Skip to main content
Normal View

Inland Waterways Maintenance

Dáil Éireann Debate, Tuesday - 5 November 2013

Tuesday, 5 November 2013

Questions (590, 591)

Maureen O'Sullivan

Question:

590. Deputy Maureen O'Sullivan asked the Minister for Arts, Heritage and the Gaeltacht further to Parliamentary Question No. 59 of 16 October 2013, the extent of railway track that needs to be closed by Irish Rail in order for a vessel on the Royal Canal, Dublin, to be given access between the First and Sea Levels of the Royal Canal; if there has been an assessment of whether the extent of track closure could be reduced to facilitate greater ease of navigation on the Royal canal; and if he will make a statement on the matter. [45986/13]

View answer

Maureen O'Sullivan

Question:

591. Deputy Maureen O'Sullivan asked the Minister for Arts, Heritage and the Gaeltacht further to Parliamentary Question No. 59 of 16 October 2013, if the option of introducing a drop lock to replace the need of the lifting bridge has been considered since the establishment of Waterways Ireland or if that assessment was made by Waterways Ireland’s predecessors; the level of use of the sea level assumed in the assessment; if the impact of the Spencer Dock greenway was taken into account and vice versa, was account taken of the impact on the greenway were the sea level to be made accessible to navigation by replacing the lifting bridge; if the assessment includes analysis of whether the effective reopening of the sea level of the Royal Canal to meaningful levels of year round traffic would be consistent with the EU's commitment to the protection and preservation of cultural heritage, in view of the fact that Dublin's waterway's heritage is part of the cultural infrastructure of Europe, contributing to economic attractiveness, job opportunities and quality of life; and if he will make a statement on the matter. [45987/13]

View answer

Written answers

I propose to take Questions Nos. 590 and 591 together.

I am advised that the option of constructing a drop lock to replace the need for the lifting bridge at the location in question has been considered by Waterways Ireland but it was not deemed viable due to the estimated costs involved, given that the minimum cost for a drop lock to replace the bridge would be of the order of €5m. Work to install a drop lock at this location would also involve considerable temporary works, the extent of which would be unknown until ground conditions were assessed in detail.

I am also advised that there have been no assessments or analyses undertaken by Waterways Ireland in respect of the level of use or impact on the Spencer Dock Greenway.

I can inform the Deputy that the length of railway track disconnected from the rest of the loop line from the station when the bridge is in the 'up' position is approximately 16 metres. However, as the control and operation of the railway line in the vicinity of the lifting bridge lies entirely with Irish Rail, only it can indicate the extent of the permanent rail line that needs to be closed when the bridge is opened.