Garda Station Refurbishment

Dáil Éireann Debate, Tuesday - 28 May 2019

Tuesday, 28 May 2019

Questions (70)

Seán Fleming

Question:

70. Deputy Sean Fleming asked the Minister for Public Expenditure and Reform the amount the OPW spent on the refurbishment of Garda stations in the Laois Garda division in 2018 and to date in 2019, in tabular form; and if he will make a statement on the matter. [22315/19]

View answer

Written answers

I can confirm the Office of Public Works have undertaken works relating to refurbishment, renovation or maintenance of facilities in twelve Garda Stations in County Laois in 2018/19. Details are included below and incorporate works funded by both the Office of Public Works and An Garda Síochána.

Garda Station

Description of current/planned works.

2018 €

2019 (to 21/05/19) €

Durrow GS

General maintenance works, Roof repair

2,845.15

482.38

Mountmellick GS

General maintenance works, Install power points, Replacement of doors

9,194.81

1,518.72

Rathdowney GS

General maintenance works

644.18

968.03

Stradbally GS

General maintenance works, Shower repair, Replace door, Exterior maintenance works

13,136.89

5,764.03

Borris-in-Ossory GS

General maintenance works, Refurbishment including Dry lining, Plastering, Wiring, Flooring, Shower/toilet facility

80,324.77

-

Ballylinan GS

Asbestos Survey

676.50

-

Portlaoise GS

General maintenance works, Emergency lighting, Repair gutter, Repair flat roof, Repairs to plaster, Pot holes. *Preparation for planned refurbishment including Ramp, Removal of raised beds, Temporary accommodation, Tree pruning, M&E Consultancy, Groundworks

55,258.34

158,431.17

Arles GS

Asbestos Survey

676.50

-

Mountrath GS

General maintenance works, Install data points

1,504.02

124.85

Abbeyleix GS

General maintenance works, Asbestos Survey

2,852.52

958.27

Clonaslee GS

General maintenance works

830.39

934.97

Portarlington GS

General maintenance works, Replace broken lights, Shower repairs, Security gate repairs

14,293.86

996.56

Total

182,237.93

170,178.98

*Refurbishment of Portlaoise Garda Station is currently at Design Stage. Some preparatory works are underway.