdown between statutory and non-statutory; and if he will make a statement on the matter. [28257/09]

Denis Naughten

Question:

314 Deputy Denis Naughten asked the Minister for Justice, Equality and Law Reform the cost of public advertising funded by his Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of his Department; and if he will make a statement on the matter. [28423/09]

I propose to take Questions Nos. 309 and 314 together.

I would refer the Deputy to my replies to Question Nos. 305 and 306 of 23 June, 2009. In the time available it has not been possible to compile the information in respect of 2008 requested by the Deputy. I will be in contact with the Deputy when the information is to hand.

Garda Stations.

Maureen O'Sullivan

Question:

310 Deputy Maureen O’Sullivan asked the Minister for Justice, Equality and Law Reform the timeframe for the closing of a Garda station (details supplied) in Dublin 1; the extent of the refurbishment; and if he will guarantee the continued existence of this Garda station in Dublin 1. [28295/09]

I am advised by the Garda authorities that due to its condition it is necessary to temporarily vacate the station referred to by the Deputy to facilitate refurbishment. During this period, Garda personnel will operate from facilities provided in Mountjoy Garda station. I am assured by the Garda authorities that current policing levels will be maintained during this period and there will be no diminution of service being provided to the community. I am not aware of any proposals to close the Garda station in question and indeed any such proposal would, in the first instance, have to be made by the Garda Commissioner in the context of the Annual Policing Plans as provided for under Section 22 of the Garda Síochána Act 2005.

Departmental Properties.

Noel Coonan

Question:

311 Deputy Noel J. Coonan asked the Minister for Justice, Equality and Law Reform the position regarding the sale of Garda houses (details supplied) attached to the Garda College, Templemore, County Tipperary, and in particular the sale of houses to the long-term occupants of same; if Garda authorities have targeted houses for sale; and if he will make a statement on the matter. [28305/09]

The allocation and utilisation of Garda resources, including accommodation where this is appropriate, is a matter for the Garda Commissioner. I have been informed by the Garda authorities that the houses referred to by the Deputy are not among those identified for sale by the Commissioner.

Road Safety.

Thomas Byrne

Question:

312 Deputy Thomas Byrne asked the Minister for Justice, Equality and Law Reform the details on the proposed introduction of privatised speed cameras nationwide. [28319/09]

The Garda authorities support the action in the Road Safety Strategy 2007-2012 to implement a safety camera network. Consequently, An Garda Síochána is engaging in a procurement process, in accordance with EU Directives, national public procurement procedures and relevant legislation, for the provision and operation of safety cameras. As a result, a preferred supplier has been selected. Until the contract discussions are concluded, it is not possible to indicate details of the proposed introduction of or a specific timescale for the project.

Departmental Bodies.

Leo Varadkar

Question:

313 Deputy Leo Varadkar asked the Minister for Justice, Equality and Law Reform his plans for State agency, tribunal or quango consolidation; and if he will make a statement on the matter. [28376/09]

I would refer the Deputy to my reply to Question No. 322 of 25 November, 2008. With the exception of some on-going work to reduce operating costs, particularly in relation to office accommodation, all of the rationalisation proposals agreed for my Department as part of Budget 2009 have been implemented.

Question No. 314 answered with Question No. 309.

Court Fines.

Jan O'Sullivan

Question:

315 Deputy Jan O’Sullivan asked the Minister for Justice, Equality and Law Reform if, in the context of people’s difficult financial circumstances at this time, he will request the courts to accept payment of fines in instalments or deferral of payments when a person has not got the means to pay a fine in full on the due date; and if he will make a statement on the matter. [28457/09]

The Fines Bill 2009, which is currently before the House and awaiting Committee Stage, makes provision for the payment of fines by instalments. Section 14 of the Bill allows a person on whom a fine has been imposed, to apply to the court to pay the fine by instalments. If the court is satisfied that to pay in full by the due date would cause undue financial hardship, it can direct that the fine be paid in instalments over a period not exceeding one year. An extension of not more than a further year may be given by the court where it is satisfied that the financial circumstances of the person have changed and the change is not due to that person's culpable neglect. The Bill also introduces the concept of "equality of impact" under which the court may reduce or raise the otherwise appropriate fine in accordance with a person's financial circumstances.

Departmental Expenditure.

Leo Varadkar

Question:

316 Deputy Leo Varadkar asked the Minister for Justice, Equality and Law Reform the amount spent by his Department on legal fees directly to lawyers or through the State Solicitor’s office for each of the years 2006, 2007 and 2008; and if he will make a statement on the matter. [28471/09]

In the time available it has not been possible to compile the details requested by the Deputy. I will be in contact with the Deputy when the information is to hand.

Crime Statistics.

Thomas P. Broughan

Question:

317 Deputy Thomas P. Broughan asked the Minister for Justice, Equality and Law Reform the crime statistics for Coolock Garda station, Dublin, for 2008 and for the first six months of 2009; and if he will make a statement on the matter. [28583/09]

The Garda Síochána Act 2005 makes provision for the compilation and publication of crime statistics by the Central Statistics Office, as the national statistical agency, and the CSO has established a dedicated unit for this purpose. I have requested the CSO to provide the statistics sought by the Deputy directly to him.

Garda Operations.

Thomas P. Broughan

Question:

318 Deputy Thomas P. Broughan asked the Minister for Justice, Equality and Law Reform if Operation Hawkeye is active; the number of gardaí involved; the amount of stolen goods recovered under this operation; the number of persons arrested and charged to date; the cost of the operation to date; and if he will make a statement on the matter. [28584/09]

In the time available it has not been possible for the Garda authorities to supply the information requested by the Deputy. I will be in contact with the Deputy when the information is to hand.

Crime Statistics.

Charles Flanagan

Question:

319 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the number of complaints of intimidation, threatening behaviour and verbal assault the Garda has recorded from 2004 to date in 2009; the number of convictions; and if he will make a statement on the matter. [28654/09]

The Garda Síochána Act 2005 makes provision for the compilation and publication of crime statistics by the Central Statistics Office, as the national statistical agency, and the CSO has established a dedicated unit for this purpose. I have requested the CSO to provide the statistics sought by the Deputy directly to him.

Garda Strength.

Charles Flanagan

Question:

320 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the analysis conducted most recently on Garda to population ratios; the breakdown by district for 2007, 2008 and to date in 2009; the strength of the Garda Síochána; the number of students in Templemore; the number of student gardaí in training in garda stations; and if he will make a statement on the matter. [28655/09]

I am informed by the Garda authorities that as of 31 May 2009, the latest date for which figures are readily available, the personnel strength of An Garda Síochána was 14,426. The total number of Student Gardaí in Templemore was 485 (211 in Phase I and 274 in Phase III) and the number of Students training in Garda Stations was 389 (Phase II).

As detailed in the Policing Plan of An Garda Síochána for 2008, the Commissioner proposed to realign Garda Divisional boundaries to make them coterminous with local authority boundaries. As a consequence of this work, the geographical areas of Garda district and sub-district stations were also realigned, thus ensuring that service delivery to the community was maintained to a high standard. The first of these realignments took place in June 2008 and, therefore, it is not possible to give the ratio of population to Garda strength comparisons for 2008 or 2009. The information in relation to 2007 is contained in Parliamentary Question No. 152 of 22 October 2008.

Irish Prison Service.

Charles Flanagan

Question:

321 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the approximate number in the prison service escort corps for 2007 and 2008; and if he will make a statement on the matter. [28656/09]

The Prison Service Escort Corps was set up in 2005 arising from the Proposal for Organisational Change in the Irish Prison Service. The approved number of staff in the Escort Corps during 2007 and 2008 was 143, inclusive of all grades. I have been advised that, allowing for temporary variations caused by the retirement or movement of staff, the actual number of staff employed remained at or very near the approved number during 2007 and 2008.

Garda Operations.

Charles Flanagan

Question:

322 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform his plans to establish Operation Cleanstreet again; if he will provide details of the successes of this operation; the resources and manpower afforded to this operation; and if he will make a statement on the matter. [28657/09]

An Garda Síochána is fully committed to tackling the supply of illegal drugs in keeping with its remit under the National Drugs Strategy.

As part of this commitment, An Garda Síochána regularly undertakes initiatives targeted at persons involved in on-street sale and supply of drugs in the community.

One such initiative is Operation Cleanstreet which is undertaken by the Garda National Drugs Unit in conjunction with district and divisional Garda management.

'Cleanstreet' is the operational generic code name allocated to the overall on-street test purchase type initiative which originally commenced in approximately 1997.

Under Operation Cleanstreet specific initiatives are planned, by Divisional / District Officers in conjunction with the Garda National Drugs Unit, at regular intervals, for the purposes of gathering evidence in furtherance of a Garda investigation into the sale and supply of drugs.

The most recent of these such initiatives took place recently in the Dublin Metropolitan Region on the 1st and 2nd July 2009, which resulted in over 100 searches taking place. This led to the arrest of eighty-five persons who were charged with offences relating to the sale and supply of illegal drugs.

The Garda National Drugs Unit continues to work together with local Garda management and district and divisional Garda drugs units to ensure a coordinated and effective approach is in place to tackle drug supply.

Charles Flanagan

Question:

323 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform if he will report on the successes of Operation Archer; the number of persons arrested; the number of prosecutions being followed up on; the number of gardaí involved; the cost of the operation to date; if it is a co-ordinated effort including Operation Anvil; and if he will make a statement on the matter. [28658/09]

In the time available it has not been possible for the Garda authorities to supply the information requested by the Deputy. I will be in contact with the Deputy when the information is to hand.

Departmental Expenditure.

Charles Flanagan

Question:

324 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the number of advertising and public relations campaigns carried out in the first six months of 2009 to promote policies or programmes being implemented by his Department; the funding provided to each campaign; and the timeframe of each campaign. [28659/09]

I would refer the Deputy to my reply to Question No. 306 of 23 June, 2009.

Prison Accommodation.

Charles Flanagan

Question:

325 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the prisoner capacity of each prison; the number of prisoners held in each prison; and if he will make a statement on the matter. [28660/09]

I wish to inform the Deputy that as of 6 July, 2009 there were 3,786 permanent beds available in the prison system. On the same day there were 3,908 prisoners in custody. This represented an occupancy level of 103%. The following table provides a breakdown of the population of each prison/place of detention on 6 July, 2009:

Prison/Place of Detention

Bed Capacity

No. of prisoners held in custody

Arbour Hill Prison

148

153

Castlerea Prison

342

312

Cloverhill Prison

431

443

Cork Prison

272

302

Dóchas Centre

85

111

Limerick Prison (male)

275

301

Limerick Prison (female)

20

26

Loughan House

150

115

Midlands Prison

469

531

Mountjoy Prison (male)

540

642

Portlaoise Prison

240

116

Shelton Abbey

100

96

St. Patrick’s Institution

217

225

Training Unit

107

107

Wheatfield Prison

390

428

Total

3,786

3,908

It is the case that there has been a consistent increase in the total prisoner population over recent years. This situation is particularly apparent over the past 12 months during which time the total number in custody has increased by 309. This represents a 8.6% rise in the number in custody.

There are a number of reasons for this increase. In particular with the extra resources provided by this Government, the Garda Síochána has been increasingly successful in prosecuting criminals and extra court sittings have resulted in higher committal rates.

There has been significant investment in the criminal justice system in recent years, not least in the prison system. Indeed, the Irish Prison Service has been engaged in an extensive programme of investment in prisons infrastructure. This has involved both the modernisation of the existing estate and the provision of extra prison spaces.

Since 1997 in excess of 1,400 prison spaces have come on stream in the prison system. These include the new prisons in Castlerea, the Midlands, Cloverhill, the Dóchas Centre and new accommodation in Limerick Prison.

Despite this significant investment, it is quite clear that, in some of our prisons, we are operating in excess of our bed capacity at this time. However, in the short to medium term this issue will be addressed by the provision of 400 prison spaces by mid 2009 by means of:

a new remand block in Castlerea Prison which will accommodate approximately 104 prisoners which opened in June;

a new block in Portlaoise Prison which will accommodate approximately 150 prisoners and which is due to open at the end of July; and

a new block in Wheatfield Prison which will accommodate 150 prisoners due to be completed in the Autumn.

Crime Levels.

Charles Flanagan

Question:

326 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the number of offences committed by persons on bail for each of the years 2004 to date in 2009; and if he will make a statement on the matter. [28661/09]

The Garda Síochána Act 2005 makes provision for the compilation and publication of crime statistics by the Central Statistics Office, as the national statistical agency, and the CSO has established a dedicated unit for this purpose.

I have requested the CSO to provide the statistics sought by the Deputy directly to him.

Bench Warrants.

Charles Flanagan

Question:

327 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the number of bench warrants that remain outstanding; his views on the execution of bench warrants; and the action he proposes to take to address deficiencies in the bench warrant system. [28662/09]

I am informed by the Garda authorities that there are 37,345 bench warrants recorded as unexecuted as of 3 July, 2009.

It is inevitable in any criminal justice system that at any given time there will be a significant number of warrants awaiting execution. The Garda authorities are committed to strengthening the warrants in the system enforcement process. The Commissioner has raised the issue of the execution of warrants with each Regional Assistant Commissioner and a range of measures, aimed at reducing the number of warrants on hand, have been identified and are being implemented. These measures include the re-assignment of additional Gardaí to this function and the appointment of Inspectors with responsibility for execution of outstanding warrants. The position is being closely monitored by senior Garda management and consideration will be given, at an organisational level, to introducing further measures to address the issue if necessary.

It should be borne in mind too that the vast majority of the outstanding bench warrants relate to unpaid fines for modest sums, arising from minor infractions of the law and not convictions arising from violent and other serious crime. An Garda Síochána give priority to the execution of warrants in respect of serious crime.

The Fines Bill 2009, which is awaiting Committee Stage in this House, provides for the payment of fines by instalments and an improved means of assessing the capacity of a person to pay a fine. It also gives the courts powers to treat non-payment of a fine in the same way as non-payment of a civil debt and to impose a community service order for non-payment of a fine. As a result, imprisonment for default should in future become the exception rather than the rule. As so many warrants relate to financial penalties, these proposals should result in a smaller number of warrants being issued and so reduce pressure on the system.

The Enforcement of Court Orders (Amendment) Bill 2009, currently before the Oireachtas, provides that certain safeguards will apply to the provisions under which a court may hear an application or grant an imprisonment order against a debtor who has failed to comply with an instalment order. This will also tend to result in a smaller number of warrants being issued.

The operation of the warrants system will continue to be monitored, particularly with a view to making whatever changes may be necessary to improve its operation.

Garda Communications.

Charles Flanagan

Question:

328 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the reason for the continuing delay in the roll-out of secure digital radio for the Garda Síochána; his views on recent media reports on the delays; and if he will make a statement on the matter. [28663/09]

There is no continuing delay in the roll-out of the National Digital Radio Service to An Garda Síochána. Roll-out of the service commenced on a phased basis in the Dublin Metropolitan Region on 16th June 2009 when the network was declared to be ready for use. A further phase of the Garda roll-out is taking place today (8th July) and further phases are planned in accordance with agreed schedules drawn up by the Garda Síochána.

The roll-out to other Garda Regions will continue thereafter in line with the provision of the national network and the Garda roll-out schedules.

Juvenile Offenders.

Charles Flanagan

Question:

329 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the number and location of all detention places for young offenders; the average monthly occupancy rate in each facility in 2007 and 2008; and his plans for additional places to be put in place for young offenders. [28664/09]

I assume the Deputy is referring to offenders under the age of 18 who are detained by Order of the Courts.

In relation to the four Children Detention Schools, which come under the remit of the Irish Youth Justice Service, an executive office of this Department, the information requested is as follows:

Children Detention School

Certified max. Capacity

2007 Rate*

2008 Rate*

%

%

Oberstown Boys School†

20 places

85

73

Oberstown Girls School†

12 places

33

31

Trinity House School†

27 places

70

58

Finglas Child and Adolescent Centre

18 places

72

63

†Located on Oberstown Campus near Lusk, Co. Dublin.

*‘Rate' is Average Monthly Occupancy Rate.

In addition boys aged 16-17 years are currently detained in St. Patrick's Institution, North Circular Road, Dublin 7, which is a closed medium security place of detention under the remit of the Irish Prison Service. St. Patrick's houses males aged 16 to 21 years and has a bed capacity of 216. It had 57 places occupied, on average, by under 18 year olds in 2007, while in 2008 the corresponding figure was 59 places.

In March 2008, the Government approved the development of new national children detention facilities on the Oberstown campus. This project will increase the number of children detention places available from 77 to 167. It is currently at the design stage and it is expected that the tendering process for construction should take place in 2010. The Deputy will be aware, however, that tendering for the construction of the new facilities will be subject to Government approval and to the necessary funding being made available.

Irish Prison Service.

Charles Flanagan

Question:

330 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform his plans to commission a new study on literacy rates among prisoners; the results of previous reports; the cost of the 2003 study; and if he will make a statement on the matter. [28665/09]

In 2003 the results of a survey commissioned by my Department were published in the Irish Prison Service publication entitled "The Prison Adult Literacy Survey — Results and Implications". The cost of commissioning and publishing the survey was €32,080. The survey found that a significant number of prisoners were not functionally literate, with 52% of them at Level 1 or Pre-Level 1 literacy levels. Level 1 is defined as knowing the alphabet but having difficulties with reading. Pre-Level 1 is defined as being unable to read simple words but with the ability to write their names or know the alphabet. More than twice as many prisoners are at the lowest level compared with the population generally. Given this deficit, literacy work is a priority element in prison education and every effort is made to publicise literacy classes and encourage as many prisoners as possible to participate.

Prisoners coming into the Education Centre of each prison have an individual interview to assess their educational needs and interests. Those with literacy difficulties are prioritised for support. They are encouraged to participate in non-academic pursuits to enhance their perception of school and education, and to stimulate a general interest in learning. Once their personal self confidence grows they are proactively encouraged to participate in courses which require increased emphasis on the use of text and written format.

Following on the recommendations of the 2003 survey a number of significant initiatives commenced or were strengthened in the prisons. These initiatives parallel efforts to address adult literacy in the community. Among these are the fuller use of negotiated learning plans for all literacy students, introducing and supporting the FETAC level 1 and level 2 courses, the introduction of the National Adult Literacy Agency's assessment framework "Mapping the Learning Journey", devising and delivering the national 30-hour Initial Tutor Training course for new teachers and drawing up and rolling out a national Literacy Plan for Prison Education — work on which commenced in 2009.

There are currently no plans to undertake a further survey.

Garda Equipment.

Charles Flanagan

Question:

331 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the number of the Garda Síochána firearms stolen, reported stolen, missing or otherwise unaccounted for in each of the years 2004 to date in 2008; and if he will make a statement on the matter. [28666/09]

I have been informed by the Garda authorities that two firearms were reported stolen over this five year period*, one in 2004 and the other in 2006. Both firearms were subsequently recovered.

*From the beginning of 2004 up to 15 December 2008.

Irish Prison Service.

Charles Flanagan

Question:

332 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the number of mobile phones seized in each of the prisons to date in 2009; the measures put in place in each prison to prevent mobile phone use by prisoners; the categories of visitor and staff in each prison permitted to enter the prison with mobile phones on their person; and if he will make a statement on the matter. [28667/09]

Mobile phones are viewed as highly valuable commodities which could assist in illegal activity and eliminating their supply is one of the major challenges facing prisons worldwide.

The Irish Prison Service is dealing with this problem through a multifaceted approach which incorporates measures to prevent the smuggling of mobile phones into prisons, search and find operations aimed at locating and removing phones from within the prisons and the installation of mobile phone blocking technology.

Airport style scanners and x-ray machines are now in operation at the entrances of all closed prisons (excluding the Training Unit and Arbour Hill). Cell and area searches for contraband such as mobile phones take place in all prisons on a daily basis. These include random, targeted and intelligence led searches. These searches have been particularly effective and local intelligence indicates that the availability of mobile phones has decreased across the prison system.

Only Governor grades and other persons that may from time to time be authorised by the Governor, for example, the Director General of the Irish Prison Service are permitted to enter prisons while in possession of a mobile phone.

In relation to mobile phone inhibition, as the Deputy will be aware, a project to identify means of inhibiting the use of mobile phones in prisons has been ongoing since April 2007. The project commenced at the Midlands Prison and results to date have been sufficiently positive to convince the Irish Prison Service of the merit of extending the inhibition system at the Midlands into the new "C" block at Portlaoise Prison and also to the nearby Segregation Unit, and installation work in this regard is close to completion.

Three other test projects are also being undertaken at other prison locations. When all trial systems are fully in place and evaluation is complete it is intended to seek competitive tenders on a prison by prison basis from each of the companies in the trials whose product meets the requirements of the Irish Prison Service in relation to mobile phone inhibition.

In relation to the number of mobile phones seized in each of the prisons to date in 2009, I have been informed by the Irish Prison Service that it was not possible to collate the relevant information in the time available but I include, for the Deputy's information, the latest figures I have to hand on the following table. I will furnish the updated information to the Deputy as soon as possible.

Mobile Phone Seizures for 2008 and up to 20.03.09

Prison/Place of Detention

2008

2009 (to 20.03.09)

Arbour Hill

3

2

Castlerea

106

21

Cloverhill

128

10

Cork

64

8

Dóchas Centre

55

14

Limerick

292

87

Loughan House

58

9

Midlands

136

13

Mountjoy (Male)

580

137

Portlaoise

41

19

Shelton Abbey

72

27

St. Patrick’s

160

25

Training Unit

120

17

Wheatfield

232

42

Total

2,047

431

Drugs in Prisons.

Charles Flanagan

Question:

333 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the number, location and date of introduction of BOSS chairs in the prison system here; the approximate cost of such a chair; his plans for the roll out of these chairs across all prisons; and if he will make a statement on the matter. [28670/09]

The first Body Orifice Security Scanner (BOSS) chair was introduced by the Irish Prison Service in early 2008 on a pilot basis as part of a wide range of security initiatives introduced to combat the smuggling of contraband into our prisons. Since then seven additional chairs have been installed bringing the total to eight and it is proposed to introduce them in all closed prisons during the course of this year, subject to the availability of resources.

The approximate cost of a BOSS chair is €12,000. For security reasons, I am not in a position to indicate the precise locations of this equipment.

Garda Deployment.

Charles Flanagan

Question:

334 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the number of members of the Garda Síochána who are regularly carrying out non-front line duties that could be carried out by civilians; the rank of these members; and if he will make a statement on the matter. [28671/09]

Charles Flanagan

Question:

335 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the number of civilians carrying out non-front line duties in the Garda Síochána; the annual increase in civilianisation since 2002; the number of posts to be filled; and if he will make a statement on the matter. [28672/09]

I propose to take Questions Nos. 334 and 335 together.

I have requested the information sought by the Deputy from the Garda Commissioner. I will write to the Deputy directly when this information is to hand.

Proposed Legislation.

Charles Flanagan

Question:

336 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the consultation process for the White Paper on crime; the budget in respect of same; the methods being used for the promotion and community involvement in the process; when the consultation process will commence and where; and if he will make a statement on the matter. [28673/09]

I refer the Deputy to my Reply to Parliamentary Question No. 289 of Tuesday, 24 February 2009, which sets out the position in this matter. As indicated therein, a key element in the White Paper process will be the production of a series of discussion documents designed to stimulate and structure the debate on relevant topics. I can confirm that the first in the series will be published shortly.

Crime Prevention.

Charles Flanagan

Question:

337 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the position regarding his knife crime campaign; the organisers contracted to run the campaign; the budget for the campaign; the timeframe for same; the location of road shows; the methods of advertising and promoting the campaign; and if he will make a statement on the matter. [28674/09]

In the time available it has not been possible for the Garda authorities to supply the information requested by the Deputy. I will be in contact with the Deputy when the information is to hand.

Payment of Fines.

Charles Flanagan

Question:

338 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the amount of uncollected fines imposed by the courts and the Garda Síochána, including driving related offences, for 2006, 2007 and 2008; and if he will make a statement on the matter. [28675/09]

Statistics of the kind sought by the Deputy are not readily available, in particular because there is inevitably a time lapse between a fine being imposed and its collection.

Garda Remuneration.

Charles Flanagan

Question:

339 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the overtime budget spent for the Garda Síochána and the Prison Service for each year since 2004 to date in 2009; and if he will make a statement on the matter. [28676/09]

The information requested by the Deputy is set out in the following tables.

Overtime Expenditure in An Garda Síochána

Year

Expenditure

€ million

2004

63.1

2005

79.5

2006

105.0

2007

138.4

2008

115.3

2009 (to 6th July)

41.9

Overtime Expenditure in the Irish Prison Service

Year

Expenditure

€ million

2004

45.50

2005

46.00

2006

6.20*

2007

0.06*

2008

0.07*

2009 (to end June)

0.04*

*In August 2005, agreement was reached between the Irish Prison Service and the Prison Officers' Association on the Proposal for Organisational Change in the Irish Prison Service. A key element of the agreement was the elimination of overtime working and its replacement with an Additional Hours system. The introduction of the Additional Hours system has led to a very significant decrease in overtime expenditure by the Irish Prison Service since 2005. Since the introduction of the Additional Hours system, the only overtime payments made by the Irish Prison Service relate to headquarters staff.

Sentencing Policy.

Charles Flanagan

Question:

340 Deputy Charles Flanagan asked the Minister for Justice, Equality and Law Reform the breakdown of the number of offences resulting in imprisonment (details supplied) for each year for the past five years; and the average time spent in prison under each heading over the same timeframe. [28677/09]

I wish to advise the Deputy that the available statistical information can be obtained from the Annual Reports of the Irish Prison Service for the years requested. I am further advised that the 2008 report will be published in the near future. The Irish Prison Service have also informed me that the relevant reports are available on their website:www.irishprisons.ie

Citizenship Applications.

Noel Ahern

Question:

341 Deputy Noel Ahern asked the Minister for Justice, Equality and Law Reform the position in the case of a person (details supplied) in Dublin 5 who applied for naturalisation in 2006 when the fee was €550 and when the certificate of naturalisation was being granted the fee had increased; the way this situation arose; his views on whether it is fair; and if he will make a statement on the matter. [28737/09]

The Irish Nationality and Citizenship (Fees) Regulations, 2008, sets out the prescribed fees payable by applicants on the issue of a certificate of naturalisation since 1 August, 2008. The fees are as follows:

(a) where an application is made on behalf of a minor, a fee of €200.00

(b) where an application is made by a spouse of a naturalised Irish citizen, a fee of €950.00

(c) where an application is made by a widow or widower of an Irish citizen, a fee of €200.00

(d) in the case of all other applications, a fee of €950.00

(e) the fee payable under (a), (b), (c), or (d) shall be nil, if the application for the certificate concerned was made by or on behalf of a refugee or stateless person or by or on behalf of a programme refugee.

The increases in fees were in line with inflation for the period 1993 to 2008. While the fees are designed to reflect the effort and cost involved in processing the different categories of applicant, the certification fees do not recoup the full cost of processing in any category.

As this is a certification fee, it is the date of issue rather than the date of application that must be taken into account. Certificates of naturalisation can only be issued on payment of the prescribed fee at the time of certification.

Officials in the Citizenship Division of my Department inform me that the person in question has paid the prescribed fee and that her certificate of naturalisation was issued to her by registered post on 26 May, 2009.

Asylum Support Services.

Noel Ahern

Question:

342 Deputy Noel Ahern asked the Minister for Justice, Equality and Law Reform if he will provide this Deputy with the details of the current usage of a centre (details supplied) in County Dublin; the number compared with recent years; the number of nationalities who are residing there in 2009; the category of applicant residing there; and if he will make a statement on the matter. [28750/09]

In replying to the Deputy's Question, it is firstly necessary to give the following general background to the asylum seeker accommodation system.

The Reception and Integration Agency (RIA) is responsible for the accommodation of asylum seekers in accordance with the Government policy of direct provision and dispersal. The RIA is currently accommodating almost 6,900 persons representing 94 nationalities across 59 centres in 23 counties.

Persons entering the State seeking asylum make their initial asylum application with the Office of the Refugee Applications Commissioner (ORAC). Once an asylum application is made, the asylum seeker is offered accommodation by RIA. All such asylum seekers are provided with initial accommodation for a reception period usually of 10 to 15 days at a reception centre prior to being re-accommodated on dispersal to longer-term accommodation centres.

Balseskin Reception Centre in St. Margaret's, North Dublin, is the main reception centre for newly arrived asylum seekers in the State: there is another smaller reception centre in Kilmacud, Dublin. While at Balseskin, asylum seekers are offered medical screening and associated health supports at the on-site Health Centre operated by the Health Services Executive (HSE). Also, they are registered on-site by the Community Welfare Services for certain welfare supports such as direct provision allowance. Initial substantive interviews by ORAC are also conducted in Balseskin. Residents at Balseskin avail of full board accommodation and avail of other on-site facilities, including child and family supports. Once the initial reception period is completed, the RIA ‘disperses' asylum seekers from Balseskin to longer-term asylum accommodation centres throughout the country.

In relation to the specific details sought, the number of residents being accommodated changes on a daily basis. This is due to Balseskin being a reception centre with, as explained above, a high turnover of residents. Because of its particular reception function, occupancy would generally remain high. As at 3 July 2009, there were in the order of 250 residents on-site representing 42 nationalities. On average, to date in 2009, the occupancy level at Balseskin Reception Centre has been in the order of 264 persons. This compares with an occupancy for the centre at end-July 2008 of 216 persons and at end-July 2007 of 260 persons.

International Agreements.

Denis Naughten

Question:

343 Deputy Denis Naughten asked the Minister for Foreign Affairs the steps he will take to protect Irish interests under the proposed US tax haven abuse laws; and if he will make a statement on the matter. [28255/09]

There are a number of proposals, in Congress, and from the Administration, for measures to address the use of tax havens by individuals or companies.

Ireland is not considered a tax haven and proposals in this area should not be a threat to our interests. Nonetheless, the Embassy in Washington is closely following developments in this regard and promoting awareness among policy-makers that Ireland's tax system is fully compliant with OECD and EU frameworks and that Ireland has a network of tax treaties and information sharing agreements with many countries, including the United States.

The Embassy in Washington and IDA are monitoring proposed changes to the broader US international tax system and reviewing the possible implications for Ireland. They are continuing a comprehensive programme of outreach with contacts in the Administration and Congress to ensure that the mutual benefits of our existing relationships with the U.S. and U.S. companies in Ireland are fully understood.

Overseas Development Aid.

Olivia Mitchell

Question:

344 Deputy Olivia Mitchell asked the Minister for Foreign Affairs the amount of overseas development aid that has been allocated to the United Nations Population Fund for 2009; if the allocation includes UNFPA trust funds concerning female genital mutilation, maternal mortality and reproductive health commodity security; and if he will make a statement on the matter. [28288/09]

The Government's 2006 White Paper on Irish Aid outlines our commitment to addressing the specific health needs of women, as an essential element in Ireland's contribution to improving health and fighting poverty in developing countries. We work closely with a number of UN agencies to address maternal health issues, including the United Nations Population Fund (UNFPA). Our partnership with the UNFPA is focused in particular on the reduction of maternal mortality, the fight against HIV and AIDS and the need to address gender inequality.

The reality is that, to date, progress in these areas has been limited. Every year some 500,000 women die and a further 10 million suffer from severe illnesses or disabilities as a result of complications in pregnancy and childbirth. Underlying this tragedy is the lack of access by women in developing countries to good quality maternal and reproductive health, including family planning. In addition, it is estimated by the World Health Organisation that between 100 million and 140 million girls and women worldwide are living with the consequences of female genital mutilation.

The Government's aid programme, Irish Aid, currently supports the work of the UNFPA in these areas through a multi-annual framework agreement for the years 2008-2011. Under the agreement, €3 million is being provided in core funding to the UNFPA in 2009, bringing Ireland's overall contribution to the work of the Fund to €23.5 million since 2005. This includes contributions totalling €5 million for the UNFPA Trust Funds for Maternal Health and Global Reproductive Health Commodities Security, and for a joint programme with UNICEF on female genital mutilation.

Emigrant Support Services.

Dinny McGinley

Question:

345 Deputy Dinny McGinley asked the Minister for Foreign Affairs the discussions he has had with the United States authorities regarding the status of the undocumented Irish residents there; and if he will make a statement on the matter. [28350/09]

The Government attaches the highest importance to resolving the plight of our undocumented citizens in the United States. We have emphasised our strong support for the undocumented in all our engagements with the US Administration and Congress, including during meetings with President Obama and Secretary of State Clinton in Washington this March. During that visit we also had useful exchanges on this issue with Speaker of the House of Representatives, Nancy Pelosi, and Chairman of the Senate Judiciary Committee, Patrick Leahy. In addition, I raised the issue in my discussions with Senator Chuck Schumer and Congresswoman Zoë Lofgren, the respective Chairs of the Senate and House subcommittees on immigration.

Most recently, the Taoiseach and I held extensive discussions on the issue with the Congressional delegation, led by Congressman Neal, which visited Ireland last week. This included particularly useful exchanges with influential legislators, Congressman Luis Gutierrez and Congresswoman Nydia Velazquez, both strong proponents of comprehensive immigration reform and leading members of the Hispanic Caucus.

As the Deputy is aware, in the absence of comprehensive immigration reform, the Government has been actively pursuing a bilateral approach, aimed at facilitating greater legal migration between the two countries. The approach has had three core objectives: a reciprocal Working Holiday Agreement (now operational); new bilateral arrangements to provide reciprocal long term E3 working visas; and a solution for our undocumented.

While the inclusion of Ireland in an expanded version of the E3 programme would provide extensive new opportunities for Irish people to work in the United States and help ensure that a new generation of undocumented Irish does not develop, our friends on Capitol Hill have been clear that the status of the undocumented Irish cannot be addressed in isolation from other ethnic groups, including by way of an E3. Their advice is that the best prospect for a solution for the undocumented continues to lie with comprehensive immigration reform.

On 25 June, President Obama met with a range of key Congressional figures, including supporters and opponents of reform, to discuss this issue and identify how to begin fixing what he has described as a broken immigration system. His statement following the meeting that his ‘Administration is fully behind an effort to achieve comprehensive immigration reform' is very welcome. I also note the announcement that the Administration, under the direction of Secretary of Homeland Security, Janet Napolitano, will work with a leadership group from Congress to take forward the issue.

As President Obama noted, however, immigration remains ‘a sensitive and politically volatile issue' in the United States. Bi-partisan support is considered vital to the success of comprehensive reform and our friends on Capitol Hill, including those within the visiting delegation, have made it clear that progressing legislation will continue to present significant challenges.

While encouraged by recent developments, the immediate prospects for immigration reform remain uncertain. The Government is determined to continue to highlight the difficulties facing our undocumented citizens and to support the Administration in its efforts to implement reform.

Departmental Expenditure.

Denis Naughten

Question:

346 Deputy Denis Naughten asked the Minister for Foreign Affairs the cost of public advertising funded by his Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of his Department; and if he will make a statement on the matter. [28421/09]

Advertising undertaken by my Department typically includes; advisory notices on public opening hours over holiday periods, changes in passport application procedures and fees, and public information notices relating to significant developments in the European Union or in regard to Ireland's Official Development Assistance programme, Irish Aid.

While much of this material is now placed on the Department's website, a certain level of advertising continues to be necessary in order to reach all of our customers, particularly in relation to important passport and consular services.

The following table give the details of such advertising both statutory and non-statutory, under Votes 28 (Foreign Affairs) and 29 (International cooperation) for 2009 to date.

Statutory

Non-Statutory

Vote 28 Department of Foreign Affairs

949

28,887

Vote 29 International Cooperation

Nil

38,934

The statutory advertising in question relates to advertising in the Iris Oifigiúil.

Leo Varadkar

Question:

347 Deputy Leo Varadkar asked the Minister for Foreign Affairs the amount spent by his Department on legal fees directly to lawyers or through the State Solicitor’s office for each of the years 2006, 2007 and 2008; and if he will make a statement on the matter. [28469/09]

As the Deputy will be aware, Government Departments do not pay for the legal services provided by the Office of the Attorney General and the Chief State Solicitors Office or for advice from Counsel briefed by them.

My Department has a Legal Division, staffed by qualified legal professionals who provide legal advice on a wide range of international legal issues. Having such ‘in-house' legal experts reduces the costs which would be incurred if the Department was to engage externally for all of its legal services.

The costs for engaging external legal services in Ireland and overseas, for the period requested, is set out in tabular form.

Year

2006

2007

2008

Legal Costs

€319,110

€299,830

€217,443

Sports Funding.

John O'Mahony

Question:

348 Deputy John O’Mahony asked the Minister for Arts, Sport and Tourism if he informed the Gaelic Players Association, at a meeting in June 2009, that the player grants scheme as operated in 2008 will not be implemented in 2009; and if he will make a statement on the matter. [28308/09]

John O'Mahony

Question:

349 Deputy John O’Mahony asked the Minister for Arts, Sport and Tourism if he proposed a player grant scheme to the Gaelic Players Association in June 2009 that would apply only to players on teams that reach the final stage of the championship; and if he will make a statement on the matter. [28309/09]

I propose to take Questions Nos. 348 and 349 together.

In the agreement reached in November 2007 between the then Minister for Arts, Sport and Tourism, the Irish Sports Council (ISC), the GAA and the Gaelic Players Association, provision was made for the introduction of two schemes to recognise the outstanding contribution of senior Gaelic inter-county players to our indigenous sports, by meeting additional costs associated with elite team performance and to encourage aspiring teams and players to reach the highest levels of sporting endeavour.

It was agreed that the schemes would be funded through the ISC and would be administered through the Council and the GAA. An amount of €3.5 million was provided to the ISC in 2008 to fund the schemes. As I have previously indicated to the House, the drastically changed economic circumstances means that the taxpayer cannot continue to fund the entire cost of schemes such as this.

I have discussed this issue with the ISC and the GAA. I met representatives of the GPA on 29th June last with a view to agreeing a sustainable new scheme that would recognise the outstanding contribution of Gaelic players to our indigenous sports.

We had a robust exchange of views in an honest and open atmosphere. I explained to the GPA the difficulties facing my Department in the current economic climate. It fully understood and accepted those difficulties. I explained my view that the scheme as originally constituted was no longer viable. However, I am anxious to address the main concern of the players, which is recognition of the contribution that they make to the culture and traditions of this country. In that context I want to put in place a scheme that is sustainable and provides that recognition.

I want as many sports as possible to be funded within the limits of the resources available to me to ensure the continued strategic development of sport. I would like to see a scheme agreed with the GPA that would reflect that ambition. To put this in context, as the Deputy knows we funded athletes directly. The total cost of the other 16 sports that we fund, which is quite extensive and goes directly to athletes and not NGBs, is €2million. What I have proposed to the GPA is a very generous and worthy scheme. I hope its members will reflect on that.

Departmental Expenditure.

Denis Naughten

Question:

350 Deputy Denis Naughten asked the Minister for Arts, Sport and Tourism the cost of public advertising funded by his Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of his Department; and if he will make a statement on the matter. [28413/09]

The requested information in respect of public advertising costs incurred to date in 2009 by the Department (including the National Archives of Ireland, which forms part of the Department) is as set out in tabular form. These figures do not include the minor expenses payable to the Office of Public Works for placing notices in Iris Oifigiúil. The commissioning of advertising by the agencies under the aegis of the Department is a matter for the agencies themselves.

Leo Varadkar

Question:

351 Deputy Leo Varadkar asked the Minister for Arts, Sport and Tourism the amount spent by his Department on legal fees directly to lawyers or through the State Solicitor’s office for each of the years 2006, 2007 and 2008; and if he will make a statement on the matter. [28461/09]

In general, whenever the Department requires legal services, it obtains these from the Office of the Attorney General and/or the Office of the Chief State Solicitor. The associated costs are borne directly by those two Offices. However, on occasion and in exceptional circumstances, the Department, including the National Archives, may obtain legal services from other sources. In the years 2006 to 2008, inclusive, the costs associated with such other legal services are as set out in tabular form. The expenditure in 2008 relates to legal costs associated with the public private partnership (PPP) processes in respect of the redevelopment of the National Concert Hall and the new Abbey Theatre. Contracts for legal services in both cases are fixed-fee contracts and follow from competitive procurement processes.

Year

2006

2007

2008

Costs

€3,031

Nil

€250,802

Tourism Promotion.

Ulick Burke

Question:

352 Deputy Ulick Burke asked the Minister for Arts, Sport and Tourism the number of applications submitted to his Department as a result of the announcement of the inclusion of the mid-Shannon regions as a designated tourism incentive area for each year since its introduction; and the funding available in the estimates for such projects. [28760/09]

The Mid-Shannon Tourism Infrastructure Investment Scheme, which was introduced in section 29 of the Finance Act 2007 and launched in June 2008, provides tax incentives for investment in tourism attractions and facilities in the designated Mid-Shannon Corridor. The approval and certification of projects under the Scheme is a matter for the Mid-Shannon Tourism Infrastructure Board in accordance with the guidelines issued by the Minister for Arts, Sport and Tourism in consultation with the Minister for Finance. As the scheme takes the form of a tax incentive, it is not funded through the annual Estimates.

The Mid-Shannon Board and the executive teams within Fáilte Ireland and Shannon Development have extensively promoted the Scheme since its commencement date. Information seminars have been held with industry groups throughout the targeted region and local authorities have also been engaged to ensure their support for the Scheme and projects that might result from it. I am advised that, to date, a total of nine applications have been submitted to Fáilte Ireland and Shannon Development for consideration under the Scheme. One of these applications was submitted to the Mid Shannon Tourism Infrastructure Board a week ago and was approved. The remaining eight applications are currently being reviewed. It is anticipated that two more applications will be submitted to the Mid Shannon Tourism Infrastructure Board for evaluation within the next four weeks.

The Finance Act 2009 made provision to extend the period during which such applications can be made from one year to two years so that the latest date for the submission of applications is now 31 May, 2010. The eligible period within which expenditure must be incurred for capital allowances purposes has also been extended to 31 May, 2013.

Swimming Pool Projects.

Ulick Burke

Question:

353 Deputy Ulick Burke asked the Minister for Arts, Sport and Tourism the progress made since the date of the public announcement in June 2009 on the provision of a swimming pool in Loughrea in County Galway; if the parties in the public private partnership have been identified for the project; the costing for each participant; and the proposed starting date on the available site. [28766/09]

I understand that as a result of a tender process conducted in 2003 a developer was identified to construct and operate the swimming pool at Loughrea on behalf of Galway County Council. On 25 May 2009 my Department informed Galway County Council that a grant capped at €1.7m had been allocated under the Department's Local Authority Swimming Pool Programme towards the construction of a pool at Loughrea. The Local Authority concerned has advised that it is not possible at this stage to give a starting date for the construction of the pool.

Community Development.

Seymour Crawford

Question:

354 Deputy Seymour Crawford asked the Minister for Community, Rural and Gaeltacht Affairs the amount of funding available to each of the LEADER groups to encourage investment and jobs; the percentage of the funds that will be needed for administration; when applications will be made available; the way it will be advertised; his views on whether this is one if the few areas that can provide funding to rural areas through aid from the EU; if he will ensure that as much as possible of the approved funding is provided in the earlier stage of the scheme to avoid panic and possible poor value being received from the fund in a rush to utilise it before the closing date; and if he will make a statement on the matter. [28272/09]

As the Deputy may be aware, 36 Local Action Groups have been contracted to deliver the LEADER elements of the Rural Development Programme (RDP) 2007-2013. The Programme has been fully operational since late January 2009. Under the RDP, the main measure providing direct support for investment and job creation is Support for Business Creation and Development. In addition, there a number of other measures in the Programme, which will contribute to job creation. These include (i) Diversification into Non Agricultural Activities, (ii) Encouragement of Tourism Activities, (iii) Basic Services for the Economy and Rural Population, (iv) Village Renewal and Development and (v) Conservation and Upgrading of the Rural Heritage.

Over the lifetime of the RDP, each Group has been assigned a total allocation as well as an allocation under each individual measure. Allocations under the Business Creation and Development Measure are detailed in the table below. Under the Programme, a maximum of 20% of the overall Programme allocation can be assigned to administration costs.

In line with the bottom-up nature of the LEADER approach, the Local Action Group is the principal decision-maker in the allocation of project funding. My Department does not have any role to play in the decision-making process at group level. All Groups are currently accepting applications for funding under the various measures in the RDP, in accordance with their individual Local Development Strategies.

I can assure the Deputy that my Department is working closely with the Local Action Groups so that they maximise the impact of all funding received through the RDP in their own areas. This is being done in the context of the local strategies of the individual groups and in line with the overall objectives of the Programme. Each local Action group has received authorisation to approve projects for 2009, 2010 and 2011 to a total value as per table.

Local Action Group

Overall Programme Allocation

Business Creation and Development Measure

Overall Authorisation to approve projects to date

Avondhu/Blackwater Partnership

9,057,810

1,323,000.00

844,195

Ballyhoura Development Ltd

11,673,519

1,470,000.00

1,024,659

Carlow Co Development Partnership Ltd

8,878,177

680,000.00

82,6987

Cavan and Monaghan LEADER

12,035,118

1,405,000.00

112,1681

Comhar na nOileán Teo

4,642,415

262,000.00

1,307,469

Clare Local Development Co. Ltd

14,028,529

1,990,000.00

349,635

Donegal Local Development Co. Ltd.

12,831,901

1,195,000.00

1,178,940

FORUM Connemara

9,668,965

1,250,000.00

723,869

Fingal LEADER Partnership

7,766,780

920,000.00

901,155

Galway Rural Development Co. Ltd.

15,257,985

1,165,000.00

1,422,056

Inishowen Development Partnership

8,286,143

895,000.00

772,275

IRD Duhallow

10,315,943

1,260,000.00

961,453

Cill Dara ar Aghaidh Teo

12,282,448

955,000.00

1,144,733

Co Kilkenny LEADER Partnership Ltd

11,523,729

1,680,000.00

997,674

Laois Community and Enterprise Development Co. Ltd

10,993,608

1,630,000.00

1,024,613

Leitrim Integrated Development Co

10,845,497

1,220,000.00

1,010,808

Longford Community Resource Ltd

8,714,110

895,000.00

812,162

Louth LEADER Partnership

8,839,815

1,285,000.00

823,878

Mayo North East LEADER Partnership Co. Teo

10,751,894

1,265,000.00

1,002,085

Meath Partnership

12,748,771

1,486,000.00

1,188,195

Meitheal Forbartha na Gaeltachta Teo

17,278,809

1,680,000.00

1,610,398

North & East Kerry LEADER Partnership Teo

10,558,882

970,000.00

984,096

North Tipperary LEADER Partnership Co

9,708,008

960,000.00

904,794

Offaly Integrated Local Development Co

11,520,489

1,230,000.00

1,073,718

Roscommon Integrated Development Co

12,838,021

1,754,000.00

1,085,531

Co. Sligo LEADER Partnership Co

10,888,673

1,160,000.00

1,014,833

South East Cork Area Development Ltd

10,641,494

720,000.00

991,795

South Tipperary Local Development Co.Ltd

11,106,187

1,185,000.00

1,152,956

South Kerry Development Partnership Ltd

12,370,667

1,800,000.00

1,035,105

South West Mayo Development Co. Ltd

12,150,007

1,815,000.00

1,132,390

Waterford LEADER Partnership Ltd

10,558,519

1,310,000.00

984,062

West Cork Development Partnership

14,601,149

1,700,000.00

1,341,491

West Limerick Resources

9,997,751

1,410,000.00

931,798

Westmeath Community Development

10,987,060

925,000.00

1,024,002

Wexford Local Development

12,515,565

1,340,000.00

1,166,459

Co. Wicklow Partnership

11,135,560

1,190,000.00

1,007,509

Total

399,999,998.00

45,380,000.00

36,879,457

State Agencies.

Michael Creed

Question:

355 Deputy Michael Creed asked the Minister for Community, Rural and Gaeltacht Affairs the status of the proposed amalgamation of MFG and Údarás na Gaeltachta; and if he will make a statement on the matter. [28300/09]

I refer the Deputy to my reply to Questions Nos 299 to 302, inclusive, which were taken together on 12 May 2009. The current status of the proposed transfer of functions from MFG Teo to Údarás na Gaeltachta is that preparations for the transfer of the Rural Social Scheme to Údarás with effect from 26 July 2009 are currently well advanced, while proposals regarding both the Local Development and Social Inclusion Programme and the Rural Development Programme are currently under consideration in consultation with both organisations and the Office of the Attorney General.

Departmental Expenditure.

Denis Naughten

Question:

356 Deputy Denis Naughten asked the Minister for Community, Rural and Gaeltacht Affairs the cost of public advertising funded by his Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of his Department; and if he will make a statement on the matter. [28415/09]

Public advertising costs funded by my Department and the details provided by the agencies under the aegis of my Department so far in 2009, is in the Table.

2009

Cost of public advertising

How much of the cost was statutory advertising

How much of the cost was non-statutory advertising

Dept. of Community, Rural & Gaeltacht Affairs

19,732

230

19,502

Oifig an Choimisinéir Teanga*

14,167

**14,167

0

Waterways Ireland

0

0

0

Commissioners for Charitable Donations & Bequests

0

0

0

Údarás na Gaeltachta

7,699

47

7,652

Western Development Commission

9,568

0

9,568

An Foras Teanga, comprising:

Foras na Gaeilge

37,694

4,336

33,358

Ulster-Scots Agency

***3,353

0

3,353

*Independent statutory office.

**This cost relates to a public advertising campaign in pursuance of a statutory obligation to provide advice to the public regarding their rights under the Official Languages Act 2003.

***The exchange rate used was Sterling £0.78 = €1.00.

National Drugs Strategy.

Catherine Byrne

Question:

357 Deputy Catherine Byrne asked the Minister for Community, Rural and Gaeltacht Affairs if he will explain the management structure overseeing the National Drugs Strategy and the way in which the National Drug Strategy team has been replaced; the number of members of staff currently working on the National Drugs Strategy within his Department; and if he will make a statement on the matter. [28453/09]

Catherine Byrne

Question:

358 Deputy Catherine Byrne asked the Minister for Community, Rural and Gaeltacht Affairs his plans for the local and regional drugs task forces into the future; if he envisages them having a long term role with the National Drug Strategy; and if he will make a statement on the matter. [28454/09]

I propose to take Questions Nos. 357 and 358 together.

The Government approved the establishment of an Office of the Minister for Drugs (OMD) on 16 June. The main staffing cohort for the new Office will be drawn from my Department. A total of 14 people are currently working in this area, which equates just under 12 whole time equivalents. Direct involvement of the broader statutory sector will continue through the assignment of personnel on a half-time basis, with the possible additional direct engagement by some further agencies. Representation from the community and voluntary sectors will continue in the OMD with funding being provided by my Department to support their engagement. I look forward to the Local and Regional Drugs Task Forces continuing to play an important role in the National Drugs Strategy 2009-2016, supported by the OMD.

Catherine Byrne

Question:

359 Deputy Catherine Byrne asked the Minister for Community, Rural and Gaeltacht Affairs the funding available under his Department for drug related initiatives and projects for the remainder of 2009; when and the way this money will be allocated to the drugs task forces; and if he will make a statement on the matter. [28455/09]

Aengus Ó Snodaigh

Question:

361 Deputy Aengus Ó Snodaigh asked the Minister for Community, Rural and Gaeltacht Affairs the reason for the lack of communication with local drugs task forces since the ending of the national drugs strategy team in relation to security of their funding, the transfer of promised funds, and the fact that the insecurity regarding funding is threatening the future of several key drugs projects around the city; and if he will make a statement on the matter. [28614/09]

Aengus Ó Snodaigh

Question:

362 Deputy Aengus Ó Snodaigh asked the Minister for Community, Rural and Gaeltacht Affairs if his attention has been drawn to the fact that many drugs task force funded drugs projects have no wages to pay staff for July and August 2009 as a result of a delay or confusion regarding funding due to the demise of the national drugs strategy team and the dispersal of their staff. [28615/09]

Aengus Ó Snodaigh

Question:

363 Deputy Aengus Ó Snodaigh asked the Minister for Community, Rural and Gaeltacht Affairs if his attention has been drawn to the fact that the lacuna in deciding funding for drugs projects and drugs task forces is causing problems for planning service delivery in 2010; when a decision will be made regarding future funding of these services; if his attention has further been drawn to the fact that any cut in budget at this stage or into 2010 will result in an inability to deliver the same level of services. [28616/09]

I propose to take Questions Nos. 359 and 361 to 363, inclusive, together.

The revised funding allocations for the period July to December 2009, taking account of the Supplementary Budget in April, have now been advised to all Local Drugs Task Forces (LDTFs) and to seven of the Regional Drugs Task Forces (RDTFs). Approval was conditional on the requisite information being furnished by them and outstanding material is still awaited from 3 RDTFs. My officials are working closely with the Task Forces concerned and I would expect their allocations to be finalised in the coming days.

In 2009, €32.5m in current funding is being provided to the 24 Task Forces — €22.3m to the Locals and €10.2m to the Regionals. I want to assure the Deputies that my officials have been working closely with the Task Forces in recent weeks on finalising their funding allocations.

As I have pointed out previously, the challenges posed by the reduction in funding arising from the reduced budget allocations means that some schemes will be affected. However, I believe that if properly managed, this may also lead to improved efficiencies in services and foster better interagency working to the benefit of all.

In relation to funding for 2010, the Deputies will appreciate that this is a matter for the annual Estimates process.

Departmental Expenditure.

Leo Varadkar

Question:

360 Deputy Leo Varadkar asked the Minister for Community, Rural and Gaeltacht Affairs the amount spent by his Department on legal fees directly to lawyers or through the State Solicitor’s office for each of the years 2006, 2007 and 2008; and if he will make a statement on the matter. [28463/09]

The amount spent by my Department on legal fees directly to lawyers in the period in question was:

2006 — NIL;

2007 — €25,894;

2008 — €6,050.

While my Department does not reimburse the Chief State Solicitor's Office (CSSO) in respect of legal fees for actions in relation to my Department, my officials are in contact with that office to establish such costs and this material will be forwarded to the Deputy when it has been compiled.

Questions Nos. 361 to 363, inclusive, answered with Question No. 359.

Water and Sewerage Schemes.

Finian McGrath

Question:

364 Deputy Finian McGrath asked the Minister for Community, Rural and Gaeltacht Affairs when funding will become available for a group water scheme (details supplied) in County Mayo. [28683/09]

Under the CLÁR Programme, my Department has already made substantial commitments under the water and sewerage schemes, and against the background of the current economic climate, these schemes were suspended to new applications in August 2008.

I am reviewing the Programme as a whole, having regard to demand, the funding available and the level of outstanding commitments. In this context, I am liaising with the local authorities regarding possible further group water schemes and I will give consideration to this when the relevant information is provided to me and in the context of the available resources.

In the case raised by the Deputy, I am awaiting information from the relevant local authority.

Question No. 365 withdrawn.

Social Welfare Benefits.

James Bannon

Question:

366 Deputy James Bannon asked the Minister for Social and Family Affairs the savings she has made from the reduction in rent supplement to the most needy people in society; and if she will make a statement on the matter. [28131/09]

There are currently almost 90,000 people in receipt of rent supplement, an increase of 51% since the end of December 2007. Rent supplements are subject to a limit on the amount of rent that a recipient may incur. Setting or retaining maximum rent limits at higher levels than are justified by the open market can have a distorting effect on the rental market, leading to a more general rise in rent levels and in landlord income. This in turn may worsen the affordability of rental accommodation unnecessarily, with a particularly negative impact for those tenants on lower incomes. Prior to the Supplementary Budget, the Department of Social and Family Affairs analysed data from the Private Residential Tenancies Board, the CSO and a leading property rental website, all of which showed significant drops in rental prices over the past year.

In order to ensure that taxpayers money is not being used to pay inflated rents to private landlords, the Budget provided for decreases in both the maximum rent payable in respect of new tenancies and in rent supplement payments to existing tenants. As of 1 June 2009, the maximum rent supplement limits payable by the State in respect of new tenancies and renewals of existing ones were reduced by 6% to 7% on average, ranging up to 10%, depending on the geographical area and household size. Rent supplements for all existing tenancies were similarly reduced with effect from 1 June 2009. It is expected that landlords will reduce rents in recognition of the fact that rents have fallen generally and that there are now a large number of vacant rental properties nationally. If a landlord refuses to reduce a tenant's rent, they should be able to find alternative accommodation within the rent limits. Community Welfare Officers have discretion to provide assistance where exceptional circumstances exist in any individual case. Officers have also been advised that support, appropriate to the circumstances of the particular case, may be provided to rent supplement tenants for up to two months, where alternative accommodation is being sourced within the existing rent limits. The minimum contribution that individuals and families make towards their rent or mortgage interest payments was also increased in the Supplementary Budget by €6 to €24 per week, with effect from 1 June 2009. This increased contribution aligns the Rent Supplement scheme more closely with the rents that local authority tenants have to pay, which in Dublin city is a minimum of €25.80 a week and averages around €58.95 a week.

It is estimated that a saving of €48m will be achieved in 2009 as a result of these measures. It should be noted that even with these changes, the overall provision in the Supplementary Budget for the rent supplement scheme is €490.4 million — which is €50.7 million more than the 2008 outturn on this scheme.

Pension Provisions.

James Bannon

Question:

367 Deputy James Bannon asked the Minister for Social and Family Affairs the action she is taking on behalf of a person (details supplied) in County Westmeath to ensure that the pension benefits of workers who took out a pension with pension fund providers are secure; and if she will make a statement on the matter. [28135/09]

The Construction Federation Operatives Pensions Scheme (now known as the Construction Workers Pension Scheme) operates as a Registered Employment Agreement under the Industrial Relations Acts. Compliance with the terms of the scheme is enforced through the Construction Industry Monitoring Agency, The Labour Court and the Department of Enterprise, Trade and Employment. My Department has no direct role in relation to the operation of the scheme.

The Pensions Board has a role in relation to the scheme in so far as compliance with the various aspects of the Pensions Act is concerned. The Board will investigate matters brought to its attention which are relevant to the requirement of the Act. Alternatively, it is open to a person to make a complaint to the Pensions Ombudsman who can investigate complaints of financial loss due to maladministration and disputes of fact or law in relation to occupational pension schemes and Personal Retirement Savings Accounts.

Social Welfare Benefits.

James Bannon

Question:

368 Deputy James Bannon asked the Minister for Social and Family Affairs the reason a person (details supplied) in County Longford has been waiting over five months for their jobseeker’s allowance; when they will receive same; and if she will make a statement on the matter. [28136/09]

A claim for Jobseeker's Benefit from the person concerned was received in the Department on 29th of January 2009. There is a discrepancy in his contribution record for 2007 and enquiries are being made with his former employer. A decision on his entitlement to jobseeker's benefit will be made as soon as these enquiries are completed and the current PRSI contributions applicable is determined.

In the meantime, it is open to the person concerned to apply for job seekers allowance. The person concerned is in receipt of Supplementary Welfare Allowance from their local Health Service Executive Community Welfare Officer since 12 March 2009 at a weekly rate of €237.90.

Brendan Kenneally

Question:

369 Deputy Brendan Kenneally asked the Minister for Social and Family Affairs the number of former professional apprentices who are claiming jobseeker’s allowance or jobseeker’s benefit, the amount that has been paid out to these people every month for the past year; and the amount that is expected to be paid out to such people by the end of 2009. [28151/09]

Brendan Kenneally

Question:

370 Deputy Brendan Kenneally asked the Minister for Social and Family Affairs the number of former professional apprentices who are claiming jobseeker’s allowance or jobseeker’s benefit on a county basis. [28152/09]

I propose to take Questions Nos. 369 and 370 together.

Applicants for a jobseeker's payment are assigned a code based on their previous occupation. This code identifies a person's trade or profession, for example painter, printer or teacher. However, the Department does not have a specific code for apprentices and as a result the information requested by the Deputy is not available.

Departmental Staff.

Brendan Kenneally

Question:

371 Deputy Brendan Kenneally asked the Minister for Social and Family Affairs the number of people currently employed in social welfare offices throughout County Waterford; the breakdown of these numbers by office; the number employed per year over the past five years; and if there are plans to increase the number of staff employed in Waterford. [28153/09]

There are currently 93 people employed on a permanent basis in Social Welfare Offices in County Waterford. As a number of these avail of family-friendly work arrangements and are consequently employed on a less than full-time basis, the total employment in these offices equates to some 85 full time equivalent posts.

The following table gives a breakdown by office of permanent staff.

TABLE A

Posts

People

Waterford

Social Welfare Local Office

62.68

69

Regional/Investigative

21.70

23

Dungarvan

Regional/Investigative

1.00

1

Total

85.38

93

In addition, there are currently 4 Temporary Clerical Officers employed in the Social Welfare Local Office in Waterford City, pending the assignment of permanent staff. 9 extra staff members have been assigned to Waterford Local Office since June 2008 to deal with the significant increase in the Live Register.

Table B details the number of permanent staff in the Social Welfare Local Office and Regional/Investigative offices in the past 5 years.

TABLE B

Waterford

Dungarvan

Total

SW Local Office

Regional/ Investigative

Region/ Investigative

01-Jan-04

Posts

47.8

20.0

1

68.8

People

55.0

23.0

1

79.0

01-Jan-05

Posts

49.0

21.0

1

71.0

People

57.0

24.0

1

82.0

01-Jan-06

Posts

51.0

21.0

1

73.0

People

59.0

24.0

1

84.0

01-Jan-07

Posts

51.7

22.5

1

75.2

People

59.0

25.0

1

85.0

01-Jan-08

Posts

52.0

23.5

1

76.5

People

60.0

26.0

1

87.0

01-Jul-09

Posts

62.7

21.7

1

85.4

People

69.0

23.0

1

93.0

Social Welfare Benefits.

Michael Ring

Question:

372 Deputy Michael Ring asked the Minister for Social and Family Affairs if an anomaly exists in relation to a reply given to a person (details supplied) in County Mayo. [28356/09]

Rent supplement is administered on behalf of the department by the community welfare service of the Health Service Executive as part of the supplementary welfare allowance scheme.

Rent supplement scheme is intended to provide short-term income support to eligible people living in private rented accommodation, whose means are insufficient to meet their accommodation costs and who do not have accommodation available to them from any other source.

In determining entitlement to rent supplement, a community welfare officer must have regard to the statutory qualifying conditions of the scheme and the circumstances of each individual case.

There are a number of qualifying conditions that must be satisfied to qualify for payment of rent supplement. Under Article 9(2)(b) of the Social Welfare (Consolidated Supplementary Welfare Allowance) Regulations 2007 (SI 412 of 2007), it is a condition of a person's entitlement to rent supplement that they could reasonably have afforded the rent at the commencement of the tenancy, had at that time an expectation that s/he could have afforded the rent into the future and had experienced a substantial change in his or her circumstances leading to an inability to afford the rent. Failing that, a person may qualify for rent supplement on a number of other grounds including having been assessed by a housing authority as being homeless or having a housing need, be in receipt of a disability type payment or in any other circumstance which, in the opinion of a community welfare officer, warrant a rent supplement being paid.

The Executive has advised that rent supplement was refused on the basis that the person concerned was not in a position to afford the rent at the commencement of the tenancy in question. An appeal by the person concerned against this decision to an Appeals Officer of the Executive and to the Chief Appeals Officer of the Department of Social and Family Affairs was unsuccessful.

If the circumstances of the person concerned have changed, it is open to him to make a new application for rent supplement.

Departmental Expenditure.

Denis Naughten

Question:

373 Deputy Denis Naughten asked the Minister for Social and Family Affairs the cost of public advertising funded by her Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of her Department; and if she will make a statement on the matter. [28424/09]

The total amount spent on public advertising to date in 2009 is €137,473. €660 on statutory and €136,813 on non-statutory.

The breakdown between statutory and non-statutory advertising across the Department and the agencies under its aegis is outlined in the table.

Name of Agency/ Board

Cost of Statutory Advertising in 2009

Cost of Non-Statutory Advertising in 2009

Total cost ofAdvertising in 2009

The Department of Social and Family Affairs

660

129,000

129,660

Pensions Board

Nil

Nil

Nil

Combat Poverty Agency

Nil

Nil

Nil

Citizens Information Board (CIB)

Nil

774

774

Family Support Agency

Nil

2,810

2,810

Office of the Pensions Ombudsman

Nil

4,229

4,229

Total

660

136,813

137,473

Leo Varadkar

Question:

374 Deputy Leo Varadkar asked the Minister for Social and Family Affairs the amount spent by her Department on legal fees directly to lawyers or through the State Solicitor’s office for each of the years 2006, 2007 and 2008; and if she will make a statement on the matter. [28472/09]

Cases of social welfare fraud can be taken to court by way of criminal prosecutions or civil proceedings. All such cases are sent to the Chief State Solicitors Office (CSSO) to initiate legal proceedings through the District Courts. At present, the legal costs involved are not borne by this Department and the information requested by the Deputy is currently being sought from that Office.

In 2006, payments totalling €44,138 in respect of legal expenses and damages were made to 3 people in respect of personal injuries sustained on Departmental property. Compensation and associated legal and miscellaneous costs totalling €37,554 were paid in 5 cases of personal injury claims by employees.

In 2007, payments totalling €20,122 in respect of legal expenses and damages were made to 3 people in respect of personal injuries sustained on Departmental property. Compensation and associated legal and miscellaneous costs totalling €89,956 were paid in 8 cases of personal injury claims by employees. In addition, ex-gratia payments and legal costs totalling €96,536 were made in respect of a number of schemes. The 2008 Accounts for the Department are being finalised at present.

Social Welfare Benefits.

Olwyn Enright

Question:

375 Deputy Olwyn Enright asked the Minister for Social and Family Affairs if her attention has been drawn to the long queues, including queues onto the street for a number of hours, at a social welfare office (details supplied) in County Offaly; when and the way she will address same; and if she will make a statement on the matter. [28704/09]

The Live Register at the office concerned has increased by 76% over the last twelve months as a result of the economic downturn. Accordingly there are now larger volumes of people, both making claims for the first time and also signing on the Live Register.

Applicants for Jobseeker's Benefit and Jobseeker's Allowance at the office concerned sign on the Live Register once a month. Signing of Jobseeker's Benefit applicants is currently carried out on two days each month, Wednesday and Thursday of the same week. Signing of Jobseeker's Allowance applicants is currently only carried out on one day each month.

Queues at the office concerned are normally early in the morning before the office opens and on the day Jobseeker's Allowance applicants sign on the Live Register. From the end of July, signing arrangements for Jobseeker's Allowance applicants at the office concerned will be extended to two days, Tuesday and Wednesday of the same week. The position will be kept under review and all options will be explored to minimize delays.

Olwyn Enright

Question:

376 Deputy Olwyn Enright asked the Minister for Social and Family Affairs the length of time it takes to assess applications for jobseeker’s allowance and benefit at a social welfare office (details supplied) in County Offaly; when and the way she will bring this back to an acceptable level; and if she will make a statement on the matter. [28706/09]

The Live Register at the office concerned has increased by 76% over the last twelve months as a result of the economic downturn and staff are working flat out to deal with this increased claim load and to minimize the time taken to decide claims.

The average processing times at the office concerned for the month of June were 2.87 weeks for Jobseeker's Benefit claims and 6.05 weeks for Jobseeker's Allowance claims. The national averages for the same period were 3.34 weeks and 5.92 weeks, respectively. The Department has set a target to process 90% of Jobseeker's Benefit claims in 3 weeks and 90% of Jobseeker's Allowance claims in 6 weeks. During June the processing times for the office concerned were 65.86% and 64.63%, respectively.

The length of time it takes to process claims varies depending on the complexity of the claim, the availability of the necessary documentation from the applicant or his/her employer and the need to carry out additional enquires including the assessment of means and whether the claimant satisfies the Habitual Residence Condition.

Furthermore, processing times can vary depending on other factors such as staff vacancies, the duration of such vacancies and the turnover of staff which would impact on the overall level of experience in the office.

To cope with the increased workload an additional inspector was appointed for County Offaly in March and an additional two full-time staff and two temporary staff have been appointed to the office concerned during March and April. Accordingly, the time taken to process claims will improve as these staff, become more experienced.

It is recognised that the provision of additional staff in itself will not deal with the rising claim load. Accordingly all aspects of the work associated with the processing of claims is being examined and streamlined where possible, without compromising scheme controls.

Olwyn Enright

Question:

377 Deputy Olwyn Enright asked the Minister for Social and Family Affairs the length of time it takes to assess applications for jobseeker’s allowance and benefit at a social welfare office (details supplied) in County Laois; when and the way she will bring this back to an acceptable level; and if she will make a statement on the matter. [28709/09]

The Live Register at the office concerned has increased by 92% over the last twelve months as a result of the economic downturn and staff are working flat out to deal with this increased claim load and to minimize the time taken to decide claims.

The average processing times at the office concerned for the month of June were 2.73 weeks for Jobseeker's Benefit claims and 9.75 weeks for Jobseeker's Allowance claims. The national averages for the same period were 3.34 weeks and 5.92 weeks, respectively. The Department has set a target to process 90% of Jobseeker's Benefit claims in 3 weeks and 90% of Jobseeker's Allowance claims in 6 weeks. During June the processing times for the office concerned were 75.88% and 44.67%, respectively.

The length of time it takes to process claims varies depending on the complexity of the claim, the availability of the necessary documentation from the applicant or his/her employer and the need to carry out additional enquires including the assessment of means and whether the claimant satisfies the Habitual Residence Condition.

Furthermore, processing times can vary depending on other factors such as staff vacancies, the duration of such vacancies and the turnover of staff which would impact on the overall level of experience in the office.

To cope with the increased workload an additional two full-time staff and two temporary staff were appointed to the parent local office of the office concerned during March and April. In addition to this the Department is currently in the process of recruiting an additional inspector for County Laois. Accordingly, the time taken to process claims will improve as these additional staff, become more experienced.

It is recognised that the provision of additional staff in itself will not deal with the rising claim load. Accordingly all aspects of the work associated with the processing of claims is being examined and streamlined where possible, without compromising scheme controls.

Olwyn Enright

Question:

378 Deputy Olwyn Enright asked the Minister for Social and Family Affairs the length of time it takes to assess applications for jobseeker’s allowance and benefit at a social welfare office (details supplied) in County Offaly; when and the way she will bring this back to an acceptable level; and if she will make a statement on the matter. [28710/09]

The average claim processing times for the office in question, in the month of June, were 2.63 weeks for jobseeker's benefit and 5.05 weeks for jobseeker's allowance. The corresponding figures nationally were 3.34 weeks for jobseeker's benefit and 5.92 weeks for jobseeker's allowance.

The processing target for jobseeker's benefit is 90% in three weeks, while for jobseeker's allowance the target is 90% in six weeks. In June, 85.37% of jobseeker's benefit claims and 66.67% of jobseeker's allowance claims in the office were decided within the specified times.

Every effort is being made to bring processing times back in line with targets. Following staffing reviews in 2008 and again in recent months, some 300 extra staff have been assigned to Local Offices, new Central Support Units and the Departments Inspectorate since May 2008. This includes 90 temporary staff who have been appointed to Local Offices around the country pending the assignment of permanent staff. Arrangements are also in train to assign a further 24 inspectors.

Anyone who is under financial pressure while awaiting a decision on their claim for a jobseeker's payment can apply for Supplementary Welfare Allowance which is subject to a means test and other qualifying conditions.

Olwyn Enright

Question:

379 Deputy Olwyn Enright asked the Minister for Social and Family Affairs the length of time it takes to assess applications for jobseeker’s allowance and benefit at a social welfare office (details supplied) in County Offaly; when and the way she will bring this back to an acceptable level; and if she will make a statement on the matter. [28711/09]

The processing times for jobseeker's allowance applications for June 2009 in respect of the social welfare office in Edenderry are 13.10 weeks. The processing times for jobseeker's benefit applications for June 2009 at the office are 4.73 weeks.

The social welfare office in Edenderry is a branch office and decisions on applications made in that office as with the branch office in Castlepollard are made in their parent Social Welfare Local Office in Mullingar which is currently dealing with the significant increase in the number of persons registering as unemployed in all three offices as set out in the table.

LO/BO

4.7.2008

3.7.2009

% +

Mullingar

2,822

4,906

74

Edenderry

1,036

2,233

116

Castlepollard

672

1,278

90

Total

4,530

8,417

93

The Department has put a range of measures in place to speed up claim processing which include: Three new staff were assigned to the Mullingar Area in the beginning of the year and a further 4 temporary clerical officers have been assigned in recent weeks. A further two staff have been approved and are in the process of being resourced. A Regional Local Office Support Unit has recently been established for the purpose of alleviating backlogs in social welfare offices including the Mullingar Local Office. All measures to improve processing times are being reviewed on a continuous basis.

Departmental Staff.

Ulick Burke

Question:

380 Deputy Ulick Burke asked the Minister for Social and Family Affairs if she will provide additional staff to eliminate the long delays in applications being assessed for social assistance in Loughrea and Tuam, County Galway; and the action she will take to provide reasonable processing times for such assessments. [28771/09]

The Government is determined to ensure that people who have lost their jobs, or been put on shorter working weeks, can get access to their entitlements as quickly as possible. To that end, productivity in local offices has increased, claim processing procedures have been improved and extra staff have been put in place.

Following staffing reviews in 2008 and again in recent months, some 300 extra staff have been assigned to Local Offices, new Central Support Units and the Departments Inspectorate since May 2008. This includes 90 temporary staff who have been appointed to Local Offices around the country pending the assignment of permanent staff. Arrangements are also in train to assign a further 24 inspectors.

An additional staff member is due to report to the Loughrea office in the coming weeks and work is continuing on the assignment of a further member of staff. The office in Tuam is a branch office which operates under a contract for service to the Department and reports to the Loughrea Local Office. Additional staff allocated to the Loughrea office will also have a positive impact on decisions on claims in the Tuam area.

It is not possible to predict when claim processing time targets will be met while the Live Register continues to increase to record numbers. However, every effort is being made to ensure that people get access to financial and other supports as quickly as possible and to bring processing times back in line with targets.

Anyone who is under financial pressure while awaiting a decision on their claim for a jobseeker's payment can apply for Supplementary Welfare Allowance which is subject to a means test and other qualifying conditions.

Departmental Expenditure.

Denis Naughten

Question:

381 Deputy Denis Naughten asked the Minister for Defence the cost of public advertising funded by his Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of his Department; and if he will make a statement on the matter. [28416/09]

Expenditure on advertising by my Department in 2009 amounted to €49,343 all of which was non-statutory. Of this total, €30,923 was expended in relation to property transactions and warning notices to the public in respect of military training exercises; €11,127 was in respect of publication of a notice in the national newspapers regarding the fees payable to professional service providers; €4,353 was in respect of publication of a notice in the national newspapers concerning the Commemoration to mark the 93rd Anniversary of the 1916 Rising on Easter Sunday (April 2009). A further €2,940 related to an advertisement advising prospective candidates in the European and Local Elections and Dáil Bye-Elections who wished to contact military personnel serving overseas.

A total of €4,124 was spent on advertising by the Defence Forces in 2009 all of which was non-statutory. The expenditure was in respect of recruitment advertising.

Leo Varadkar

Question:

382 Deputy Leo Varadkar asked the Minister for Defence the amount spent by his Department on legal fees directly to lawyers or through the State Solicitor’s office for each of the years 2006, 2007 and 2008; and if he will make a statement on the matter. [28464/09]

The main requirement for legal services in my Department is in the context of administrative law litigation, usually in the form of judicial review and personal injury proceedings.

The Chief State Solicitor's Office is responsible for the costs of the State's legal teams in cases that it manages on behalf of my Department. Details of these costs are not available within the Department. Apart from the cost of the State's legal teams, my Department can be required to pay plaintiffs' legal costs as part of awards/settlements. The information in relation to these costs is as follows:

Year

Costs

2006

1,128,943

2007

1,055,078

2008

1,440,898

Other than the cost of legal services arising from litigation, my Department may from time to time have certain projects that are more suitable to assignment to a dedicated legal team on a once-off basis. Information in relation to these costs is as follows:

Year

External legal costs

2006

4,271

2007

34,891

2008

85,353

Enda Kenny

Question:

383 Deputy Enda Kenny asked the Minister for Defence the costs associated with the running, servicing and administration of Baldonnel Airport, Dublin, for each of the past three years; and if he will make a statement on the matter. [28739/09]

The total cost of running, servicing and administration of Baldonnel Airport was in the region of €1.028 million for the year 2006, €1.113 million for 2007 and €1.35 million in 2008 amounting to € 3.491 million over the three year period. These costs include electricity, gas, water, waste, cleaning and other general administration costs.

Ulick Burke

Question:

384 Deputy Ulick Burke asked the Minister for Defence the cost to his Department of providing escort security for cash transportation inter banks moves and for each of the commercial banks for each of the years 2006, 2007, 2008 and to date in 2009; and the amount paid by each bank in return for such service provided. [28768/09]

Following a detailed formal agreement with the Irish Bankers Federation, which was signed on 11 May 2005, the banks pay the total actual costs incurred by the Defence Forces in the provision of cash escorts, therefore there is no itemised breakdown per individual bank. Costs in respect of each 12 month period to end-December, are paid the following year on or before the 1st June. This is to allow for the compilation of returns from the brigades and allocation of costs following the year-end.

The total cost in respect of the provision by the Defence Forces of assistance to the Garda Síochána in protecting movements of cash for the years 2006 to 2009 is as follows:

Year

2006

2007

2008

2009

Total Number of Escorts

2,259

2,291

2,210

Breakdown due May 2010

Payment received from Irish Bankers Federation

€6.47m

€7.34m

€7.45m

Payment due June 2010

Building Energy Ratings.

Ciaran Lynch

Question:

385 Deputy Ciarán Lynch asked the Minister for the Environment, Heritage and Local Government the number of BER inspections undertaken within the social housing sector; if he will confirm that the inspections were undertaken by qualified inspectors; if he will confirm that the relevant certificate was produced to persons expressing an interest in availing of social housing; and if he will make a statement on the matter. [28116/09]

Dinny McGinley

Question:

393 Deputy Dinny McGinley asked the Minister for the Environment, Heritage and Local Government the reason Sustainable Energy Ireland requires a fee of €1,000 plus VAT to register as a building energy rating assessor; the further reason that these fees apply to unemployed persons who wish to train and work in this area; and if he will make a statement on the matter. [28264/09]

Dinny McGinley

Question:

394 Deputy Dinny McGinley asked the Minister for the Environment, Heritage and Local Government if Sustainable Energy Ireland will reduce or eliminate the fees required for unemployed persons to register or sit examinations to qualify as a building energy rating assessor; and if he will make a statement on the matter. [28265/09]

I propose to take Questions Nos. 385, 393 and 394 together.

The register of Building Energy Rating (BER) certificates maintained by Sustainable Energy Ireland (SEI) does not separately identify those certificates which relate to social housing units. The production of BER certificates and advisory reports to persons expressing an interest in availing of social housing is a matter for each individual local authority who are aware of their legal obligations in this regard.

Only persons who are fully trained and qualified and who have registered with SEI as BER assessors for dwellings may undertake BER assessments. In order to qualify as a BER Assessor, a person must have a qualification equivalent to National Certificate Level 6 in construction studies and undergo a short duration BER training course with an SEI-approved training provider. A person who is certified as having completed the necessary training may then apply to undergo SEI's National BER Assessors examination following which, provided they are successful at examination, they may seek to register with SEI as a BER assessor for dwellings.

I am advised by SEI that some of the training providers listed on SEI's website may have entered into funding arrangements with FÁS, the State training and employment agency. The fee for undertaking SEI's national examination is €100 and the initial registration fee is €1,000 for the first year and €100 per annum thereafter. In the case of companies, the registration fee is reduced to €500 in respect of the registration of a second and subsequent BER Assessor. All registration fees are used solely for the purposes of the development, maintenance and operation of the BER scheme, which is expected to be self-financing, and for this reason the fees are considered necessary and appropriate.

Capital Projects.

Michael Creed

Question:

386 Deputy Michael Creed asked the Minister for the Environment, Heritage and Local Government if he will permit local authorities to enter into contractual arrangements with the private sector for the construction and lease back of capital projects including housing, fire stations and other facilities; and if he will make a statement on the matter. [28129/09]

It is open to local authorities to enter into leasing arrangements for capital projects subject to compliance with capital appraisal guidelines issued by the Department of Finance for all publicly funded contracts and in conformity with public procurement procedures.

Earlier this year my Department issued a circular letter to local authorities setting out new arrangements for the use of leased properties for social housing purposes to assist authorities in meeting their social housing requirements. In order to promote the use of leases, a funding provision of €20 million is available for this measure in 2009. Properties that are constructed specifically for leasing to a local authority for social housing purposes may also be considered under these new arrangements, subject to proposals complying with all elements of capital appraisal and procurement requirements, including value for money criteria.

Housing Grants.

James Bannon

Question:

387 Deputy James Bannon asked the Minister for the Environment, Heritage and Local Government the allocations made in terms of housing adaptation funding to disabled persons for the period 2007-08 in Counties Longford and Westmeath; the way it compares to that for 2006-07; and if he will make a statement on the matter. [28132/09]

Details of Exchequer funding provided to Longford and Westmeath County Councils for the schemes concerned for each of the years 2006, 2007 and 2008 are set out in the following table. Data for 2006 relate to the old Disabled Persons and Essential Repairs Grant schemes. Data for 2007 and 2008 also include the new Housing Adaptation Grants for Older People and People with a Disability, as well as the Mobility Aids Grant Scheme.

Local Authority

2006

2007

2008

Longford County Council

442,074

418,699

966,847

Westmeath County Council

1,044,279

958,321

1,361,958

Departmental Funding.

James Bannon

Question:

388 Deputy James Bannon asked the Minister for the Environment, Heritage and Local Government the funding allocations for the protection and conservation of heritage here in 2007-08; the way it compares to the allocations for 2006-07; and if he will make a statement on the matter. [28133/09]

Total spending by my Department on the protection and conservation of the built and natural heritage in each of the years 2006-2008 is set out in the following table.

Year

Amount

€m

2006

61.189

2007

76.594

2008

92.280

Departmental Schemes.

James Bannon

Question:

389 Deputy James Bannon asked the Minister for the Environment, Heritage and Local Government the number of families in County Longford who have been compensated for heritage designated bogs in the county since the compensation scheme was introduced by him; and if he will make a statement on the matter. [28134/09]

To date, my Department has executed ten contracts of sale in respect of applications for the Bog Purchase Scheme from vendors in County Longford. According to my Department's records, sales have closed in three of these cases and compensation has been paid in full. In the majority of the other cases, deposits have been paid to the vendor and the balance is being held by the Chief State Solicitor's Office, while arrangements are being made to close the sales.

Planning Issues.

Brendan Kenneally

Question:

390 Deputy Brendan Kenneally asked the Minister for the Environment, Heritage and Local Government his plans to bring local democracy back into the decision making process for individual planning applications; and if he will make a statement on the matter. [28169/09]

Under the Planning and Development Act 2000, the procedure under which a person may apply for planning permission, and a planning authority, or An Bord Pleanála on appeal, may determine such an application, is open and transparent. Any person may make a written submission or observations regarding an application for permission for proposed development and, having done so, may appeal a decision of a planning authority to the Board.

Register of Electors.

Denis Naughten

Question:

391 Deputy Denis Naughten asked the Minister for the Environment, Heritage and Local Government if he will furnish a response to correspondence (details supplied); and if he will make a statement on the matter. [28245/09]

In accordance with electoral law, the preparation of the register of electors is a matter for each local registration authority and it is the duty of each authority to ensure, in so far as possible and with the cooperation of the public, the accuracy and comprehensiveness of the register.

Under section 63 of the Electoral Act 1997, students attending an educational institute in the State on a full time basis who are registered to vote and live away from the family residence for study purposes and cannot attend at their designated polling station on polling day are eligible to apply for entry onto the postal voters list. It is a matter for the relevant registration authority to satisfy itself that application forms are properly completed and duly certified by the educational institute and that the circumstances of the case are in accordance with the law. Rule 5(3)(a) of the Second Schedule to the Electoral Act 1992 provides that the registration authority may for the purposes of their duties in relation to the preparation of a register require a person to give any information in their possession which the registration authority may require.

Section 6 of the Electoral (Amendment) Act 2001 provides that a person who is on the register of electors and moves residence from one Dáil constituency to another can apply for entry to the supplement at their new address provided they have notified the registration authority to delete their name from the register in respect of their previous address. It is open, therefore, to a student to complete a change of address form (Form RFA 3) so that they may vote in the constituency in which they are ordinarily resident for the period of their studies.

Departmental Correspondence.

Denis Naughten

Question:

392 Deputy Denis Naughten asked the Minister for the Environment, Heritage and Local Government if he will furnish a response to correspondence (details supplied); and if he will make a statement on the matter. [28246/09]

Questions Nos. 393 and 394 answered with Question No. 385.

Local Authority Funding.

Fergus O'Dowd

Question:

395 Deputy Fergus O’Dowd asked the Minister for the Environment, Heritage and Local Government the applications for funding that have been received from local authorities in County Louth; the dates when applications were received; the status of the applications; the number of house units applied for; and if he will make a statement on the matter. [28266/09]

During March 2009, my Department held Housing Action Plan meetings with all housing authorities to discuss the direction and content of authorities' proposed housing investment programmes and particularly to consider the prioritisation of projects under the Social Housing Investment Programme. On foot of these discussions, and in the context of the funding available under the Revised Estimates for the Public Service 2009, each housing authority was provided with an allocation under the Social Housing Investment Programme by which to deliver on its agreed programme for the year.

In addition to funding for voluntary and co-operative housing projects, traveller specific accommodation, and improvement works programmes, the Louth housing authorities were notified of the following allocations for their main construction and acquisition programme in 2009.

Louth County Council: €12 million;

Drogheda Town Council: € 6 million;

Dundalk Town Council: € 9 million.

However, the prioritisation of projects under that programme is a matter for the authority in question.

While a significant number of projects being funded under the 2009 programme are already underway, my Department is at present liaising closely with the local authorities on further priority projects to be approved in the current year. Approval continues to be subject to the projects meeting sustainable communities objectives and my Department and the authorities must also have regard to the capital funding commitments which may arise in future years.

Water and Sewerage Schemes.

Seymour Crawford

Question:

396 Deputy Seymour Crawford asked the Minister for the Environment, Heritage and Local Government the position regarding the sewerage scheme for each of the towns (details supplied); if funding will be provided for all or any of these schemes; and if he will make a statement on the matter. [28269/09]

The Castleblaney/Ballybay/Clones Sewerage Scheme is included for funding in my Department's Water Services Investment Programme 2007 — 2009 at an estimated cost of €12 million. My Department currently awaits the submission of Monaghan County Council's preliminary report for the scheme.

Sean Fleming

Question:

397 Deputy Seán Fleming asked the Minister for the Environment, Heritage and Local Government the amount paid by local authorities prior to design and operate schemes being introduced for waste water treatment plants here; the costs being paid by local authorities in 2009 to private contractors under the DBO schemes; and if he will publish the public sector cost comparator in relation to these plans in order that there can be public transparency in order that the public are aware they are achieving value for money results for the Irish tax payer; and if he will make a statement on the matter. [28273/09]

I refer to Question No. 406 of 10 March 2009. Costs associated with the operation and maintenance of water services treatment plants have been increasing in recent years, reflecting both the increased capital investment in the sector over the past decade or so and the need to meet increased water quality standards. Details of income and expenditure by each Water Services Authority in respect of water services may be obtained from Local Authorities' Financial Outturns which are published on my Department's website.

Where local authorities propose to provide water services treatment plants by way of Public Private Partnership procurement — typically by way of a Design, Build and Operate (DBO) contract — they are required to prepare a Public Sector Benchmark (PSB) Report. The PSB consists of a comprehensive, detailed risk adjusted costing of the project elements over the whole life of the project on the basis of conventional procurement and enables a comparison to be made on a like for like basis between traditional and PPP procurement. PPP tenders are then evaluated by reference to the PSB to determine whether the PPP approach will deliver better value for money compared to traditional procurement. In all PSB reports to date, the PPP route has been shown to provide better value for money than conventional procurement, of up to 15% — 20% in the case of capital costs and 10 — 15% in the case of operating costs, depending on scale.

PSB Reports in individual cases can be obtained from the relevant procurement authorities once the tenders have been awarded.

John McGuinness

Question:

398 Deputy John McGuinness asked the Minister for the Environment, Heritage and Local Government the progress made regarding approval for funding for the serviced land initiative at Castlecomer in County Kilkenny; the stage the application is at; the timeframe involved for the completion of consideration of the project and final decision; and if he will make a statement on the matter. [28294/09]

I refer to the reply to Question No. 207 of 16 June 2009. The position is unchanged.

Phil Hogan

Question:

399 Deputy Phil Hogan asked the Minister for the Environment, Heritage and Local Government his plans to ensure that Galway County Council has adequate funding to implement its water services investment programme; his views on whether this programme is of importance to the people of Galway in view of recent drinking water crises; and if he will make a statement on the matter. [28325/09]

Funding for major water and sewerage schemes in Galway is provided under my Department's Water Services Investment Programme 2007-2009 which is available in the Oireachtas Library.

The Water Services Investment Programme is currently under review to ensure that spending is focused on priority schemes. Water Services Authorities will be asked to undertake updated assessments of needs which will be used as a key input to the review of the Programme. Priority objectives for the new Programme will include the need to deliver infrastructure required to meet National and EU standards in relation to drinking water.

Phil Hogan

Question:

400 Deputy Phil Hogan asked the Minister for the Environment, Heritage and Local Government if local authorities have communicated to him that they are experiencing or will experience financial difficulties in respect of completing or implementing their water services investment programme; and if he will make a statement on the matter. [28326/09]

A provision of €500 million is available for the Programme for 2009, which is a 1% increase on the record outturn on the Programme for last year. In addition to funding ongoing commitments and new works under the Rural Water Programme, the provision will fund ongoing progress on some 120 major water and wastewater schemes under the Water Services Investment Programme. The available resources will allow up to 50 major new water and wastewater schemes to commence this year, some of which have already started. My Department will prioritise the remaining schemes yet to start, having regard to both environmental and economic objectives i.e. schemes required to meet National and EU environmental standards in relation to drinking water and wastewater disposal, European Court of Justice cases and works that will support economic development.

In accordance with the Government's Water Pricing Policy, the marginal capital cost of providing water services infrastructure to the non-domestic sector is funded by that sector. Pending the receipt of funds from the non-domestic sector in respect of such works, local authorities fund the works themselves through the proceeds of development levies or access to borrowing. My Department continues to work closely with local authorities to ensure that within the overall financial limits applying to borrowing decisions, are taken in a way which gives the necessary prioritisation to the provision of key infrastructure.

Social and Affordable Housing.

Tom Hayes

Question:

401 Deputy Tom Hayes asked the Minister for the Environment, Heritage and Local Government if funding will be made available for social housing (details supplied) in County Tipperary; and if he will make a statement on the matter. [28327/09]

No application for funding in respect of this project has been received from South Tipperary County Council, which is responsible for the administration of the voluntary housing capital funding schemes in the county. On receipt of an application from the local authority, the proposal will be considered in the light of available resources and competing demands.

Greenhouse Gas Emissions.

Joe Costello

Question:

402 Deputy Joe Costello asked the Minister for the Environment, Heritage and Local Government the changes in greenhouse gas emissions over the past five years; his targets for each year up to 2020 to reach the 20% reduction guidelines for the EU; and if he will make a statement on the matter. [28352/09]

The EPA is responsible for compiling the national inventories of greenhouse gas emissions for Ireland and for reporting these to the European Union and the United Nations Framework Convention on Climate Change (UNFCCC). These inventories are compiled on an annual basis using the good practice guidelines established by the Intergovernmental Panel on Climate Change. The results become available in preliminary form about 11 months after the end of a calendar year, and they are then finalised and submitted as required to the EU and UNFCCC over the following 5 months.

The National Inventory Report 2009, which reports on actual emissions in 2007 and previous years, is available on the Agency's website (www.epa.ie). Preliminary greenhouse gas emissions data for 2008 are expected to become available from the Agency towards the end of 2009.

In the period 2008-2012, Ireland is required to meet a challenging greenhouse gas emission reduction target under the Kyoto Protocol; this target is binding in international law. In addition, by 2020, Ireland is committed under the EU climate and energy package agreed in December 2008 to achieve a 20% reduction on 2005 levels of greenhouse gas emissions in the sectors of the economy not covered by the EU emissions trading scheme. This 20% target is binding in EU law, as will any adjustment to it in the light of the outcome to the Conference of the Parties to the UNFCCC in Copenhagen later this year.

The EPA is responsible for emission projections. Its most recent analysis, which reflected the ESRI's then assessment of the changed economic situation, was published in March 2009. The updated figures indicated a Distance to Target for the Kyoto period 2008-2012 in the range of 1.3-1.8 million tonnes per annum, a reduction of around 3 million tonnes from the projections of Autumn 2008.

In the current economic climate, an unusually high degree of uncertainty attaches to all projections. It is now clear that the economic contraction will be deeper than assumed in the March projections. It is, accordingly, possible that Ireland will now meet its Kyoto target for the non-trading sector without using carbon credits.

It is important to emphasise that the effect of the recession on our emissions is a short-term one and it would be a serious mistake to ease off on our efforts to address the underlying trend. When economic growth resumes, so too will our emissions grow unless we have the measures in place to achieve the necessary reductions.

All relevant Government Departments are working on the development of further measures to reduce Ireland's greenhouse gas emissions. This work is overseen by the Cabinet Committee on Climate Change and Energy Security, which is chaired by the Taoiseach.

Departmental Expenditure.

Denis Naughten

Question:

403 Deputy Denis Naughten asked the Minister for the Environment, Heritage and Local Government the cost of public advertising funded by his Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of his Department; and if he will make a statement on the matter. [28419/09]

The information requested in respect of my Department is being compiled and will be forwarded to the Deputy as soon as possible.

Leo Varadkar

Question:

404 Deputy Leo Varadkar asked the Minister for the Environment, Heritage and Local Government the amount spent by his Department on legal fees directly to lawyers or through the State Solicitor’s office for each of the years 2006, 2007 and 2008; and if he will make a statement on the matter. [28467/09]

The legal costs incurred by the Department and by the Chief State Solicitor's Office on behalf of my Department are set out in the table. These do not include the costs of the Planning Tribunal.

Year

Amount

2008

2,485,619

2007

864,289

2006

2,214,747

National Heritage Sites.

Aengus Ó Snodaigh

Question:

405 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government the reason he did not submit the Hill of Tara and the entire revised Ireland’s tentative list of UNESCO sites to UNESCO as promised, for the July 2009 33rd session of the world heritage committee in Seville, Spain. [28622/09]

Aengus Ó Snodaigh

Question:

406 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government the amount spent in hiring consultants and reviewing Ireland’s list of world heritage sites in the past two years. [28623/09]

Aengus Ó Snodaigh

Question:

407 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government his plans in relation to revising Ireland’s tentative list of UNESCO sites. [28624/09]

Aengus Ó Snodaigh

Question:

408 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government the way he or his advisers made a determination of the ability of Tara to become a UNESCO site, before the advisers had visited the site or reviewed the M3. [28625/09]

Aengus Ó Snodaigh

Question:

409 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government if his attention has been drawn to the fact that an organisation (details supplied) nominated the Hill of Tara as a world heritage site, but only on condition that the M3 was rerouted, in view of the fact that it passes through the middle of the proposed world heritage site. [28626/09]

Aengus Ó Snodaigh

Question:

410 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government his views on whether UNESCO will accept the Hill of Tara as a UNESCO site with the M3 passing through it. [28627/09]

Aengus Ó Snodaigh

Question:

411 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government if he will define the area of the proposed Tara world heritage site. [28628/09]

Aengus Ó Snodaigh

Question:

412 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government his views on the cost involved if UNESCO demands that Ireland move the M3 motorway, once Tara is declared a world heritage site. [28629/09]

Aengus Ó Snodaigh

Question:

413 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government if he has included a consortium (details supplied), the M3 public private partners, in the consultation process for making Tara a world heritage site; and if so, its involvement in relation to same. [28630/09]

Aengus Ó Snodaigh

Question:

414 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government if he has included Iarnród Éireann in the consultation process, in view of the fact that the preferred route for Navan-Dublin railway was announced in May 2009 and will be passing through the proposed Tara world heritage site. [28631/09]

Aengus Ó Snodaigh

Question:

415 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government if he has included EirGrid in the consultation process, in view of the fact that the Department of Transport has proposed that the north south electrical connector be placed underground along the M3 or the N3, thereby passing through the proposed Tara world heritage site. [28632/09]

Joanna Tuffy

Question:

427 Deputy Joanna Tuffy asked the Minister for the Environment, Heritage and Local Government if he was scheduled to present a revised tentative list to UNESCO at the Seville world heritage committee meeting; if not, when it is required to do so; and if he will make a statement on the matter. [28693/09]

Joanna Tuffy

Question:

428 Deputy Joanna Tuffy asked the Minister for the Environment, Heritage and Local Government the steps taken to have Tara considered a world heritage site; and if he will make a statement on the matter. [28694/09]

Joanna Tuffy

Question:

430 Deputy Joanna Tuffy asked the Minister for the Environment, Heritage and Local Government the position regarding the publishing of the list of potential sites for world heritage site nomination that was to have been published in spring 2009; his views on the inclusion of Tara in this list; and if he will make a statement on the matter. [28696/09]

I propose to take Questions Nos. 405 to 415, inclusive, and Questions Nos. 427, 428 and 430 together.

I am aware of some misleading information in the media recently concerning the process of nomination for UNESCO World Heritage status and am pleased to have the opportunity to put the facts on record.

Ireland's tentative list of potential sites for nomination for inscription on the World Heritage List was last updated in 1992, and does not include the Hill of Tara. Last year I directed my Department to review the 1992 list, and requested that the Tara complex, amongst other sites, be considered for inclusion on a revised list. In December 2007 & April 2008 I arranged for Dr. Jukka Jokileht, a world heritage UNESCO expert, to visit a number of these sites to advise on their suitability for inclusion.

In October 2008 I established an expert advisory group to carry out the review of the tentative list; consultants have not been engaged by my Department on the review process. Total expenditure by my Department to date on the tentative list review is approximately€42,700.

The expert advisory group (EAT) has completed extensive analysis of the sites on the current tentative list. Members of the public and interested groups were also invited to submit potential properties for inclusion on the new tentative list. 31 such proposals were received and these were considered and assessed by the EAG.

On the basis of its own analysis, and consideration and assessment of the proposals received from the public and interested groups, the EAG has now finalised a draft new tentative list which contains the details of the properties which the EAG considers are of outstanding universal value, meet the UNESCO World Heritage inscription criteria in terms of integrity and authenticity and have the best potential for future inscription on the World Heritage List. I expect to be in a position to publish this draft tentative list for public consultation before the end of the month, and I understand that the Hill of Tara is included in this list.

While it was initially envisaged that Ireland's new tentative list would be submitted to UNESCO in advance of the June 2009 session of the World Heritage Committee, this has not been possible mainly because the review process and World Heritage Committee requirements for the tentative list process have been more complex than at first envisaged. It was also considered better to take more time in preparing a new tentative list in keeping with UNESCO guidelines and best international practice. I will be forwarding the new tentative list to UNESCO before the end of this year and it will then be presented at the 34th Session of the World Heritage Committee in 2010.

I am not currently in a position to process a nomination for the Hill of Tara for inscription on UNESCO's World Heritage List as the property was not included on the 1992 tentative list. Only sites that have been on the State Party's tentative list for a period of at least one year may be nominated for consideration by the World Heritage Committee for inscription on the World Heritage List. In order to adhere to the very stringent UNESCO requirements concerning management of sites and other matters, in practice it usually takes a number of years following inclusion on a tentative list before a site is considered suitable for inscription.

Planning Issues.

Aengus Ó Snodaigh

Question:

416 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government the reason he did not revoke archaeological licences and halt excavations on the M3, in the Lismullin-Tara area, when the European Commission put him on notice that an environmental impact assessment was required. [28633/09]

Aengus Ó Snodaigh

Question:

417 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government the amount spent on outside legal counsel to defend the action in relation to the requirement for an environmental impact assessment for the M3 project in the European Court of Justice. [28634/09]

Aengus Ó Snodaigh

Question:

418 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government the consequences for the National Monuments Act 1930, and archaeological codes of practice, if the European Court of Justice finds against Ireland. [28636/09]

Aengus Ó Snodaigh

Question:

419 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government the consequences for capital infrastructure projects, already under way, if the European Court of Justice finds against Ireland in relation to environmental impact assessments. [28637/09]

Aengus Ó Snodaigh

Question:

421 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government the reason, in view of the legal action initiated by the European Commission, and his admission that there are gaps in the way archaeological finds are dealt with in certain circumstances, he is defending the environmental impact assessment case being taken against Ireland by the European Commission, rather than amending the Act to adopt the recommendations of the Commission. [28639/09]

Joanna Tuffy

Question:

426 Deputy Joanna Tuffy asked the Minister for the Environment, Heritage and Local Government the steps he has taken to comply with the recommendations of the European Commission in respect of the need for environmental impact assessments for works that affect national monuments; and if he will make a statement on the matter. [28692/09]

I propose to take Questions Nos. 416 to 419, inclusive, 421 and 426 together.

I understand that the questions refer to the European Court of Justice (ECJ) case C50/09, initiated by the European Commission, concerning Ireland's alleged failure to properly transpose and implement certain provisions of Council Directive 85/337/EEC on the assessment of the effects of certain public and private projects on the environment. The Reasoned Opinion from the European Commission relates only to the excavations at the national monument at Lismullin and not to any other archaeological works along the route of the M3 motorway.

In the case of Lismullin, the vulnerability of the remaining fragile archaeological features required urgent steps to be taken, and although the question of an EIA did not arise, it would not have been practicable in any event. Despite protective covering, heavy rainfall since its discovery had already significantly impacted on the site. Urgent measures were needed to ensure that no further degradation occurred.

The option of preservation in situ had been carefully considered by the then Minister for the Environment, Heritage and Local Government. The conclusion reached was that, because of the fragility of the features and the location of the site in a natural hollow, preservation in situ could not guarantee the actual preservation of the monument. This conclusion was endorsed by the Expert Advisory Committee I appointed, on the advice of the Director of the National Museum, to advise on the conduct of the archaeological works. The only viable archaeological option, therefore, was preservation by record, i.e. the full archaeological excavation and recording of the exposed features.

Ireland lodged a comprehensive defence in this case on 27 April 2009. The European Commission is required to lodge its response with the Court not later than 15 July 2009. I am not prepared to speculate on the outcome or possible consequences of this case.

The engagement and remuneration of legal counsel to advise in this case is a matter for the Office of the Attorney General.

Legislative Programme.

Aengus Ó Snodaigh

Question:

420 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government the reason he did not present a new National Monuments Act as promised in the middle of 2008. [28638/09]

Aengus Ó Snodaigh

Question:

422 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government the amount spent conducting a consultation for a revision of the National Monuments Act 1930, and archaeological policy. [28640/09]

Joanna Tuffy

Question:

425 Deputy Joanna Tuffy asked the Minister for the Environment, Heritage and Local Government the position regarding the promised National Monuments Bill; and if he will make a statement on the matter. [28691/09]

I propose to take Questions Nos. 420, 422 and 425 together.

The Expert Advisory Committee I established to review archaeological policy and practice submitted its recommendations on improving and updating national monuments legislation in February 2009, following which work began on the preparation of Heads of a Bill. This is now at an advanced stage and I expect to circulate the Heads to other Departments for consideration shortly. The Expert Committee met five times during 2008 and the related costs, along with the costs of information seminars held for other interested parties, amounted to €30,871.38.

Question No. 421 answered with Question No. 416.
Question No. 422 answered with Question No. 420.

Aengus Ó Snodaigh

Question:

423 Deputy Aengus Ó Snodaigh asked the Minister for the Environment, Heritage and Local Government the reason he has agreed a code of practice with EirGrid when it is based on the National Monuments Act 1930. [28642/09]

Codes of Practice, such as that recently agreed between my Department and EirGrid, provide a framework to enable infrastructure providers to progress their work programmes, while carrying out appropriate archaeological mitigation in accordance with an agreed set of principles and actions. They serve as operational guidance to ensure best archaeological practice in accordance with legal and other requirements and may be revised, as necessary, to reflect legislative change or other relevant developments.

EU Directives.

Finian McGrath

Question:

424 Deputy Finian McGrath asked the Minister for the Environment, Heritage and Local Government if the environmental noise directive, Directive 2002/49/EC, has been transposed and implemented; and if so, the details regarding the completion of noise maps and action plans. [28684/09]

The Environmental Noise Regulations 2006 give effect in Ireland to EU Directive 2002/49/EC relating to the assessment and management of environmental noise. The EPA is designated as the National Authority for the purpose of the Regulations. The Agency's role includes supervisory, advisory and coordination functions in relation to both noise mapping and action planning, as well as reporting requirements for the purpose of the Directive.

The Directive and Regulations provide for a two-stage approach to the assessment and management of environmental noise, and the preparation of strategic noise maps for areas and infrastructure falling within defined criteria, e.g. large agglomerations, major roads, railways and airports. Responsibility for the preparation of such maps lies with the designated noise mapping authorities, i.e., the relevant local authorities, Dublin Airport Authority, the National Roads Authority, Iarnród Éireann and the Railway Procurement Agency. Based on the results of the mapping process, the designated action planning authorities, i.e. the local authorities are required to prepare noise action plans for each entity concerned which falls within their functional area.

The required noise maps were prepared during 2007 and the associated action plans commenced preparation following this. At this stage, all strategic mapping has been finalised and actions plans have either been completed or are in the process of being finalised at present. The Regulations also provide for strategic noise maps and action plans to be made available to the public. They further provide for public consultation on proposed action plans, and for the results of public consultation to be taken into account in finalising action plans or reviews of action plans. Copies of maps and actions plans are available directly from the local authorities concerned. For example the action plan for Dublin may be viewed at www.dublincity.ie under Noise Maps and Action Plans.

Data in relation to the noise maps and the action plans were reported by the EPA to the European Commission within the specified time frame laid down in the Directive. The EPA has also submitted data in relation to the major roads, major railways, major airports and agglomerations designated by Member States concerning the second implementation stage of the Directive for which noise mapping will be carried out in 2012 with Action Plans to follow in 2013.

Question No. 425 answered with Question No. 420.
Question No. 426 answered with Question No. 416.
Questions Nos. 427 and 428 answered with Question No. 405.

National Monuments.

Joanna Tuffy

Question:

429 Deputy Joanna Tuffy asked the Minister for the Environment, Heritage and Local Government the steps taken to protect Lismullin, County Meath; and if he will make a statement on the matter. [28695/09]

The national monument at Lismullin has been included in the Register of Historic Monuments established under Section 5 of the National Monuments (Amendment) Act, 1987. That portion of the monument encompassed by the M3 Motorway Scheme has been archaeologically excavated and recorded to achieve preservation by record. Notice must be given to my Department no less than two months prior to the carrying out of any works to a registered historic monument. In addition, no detection device may be used at, or in the vicinity of, such a monument without a licence from my Department.

Question No. 430 answered with Question No. 405.

Water and Sewerage Schemes.

Joanna Tuffy

Question:

431 Deputy Joanna Tuffy asked the Minister for the Environment, Heritage and Local Government if, in response to the findings of the Environmental Protection Agency report Urban Waste Water Discharges in Ireland: A Report for the Years 2006 and 2007, that there is inadequate waste water treatment at Kinsale and Skibbereen, County Cork, he will ensure adequate treatment is in place; and if he will make a statement on the matter. [28697/09]

The Kinsale and Skibbereen Sewerage Schemes are included for funding under my Department's Water Services Investment Programme 2007 — 2009 at €20 million each. I understand that the Kinsale scheme and the collection network element of the Skibbereen scheme are under construction. Cork County Council are currently preparing the contract documents for the wastewater treatment plant element of the Skibbereen scheme, which will be procured, along with treatment plants for Baltimore, Dunmanway and Schull, as a single Design Build Operate (DBO) contract. Accordingly, further details on progress with the two schemes may be obtained from the Council.

Joanna Tuffy

Question:

432 Deputy Joanna Tuffy asked the Minister for the Environment, Heritage and Local Government the works due to be carried out and the cost of same in 2009 in works to improve waste water treatment facilities at places that were identified by the Environmental Protection Agency as having inadequate treatment facilities in tabular form; and if he will make a statement on the matter. [28698/09]

I assume the question refers to the table of agglomerations where the provision of secondary wastewater treatment is outstanding, as set out by the EPA in page 4 of its report Urban Wastewater Discharges in Ireland — A Report for the Years 2006 — 2007.

My Department has funded a programme of works in successive years to ensure that priority is accorded to meeting the requirements of the Directive. As a result of these works, compliance with the requirement to provide secondary treatment of wastewater at plants increased from 25% in 2000 to some 92% at present. In the case of the 28 agglomerations outlined by the EPA in the table referred to, the required treatment plants have since been provided in the case of 6 locations; the required treatment plants will come into operation later this year in the case of a further 4 locations; a further 4 plants are under construction and the remainder are scheduled to commence construction between 2009 and 2013.

The approved costs incurred in the development of these projects are recouped to the local authorities under my Department's Water Services Investment Programme. Information in relation to costs arising on each individual project in 2009 may be obtained from the relevant local authorities.

Joanna Tuffy

Question:

433 Deputy Joanna Tuffy asked the Minister for the Environment, Heritage and Local Government the steps taken following the European Court of Justice finding in 2008 that inadequate waste water treatment was being carried out at six locations here; and if he will make a statement on the matter. [28699/09]

The current position in relation to the provision of the required infrastructure arising from this judgement is set out in the following table:

Location

Current position

Tramore

Works completed

Sligo

Works completed

Howth

Works in progress and expected to be finalised in 2009

Bray

Works in progress and expected to be finalised in 2011

Shangannagh

Works in progress and expected to be finalised in 2011

Letterkenny

Works in relation to collection networks completed. Contract for Treatment Plant expected to be awarded end of 2009 and works finalised by end of 2011.

Departmental Contracts.

Joanna Tuffy

Question:

434 Deputy Joanna Tuffy asked the Minister for the Environment, Heritage and Local Government the amounts paid in respect of private public relations contracts for the years 2006, 2007, 2008 and 2009; the public relations companies or professionals to whom these amounts were paid and the contracts in relation to same; and if he will make a statement on the matter. [28700/09]

The information requested in respect of my Department is being compiled and will be forwarded to the Deputy as soon as possible.

Public Service Staff.

Noel Ahern

Question:

435 Deputy Noel Ahern asked the Minister for the Environment, Heritage and Local Government the number of staff with a degree in environmental science that are employed by local authorities, his Department or agencies under his remit; the standing of the degree in his Department; if same is a requirement for many local authority positions; the promotional prospects that are available to staff with this degree with reference to a matter (details supplied); and if he will make a statement on the matter. [28747/09]

My Department employs staff with a wide range of professional qualifications in the environment area, including natural heritage. In addition, many administrative staff have degrees in a variety of subjects. However, my Department's Human Resources records do not hold information in a way that would readily identify the number of staff that hold a degree in Environmental Science. My Department, in conjunction with the Public Appointments Service, requires that all professional and technical staff recruited into my Department possess the necessary qualifications and experience for the posts concerned and these are specified for the individual competitions. The skills and competencies for promotional posts are specific to the requirements of the posts being filled.

My Department does not hold information on qualifications held by staff of local authorities. As Minister, I may declare qualifications for any post within the local authority sector with reference to the standard of the qualification. All vacant posts in local authorities must be filled through the appropriate recruitment processes. Day to day operational matters, including the qualifications of staff of the agencies under the aegis of my Department, are matters for the individual agencies concerned.

Water and Sewerage Schemes.

Ulick Burke

Question:

436 Deputy Ulick Burke asked the Minister for the Environment, Heritage and Local Government the progress that has been made following his meeting with representatives of an organisation (details supplied) in financing of the waste water enhancement scheme for a town in County Galway; when the project will commence. [28758/09]

The Athenry Sewerage Scheme is included for funding in my Department's Water Services Investment Programme 2007 — 2009. My Department currently awaits Galway County Council's Design Review Report for the scheme.

Ulick Burke

Question:

437 Deputy Ulick Burke asked the Minister for the Environment, Heritage and Local Government the position regarding the extension and upgrade of a regional water scheme for a town (details supplied) in County Galway; and if he will make a statement on the matter. [28759/09]

The Loughrea Regional Water Supply Scheme is included for funding under my Department's Water Services Investment Programme 2007 — 2009. My Department awaits the submission of Galway County Council's Design Review Report for the scheme.

Ulick Burke

Question:

438 Deputy Ulick Burke asked the Minister for the Environment, Heritage and Local Government the funding available for the upgrade of the water treatment plant for a town (details supplied) in County Galway; if the tenders for the above scheme have been with his Department for some time; his views on the nature of the supply, both in quality and quantity; and if he will make a statement on the matter. [28764/09]

The Gort Regional Water Supply Scheme is included for funding in my Department's Water Services Investment Programme 2007-2009. Following Galway County Council's submission of its tender report and recommendations for this scheme to my Department last month, the Council was recently requested to submit additional information to enable the Department to finalise its consideration of the report. The revised tender report will be dealt with as quickly as possible on its receipt by my Department.

Water Quality.

Ulick Burke

Question:

439 Deputy Ulick Burke asked the Minister for the Environment, Heritage and Local Government if in view of the recent Environmental Protection Agency report his attention has been drawn to the crisis in water quality in Kinvara Bay, County Galway, due to the absence of a proper and safe sewerage waste water treatment system for this coastal location. [28767/09]

The Kinvara Sewerage Scheme is included for funding in my Department's Water Services Investment Programme 2007 — 2009. My Department awaits Galway County Council's Design Review Report for this scheme.

Architectural Heritage.

Ulick Burke

Question:

440 Deputy Ulick Burke asked the Minister for the Environment, Heritage and Local Government his plans for the retention of the Turoe stone at its present location at Bullaun, Loughrea, County Galway; and if he will make a statement on the matter. [28770/09]

My Department is in consultation with the Office of Public Works to establish appropriate conservation arrangements for the Turoe Stone, a national monument in state ownership, following which there will be further discussions with local interests regarding its long-term protection.

Local Authority Housing.

Ned O'Keeffe

Question:

441 Deputy Edward O’Keeffe asked the Minister for the Environment, Heritage and Local Government if he will arrange to release documentation in relation to a project application by a council (details supplied) in County Cork in view of a written request submitted to his Department on 22 May 2009. [28775/09]

Copies of the correspondence requested from my Department were forwarded to the person concerned on 10 June, 2009.

Telecommunications Services.

Brendan Kenneally

Question:

442 Deputy Brendan Kenneally asked the Minister for Communications, Energy and Natural Resources the plans in place to provide broadband to the rural areas of County Waterford that are currently not served; and when these plans will be put in place. [28167/09]

Brendan Kenneally

Question:

443 Deputy Brendan Kenneally asked the Minister for Communications, Energy and Natural Resources the status of broadband provision in County Waterford by town. [28168/09]

I propose to take Questions Nos. 442 and 443 together.

Broadband services are provided by private service providers over various platforms including DSL (i.e over the telephone lines), fixed wireless, mobile, cable, satellite and fibre. Details of broadband availability from service providers together with the availability of broadband services in specific areas, including areas in County Waterford, are available at www.broadband.gov.ie.

In order to address a lack of broadband in areas where it is not commercially viable for the private sector to operate my Department entered into a contract with "3", a Hutchison Whampoa company, for the delivery of the National Broadband Scheme (NBS) in late December 2008. 3 is required to provide services to all fixed residences and businesses that are located within the NBS Coverage Area and who seek a service. The NBS will be rolled out on an Electoral Division (ED) basis. Details of the EDs to be covered by the NBS can be found at: http://www.dcenr.gov.ie/Communications/Communications+Development/National+Broadband+ Scheme.htm. The EDs in County Waterford that will be covered by the NBS are set out on the following list.

Challenging programme roll-out targets have been agreed with 3 and initial NBS services were launched in a small number of rural areas at the end of April this year. Broadband coverage in individual EDs will be made available incrementally during the coming months. The forthcoming availability of services to premises located within identified EDs will be announced progressively prior to their enablement on 3's coverage map which can be accessed on its website at www.three.ie/nbs. All of the EDs in the NBS Coverage Area are required to be enabled by the end of September 2010.

National Broadband Scheme (NBS)

Electoral Divisions (ED) to be Covered by the NBS in County Waterford

ED Name

Ed Reference No.

Ballyduff

ED 227004

Ballydurn

ED 227005

Ballynamult

ED 227013

Ballysaggart More

Ed 227014

Bohadoon

ED 227015

Carrigcastle

ED 227019

Castlerichard

ED 227021

Clashmore

ED227022

Colligan

ED 227025

Comeragh

ED 227026

Coumaraglin

ED 227027

Fews

ED 227038

Fox’s Castle

ED 227039

Gardenmorris

ED 227040

Georgestown

ED 227041

Glen Ed

ED 227042

Graignagower

ED 227045

Gurteen

ED 227048

Kilbarrymeaden

Ed 227052

Kilcockan

ED 227053

Kilwatermoy East

Ed 227062

Knockaunbrandaun

Ed 227065

Knockmahon

ED 227066

Mocollop

ED 227068

Modelligo

ED 227070

Mountkennedy

ED 227072

Rathgormuck

ED 227078

Ross

ED 227082

Seskinan

ED 227083

Templemichael

ED 227087

Tinnasaggart

ED 227088

Community Development.

Seymour Crawford

Question:

444 Deputy Seymour Crawford asked the Minister for Communications, Energy and Natural Resources the amount of funding being made available to each of the LEADER groups to encourage investment and jobs; the percentage of the funds which will be needed for administration; when applications will be made available; the way they will be advertised; his views on whether this is one of the few areas that can provide funding to rural areas through significant aid from the EU; if he will ensure that as much as possible of the approved funding is provided in the earlier stage of the scheme to avoid panic and possible poor value being received from the fund in a rush to utilise it before the closing date. [28208/09]

I assume the Deputy is referring to the Community Support Scheme (CSS) operated by the LEADER groups in areas where commercial salmon fishing has been a well established activity.

The following table sets out the amount of funding available to each of the LEADER companies through the CSS. Each LEADER company received an administration grant equivalent to 15% of the funds made available to it subject to a maximum of €70,000 per company. The CSS is an Exchequer funded scheme.

The focus of the scheme is primarily on those communities where commercial salmon fishing has been a well-established activity and where its withdrawal demonstrably impacts on the economic and social fabric of the community. The scheme is being administered through 15 identified LEADER companies and Comhdháil Oileáin na hÉireann (in respect of island communities) and Meitheal Forbartha na Gaeltachta Teoranta (in respect of the Gaeltacht areas) under the supervision of the Department in conjunction with the Department of Community, Rural and Gaeltacht Affairs.

The scheme was advertised in 2008 and the closing date for receipt of applications under the scheme was extended to the 31 March 2009 to facilitate maximum participation in the scheme. All funding in relation to the scheme must be drawn down by the LEADER companies by November 2009.

Leader Company

Total Allocation (revised)

1

Wexford Organisation for Rural Development

91,500

2

Waterford LEADER Partnership

615,400

3

West Cork LEADER Co-operative Society Ltd

733,300

4

South & East Cork Area Development Ltd

188,000

5

South Kerry Development Partnership Ltd

342,210

6

Tuatha Chiarrai Teo

221,490

7

West Limerick Resources Ltd

262,530

8

Rural Resource Development Ltd (Clare)

183,000

9

Galway Rural Development Co Ltd

183,915

10

Comhdháil Oileáin na hÉireann

189,405

11

Comhar Iorrais LEADER Teo

210,000

12

Meitheal Forbartha na Gaeltachta Teo

632,350

13

Co Sligo LEADER Partnership Co Ltd

137,250

14

Donegal Local Development Co Ltd

279,500

15

Inishowen Rural Development Ltd

286,210

16

Louth LEADER

5,325

17

Meath Community Partnership

91,500

Totals

4,652,885

Broadcasting Services.

John O'Mahony

Question:

445 Deputy John O’Mahony asked the Minister for Communications, Energy and Natural Resources if he has consulted with RTÉ regarding the future of live television coverage of gaelic games in Britain, America and around the world following the collapse of a company (details supplied); and if he will make a statement on the matter. [28215/09]

The issue of live television coverage by RTÉ of gaelic games in Britain, America and around the world is an operational matter for RTÉ to consider and I have not consulted the company in that regard.

Telecommunications Services.

Denis Naughten

Question:

446 Deputy Denis Naughten asked the Minister for Communications, Energy and Natural Resources the steps he will take to provide a broadband service to communities who cannot avail of broadband from existing suppliers and are not covered by the national broadband scheme; and if he will make a statement on the matter. [28248/09]

When considering the exclusion of certain unserved premises from the National Broadband Scheme (NBS), it is important to clarify that, in designing the NBS, which was approved by the EU Commission, a balance had to be struck between reaching as many unserved areas as possible and minimising the impact of the scheme on businesses already providing broadband services in rural areas.

EU State aid and competition rules govern how States can intervene in areas where there are existing service providers. The nature of broadband networks is such that they provide a coverage footprint over a certain area rather than an individual link to isolated premises. It was essential to guard against the NBS coverage footprint spilling over, to an extent which would be unacceptable from a state aids perspective, into surrounding areas already served by existing service providers. Accordingly, to try to include individually unserved premises that are located within EDs deemed to be already served within the scope of the NBS would have given rise to an unacceptable level of market distortion and therefore, such areas had to be excluded.

It is expected that over time, as competition increases and technology develops, service providers will be attracted to offer service to any such premises located within currently served areas. My Department is also considering how isolated unserved rural premises might be addressed by an appropriate intervention within State aid rules.

Television Licence Fee.

John McGuinness

Question:

447 Deputy John McGuinness asked the Minister for Communications, Energy and Natural Resources if the cost of operating the free TV licence scheme is paid by the Government to cost involved for each of the past five years. [28280/09]

The Department of Social and Family Affairs operates a Household Benefits Package and those who qualify to receive this package are entitled to a free television licence. The Department of Social and Family Affairs pays the cost of these free licences to my Department. The following table sets out the amounts that the Department of Social and Family Affairs paid to my Department for each of the past five years.

Year

DSFA Gross Receipts in respect of Free Television Licences

€million

2004

44.3

2005

49.5

2006

48.7

2007

51.4

2008

53.7

An Post collects the fees for standard television licences, which it pays to my Department. In turn, my Department pays An Post a commission for the collection of the standard licences and for administration in respect of the free licences. Once this payment is deducted, 95% of net television licence fee receipts (both free and standard television licences) are paid to RTÉ and 5% of net television licence receipts are in turn paid to the Broadcasting Commission of Ireland in respect of the Broadcasting Fund. This latter rate will increase to 7% under the Broadcasting Bill 2008, which was recently passed by the Oireachtas.

Departmental Expenditure.

Denis Naughten

Question:

448 Deputy Denis Naughten asked the Minister for Communications, Energy and Natural Resources the cost of public advertising funded by his Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of his Department; and if he will make a statement on the matter. [28414/09]

The detail requested by the Deputy is contained in the following table.

Division

Details of Adverts

Cost (incl VAT)

Statutory/Non-statutory

Oil Supply

Iris Oifigiúil — SI 09/059 European Communities (Internal Market in Electricity) (Amendment) Regulations 2009

53.00

Statutory

Oil Supply

Iris Oifigiúil — SI 09/214 NORA (Returns & Levy) (Amendment) Regulations 2009

42.00

Statutory

Gas (Corporate)

Publication of BGÉ Board Member in Iris Oifigiuil

20.00

Statutory

Broadcasting Policy

Advertising of Major Events Coverage

3,145.21

Statutory

Energy Efficiency and Affordability Division

Advertising of public notice in Iris Oifigiúil for SI No. 76 of 2009

53.00

Statutory

Inland Fisheries

Advertising of Bye-laws and Statutory Instruments

14,280.00

Statutory

EMD

Public notices in connection with the grant of prospecting licences

14,416.00

Statutory

Renewable and Sustainable Energy

Publication in Iris Oifiguil of SI 226 of 2009 — European Communities (Internal Market in Electricity) Regs. 2009

64.00

Statutory

Corporate Services (SCU)

Advertising in the Independent for public consultation on the External Customer Charter

752.33

Non-statutory

PAD

Advertising in connection with the North West Mayo Forum

1,419.50

Non-Statutory

PAD

Notice of intention to grant a Petroleum Prospecting Licence to Lansdowne Celtic Sea Ltd.

1,552.92

Statutory

PAD

Notice of intention to grant a Petroleum Prospecting Licence to TGS-Nopec Geophysical Company ASA

2,355.73

Statutory

Leo Varadkar

Question:

449 Deputy Leo Varadkar asked the Minister for Communications, Energy and Natural Resources the amount spent by his Department on legal fees directly to lawyers or through the State Solicitor’s Office for each of the years 2006, 2007 and 2008; and if he will make a statement on the matter. [28462/09]

The identification of records prior to January 2007 cannot be facilitated without undue commitment of staff resources and administrative costs. However, if the Deputy has a question in relation to a specific item I will make appropriate enquiries. Expenditure by the bodies under the aegis of the Department is a day to day operational issue for those bodies and is a matter for them. The following table contains details of legal costs for my Department in 2007 and 2008.

Year

Cost

2007

702,065.00

2008

2,157,807.94

I would point out that these figures include the cost of necessary legal advice in relation to important procurement activity undertaken by my Department. They also include legal costs arising from the Moriarty Tribunal.

Mobile Telephony.

Pat Breen

Question:

450 Deputy Pat Breen asked the Minister for Communications, Energy and Natural Resources his views on the experience of mobile phone consumers who have large mobile phone bills as a result of receiving premium subscription texts, where the terms and conditions of such subscription services are not immediately evident; his plans to introduce legislation to assist mobile phone consumers; and if he will make a statement on the matter. [28713/09]

I am very concerned about the increase in the number of complaints by consumers in recent years in relation to the subscription services, particularly in relation to the lack of transparency in the provision of those services which has resulted in many consumers incurring unexpected charges. In order to address this and other issues concerning the regulation of premium rate services I have obtained Government approval to publish a Bill entitled Communications Regulation (Premium Rate Services) Bill 2009, for the purpose of transferring the regulation of premium rate services from Regtel to ComReg.

The Bill is aimed at ensuring a robust and timely response to those service providers who continue to flout the rules and mislead consumers. It will provide for the necessary enforcement measures to ensure effective regulation by ComReg. I intend to progress the Bill through the Oireachtas as quickly as possible. When enacted, I believe it will adequately address the issues relating to subscription services, lead to improved protection for consumers and enhance confidence in the sector.

Telecommunications Services.

Noel Ahern

Question:

451 Deputy Noel Ahern asked the Minister for Communications, Energy and Natural Resources if he has received a request for the State to take over a company (details supplied); the person such requests are from; his views on the subject; and if he will make a statement on the matter. [28736/09]

No request has been made to my Department proposing the nationalisation of eircom. The commercial performance and ownership of the company is a matter for the company in the first instance and I have no direct role in this regard. Given the importance of eircom to Ireland's communication infrastructure and services, I am monitoring the overall situation in relation to the company but I have no plans to propose State ownership.

Electricity Generation.

Noel Ahern

Question:

452 Deputy Noel Ahern asked the Minister for Communications, Energy and Natural Resources if he will clarify a matter in relation to a company (details supplied) selling electricity below that of the ESB; his policy on same; the reason the ESB cannot obtain permission to reduce prices likewise; the net loss of revenue to the ESB per 10,000 customers who sign over to the other company; the number of customers who have moved to date in 2009; if the ESB will require a subsidy to survive; and the further reason that the cap cannot be lifted on the ESB to allow provision of free competition. [28744/09]

I welcome the fact that the benefits of competition in electricity retail supply, which have previously been confined to large industrial and commercial customers, are becoming available to domestic consumers. The entry into the domestic electricity market of Airtricity and Bord Gáis Energy demonstrates that policy to encourage competition in electricity generation and supply is paying dividends for consumers.

The independent suppliers are currently offering discounts of between 10% and 14% on ESB tariffs. These discounts apply even after the 10% reduction to the regulated ESB price announced by the Commission for Energy Regulation (CER) on 1 May. The independent suppliers are also offering domestic consumers other choices, such as the proportion of renewable electricity they purchase, as well as alternative billing arrangements. Domestic customers have been switching to the independent suppliers in significant numbers. To date in 2009, 196,815 domestic customers have left ESB. However, it is important to note that ESB still retains almost 90% of domestic electricity customers.

The net loss of revenue to the ESB per 10,000 customers who sign over to alternative suppliers is an operational matter for ESB. ESB is, and will remain, a commercially viable entity. There is no question of subsidising ESB's operations. Energy price regulation is designed to ensure that a dominant player does not engage in uncompetitive, short-term pricing practices, which could undermine or drive out emerging competition. The CER has signalled that it intends to cease regulating ESB Public Electricity Supply (PES) prices when sufficient competition has taken hold in the domestic and SME market. This is in line with EU legal requirements for the internal energy market. ESB's tariffs are set by the CER at a level that reflects the costs incurred by ESB in supplying that electricity. If ESB can reduce its legitimate costs then the regulator will permit them to charge a lower tariff. Below-cost selling of electricity or other anti-competitive practices is not permitted under the regulatory model.

The nature of regulation is to drive improved efficiencies and lower costs in areas that are under regulatory control. This is designed to benefit customers first and foremost. The CER will continue its review of overall energy tariff structures over the coming months taking account of global fuel prices, the necessity for regulatory and market certainty for the energy sector, and economic conditions.

Telecommunications Services.

Ulick Burke

Question:

453 Deputy Ulick Burke asked the Minister for Communications, Energy and Natural Resources the availability by way of a map of the broadband service in County Galway; the provider in each area; the scale of availability and speed and when service will be made available in areas currently without service. [28772/09]

Broadband services are provided by private service providers over various platforms including DSL (i.e over the telephone lines), fixed wireless, mobile, cable, satellite and fibre.

Details of broadband availability from service providers together with the availability of broadband services in specific areas, including areas in County Galway, are available at www.broadband.gov.ie. Additionally, the National Broadband Scheme (NBS) will bring broadband services to some areas of County Galway. Details of the areas to be covered by the NBS can be found at: http://www.dcenr.gov.ie/Communications/Communications+Development/ National+Broadband+Scheme.htm. These areas are shown in the following list on an Electoral Division (ED) basis.

National Broadband Scheme (NBS)

EDs to be Covered by the NBS in County Galway

ED Name

ED Reference Number

Abbeygormacan

ED 67003

Abbeyville

ED 67004

Addergoole

ED 67005

Ahascragh

ED 67006

Aille

ED 67007

Ballycahalan

ED 67022

Ballyglass

ED 67023

Ballymacward

ED 67024

Ballynagar

ED 67027

Ballynakill

ED 67028

Beaghmore

ED 67034

Belclare

ED 67035

Bencorr

ED 67037

Boyounagh

ED 67038

Bracklagh

ED 67039

Bullaun

ED 67040

Bunowen

ED 67041

Cahermore

ED 67042

Camus

ED 67044

Cappalusk

ED 67045

Cappard

ED 67046

Carrownagur

ED 67049

Carrowrevagh

ED 67050

Claretuam

ED 67056

Cleggan

ED 67058

Clifden

ED 67059

Clonbern

ED 67060

Clontuskert

ED 67063

Clonbur

ED 67064

Cloonkeen

ED 67066

Cloonkeen

ED 67067

Colmanstown

ED 67068

Cong

ED 67069

Coos

ED 67071

Creggs

ED 67073

Cur

ED 67076

Curraghmore

ED 67077

Cushkillary

ED 67078

Derrew

ED 67080

Derryglassaun

ED 67082

Doonbally

ED 67086

Doonloughan

ED 67087

Drumkeary

ED 67090

Drummin

ED 67091

Eyrecourt

ED 67095

Foxhall

ED 67096

Gorumna

ED 67102

Grange

ED 67104

Hillsbrook

ED 67107

Illion

ED 67108

Inishmore

ED 67110

Island

ED 67111

Kilbennan

ED 67114

Kilchreest

ED 67115

Kilconierin

ED 67117

Kilcoona

ED 67119

Kilcroan

ED 67120

Kilcummin

ED 67121

Kilcummin

ED 67122

Killaan

ED 67123

Killallaghtan

ED 67124

Killeen

ED 67128

Killian

ED 67132

Killimor

ED 67133

Killimor

ED 67134

Killinny

ED 67135

Killoran

ED 67137

Killower

ED 67138

Killursa

ED 67140

Kilmeen

ED 67143

Kilquain

ED 67145

Kilreekill

ED 67146

Kilshanvy

ED 67147

Kilthomas

ED 67150

Kiltormer

ED 67151

Kiltullagh

ED 67152

Kiltullagh

ED 67153

Knockboy

ED 67155

Laurencetown

ED 67159

Leitrim

ED 67160

Letterbrickaun

ED 67161

Letterfore

ED 67162

Lettermore

ED 67163

Levally

ED 67164

Loughatorick

ED 67168

Marblehill

ED 67171

Milltown

ED 67173

Moat

ED 67174

Mountain

ED 67177

Mounthazel

ED 67178

Moyrus

ED 67182

Oatfield

ED 67183

Owengowla

ED 67186

Pallas

ED 67187

Portumna

ED 67188

Raford

ED 67189

Raheen

ED 67191

Rinvyle

ED 67192

Ross

ED 67193

Roundstone

ED 67194

Scregg

ED 67196

Selerna

ED 67197

Shankill

ED 67198

Sillerna

ED 67199

Templetogher

ED 67206

Tiaquin

ED 67207

Toberadosh

ED 67209

Toberroe

ED 67210

Turlough

ED 67214

Tynagh

ED 67215

Woodford

ED 67216

Grant Payments.

Michael Creed

Question:

454 Deputy Michael Creed asked the Minister for Agriculture, Fisheries and Food the number of applications for installation aid and early retirement scheme that were received after the closing date either by his Department or to Teagasc which have since been approved for payment; and if he will make a statement on the matter. [28125/09]

No applications received after the suspension of both the Young Farmers' Installation and Early Retirement Schemes on the 14 October 2008 have been approved for payment.

Harbours and Piers.

Brendan Kenneally

Question:

455 Deputy Brendan Kenneally asked the Minister for Agriculture, Fisheries and Food when harbour development works will begin in Dunmore East, County Waterford; the status of the project; and if he will make a statement on the matter. [28165/09]

The following funding is being provided for works at Dunmore East Fishery Harbour Centre as part my Department's 2009 Fishery Harbour and Coastal Infrastructure Development Programme.

Safety and Maintenance

297,000

Disability Access

15,000

Harbour sedimentation/dredging study

7,000

Repairs to East Pier — Phase II

210,000

Upgrading slipway and access to West Wharf

57,000

Future investment at Dunmore East Fishery Harbour Centre will be considered each year in the context of available exchequer funding and overall national priorities.

Agriculture Sector.

Arthur Morgan

Question:

456 Deputy Arthur Morgan asked the Minister for Agriculture, Fisheries and Food the volume of produce exported in each of the past five years by product category; and if he will make a statement on the matter. [28187/09]

The Department of Agriculture, Fisheries and Food publishes detailed data on Agri-Food trade based on CSO data. This data is published in the Compendium of Agriculture Statistics on an annual basis. The Compendium is available under the Publications section of the Department of Agriculture, Fisheries and Food's website at www.agriculture.gov.ie The table gives export details, in terms of the tonnage exported, for a selected range of key product categories.

2004

2005

2006

2007

2008

Volume exported in 000’s of tonnes

Beef

410.83

398.02

428.51

432.87

428.27

Sheepmeat

53.60

57.82

54.94

52.79

44.39

Pigmeat

104.29

113.90

124.83

127.29

122.67

Poultry

94.22

91.31

87.21

90.83

97.40

Dairy Products, Caseins, Ingredients & Eggs

793.76

829.54

916.39

979.52

921.17

Cereals & Cereal Preparations

251.90

395.26

307.33

275.92

316.56

Fruit & Vegetables including Potatoes

155.81

175.32

175.46

418.43

187.74

Source: CSO Trade Data.

For most products, other than sheepmeat, the volume exported had increased in the five- year period reflecting the success of Ireland's agri-food exporters.

Arthur Morgan

Question:

457 Deputy Arthur Morgan asked the Minister for Agriculture, Fisheries and Food the distribution of Irish agrifood exports by sector for the past ten years; the destination of these exports relative to each sector; the overall export contribution of the agrifood sector in 2009 and in each of the past ten years; and if he will make a statement on the matter. [28188/09]

In view of the highly detailed nature of the Deputy's request for information, I would like to, in the first instance, point him towards a relevant data source. The Department of Agriculture, Fisheries and Food publishes detailed data on Agri-Food trade based on CSO data. This data is published in the Compendium of Agriculture Statistics on an annual basis. The Compendium is available under the Publications section of the Department of Agriculture, Fisheries and Food's website at www.agriculture.gov.ie.

The table attached gives aggregate export details, in terms of the value exported for the sector over the past ten years as well as the proportion of trade that the agri-food sector accounted for in terms of total exports. In 2008, the sector accounted for approximately 10% of total merchandise exports compared to approximately 9.6% in 1999. Over the 10-year period in question, the sector accounted for around 9% of total exports on average. In 2008, it is estimated that over three-quarters of exports in the sector were destined for EU markets. In 2000 this was approximately two-thirds. The UK, including Northern Ireland, remains a key market for exports and accounted for over 46% of agri-food exports in 2008, compared to 36% in 2000. The proportion of agri-sector trade accounted for through non-EU trade has declined from approximately 34% in 2000 to approximately 24% in 2008.

Agri-Sector Export Values in Millions and Percentage of Total Exports

Year

Exports

% of Total Exports

Year

Exports

% of Total Exports

€m

%

€m

%

1999

6,414

9.6

2004

7,294

8.6

2000

7,057

8.4

2005

7,761

8.9

2001

6,873

7.4

2006

8,654

10.0

2002

6,877

7.3

2007

9,203

10.3

2003

7,027

8.6

2008

8,595

10.0

Source: CSO Trade Data.

Arthur Morgan

Question:

458 Deputy Arthur Morgan asked the Minister for Agriculture, Fisheries and Food the markets to which Irish exports are going by volume; the efforts made to develop further markets; and if he will make a statement on the matter. [28189/09]

For the year 2008, the CSO estimates that the Irish food and beverage sector exported €8.6 billion in product. While strides towards greater market diversification continue, particularly towards the wider EU and Far East, established high value markets remain the primary destination for Irish agri-food exports. In 2008, the CSO estimated that over 75% of exports in the sector were destined for EU markets. The UK, including Northern Ireland, remains a key market for exports and accounted for over 46% of agri-food exports in 2008.

My Department in conjunction with the industry, the Department of Foreign Affairs and Bord Bia continues to pursue the opening up of markets. The Meat Market Access Group was established in 2007 to ensure market for Irish meat to non-EU markets. The main barrier had been the restrictions imposed by countries as a result of BSE. Efforts to remove remaining restrictions have met with considerable success. The Saudi Arabian and South African markets were re-opened in 2007 while, more recently, the Philippines and Israel have lifted their restrictions. Efforts are continuing to regain access to other markets such as Japan and Indonesia, which continues to restrict for BSE related reasons, and Russia, whose restrictions are related to the recent dioxin incident.

Building on the ongoing work of the Meat Market Access Group, an inter-Departmental Group chaired by my Department and comprised of representatives from the Departments of Foreign Affairs and Enterprise, Trade and Employment, An Bord Bia, Enterprise Ireland and Bord Iascaigh Mhara has also been established and is currently engaged in a coordinated effort to identify potential market opportunities for the full range of Irish food and beverages, prioritisation of market initiatives and broader access issues.

Arthur Morgan

Question:

459 Deputy Arthur Morgan asked the Minister for Agriculture, Fisheries and Food the average annual farm gate price for each of the main farm products in each of the past five years; the average annual wholesale price for each of the main farm products in each of the past five years; and if he will make a statement on the matter. [28190/09]

Prices paid to producers are measured through agricultural output price indices (API). According to the Central Statistics Office, in the 5-year period covering the years 2004 to 2008 inclusive, the total index for agricultural output prices increased by approximately 20%, with significant variations between commodities over the period. For example, these indices increased by 33% for cattle for slaughter, 18% for milk and 32% for cereals during the period. The tables outline the changes in both the Agriculture Price Indices and Wholesale Price Indices over the period 2004-2008.

Agriculture Output Price Indices

% Change over 5 years

Year

2004

2005

2006

2007

2008

Total Output Index

101.8

102.3

107.4

118

122.3

20%

Milk

95.3

93.5

90.2

111

112.7

18%

Cows for Slaughter

103.2

107.1

118

115.2

137.4

33%

Sheep

117.6

109.6

112.2

114.9

120.2

2%

Pigs

103.3

101.5

108.8

103

112.4

9%

Poultry

111.6

108.1

106.9

112.2

125.2

12%

Cereals

100.9

96.6

110.6

185.4

133.1

32%

Potatoes

97.6

145.5

236.3

218.4

179.1

84%

Vegetables

110.7

116.1

123.6

138.1

139

26%

Source: CSO Agriculture Price Indices.

Wholesale Price Indices

% Change over 5 years

Year

2004

2005

2006

2007

2008

Food products

101.3

105.9

109.3

113.1

118.8

17.2%

Meat and meat products

107.7

112.2

120.8

124.7

135.0

25.3%

Fruit and vegetables

128.0

127.4

128.5

132.2

135.7

6.0%

Dairy products

97.0

98.2

98.5

107.5

107.0

10.3%

Other food products

98.2

105.4

107.2

107.5

112.8

14.8%

Source: CSO Wholesale Price Indices.

Food Industry.

Arthur Morgan

Question:

460 Deputy Arthur Morgan asked the Minister for Agriculture, Fisheries and Food the initiatives he is taking to work with the agrifood industry; the efforts he is making directly or in conjunction with his EU colleagues to promote the agrifood sector here; the correspondence he has had with these organisations to address their concerns on the future of the sector; and if he will make a statement on the matter. [28191/09]

It is my function as Minister to continue to plan to help the sector remain competitive so that it can capitalise on the inevitable global recovery and meet the challenges in the coming decade. Addressing the industry's capacity to compete successfully at home and overseas has assumed a new urgency and my belief is that a new development plan for the period to 2020 is required to maintain the impetus gained from the very successful Agri-Vision 2015 strategy. Preparatory work has already started on this plan which is focusing on the critical issue of competitiveness, the challenges from the global economic downturn, currency fluctuations, climate change and how best to maximise the opportunities arising from a growing international food and energy crop markets. There will be a role for all major stakeholders in this process.

My own view, which I have expressed at meetings of the Council and bilaterally to my Ministerial colleagues, is that we must maintain a strong agricultural production base in the European Union in the future to take account of the challenges ahead in meeting increased demands for food. Any reduction in food production in the EU would be taken up elsewhere where less efficient production systems exist and would result in a heavier carbon footprint. We must also undertake food production and distribution in a manner that is sustainable in all its dimensions — economically, socially and environmentally.

There will be major challenges ahead from climate change, increased competition on world and EU markets, the financial crunch and other factors. We must ensure that we have the capacity to cope with the challenges and fully exploit the opportunities as they emerge. To do so our whole sector, from farm to fork, must be highly efficient and competitive. It must also be innovative, producing the products that changing consumer tastes demand, and it must be relentlessly focused on quality and safety.

Grant Payments.

Seymour Crawford

Question:

461 Deputy Seymour Crawford asked the Minister for Agriculture, Fisheries and Food when a person (details supplied) in County Monaghan can expect to be awarded a REP scheme three payment; and if he will make a statement on the matter. [28192/09]

My officials are currently processing the application of the person named. It is expected that payment will issue within the next 15 days.

John Cregan

Question:

462 Deputy John Cregan asked the Minister for Agriculture, Fisheries and Food if he will confirm when inspections will be carried out in the context of applications for the farm waste management scheme in respect of persons (details supplied) in County Limerick. [28193/09]

I am pleased to say that pre-payment inspections have been carried out in both these cases. My Department is currently processing the applications concerned and a decision will be made as soon as possible.

Tom Sheahan

Question:

463 Deputy Tom Sheahan asked the Minister for Agriculture, Fisheries and Food when a person (details supplied) will receive her entitlements from the national reserve; and if he will make a statement on the matter. [28194/09]

The person named submitted an application for an allocation of entitlements under Category B of the 2007 National Reserve. This category caters for new entrants to farming who commenced farming after 31 December 2005. In addition applicants are required to fulfil certain criteria relating to on and off-farm income limits and educational qualifications.

When the person named initially submitted her application she did not submit sufficient information in order to fully process her application. My Department wrote to the person named on 26th March 2008 requesting the outstanding information. My Department contacted the person named by telephone and spoke with her husband on 9th July 2008 who confirmed the relevant information would be submitted. My Department subsequently wrote to the person named on 10th September 2008, 6th November 2008, 14th November 2008 and 2nd December 2008 requesting the outstanding information.

As the person named had still not submitted the required information a letter issued to her on 4th June 2009 stating that her application was being rejected, as the required information had not been submitted. To date numerous attempts have been made to obtain the required information and if the person named can submit the outstanding information my Department will be in a position to re-examine her application.

Denis Naughten

Question:

464 Deputy Denis Naughten asked the Minister for Agriculture, Fisheries and Food further to Parliamentary Question No. 550 of 21 October 2008, the position regarding the recovery of funds; and if he will make a statement on the matter. [28250/09]

My Department is in discussions with the Company regarding recovery of the amount involved.

P. J. Sheehan

Question:

465 Deputy P. J. Sheehan asked the Minister for Agriculture, Fisheries and Food when a person (details supplied) in County Cork will be awarded a REP scheme three payment; and if he will make a statement on the matter. [28328/09]

Payment to the person named will issue within the next 10 days.

Question No. 466 withdrawn.

Agriculture Sector.

Arthur Morgan

Question:

467 Deputy Arthur Morgan asked the Minister for Agriculture, Fisheries and Food the geographical concentration of agrifood employment here; the geographical concentration of agrifood employment by sector, for example primary agriculture, processing and ancillary services; and if he will make a statement on the matter. [28333/09]

Employment in the agri-food sector accounted for 179,200 jobs, or 8.5% of employment in 2008, according to figures from the CSO's Quarterly National Household Survey. Of this total, 117,100 were employed in primary agriculture, 50,000 in food and beverage production, 7,800 in wood processing, 2,200 in forestry and 2,100 in fishing.

The agri-food sector encompasses a wide range of company types and sizes, from the small independent farmhouse producer to the large food processors. The latest available figures for 2006 show a wide geographical dispersion throughout the country, whereas the Dublin area dominates the overall manufacturing sector. Of the 665 units in the food and drink sector, 44% were located in the Border, Midlands and West (BMW) Region.

These figures underpin the importance of the agri-food sector both in terms of employment and geographical spread.

Departmental Expenditure.

Denis Naughten

Question:

468 Deputy Denis Naughten asked the Minister for Agriculture, Fisheries and Food the cost of public advertising funded by his Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of his Department; and if he will make a statement on the matter. [28412/09]

The cost of public advertising funded by my Department to the end of June 2009 was €176,031.11.

Statutory expenditure:

€28,736.60 paid to Brindley Advertising Ltd.

€29,686.74 paid to AFA O'Meara Advertising

Non-statutory expenditure:

€117,607.76 paid to AFA O'Meara Advertising.

Leo Varadkar

Question:

469 Deputy Leo Varadkar asked the Minister for Agriculture, Fisheries and Food the amount spent by his Department on legal fees directly to lawyers or through the State Solicitor’s office for each of the years 2006, 2007 and 2008; and if he will make a statement on the matter. [28460/09]

It is not possible to compile the information requested within the short timeframe available. My Department will write to the Deputy within the next two weeks detailing the information requested.

Grant Payments.

Willie Penrose

Question:

470 Deputy Willie Penrose asked the Minister for Agriculture, Fisheries and Food the reason he continues to subject a person (details supplied) in County Meath to unnecessary delay in checking the amended plan submitted; if he will take steps to have same awarded without further delay; and if he will make a statement on the matter. [28612/09]

To comply with European Union regulations all REPS 4 applications and plans, including adjusted plans, are subject to eligibility and other checks. The checking procedures are in the final stages and I expect that payment in this case will issue in the next few weeks.

Animal Carcase Disposal.

Willie Penrose

Question:

471 Deputy Willie Penrose asked the Minister for Agriculture, Fisheries and Food if he will take steps to expedite an application by a person (details supplied) for an appropriate licence. [28613/09]

The person concerned has applied to my Department for approval to treat animal by-products in a composting plant in accordance with Regulation (EC) No 1774 of 2002. This Regulation lays down strict controls for the safe use and disposal of animal by-products, with a view to safeguarding human and animal health.

As part of the approval process, the plant operator must be able to demonstrate that the technology used is capable of achieving prescribed processing parameter requirements consistently and reliably. To that end a satisfactory validation proposal must be submitted to my Department, before validation of the plant can commence. Unfortunately validation proposals submitted to date have not been satisfactory and the person concerned has been advised that it will be necessary to cease accepting animal by-products from 15th July 2009, unless a satisfactory validation proposal is received and agreed in the meantime. Any relevant information received from the applicant will be dealt with as a matter of priority.

Dairy Sector.

Pat Breen

Question:

472 Deputy Pat Breen asked the Minister for Agriculture, Fisheries and Food the measures being taken both at Irish and EU level to assist dairy farmers; and if he will make a statement on the matter. [28715/09]

Last November, when it became apparent that dairy commodity prices internationally were in decline, I pressed the EU Commissioner for Agriculture, Food and Fisheries, Mariann Fisher Boel, to re-activate dairy market supports. These had been suspended since 2006 because of the historically high milk prices that had prevailed in the intervening period.

The first step taken by the Commission, following my intervention, was to introduce the aid scheme for private storage of butter a full two months ahead of the normal date, ensuring that market support for butter was available in January instead of March. The scheme remains in place and has already supported the storage of some 96,000 tonnes of butter at EU level. Public intervention for butter and skimmed milk powder opened in March. When the mandatory limits of butter and SMP to be purchased at the intervention price were reached, 30,000 tonnes and 109,000 tonnes respectively, I secured agreement for the continuation of these schemes under tendering arrangements that are close to intervention prices.

To date some 81,000 tonnes of butter have been bought into intervention, equal to 8 per cent of the butter production in January to June. As regards skimmed milk powder, 203,000 tonnes have been purchased into stock, equal to more than 38 per cent of the SMP production in January to June this year. In all, 20,000 tonnes of butter and 27,000 tonnes of skimmed milk powder from Ireland have been funded under these schemes at an approximate value of €60 million to Irish dairy processors.

Also re-introduced in January were export refunds for butter, cheese, skimmed milk powder and whole milk powder. So far this year, licenses to export some 96,000 tonnes of butter and butteroil and 123,000 of SMP have been issued, which will enable these quantities to utilise export refunds for export outside the Community. Similarly, licenses were issued in respect of cheese exports for 129,000 tonnes. The support value of this trade amounts to a further €113 million when these products are exported. Taken together there has been a considerable commitment of EU funds to support the dairy sector. However, with the market continuing to show resistance, the Commissioner has agreed to bring forward proposals to the Council of Ministers next week with a view to continuing to keep open the private storage scheme for butter and intervention for butter and SMP. If agreed by the Council, these measures will be a further boost to the sector. I will also continue to press for the removal of the ‘free at frontier price' for cheese, which has limited the export of cheddar and other cheese products.

Farm Household Incomes.

Ulick Burke

Question:

473 Deputy Ulick Burke asked the Minister for Agriculture, Fisheries and Food the average incomes for each of the farming sectors, cereals, dairy, beef, sheep and dry stock for each of the years 2006, 2007, 2008 and to date in 2009; his proposals for these sectors to avoid a collapse in family farm incomes; and if he will make a statement on the matter. [28773/09]

The most recently published data on average incomes by sector is the National Farm Survey 2008. The table shows average family farm income by sector for the period 2006-2008 (2009 is not yet available).

Average Family Farm Income by System of Farming

2006

2007

2008

Dairying

36,221

51,071

45,732

Dairying/Other

24,774

31,068

23,733

Cattle Rearing

8,291

7,702

7,739

Cattle Other

11,292

10,710

11,200

Mainly Sheep

11,902

10,682

9,593

Mainly Tillage

28,536

40,611

19,380

All Systems

16,680

19,687

16,993

Source: Teagasc, National Farm Survey (various years).

In line with the forecasts of international organisation such as the FAO and OECD, there has been evidence of increased volatility in market prices and farm incomes in recent years. Income rose in 2007 as tighter supplies on international commodity markets led to higher output prices particularly on dairy and cereal markets. While these high output prices were maintained into the early part of 2008, there was a swift decline in the latter part of 2008, which has continued into 2009, most notably for the dairy sector. There is no doubt that certain parts of the industry are facing significant challenges again this year, however, some reduction in input prices should help to soften the impact of these difficulties. I will be also pressing the European Commission to use all possible market management measures to improve demand and prices on EU markets. For the medium term outlook the European Commission forecast a gradual recovery aided by growth in global food demand due to population increase and also a longer-term decline in the growth of food-crop productivity. With this in mind preparatory work has begun on a new development plan for the agri-food sector for the period to 2020. It will focus on the critical issues of competitiveness, the challenges from the global economic downturn, currency fluctuations, climate change and how best to maximise the opportunities arising from a growing international food and energy crop markets.

Schools Building Projects.

Michael Creed

Question:

474 Deputy Michael Creed asked the Minister for Education and Science the position regarding the proposed development of a new school (details supplied) in County Cork; and if he will make a statement on the matter. [28174/09]

Michael Creed

Question:

492 Deputy Michael Creed asked the Minister for Education and Science the situation regarding the proposed development of a new school (details supplied) in County Cork; and if he will make a statement on the matter. [28296/09]

I propose to take Questions Nos. 474 and 492 together.

As the Deputy will be aware, my Department has identified a suitable site for the school referred to by him. Contracts for the acquisition of the site have been received and are being examined by the Chief State Solicitor's Office (CSSO) which acts on behalf of the Department on property related matters. The Deputy will appreciate that given the commercial sensitivities in relation to the acquisition of sites generally, I am not in a position to comment any further at this time.

Sean Sherlock

Question:

475 Deputy Seán Sherlock asked the Minister for Education and Science the funding stream that is available to a school (details supplied) in County Cork wishing to demolish an existing structure and build a much needed new classroom; and if he will make a statement on the matter. [28110/09]

I can confirm that the school to which the Deputy refers has made an application to my Department for large scale capital funding for an extension.

The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 2.1 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

Sean Sherlock

Question:

476 Deputy Seán Sherlock asked the Minister for Education and Science the status of an application under the capital works programme that applied in October 2006 by a school (details supplied) in County Cork; and if he will make a statement on the matter. [28119/09]

I can confirm that the school to which the Deputy refers has made an application to my Department for large scale capital funding for an extension.

The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 2.1 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

In the meantime, it is open to the school to apply to the Department for temporary accommodation if necessary.

Teaching Qualifications.

Michael Creed

Question:

477 Deputy Michael Creed asked the Minister for Education and Science further to Parliamentary Question No. 203 of 18 June 2009 if he will reconsider the leaving certificate Irish language requirements for science graduates who wish to pursue a career in teaching; the future role of the sciences in developing the knowledge economy; if he will reconsider this requirement; and if he will make a statement on the matter. [28126/09]

As I outlined to the Deputy in June, there is a set of common criteria for entry to courses leading to qualification as a primary teacher, which includes certain Leaving Certificate requirements. Applicants for the approved Graduate Diploma in Education (Primary Teaching) and the Higher Diploma in Arts in Primary Education must have the following academic qualifications:

(a) an honours Bachelor degree — level 8 on the National Framework of Qualifications or a qualification at level 9 or 10 on the National Framework of Qualifications, and

(b) the following second level qualifications (or approved equivalents):

(i) in the Leaving Certificate Examination from 1969 onwards: a grade C3 or above in Higher Level Irish; a grade D3 or above in Mathematics (Ordinary or Higher level); and a grade C3 or above in English (Ordinary level) or grade D3 or above in English (Higher level);

(ii) in the Leaving Certificate Examination prior to 1969, Honours in Irish and passes in English and Mathematics.

A post primary teacher in Ireland must hold a suitable degree and a suitable teacher education qualification. Details of the qualifications needed to be eligible for appointment to an incremental salaried teaching position in a voluntary secondary school, other than in a probationary capacity, are available on the Teaching Council website: www.teachingcouncil.ie. Irish is not an essential requirement for teaching other subjects, such as science, in a post primary school.

I am glad to have graduates entering teacher education from a range of disciplines and backgrounds, including the sciences. However, it is necessary to maintain teaching standards at a high level and so it is considered important that applicants have a good Leaving Certificate generally.

With regard to teachers in the primary sector, it is essential that they have a high standard of Irish on entry to teacher education programmes. It is a particular feature of Irish primary education that children, from the beginning of schooling, have an experience of language learning in two subjects, Irish and English. In addition the use of Irish is integrated throughout the primary curriculum where possible and Irish is used as a natural means of communication in the daily life of the class and the school. For these reasons, there are no plans to reduce the Irish language requirement for entry to teacher education programmes.

In the context of Section 38 of the Teaching Council Act, the Teaching Council has begun work on the development of its strategy for the review and accreditation of initial teacher education including the knowledge, skills and competences required of teachers in today's profession. Consultation fora have taken place and the Council hopes to commence reviews on a pilot basis in late 2009.

I have asked the Council to advise me on policy in this regard, in particular in relation to Irish, and the need for teachers to have full competence to teach the Irish curriculum. I look forward to the Council's recommendations in this important area.

Science, technology, engineering and mathematics are seen as the drivers of growth and innovation in the knowledge society. Ireland's continued competitiveness depends strongly on increasing the numbers of students studying the physical sciences at senior cycle, and on enhancing the attractiveness of mathematics, science, technology and engineering options so that students will choose these as third level options and as career opportunities.

School Staffing.

Lucinda Creighton

Question:

478 Deputy Lucinda Creighton asked the Minister for Education and Science the effect cuts will have on special needs teaching for the 2009-10 academic year in a school (details supplied) in Dublin 6; if there will be resource or special needs teachers or assistants lost; and if he will make a statement on the matter. [28138/09]

Based on the information provided by the school to my Department, the level of learning support teaching in the school in question will not change in the forthcoming school year.

The Deputy will be aware that the National Council for Special Education (NCSE) is responsible, through its network of local Special Educational Needs Organisers (SENOs), for allocating additional resource teachers and Special Needs Assistants (SNAs) to primary and post primary schools to support children with special educational needs. The NCSE operates within my Department's criteria in allocating such support.

The NCSE has been requested by my Department to arrange for its SENOs to review SNA allocations in all schools with a view to ensuring that the criteria governing the allocation of such posts are properly met. The review is currently underway and it is intended that it will be completed during 2009.

SENOs will be in close contact with schools as part of this review process. I have forwarded the Deputy's query to the NCSE for their attention and direct reply.

Institutes of Technology.

Brendan Kenneally

Question:

479 Deputy Brendan Kenneally asked the Minister for Education and Science the position regarding the application for university status for Waterford Institute of Technology. [28154/09]

The position is that applications have been received from three higher education institutions for designation as Universities; Waterford Institute of Technology, Dublin Institute of Technology and Cork Institute of Technology.

The issue of university designation does not just affect the institutions and the regions from which applications have been received; it also impacts on the future structure of the higher education system throughout the country. The Government wants to build on our strengths and to provide an environment where all our higher education institutions can develop in a way that best serves the country as a whole as well as the regions where they are based.

I have asked the strategy group on higher education to report to me before the end of the year with a two-decade roadmap for the development of the sector.

That group is now critically examining the roles and relationships of higher education institutions so that the system can deliver the levels of efficiency, performance, innovation and growth that will optimise Ireland's ‘smart' economic recovery and social development.

There are no plans to advance any of the current applications for university status before the strategy group completes its work.

Higher Education Sector.

Brendan Kenneally

Question:

480 Deputy Brendan Kenneally asked the Minister for Education and Science when the review of the third level sector will be completed; and when it will be published. [28155/09]

Brendan Kenneally

Question:

481 Deputy Brendan Kenneally asked the Minister for Education and Science the people who are compiling the review of the third level sector; the number of times this group has met. [28156/09]

I propose to take Questions Nos. 480 and 481 together.

The process to develop a new national strategy for higher education is being led by a High Level Steering Group chaired by Dr Colin Hunt which draws on national and international expertise. Membership of the group is listed below. The group has met on four occasions since its launch in February 2009. The process is expected to be completed by the end of the year.

Steering Group Membership:

Dr Colin Hunt, Economist

Dr John Hegarty, Provost Trinity College Dublin

Marion Coy, President, Galway-Mayo Institute of Technology

Professor John Casteen, President of the University of Virginia

Professor Jussi Valimaa, University of Jyvaskyla

Dick Lehane, former Senior Vice-President of Worldwide Manufacturing at the EMC Corporation

Paul Rellis, Managing Director, Microsoft Ireland

Peter Cassells, Chair of the National Centre for Partnership Performance

Shane Kelly, President of USI

Michael Kelly, Chairman of Higher Education Authority

Dr Mary Canning, Former World Bank Education Specialist and authority member, HEA

Brigid McManus, Secretary General, Department of Education and Science

Martin Shanagher, Assistant Secretary, Department of Enterprise Trade and Employment

Mary Doyle, Assistant Secretary, Department of An Taoiseach

Robert Watt, Assistant Secretary, Department of Finance

Schools Building Projects.

Emmet Stagg

Question:

482 Deputy Emmet Stagg asked the Minister for Education and Science the plans to provide a new secondary school at Derrinturn, County Kildare to serve the north-west Kildare area. [28195/09]

Forward Planning Section of my Department is in the process of identifying the areas where significant additional accommodation will be required at primary and post-primary level for future school years.

Factors under consideration include population growth, demographic trends, current and projected enrolments, recent and planned housing developments and capacity of existing schools to meet demand for places. Having considered these factors decisions will be taken on the means by which emerging needs will be met within an area.

Post-primary accommodation requirements for the Derrinturn area will be considered in this regard.

School Accommodation.

Emmet Stagg

Question:

483 Deputy Emmet Stagg asked the Minister for Education and Science when funding will be provided to end the use of prefabs at a school (details supplied) in County Kildare. [28196/09]

In 2002, the Department received an initial application for large scale capital funding to provide for suitable ancillary accommodation at the school referred to by the Deputy. An updated application was received in September 2007 seeking funding for a major extension to include additional classroom accommodation.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme.

However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

John O'Mahony

Question:

484 Deputy John O’Mahony asked the Minister for Education and Science his proposals to address all outstanding accommodation requirements at primary and post-primary schools throughout County Mayo over the next two years; and if he will make a statement on the matter. [28213/09]

The Forward Planning Section of my Department is in the process of identifying the areas where significant additional accommodation will be required at primary and post-primary level for future years. The area referred to by the Deputy will be included in this process.

Factors under consideration include population growth, demographic trends, current and projected enrolments, recent and planned housing developments and capacity of existing schools to meet demand for places.

Having considered these factors decisions will be taken on the means by which emerging needs will be met within the area.

School Transport.

Denis Naughten

Question:

485 Deputy Denis Naughten asked the Minister for Education and Science the status of his review of school transport catchment boundaries; and if he will make a statement on the matter. [28249/09]

A Value for Money Review of the School Transport Scheme, including catchment boundaries, is currently being undertaken by my Department and is due to be completed by the end of the year.

The Steering Committee of the Review is looking at the original objectives of the scheme, whether these objectives remain valid today, the extent to which the objectives are being achieved and whether there are possibilities for economies or efficiencies that would improve the value for money of the scheme. In this context, the review is also looking at fundamental issues such as catchment boundaries, which is in line with the commitment in the Programme for Government.

The review, when completed, will be published and sent to the Oireachtas Select Committee on Education and Science.

Schools Building Projects.

Seymour Crawford

Question:

486 Deputy Seymour Crawford asked the Minister for Education and Science the position regarding the progress towards the building project at a college (details supplied) in County Monaghan; his views on the fact that this is dangerous for both pupils and personnel; and if he will make a statement on the matter. [28274/09]

The school to which the Deputy refers, is at an early stage of architectural planning. A stage 1 submission (Site Suitability, Site Report, Initial Sketch Scheme) is currently being reviewed by my Department.

The progression of all large scale building projects, including this project, from initial design stage to construction phase will continue to be considered in the context of my Department's multi-annual school Building and modernisation Programme.

However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of this project at this time.

Seymour Crawford

Question:

487 Deputy Seymour Crawford asked the Minister for Education and Science the position regarding the progress towards a building project at a school (details supplied) in County Monaghan; and if he will make a statement on the matter. [28275/09]

The school to which the Deputy refers is at an early stage of architectural planning. A stage 2A submission(developed sketch scheme) was approved by my Department in March 2009.

In February, I announced details of 43 major building projects to proceed to tender and construction and 25 high priority projects to commence architectural planning.

The Deputy will understand that it is not possible to advance all projects at the same time. It was not possible to include the project for this school in the February announcement. Therefore, it is unlikely that it will be progressed further in 2009.

The progression of all large scale building projects, including this project, from initial design stage to construction phase will continue to be considered in the context of the Department's multi-annual school Building and modernisation Programme.

However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of this project at this time.

Willie Penrose

Question:

488 Deputy Willie Penrose asked the Minister for Education and Science the position relating to the provision of a new school building for a school (details supplied) in County Longford; and if he will make a statement on the matter. [28284/09]

The school to which the Deputy refers has applied to my Department for capital funding for a new school building.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of my Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

The school authority has been advised to apply to my Department for funding to repair the existing school building if the Board of management deems this necessary.

Willie Penrose

Question:

489 Deputy Willie Penrose asked the Minister for Education and Science the position regarding the application for a new school building (details supplied) in County Westmeath; and if he will make a statement on the matter. [28285/09]

I can confirm that my Department is in receipt of an application for major capital funding from the school to which the Deputy refers.

I recently met with a deputation from the school to discuss its accommodation needs and I am aware that the Patron has donated a site for the provision of a new school building. The deputation was advised that the Forward Planning Section of my Department is currently identifying the areas throughout the country where significant additional accommodation will be needed at primary and post primary level in the medium to long term. Factors under consideration include population growth, demographic trends, current and projected enrolment, recent and planned housing developments and the capacity of existing schools to meet demand for places.

The accommodation needs of the school in question will be considered both in this context and that of the competing demands on my Department's capital budget.

Willie Penrose

Question:

490 Deputy Willie Penrose asked the Minister for Education and Science the position regarding a new secondary school (details supplied) in County Westmeath; if it is necessary for the land to be designated before it can be provided; and if he will make a statement on the matter. [28286/09]

Forward Planning Section of my Department is in the process of identifying the areas where significant additional accommodation will be required at primary and post-primary level for future school years.

Factors under consideration include population growth, demographic trends, current and projected enrolments, recent and planned housing developments and capacity of existing schools to meet demand for places. Having considered these factors decisions will be taken on the means by which emerging needs will be met within an area. Post-primary accommodation requirements in the area referred to by the Deputy will be considered in this context.

The N4/M4 Area Development Plan indicates that a post primary school will not be required in the area referred to by the Deputy until post 2011 and my Department has requested the local authority to reserve a site for this development.

Jimmy Deenihan

Question:

491 Deputy Jimmy Deenihan asked the Minister for Education and Science the position regarding the provision of a new primary school for an area (details supplied) in County Kerry; and if he will make a statement on the matter. [28291/09]

As the Deputy may be aware, I announced in September 2008 that the project for the school in question was to proceed to re-tender and construction.

My Department's Building Unit is currently awaiting a Stage 2B (Detailed Design) submission, to comply with the new form of Government Construction Contract. Once it is received and examined, my officials will be in contact with the school authorities regarding further progress.

Question No. 492 answered with Question No. 474.

Irish Language.

Michael Creed

Question:

493 Deputy Michael Creed asked the Minister for Education and Science the situation regarding the proposed development of an Irish language educational facility (details supplied) in County Cork; and if he will make a statement on the matter. [28297/09]

My Cabinet colleague, the Minister for Community, Rural and Gaeltacht Affairs and my predecessor Minister Hanafin announced in March 2007 that a support and development initiative for the Irish language under the aegis of An Chomhaire um Oideachas Gaeltachta agus Gaelscolaíochta would be located at Coláiste Íosagáin in Baile Bhúirne and that four additional staff would be assigned to An Chomairle for this purpose.

My Department has been in continuing discussion with the Department of Finance on the grading of these posts. However, they are now affected by the moratorium on public service posts.

A Co-ordinating committee made up of representatives from An Chomhairle um Oideachas Gaeltachta agus Gaelscolaíochta, Údarás na Gaeltachta and Foras na Gaeilge has been set up to advise on cooperative elements of the overall work to be carried out in support of Irish. An Chomhairle um Oideachais Gaeltachta agus Gaelscolaiochta has a budget of €1.234m for the purpose of providing policy advice, research, support services and texts and materials to support the teaching of and through Irish. The Chomhairle has published an extensive resource directory of the materials now available to support the teaching through Irish of subjects at primary and post primary level, and operates a mobile library van so that schools can see at first hand what is available. The Tus Maith primary support service and the Second Level Support Service continue to provide professional development for teachers in this area. In addition, my Department is investing heavily in Séidean Sí materials and resources for Irish medium primary schools.

My Department will continue to build on this investment in the light of the resources available.

Schools Building Projects.

Noel Coonan

Question:

494 Deputy Noel J. Coonan asked the Minister for Education and Science the status of an application for building works in respect of a school (details supplied) in County Tipperary; when a decision will be made; and if he will make a statement on the matter. [28301/09]

The Department received an application for large scale capital funding to provide accommodation to cater for the amalgamation of the two primary schools in the town referred to by the Deputy. The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 1.4 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. In light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

School Transport.

John Perry

Question:

495 Deputy John Perry asked the Minister for Education and Science if he will ensure that school transport is provided for a person (details supplied) in County Sligo; and if he will make a statement on the matter. [28317/09]

The National Council for Special Education has responsibility, through its network of Special Educational Needs Organisers (SENOs), for the establishment of special education facilities and for allocating resource teachers and special needs assistants to schools to support children with special needs.

Under the terms of the school transport scheme for children with special needs, a child is eligible for transport if he or she is attending the nearest recognised mainstream school, special class/special school or unit that is, or can be resourced to meet the child's special educational needs under my Department's criteria.

In this case the application for transport indicates that the child will not be enrolling in the nearest such school. In that regard, my Department has requested the SENO to clarify certain matters in relation to the allocation of resources. The case will be reviewed in the light of the SENO's report.

Higher Education Grants.

Mattie McGrath

Question:

496 Deputy Mattie McGrath asked the Minister for Education and Science the financial supports available to a person (details supplied) in south Tipperary who wishes to return to education. [28320/09]

Under the terms of the maintenance grants schemes grant assistance is awarded to students who meet the prescribed conditions of funding including those which relate to age, residence, means, nationality and previous academic attainment.

The Maintenance Grant Scheme for Students attending Post Leaving Certificate courses is administered by the Vocational Education Committees on behalf of my Department. The scheme is means tested, but does not exclude candidates who are not in receipt of a social welfare payment. The decision on eligibility for funding under this scheme is a matter for the relevant VEC to determine. It will be necessary for the candidate referred to by the Deputy to contact her VEC directly to have her eligibility assessed.

Graduate Retention.

Arthur Morgan

Question:

497 Deputy Arthur Morgan asked the Minister for Education and Science the steps he has taken to solve the problem of graduate retention in the western region; the partnerships that are in place between his Department, third level institutions and enterprise groups to promote graduate retention; and if he will make a statement on the matter. [28334/09]

A breakdown of county of employment vs. county of origin of graduates is available annually from the Higher Education Authority in their What Do Graduates Do? series of reports. The latest available report published in October 2008 indicates that nationally 31% of graduates find employment in their county of origin. Galway has the third highest graduate retention rate (63%) after Dublin(93%) and Cork (68%). The key role for the third level institutions in relation to graduate employability is to ensure that courses provided are relevant to the skills needs of the economy. In this regard our higher education institutions recognise the business community as a key stakeholder and have developed governance and management arrangements to provide for business input at strategic decision making level. Work placements are available on a large number of courses throughout the third level sector and liaison between employers and institutes when designing courses and programmes are a common feature throughout the sector. While many individual third level institutions have forged close links with industry at a local level and develop courses in response to their specific workforce needs, it should be noted that there are many factors which may influence a graduate's choice of employment and some may not necessarily wish to secure employment in their county of origin.

Teachers’ Remuneration.

John Deasy

Question:

498 Deputy John Deasy asked the Minister for Education and Science the reason that service in private post-primary schools in other EU states is not recognised when assessing applications for the award of incremental credits to teachers at second level while similar service in private primary schools in other EU states is recognised; and if he will make a statement on the matter. [28353/09]

John Deasy

Question:

499 Deputy John Deasy asked the Minister for Education and Science his plans to treat service in private post-primary schools in other EU states on the same basis as service in private primary schools in other EU states when assessing applications for the award of incremental credits to teachers at second level; and if he will make a statement on the matter. [28354/09]

I propose to take Questions Nos. 498 and 499 together.

The criteria for the award of incremental credit to recognised teachers is agreed by the Teachers Conciliation Council which is made up of representatives of the teacher representative bodies, school management and the Departments of Education and Science and Finance under an Independent Chairperson. The Teachers Conciliation Council is part of the Scheme of Conciliation and Arbitration for Teachers, the purpose of which is to provide a means of dealing with claims and proposals relating to the salaries and terms and conditions of teachers' service.

Currently, the incremental credit scheme for teachers makes no provision for the recognition of service given in private post primary schools. However as discussions on this issue are ongoing under the auspices of the Teachers Conciliation Council, I am not in a position to comment further at this time.

Higher Education Grants.

Catherine Byrne

Question:

500 Deputy Catherine Byrne asked the Minister for Education and Science when the terms of the higher education grant scheme for Dublin City Council and the City of Dublin Vocational Education Committee will be announced for 2009; the details of this scheme; and if he will make a statement on the matter. [28374/09]

The review of criteria for the 2009 maintenance grant schemes is currently being finalised. Decisions on the 2009 schemes will be announced as soon as the process is completed.

Departmental Expenditure.

Denis Naughten

Question:

501 Deputy Denis Naughten asked the Minister for Education and Science the cost of public advertising funded by his Department in 2009; the breakdown between statutory and non-statutory; the corresponding figure for each agency under the control of his Department; and if he will make a statement on the matter. [28417/09]

To date in 2009 the cumulative value of advertising placed by my Department is €45,000.

My Department advertises for a wide range of educational related schemes and programmes. In general the advertising undertaken by my Department encompasses, for example, invitations to forward submissions on education related schemes/projects, invitations to tender for school building programmes and staff appointments in the public sector.

A detailed breakdown of the type of advertising placed by my Department between statutory and non-statutory categories is not readily available.

With regard to the bodies under the aegis of my Department, the expenditure incurred on advertising by the bodies is a matter for each agency. This information is not collated centrally by my Department.

If the Deputy has a particular advertising campaign in mind I would be happy to have my officials obtain the relevant details and to communicate them to the Deputy.

Departmental Funding.

Mary Upton

Question:

502 Deputy Mary Upton asked the Minister for Education and Science the position relating to funding for the Irish Centre for Talented Youth; if he will respond to queries regarding funding from a person (details supplied); and if he will make a statement on the matter. [28429/09]

Notwithstanding the increase of €302 million in the education budget for 2009, which is a real achievement in the current economic climate, a number of tough and difficult decisions had to be taken.

These decisions included the decision to discontinue the annual funding of €97,000 that my Department made available to the Centre for Talented Youth (CTYI) at Dublin City University.

While it is appreciated that the discontinuation of this funding will impact on the centre, given the current volatile and challenging economic climate, difficult choices had to be made in order to contain public sector spending. Tax revenues are down significantly and Government expenditure has to reflect this reality. The priority of this budget was to focus on measures to channel as much as was possible of the available resources to the direct funding of our schools.

A response is issuing this week to the query regarding funding from the person referred to by the Deputy.

Departmental Expenditure.

Leo Varadkar

Question:

503 Deputy Leo Varadkar asked the Minister for Education and Science the amount spent by his Department on legal fees directly to lawyers or through the State Solicitor’s office for each of the years 2006, 2007 and 2008; and if he will make a statement on the matter. [28465/09]

It is not possible to provide the information requested in the time available. A reply will issue to the Deputy as soon as the information is to hand.

Schools Building Projects.

Noel Coonan

Question:

504 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding a building project at a school (details supplied) in County Tipperary; the timeframe for completion of works; and if he will make a statement on the matter. [28591/09]

The management authority of the school referred to by the Deputy submitted an application for additional accommodation to my Department. This application was approved last May to enable the school to either purchase temporary accommodation or to build a permanent structure with the funding available.

The funding was approved on a devolved basis which means that responsibility for the day to day management of the project has been devolved to the school authority.

Noel Coonan

Question:

505 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding a building project at a school (details supplied) in County Tipperary; and the timeframe for completion of works. [28592/09]

I can confirm that the school to which the Deputy refers has made an application to my Department for large scale capital funding for an extension. The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 3.2 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

Computerisation Programme.

Noel Coonan

Question:

506 Deputy Noel J. Coonan asked the Minister for Education and Science his position regarding the provision of broadband for a school (details supplied) in County Tipperary; the reason for delay in providing the infrastructure; the timeframe for providing same; and if he will make a statement on the matter. [28593/09]

I would like to inform the Deputy that the school in question has had a satellite broadband connection since January 2006. In June 2008 at the schools request, the satellite dish was removed during building works, and as there was no alternate location available, the satellite dish was temporarily stored. During this downtime the National Council for Technology in Education (NCTE) investigated the possibility of providing the school with DSL broadband, but unfortunately the school lines failed the DSL Broadband test and therefore satellite was still the only broadband option available to the school. In March 2009, as the building works were completed, the school agreed to the reconnection of the service. Following some delays and the replacement of some faulty equipment parts, the satellite broadband service was restored at the beginning of May this year and, I am informed, has been operating normally since then.

My Department is currently evaluating tenders from Service Providers for Phase II of the Schools Broadband Programme and the broadband connections for some schools may be reviewed or upgraded depending on the results of that process.

Schools Building Projects.

Noel Coonan

Question:

507 Deputy Noel J. Coonan asked the Minister for Education and Science if a school (details supplied) in County Tipperary has applied for any building works; the timeframe for providing same; and if he will make a statement on the matter. [28594/09]

My Department is not in receipt of an application for major capital works at the school referred to by the Deputy. However the school has received funding for building works in recent years under the Summer Works Scheme.

Noel Coonan

Question:

508 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding a building project at a school (details supplied) in County Tipperary; the timeframe for completion of works; and if he will make a statement on the matter. [28595/09]

I can confirm that the school to which the Deputy refers has made an application to my Department for large scale capital funding for an extension. The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 4.1 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

Noel Coonan

Question:

509 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding a building project at a school (details supplied) in County Tipperary; the timeframe for completion of works; and if he will make a statement on the matter. [28596/09]

I can confirm that the school to which the Deputy refers has made an application to my Department for large scale capital funding for an extension. The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 2.1 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

Schools Refurbishment.

Noel Coonan

Question:

510 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding an application under the summer works scheme by a school (details supplied) in County Tipperary; the timeframe for completion of works; and if he will make a statement on the matter. [28597/09]

There is no record in my Department of an application from the school in question for funding under the current Summer Works Scheme.

Noel Coonan

Question:

511 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding a school (details supplied) in County Tipperary which has applied for works under the summer works scheme; the timeframe for completion of works; and if he will make a statement on the matter. [28598/09]

Noel Coonan

Question:

514 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding an application under the summer works scheme by a school (details supplied) in County Tipperary; the timeframe for completion of works; and if he will make a statement on the matter. [28601/09]

Noel Coonan

Question:

517 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding an application under the summer works scheme by a school (details supplied) in County Tipperary; the timeframe for completion of works; the works to be carried out; and if he will make a statement on the matter. [28604/09]

Noel Coonan

Question:

522 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding an application under the summer works scheme by a school (details supplied) in County Tipperary; the timeframe for completion of works; the works to be carried out; and if he will make a statement on the matter. [28609/09]

Noel Coonan

Question:

530 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28717/09]

Noel Coonan

Question:

532 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28719/09]

Noel Coonan

Question:

533 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28720/09]

Noel Coonan

Question:

534 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28721/09]

Noel Coonan

Question:

535 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28722/09]

Noel Coonan

Question:

536 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28723/09]

Noel Coonan

Question:

537 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28724/09]

Noel Coonan

Question:

538 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28725/09]

Noel Coonan

Question:

539 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28726/09]

Noel Coonan

Question:

540 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28727/09]

Noel Coonan

Question:

541 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28728/09]

Noel Coonan

Question:

542 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28729/09]

Noel Coonan

Question:

543 Deputy Noel J. Coonan asked the Minister for Education and Science the status of a summer works scheme application for a school (details supplied) in County Tipperary; the timeframe for the completion of works; the stage the project is at; and if he will make a statement on the matter. [28730/09]

I propose to take Questions Nos. 511, 514, 517, 522, 530 and 532 to 543, inclusive, together.

The schools referred to by the Deputy were approved for funding under the current Summer Works Scheme. The details of the works to be carried out are included in the attached tabular statement of all schools approved for such funding in County Tipperary.

The grants were sanctioned on condition that the works commence on site and 70% of the funding has been drawn down within 6 months of the date of the letter and that the remaining 30% of the funding is drawn down within 9 months of the date of this letter. If there are valid reasons why the above timetable cannot be met a case can be made to my Department for an extension of the deadlines.

Schools Building Projects.

Noel Coonan

Question:

512 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding a school (details supplied) in County Tipperary which has applied for major capital funding; the timeframe for completion of works; and if he will make a statement on the matter. [28599/09]

I can confirm that the school to which the Deputy refers has made an application to my Department for large scale capital funding for an extension. The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 2.4 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

Noel Coonan

Question:

513 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding a school (details supplied) in County Tipperary which has applied for major capital funding; the timeframe for completion of works; the works to be completed; and if he will make a statement on the matter. [28600/09]

I can confirm that the school to which the Deputy refers has made an application to my Department for large scale capital funding for an extension. The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 3.1 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

Question No. 514 answered with Question No. 511.

Noel Coonan

Question:

515 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding a school building project at a school (details supplied) in County Tipperary; the timeframe for completion of works; and if he will make a statement on the matter. [28602/09]

I can confirm that the school to which the Deputy refers has made an application to my Department for large scale capital funding for an extension. The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 1.2 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

Noel Coonan

Question:

516 Deputy Noel J. Coonan asked the Minister for Education and Science if a school (details supplied) in County Tipperary has made an application for building works; if so, the stage the application is at; and if he will make a statement on the matter. [28603/09]

I can confirm that the school to which the Deputy refers has made an application to my Department for large scale capital funding for an extension. The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 2.2 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

Question No. 517 answered with Question No. 511.

Noel Coonan

Question:

518 Deputy Noel J. Coonan asked the Minister for Education and Science the position regarding an application for a refurbishment and extension project in respect of a school (details supplied) in County Tipperary; the timeframe for completion of works; the works to be carried out; and if he will make a statement on the matter. [28605/09]

I can confirm that the school to which the Deputy refers made an application to my Department for large scale capital funding for an extension. The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 2.1 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

Noel Coonan

Question:

519 Deputy Noel J. Coonan asked the Minister for Education and Science the position in relation to additional accommodation in respect of a school (details supplied) in County Tipperary; when the project will proceed to the next stage; and if he will make a statement on the matter. [28606/09]

I can confirm that the school to which the Deputy refers made an application to my Department for large scale capital funding for an extension. The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 2.4 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

Noel Coonan

Question:

520 Deputy Noel J. Coonan asked the Minister for Education and Science the position in relation to additional accommodation in respect of a school (details supplied) in County Tipperary; when the project will proceed to the next stage; and if he will make a statement on the matter. [28607/09]

I can confirm that the school to which the Deputy refers made an application to my Department for large scale capital funding for an extension. The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 3.4 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

Schools Refurbishment.

Noel Coonan

Question:

521 Deputy Noel J. Coonan asked the Minister for Education and Science the position in relation to a bus parking space outside a school (details supplied) in County Tipperary being more clearly marked; when the project will proceed to the next stage; and if he will make a statement on the matter. [28608/09]

My Department is not in receipt of an application for works in relation to bus parking spaces outside the school referred to by the Deputy. It is open to the school to use funds available to it under its Minor Works Grant for work of this nature.

Question No. 522 answered with Question No. 511.

Schools Building Projects.

Noel Coonan

Question:

523 Deputy Noel J. Coonan asked the Minister for Education and Science the position in relation to additional accommodation in respect of a school (details supplied) in County Tipperary; when the project will proceed to the next stage and be completed; and if he will make a statement on the matter. [28610/09]

As the Deputy may be aware, I announced in September 2008 that the project for the school in question was to proceed to re-tender and construction.

My Department's Building Unit is currently awaiting a Stage 2B (Detailed Design) submission, to comply with the new form of Government Construction Contract. Once it is received from the school authority and examined, my officials will be in contact with the school regarding further progress.

Noel Coonan

Question:

524 Deputy Noel J. Coonan asked the Minister for Education and Science if a school (details supplied) in County Tipperary has made an application for building works; if so, the stage the application is at; and if he will make a statement on the matter. [28611/09]

I can confirm that the school to which the Deputy refers made an application to my Department for large scale capital funding for an extension. The application has been assessed in accordance with the published prioritisation criteria for large scale building projects and assigned a band 2.4 rating.

The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.

Deirdre Clune

Question:

525 Deputy Deirdre Clune asked the Minister for Education and Science the position regarding the provision of a school for a school (details supplied) in County Cork. [28679/09]

I am pleased to inform the Deputy that the school building to which she refers has recently been completed. The handover of the new building to the school authorities took place at the end of June.

School Facilities.

Deirdre Clune

Question:

526 Deputy Deirdre Clune asked the Minister for Education and Science the procedures in place to hand over a school from the State to a community; and if he will make a statement on the matter. [28680/09]

The interests of the State, in primary school buildings constructed on sites not in the ownership of the State, is protected by way of long-term legal agreements. These legal agreements generally take the form of a charge registered as a burden on the relevant legal folio and must be surrendered by my Department should the owner of the site wish to dispose of the property. Prior to agreeing to a request to surrender Ministerial interest on charged property, my Department examines all requests to determine whether the property is required for future educational use.

The Deputy may wish to note that my Department has a general policy of encouraging the use of school facilities by community and other groups where this is possible and where appropriate arrangements are made to reimburse the school for any additional expenditure incurred by the school associated with such usage (heating, lighting, caretaking, insurance, etc). However, any proposal for the use of school facilities outside of normal schools hours must be approved by the local school management authorities in the first instance. In 2005, my Department issued a circular letter to all school authorities urging them to make their facilities available, where possible, for community and recreation purposes.

Special Educational Needs.

Deirdre Clune

Question:

527 Deputy Deirdre Clune asked the Minister for Education and Science if he will provide an exemption for children with special needs from his new arrangements regarding uncertified cover for teachers; and if he will make a statement on the matter. [28681/09]

As a result of the 2009 Budget provisions for Education, and following subsequent proposals from the management bodies of primary and second level schools, new arrangements were put in place for substitution cover in the period January to June this year. These arrangements will continue for the 2009/2010 school year pending the completion of a review of the supervision, substitution arrangements and related matters.

New arrangements are not being introduced for the provision of substitution cover for teachers of special classes in mainstream schools or in special schools.

School Placement.

Deirdre Clune

Question:

528 Deputy Deirdre Clune asked the Minister for Education and Science if he will provide a school place in September 2009 for a child (details supplied) in County Cork; and if he will make a statement on the matter. [28682/09]

As the Deputy will be aware, the National Council for Special Education (NCSE) is responsible, through its network of local Special Educational Needs Organisers, for allocating resource teachers and Special Needs Assistants to primary and post primary schools to support children with special needs. The NCSE operates within my Department's criteria in allocating such support.

I understand that the NCSE has been actively working with the family concerned to identify a suitable post-primary placement.

Schools Building Projects.

Frank Feighan

Question:

529 Deputy Frank Feighan asked the Minister for Education and Science the schools in counties Roscommon and Leitrim that are at the pre-architectural planning stage; and the programme of funding and plans in place to progress same. [28690/09]

The details of the schools in Counties Roscommon and Leitrim that are in the pre-architectural planning stage are given in the tabular statement.

The Deputy should be aware that the details refer to major capital grant applications only and does not include applications for funding under schemes such as the Summer Works Scheme and Emergency Works Scheme.

The progression of all large scale building projects from initial design stage through to construction phase will be considered in the context of the Department's multi-annual School Building and Modernisation Programme.

However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of these projects at this time.

County

Number

School

Leitrim

08673V

The Hunt N S Castle Street (Leitrim)

Leitrim

15194A

Naomh Caillin Fiodhnach Foxfield (Leitrim)

Leitrim

16474L

Carrigallen N S Carrigallen (Leitrim)

Leitrim

17233R

Manorhamilton B N S Scoil San Clar (Leitrim)

Leitrim

18181G

St. Hugh’S N.S. Dowra (Leitrim)

Leitrim

71540J

Carrigallen Vocational School Carrigallen (Leitrim)

Leitrim

71570S

Vocational School Drumshanbo (Leitrim)

Leitrim

81013P

St. Clare’S Comprehensive School Manorhamilton (Leitrim)

Leitrim

91496V

Community School Carrick-On-Shannon (Leitrim)

Leitrim

91519H

Ballinamore Community School Ballinamore (Leitrim)

Leitrim

71560P

Lough Allen College, Drumkeerin

Leitrim

19423J

St Patrick’s NS, Drumshanbo (Leitrim)

Leitrim

18656E

SN Beal an Atha Mhoir (Leitrim)

Roscommon

14966W

Kilteevan N S Roscommon (Roscommon)

Roscommon

15083O

St Marys Convent N S Roscommon (Roscommon)

Roscommon

15557K

Cloonfad N S Ballyhaunis (Roscommon)

Roscommon

16427C

Clonown N S Athlone (Roscommon)

Roscommon

16816N

Attyrory N S Ballinasloe (Roscommon)

Roscommon

17094G

S N Rath Cruachan Beal Atha Na Gcearr (Roscommon)

Roscommon

18395C

S N Cluain Na Cille Athlone (Roscommon)

Roscommon

18626S

An Gleann Duibh NS, Kiltoom, Athlone

Roscommon

19368E

S N Naomh Ciaran Scoil Naomh Ciaran (Roscommon)

Roscommon

20126K

Gaelscoil De Hide Cnoc Na Cruibe (Roscommon)

Roscommon

65080P

C.B.S. Roscommon Abbeytown (Roscommon)

Roscommon

91493P

Castlerea Community School Castlerea (Roscommon)

Roscommon

16291D

Clooncagh NS, Strokestown (Roscommon)

Question No. 530 answered with Question No. 511.

Schools Refurbishment.

Noel Coonan

Question:

531 Deputy Noel J. Coonan asked the Minister for Education and Science the number of schools in County Tipperary that have benefited from the summer works scheme to date since its introduction; if responses given to previous parliamentary questions remain unchanged; if not, the position regarding same; and if he will make a statement on the matter. [28718/09]

Tabular statements provide details of all the projects in County Tipperary approved for funding under the Summer Works Schemes 2004-2009 and the revised details following appeals of applications not approved in 2009.

Summer Works Scheme 2009

Unapproved Applications in North Tipperary

County

Sector

Roll No.

School

Works requested

Reason

Tipperary N.R.

Primary School

17543J

Cloughjordan NS Cloughjordan

Roof works

Works carried under conting-ency fund

Tipperary N.R.

Primary School

17653Q

Castleiny N S Luach Magh

Roof works/toilet upgrade/conversion works

Works carried out under Small Schools Scheme

Tipperary N.R.

Primary School

18087O

S N Odhran Naofa Baile na Cloiche

Roof works

Works carried out under Small Schools Scheme

Tipperary N.R.

Post Primary School

65380E

St Mary’s Secondary School Nenagh

Toilet upgrade/electrical upgrade/ roof works/window replacement

Works not absolutely necessary at this time

Tipperary N.R.

Post Primary School

65450W

C.B.S. Thurles O’Donovan Rossa St

Project too large for delivery over summer months also contain-ed a new build element, which does not qualify under the Scheme

Tipperary N.R.

Post Primary School

72370P

Borrisokane Community College Borrisokane

Sewerage works

Works carried out under contingency fund

Tipperary N.R.

Post Primary School

72470T

St. Sheelan’s College Templemore

Window replacement/ tarmacking

Works not absolutely necessary at this time

Summer Works Scheme 2009

Invalid applications submitted by schools in North Tipperary

County

Sector

Roll No.

School

Reason

Tipperary N.R.

Primary School

17237C

S N Cill Barfhionn Coolbawn

Consultant not properly qualified under the terms of the Scheme

Tipperary N.R.

Primary School

19677R

Scoil Iosagain Upper-Church Central NS

Consultant not properly qualified under the terms of the Scheme

Tipperary SWS 2004-2009

County

School No.

School

Works

2004

Tipperary

65240L

Presentation Secondary School

Thurles

roof repair

Tipperary

65280A

Scoil Mhuire

roof repair

Tipperary

65500L

St. Anne’s Secondary School

Tipperary Town

upgrade heating system

Tipperary

72370P

Borrisokane VS

Nenagh

mechanical and electrical

Tipperary

72420E

Central Technical Institute

Clonmel

roof repair

Tipperary

72450N

St. Joseph’s College

fire safety

Tipperary

72470T

St. Sheelans

toilet upgrade

Tipperary

72480W

St. Ailbes Vocational School

Tipperary Town

roof repair

Tipperary

72490C

Gairm Scoil Mhuire

toilet upgrade

Tipperary

07048O

Mohober National School

Mullinahone

sewerage treatment

Tipperary

07358I

Skeheenarinky National School

Cahir

roof replacement

Tipperary

11367I

Scoil Mhuire

Nenagh

wheelchair access & toilet

Tipperary

11384I

Gurtagarry National School

Toomevara

effluent treatment plant

Tipperary

12349L

Scoil Mhuire na nAingeal

Clonmel

Mechanical & Electrical

Tipperary

16810B

Youghal Arra National School

Nenagh

disabled access & toilet

Tipperary

17276M

Scoil na mBráithre

Tipperary Town

roof repair

Tipperary

17498H

Scoil Naomh Sheosamh

access for all and fire safety

Tipperary

17511T

Ballinure National School

Thurles

heating & electrical

Tipperary

17634M

Scoil Ailbhe

Thurles

re-surface play area/car park/paths

Tipperary

17681V

Scoil Na Maighne

Thurles

repair to toilet

Tipperary

17712G

Kilkeary National School

Norwood

sewerage system

Tipperary

18135W

Scoil Angela Ursuline

replacement roof

Tipperary

18443K

St. Joseph’s National School.

Roscrea

electrical improvement

Tipperary

19874T

Scoil Mhuire Presention

electrical improvement

Tipperary

01862M/ 01285A

St.Michaels Girl’s & Boys National School

Tipperary Town

replacement heating system

Tipperary

12180W

Presentation Primary

Clonmel

provide ramps & lift access

Tipperary

17799V

Ayle National School

Monard

toilet upgrade

Tipperary

18345K

St Joseph’s National School

Roscrea

sewerage improvement

Tipperary

18486F

Scoil Mhuire

Clonmel

alterations to toilets

Tipperary

18716T

Cahir Boy’s National School

Cahir

electrical improvement

Tipperary

19356U

St. Mary’s Central National School

upgrade toilet facilities

2005

Tipperary

07358I

S N Sceichin A Rince , An Chuirt Doite , An Chathair

Windows

Tipperary

09432E

St Josephs NS, Convent of Mercy, Tipperary

Roofs

Tipperary

11470B

Slieveardagh N S, The Commons, Thurles

Roofs

Tipperary

12180U

Presentation Primary School, Clonmel, Co Tipperary

Access For All

Tipperary

12349L

S N Muire Na Naingeal, Clochar Na Carthanachta, Sraid Mortuin

Windows

Tipperary

16112A

St Marys Convent, Nenagh, Co Tipperary

Electrical

Tipperary

16810B

Eochaille Ara N S, Newtown, Nenagh

Access For All

Tipperary

17276M

Scoil Na Mbraithre, Tipperary, Co Tipperary

Windows

Tipperary

17498H

S N Sheosamh

Car park

Tipperary

17681V

S N Na Maighne, Thurles, Co Tipperary

Roofs

Tipperary

17703F

S N Ard Croine, Nenagh, Co Tipperary

Windows

Tipperary

17731K

S N Iosef Naofa, Templemore, Co Tipperary

Mechanical

Tipperary

18135W

Scoil Angela, Ursuline Convent, Thurles

Windows

Tipperary

18213Q

S N Leamhach, Thurles, Co Tipperary

External Environment

Tipperary

18345K

S N Iosef Naofa, Cor An Bhile, Roscrea

Roofs

Tipperary

18486F

S N Cill Siolain, Cill Siolain, Clonmel

Access For All

Tipperary

19874T

Scoil Na Toirbhirte, Presentation Convent Ns, Thurles

Electrical

Tipperary

19937R

Gaelscoil Aonach, Bothar Naomh Chonlain, Aonach Urmhumhan

External Environment

Tipperary

65440T

Our Lady’s SS Templemore

Fencing

Tipperary

65450W

C.B.S. Thurles, O’Donovan Rossa St, Thurles

Gas

Tipperary

65460C

Presentation Secondary School, Thurles, Co Tipperary

Windows

Tipperary

65470F

Ursuline Secondary School, Thurles, Co. Tipperary

Windows

Tipperary

65500L

St. Annes Convent of Mercy

Science Labs

Tipperary

72370P

Borrisokane Community College, Borrisokane, Co Tipperary

Electrical

Tipperary

72400V

Vocational School, Carrick-On-Suir, Co Tipperary

Roofs

Tipperary

72420E

Central Technical Institute, Clonmel, Co Tipperary

Mechanical

Tipperary

72430H

Scoil Ruain, Killenaule, Thurles

Windows

Tipperary

72440K

Nenagh VS

Complete Fencing of Large Site

Tipperary

72470T

St. Sheelan’s College, Templemore, Co Tipperary

Roofs

Tipperary

72480W

St. Alibe’s School, Rosanna Road, Tipperary Town

Toilets

Tipperary

72490C

Vocational School, Castlemeadows, Thurles

Electrical

Tipperary

76063D

Col Dún Iascaigh

Security fencing

Tipperary

76069P

Colaiste Phobáil Rós Cré, Corville Rd, Roscrea

Electrical

Tipperary

11605V

Rosegreen

Tarmacing

Tipperary

13847J

Hollyford NS

Structural improvements to fabric of building

Tipperary

18582B

Ballylooby National School

Convert Space to cater for Computer Room/

Tipperary

19294B

Lisvernane National School

Tarmacing

Tipperary

19356U

Killenaule National School

Fencing

Tipperary

65350S

Patrician Presentation, Fethard

Refurbishment of 3 Science Labs

2006

Tipperary

65240L

Presentation Secondary School, Ballingarry, Thurles

Windows

Tipperary

65300D

Rockwell College, Cashel, Co Tipperary

Electrical

Tipperary

65320J

Ard Scoil na mBraithre, Clonmel

External Environment

Tipperary

65450W

C.B.S. Thurles, O’Donovan Rossa St, Thurles

Electrical

Tipperary

65460C

Presentation Secondary School, Thurles, Co Tipperary

Science Lab

Tipperary

65490L

The Abbey School, Station Road, Tipperary Town

Windows

Tipperary

72400V

Comeragh College, Greenside, Carrick-On-Suir

Windows

Tipperary

72420E

Central Technical Institute, Clonmel, Co Tipperary

Roofs

Tipperary

72430H

Scoil Ruain, Killenaule, Thurles

Windows

Tipperary

72440K

Nenagh Vocational School

Electrical

Tipperary

72450N

St Joseph’s College, Newport, Co Tipperary

Roofs

Tipperary

72480W

St. Alibe’s School, Rosanna Road, Tipperary Town

Home Economics Room

Tipperary

72480W

St. Alibe’s School, Rosanna Road, Tipperary Town

Toilets

Tipperary

72490C

Vocational School, Castlemeadows, Thurles

Access For All

Tipperary

76063D

Colaiste Dun Iascaigh, Cashel Road, Cahir

Toilets

Tipperary

76069P

Colaiste Phobáil Ros Cré, Corville Rd, Roscrea

Mechanical

Tipperary

01594N

St Johns, Roscrea, Co Tipperary

Toilets

Tipperary

09432E

Convent Of Mercy, Tipperary, Co Tipperary

Windows

Tipperary

12180U

Presentation Primary School, Clonmel, Co Tipperary

Car Parking

Tipperary

13847J

Hollyford N S, Hollyford, Co Tipperary

Windows

Tipperary

16059W

Emly N S, Emly, Co Tipperary

Electrical

Tipperary

16112A

St Marys Convent, Nenagh, Co Tipperary

Mechanical

Tipperary

17276M

Scoil na mBraithre, Tipperary

External Environment

Tipperary

17681V

S N Na Maighne, Thurles, Co Tipperary

Windows

Tipperary

18085K

Ballyneale N S, Carrick On Suir, Co Tipperary

Mechanical

Tipperary

18135W

Scoil Angela, Ursuline Convent, Thurles

Mechanical

Tipperary

18135W

Scoil Angela, Ursuline Convent, Thurles

Mechanical

Tipperary

18345K

S N Iosef Naofa, Cor An Bhile, Roscrea

Roofs

Tipperary

18538V

Scoil Mhuire, Caislean Nua, Clonmel

Roofs & disabled access

Tipperary

18559G

S N Cill Na Naomh, Killeen, Nenagh

Access For All

Tipperary

18582B

Ballylooby N S, Cahir, Co Tipperary

Toilets

Tipperary

18775M

S N Micheal Naofa, Holycross, Thurles

Windows

Tipperary

19874T

Scoil Na Toirbhirte, Presentation Convent Ns, Thurles

Toilets

2007

Tipperary

65241N

St Josephs College

Borrisoleigh

Technology Room

Tipperary

65300D

Rockwell College

Cashel

Science Lab

Tipperary

65330M

Loreto Secondary School

Coleville Rd.

Other Structural

Tipperary

65350S

Patrician Presentation

Rocklow Rd.

Upgrade Mechanical

Tipperary

65370B

St. Joseph’s C.B.S

Summerhill

Science Lab

Tipperary

65450W

C.B.S. Thurles

O’Donovan Rossa St

Upgrade Mechanical

Tipperary

65460C

Presentation Secondary School

Thurles

Upgrade Electrical

Tipperary

65470F

Ursuline Secondary School

Thurles

Partial Replacement of Roof

Tipperary

65490L

The Abbey School

Station Road

General Upgrade to Toilets

Tipperary

65500L

St. Anne’s Secondary School

Convent Of Mercy

Woodwork/Metalwork Room

Tipperary

72370P

Borrisokane Community College

Borrisokane

Partial Replacement of Roof

Tipperary

72400V

Comeragh College

Greenside

Science Lab

Tipperary

72420E

Central Technical Institute

Clonmel

General Upgrade to Toilets

Tipperary

72430H

Scoil Ruain

Killenaule

General Upgrade to Toilets

Tipperary

72440K

Nenagh Vocational School

Dromin Road

Ramps

Tipperary

72450N

St Joseph’s College

Newport

Toilet Facilities

Tipperary

72470T

St. Sheelan’s College

Templemore

Upgrade Electrical

Tipperary

72480W

St. Alibe’s School

Rosanna Road

Partial Replacement of Roof

Tipperary

72490C

Vocational School

Castlemeadows

Science Lab

Tipperary

76063D

Colaiste Dun Iascaigh

Cashel Road

Builders Work

Tipperary

76069P

Colaiste Phobáil Ros Cré

Corville Rd

Partial Replacement of Roof

Tipperary

04067F

Convent Of Mercy

Newport

Complete Replacement of Windows

Tipperary

04075E

Moyglass N S

Moyglass

Ceiling Repairs

Tipperary

04075E

Moyglass N S

Moyglass

Erecting Partitions

Tipperary

04075E

Moyglass N S

Moyglass

Upgrade of Windows

Tipperary

04075E

Moyglass N S

Moyglass

Toilet Facilities

Tipperary

13991Q

Birdhill N S

Killaloe

Toilet Facilities

Tipperary

16059W

Emly N S

Emly

Complete Replacement of Roof

Tipperary

16112A

St Marys Convent

Nenagh

Toilet Facilities

Tipperary

16344V

St Marys Jnr B N S

Nenagh

Upgrade Electrical

Tipperary

16725K

S N Mhuire Na Mbraithre

Carrick On Suir

Upgrade Electrical

Tipperary

16979S

St Colmcilles Primary School

Templemore

Upgrade Mechanical

Tipperary

17237C

S N Cill Barfhionn

Coolbawn

Upgrade Electrical

Tipperary

17237C

S N Cill Barfhionn

Coolbawn

Upgrade Mechanical

Tipperary

17511T

S N Baile An Iubhair

Thurles

Repairs of Roof

Tipperary

17511T

S N Baile An Iubhair

Thurles

Sewerage

Tipperary

17634M

Scoil Ailbhe

Thurles

Upgrade Electrical

Tipperary

17703F

S N Ard Croine

Nenagh

Ramps

Tipperary

17712G

S N Chiarda Naofa

Kilkeary

Upgrade Electrical

Tipperary

17731K

S N Iosef Naofa

Templemore

Windows

Tipperary

17799V

S N Na Haille

An Mhoin Ard

Repairs of Roof

Tipperary

18085K

Ballyneale N S

Carrick On Suir

Boiler Replacement

Tipperary

18085K

Ballyneale N S

Carrick On Suir

Builders Work

Tipperary

18085K

Ballyneale N S

Carrick On Suir

Upgrade Electrical

Tipperary

18135W

Scoil Angela

Ursuline Convent

Upgrade Electrical

Tipperary

18343G

S N Chaoimhghin

Baile Dhaith

Partial Replacement of Roof

Tipperary

18343G

S N Chaoimhghin

Baile Dhaith

Partial Replacement of Windows

Tipperary

18343G

S N Chaoimhghin

Baile Dhaith

General Upgrade to Toilets

Tipperary

18350D

S N Na Hinse

Thurles

Partial Replacement of Windows

Tipperary

18396E

S N Rath Eilte

Thurles

Toilet Facilities

Tipperary

18465U

S N Lios An Halla

Nenagh

Upgrade Electrical

Tipperary

18501V

Grangemockler N S

Carrick On Suir

Upgrade Mechanical

Tipperary

18512D

Scoil Phroinsias Naofa

Garryshane

Complete Replacement of Windows

Tipperary

18512D

Scoil Phroinsias Naofa

Garryshane

Partial Replacement of Roof

Tipperary

18557C

S N Teampall Doire

Nenagh

Partial Replacement of Roof

Tipperary

18716T

Cahir B N S

Cahir

General Upgrade to Toilets

Tipperary

19356U

Killenaule N S

Killenaule

Boiler Replacement

Tipperary

19421F

Kilross Ns

Kilross

Gutters/Facia

Tipperary

19690J

Clonoulty Central N S

Goolds Cross

General Upgrade to Toilets

Tipperary

19874T

Scoil Na Toirbhirte

Presentation Convent Ns

Upgrade Mechanical

Tipperary

19937R

Gaelscoil Aonach

Bothar Naomh Chonlain

Resource Room

2009

Tipperary

01285/ 01862M

Tipperary Jnr Bn S & GNS

St.Michael’s St

Upgrade Electrical

Tipperary

02428B

Lackamore N S

Newport

Partial Replacement of Roof

Tipperary

02428B

Lackamore N S

Newport

Car Parking

Tipperary

07245S

Cullen N S

Cullen

Partial Replacement of Windows

Tipperary

09432E

St Josephs Primary School

Tipperary Town

Upgrade Play Area

Tipperary

10533R

Ballydrehid N S

Cahir

Upgrade Electrical

Tipperary

12124K

Rear N S

Newport

Complete Replacement of Windows

Tipperary

12349L

S N Muire Na Naingeal Clochar Na Carthanachta

Sraid Mortuin

Upgrade Play Area

Tipperary

13210I

St Josephs National School

Ballingarry

Ramps

Tipperary

13867P

St Cronans Ns

Roscrea

Upgrade Play Area & Fencing

Tipperary

13991Q

Birdhill N S

Killaloe

Replace Carpets

Tipperary

14426N

Knockavilla N S

Dundrum

Ramps

Tipperary

14426N

Knockavilla N S

Dundrum

Upgrade Play Area

Tipperary

15008A

Shronell N S

Lattin

Car Parking

Tipperary

15157R

Mount Bruis N S

Mount Bruis

Boiler Replacement

Tipperary

15299O

Gaile N S

Holycross

Repairs of Roof

Tipperary

15299O

Gaile N S

Holycross

Complete Replacement of Windows

Tipperary

15778D

St Marys N S

Nenagh

Boiler Replacement

Tipperary

16211C

Two Mile Borris N S

Thurles

Complete Replacement of Windows

Tipperary

16979S

St Colmcilles Primary School

Templemore

Partial Replacement of Roof

Tipperary

17140K

S N Baile Sluagh

Thurles

Repairs of Roof

Tipperary

17276M

Scoil Na Mbraithre

Tipperary

General Upgrade to Toilets

Tipperary

17486A

S N Cleireachain

Clonmel

Upgrade Play Area

Tipperary

17512V

S N Flannain Naofa

Rath Chobain

General Upgrade to Toilets

Tipperary

17620B

S N Rois Mhoir

Clonoulty

Repairs of Roof

Tipperary

17634M

Scoil Ailbhe

Thurles

General Upgrade to Toilets

Tipperary

17703F

S N Ard Croine

Nenagh

Upgrade Mechanical

Tipperary

17731K

S N Iosef Naofa

Templemore

Repairs of Roof

Tipperary

17783G

S N Chuirt Doighte

Cahir

Complete Replacement of Roof

Tipperary

17940T

S N Na Mbuachailli

Tulach Seasta

Complete Replacement of Windows

Tipperary

18135W

Scoil Angela

Ursuline Convent

General Upgrade to Toilets

Tipperary

18285S

S N Cill Chuimin

Thurles

Complete Replacement of Roof

Tipperary

18345K

Soil Iosef Naofa NS

Cor an Bhile

Mechanical Works

Tipperary

18350D

S N Na Hinse

Thurles

Partial Replacement of Roof

Tipperary

18396E

S N Rath Eilte

Thurles

Partial Replacement of Roof

Tipperary

18465U

S N Lios An Halla

Nenagh

Sewerage

Tipperary

18465U

S N Lios An Halla

Nenagh

Partial Replacement of Windows

Tipperary

18538V

Scoil Mhuire

Caislean Nua

Complete Replacement of Windows

Tipperary

18557C

S N Teampall Doire

Nenagh

Replace Carpets

Tipperary

18559G

S N Cill Na Naomh

Killeen

General Upgrade to Toilets

Tipperary

18559G

S N Cill Na Naomh

Killeen

Complete Replacement of Windows

Tipperary

19356U

Killenaule N S

Killenaule

Provision of a Play Area

Tipperary

19540N

Clogheen Central N S

Clogheen

Upgrade Electrical

Tipperary

19640R

Scoil Mhuire NS

Lismackin

Windows & Door replacement

Tipperary

19692N

St John The Baptist

Old Road

Replace Carpets

Tipperary

19696V

Cashel Deanery

Cashel

Replace Carpets

Tipperary

19874T

Presentation Convent NS

Thurles

Tarmacing

Tipperary

20155R

St John The Baptist Boys School

Cashel

Replace Carpets

Tipperary

65300D

Rockwell College

Cashel

Curricular Requirements

Tipperary

65350S

Patrician Presentation

Rocklow Rd.

CCTV

Tipperary

65370B

St. Joseph’S C.B.S

Summerhill

General Upgrade to Toilets

Tipperary

65410K

Cistercian College

Roscrea

Classroom

Tipperary

65460C

Presentation Secondary School

Thurles

Upgrade Mechanical

Tipperary

65470F

Ursuline Secondary School

Thurles

CCTV

Tipperary

65500L

St. Anne’s Secondary School

Convent Of Mercy

Science Lab

Tipperary

72430H

Scoil Ruain

Killenaule

Outdoor to Indoor

Tipperary

72450N

St Joseph’s College

Newport

Complete Replacement of Windows

Tipperary

72490C

Coláiste Mhuire Co-Ed

Castlemeadows

Complete Replacement of Windows

Tipperary

76069P

Colaiste Phobáil Ros Cré

Corville Rd

General Upgrade to Toilets

Tipperary

76069P

Colaiste Phobáil Ros Cré

Corville Rd

Gutters/Facia

Tipperary

91497A

Cashel Community School

Dualla Road

Repairs of Roof

Tipperary

91497A

Cashel Community School

Dualla Road

Fencing

Questions Nos. 532 to 543, inclusive, answered with Question No. 511.

Vocational Education Committees.

Enda Kenny

Question:

544 Deputy Enda Kenny asked the Minister for Education and Science the costs associated with the calling of statutory meetings of each vocational education committee authority for each of the past three years; and if he will make a statement on the matter. [28740/09]

Each VEC is required to hold at least 10 statutory meetings of its full committee per annum. In addition, it is a statutory requirement, under Section 32 of the Vocational Education (Amendment) Act 2001, that a finance sub-committee is formed to report to the main committee on at least four occasions per year. VECs may also establish other statutory sub-committees, as provided for by Section 31 of the 2001 Act. Indeed, it is a requirement of the VEC Code of Governance that each VEC form an audit committee in accordance with this section of that Act.

VECs are given a high level of autonomy in the management and appropriation of their budgets and each VEC is allowed to distribute its allocations in line with its priorities and perceptions of need. Costs associated with the calling of statutory meetings are met from these financial allocations, and in that regard the Deputy will appreciate that the information requested is not held in my Department and that it would require an inordinate amount of administrative time to compile.

Enda Kenny

Question:

545 Deputy Enda Kenny asked the Minister for Education and Science the position regarding the replacement of two retiring adult education officers in Mayo Vocational Education Committee; if his attention has been drawn to the High Court judgment to the effect that adult education organisers are deemed to be and categorised as being educationalists and are therefore not subject to and outside of a moratorium ban on general recruitment; and if he will arrange for replacements to be appointed to fulfil programmes of adult education in this VEC area. [28741/09]

Enda Kenny

Question:

546 Deputy Enda Kenny asked the Minister for Education and Science if he will confirm if replacements for adult education organisers are exempt from a moratorium on public recruitment on the basis that their positions are categorised as educationalist; and if he will make a statement on the matter. [28742/09]

I propose to take Questions Nos. 545 and 546 together.

The posts referred to by the Deputy are subject to the moratorium on recruitment and promotion applicable to the civil and public service and my Department does not have any authority to approve the filling of the posts.

On 30 March 2009, the Department issued Circular 23/2009 — Implementation of Moratorium on Recruitment and Promotions in the Public Service — to VECs outlining the impact of the moratorium. The moratorium is specific in relation to frontline services in schools. Teachers and SNAs will be governed by a ceiling to be determined in the Autumn, rather than an embargo on filling vacancies as they arise, which is the case across most of the public sector. This arrangement applies to teachers or teacher equivalents that are directly providing tuition to pupils in schools, in special programmes or in adult and further education settings.

The implications of the moratorium on all areas of education are currently under examination in my Department.

Psychological Service.

Noel Ahern

Question:

547 Deputy Noel Ahern asked the Minister for Education and Science if he will clarify the situation regarding the assessment of children process; the way children are selected for assessment; if a teacher could submit the names of children that he or she is concerned about for assessment; if there is a particular assessment after fifth class; if it is correct that only two children per school per year are selected for assessment; the cost of each assessment; whether his Department, the school or the parent pays for the assessment; if any child will be assessed at a subsidised rate at the parent’s expense; the steps that he will take for a child where the assessment shows same is below average; and if he will make a statement on the matter. [28748/09]

I can inform the Deputy that all primary and post primary schools have access to psychological assessments either directly through my Department's National Educational Psychological Service (NEPS) or through the Scheme for Commissioning Psychological Assessments (SCPA) which is administered by NEPS.

NEPS encourages a staged assessment process whereby each school takes responsibility for initial assessment, educational planning and remedial intervention, in consultation with their assigned NEPS psychologist. Only if there is a failure to make reasonable progress in spite of the school's best efforts, will a child be referred for individual psychological assessment. This system allows the psychologists to give early attention to urgent cases and also to help many more children indirectly than could be seen individually.

The introduction of the General Allocation model for primary schools in 2005/06 means that children with high incidence special needs no longer have to wait for an individual assessment before they can get access to extra support.

Children who manifest very special or urgent needs in school and who have not been previously assessed by a psychologist and are brought to the attention of a NEPS psychologist by the Principal teacher will usually be assessed by the psychologist within that school term. Normally, principals of schools prioritise those children in need of psychologist assessment in consultation with the assigned psychologist.

In the case of schools that do not currently have dedicated NEPS psychologists assigned to them, as I already mentioned, such schools have access to psychological assessments through the SCPA. Under this Scheme, schools can commission assessments from a member of the panel of private practitioners approved by NEPS, and NEPS will pay the fees directly to the psychologist concerned.

Should school authorities have specific difficulties with regard any of the foregoing I would suggest that they should contact the relevant local NEPS Regional Director, for whom contact details are available on my Department's website.

All primary schools are allocated additional teaching resources under the General Allocation Model to enable them support pupils with educational needs. Schools can decide how best to use this allocation based on the needs of the pupils.

Child Abuse.

Noel Ahern

Question:

548 Deputy Noel Ahern asked the Minister for Education and Science the position regarding the recently published Ryan commission report, if the redress system will be reopened for new applications in view of the fact that many children detained in these institutions did not know of the system and are only now coming forward to apply; if he will respond to the case of a person (details supplied) in Dublin 1. [28751/09]

I wish to advice the Deputy that the position in relation to recently published Ryan Report is that the Government has accepted all of its recommendations and is committed to their full implementation. To this end, Barry Andrews, TD, Minister for Children & Youth Affairs will bring an implementation plan to Government before the end of the month.

In relation to the specific case referred to, the Deputy may be aware that Section 8(2) of the Act provides that the Board may, at its discretion and where it considers there are exceptional circumstances, extend the period referred to in subsection (1) — i.e. the 3 year period set by the legislation for the making of applications to the Board.

However the issue of extending the Redress Scheme to allow for persons to make late applications is amongst a range of issues raised by groups representing survivors of abuse, all of which will now require further consideration by the Government.

Schools Building Projects.

Ulick Burke

Question:

549 Deputy Ulick Burke asked the Minister for Education and Science the position regarding the provision of a new school as a replacement for a school (details supplied) in view of the fact that a site has been acquired for several years and planning for this development is in place; and if he will make a statement on the matter. [28769/09]

The project to which the Deputy refers is at an advanced stage of architectural planning.

The progression of all large scale building projects, including the project for this school will be considered in the context of my Department's Multi-Annual School Building and Modernisation Programme.

However, in light of current competing demands on the Department's capital budget, it is not possible to give an indicative timeframe for the further progression of the project at this time.

Special Educational Needs.

Ulick Burke

Question:

550 Deputy Ulick Burke asked the Minister for Education and Science if he will review his decision to withdraw special needs supports to the schools affected by his decision in view of the consequences it will have on the resulting loss in the potential of these students to reach their full educational achievement and the effect of same on their quality of life for the future. [28774/09]

I wish to assure the Deputy that there will be no pupil with a special educational need who will be without access to a special needs teacher as a result of the decision to apply the normal rules which govern the appointment and retention of teachers of special classes for pupils with a mild general learning disability.

All primary schools were allocated additional teaching resources under the General Allocation Model to enable them support pupils with high incidence special educational needs including mild general learning disability (MGLD). Schools can decide how best to use this allocation based on the needs of the pupils. Most pupils with a MGLD are included in ordinary classes with their peers and are supported by their class teacher. The curriculum is flexible so that teachers can cater for the needs of children of different abilities.

The Deputy will be aware that teacher allocations to schools typically increase or decrease depending on pupil enrolment. In the case of classes for MGLD the normal pupil teacher ratio that applies is 11:1. My Department however permits schools to retain a teaching post where it has a minimum of 9 pupils in the class. This minimum was not fulfilled in a number of classes therefore schools no longer qualify to retain the classes.

My Department has considered a number of appeals from schools in relation to the loss of the classes. Some schools have advised that they had enrolled children with a low incidence disability in classes intended for pupils with a mild general learning disability. These children may qualify for individual resource teaching support through the National Council for Special Education (NCSE) and schools were advised that it is open to them to liaise with the local Special Educational Needs Organiser (SENO) in this regard.

I wish to reiterate that pupils with a mild general learning disability have, and will continue to have, access to additional teaching resources to support their education. However, there is a requirement to make appropriate use of the resources available and along with all other areas of expenditure, provision is dependent on the resources available to the Government.