Skip to main content
Normal View

Air Corps

Dáil Éireann Debate, Tuesday - 27 July 2021

Tuesday, 27 July 2021

Questions (885)

Cian O'Callaghan

Question:

885. Deputy Cian O'Callaghan asked the Minister for Defence if consideration has been given to purchasing Jordanian aircraft (details supplied) which may be able to be purchased by the State for significantly less than the already ordered new aircraft; and if he will make a statement on the matter. [39821/21]

View answer

Written answers

My priority as Minister for Defence is to ensure that the operational capability of the Army, Air Corps and Naval Service is maintained to the greatest extent possible. This is primarily to enable the Defence Forces to carry out their roles assigned by Government as set out in the White Paper on Defence. Equipment priorities for the Army, Air Corps and Naval Service are being considered in the context of the lifetime of the White Paper on Defence as part of the capability development and Equipment Development Planning (EDP) process.

In this context, the principal aim over the period of the White Paper is to replace and upgrade, as required, existing capabilities in order to retain a flexible response for a wide range of operational requirements at home and overseas. Budget 2021 provides a Capital allocation of €131m for investment in Defence equipment and barracks infrastructure and will enable continued investment in major equipment platforms such as Defence Forces vehicle fleet. The increased capital funding for 2021 builds on increased levels of capital expenditure totalling €392m over the years 2018 – 2020.

In relation to air-based capability, my immediate priorities have been the acquisition of three Pilatus PC-12 aircraft in the Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) role and for two Airbus C295 maritime patrol aircraft. An additional PC-12 was also acquired in response to the Covid 19 situation. Some €276 million, including VAT, has been committed to the acquisition of these enhanced capabilities.

The White Paper provides for the replacement of the two CASA 235 maritime patrol aircraft with consideration to be given to their replacement with larger more capable aircraft which would enhance maritime surveillance and provide a greater degree of utility for transport and cargo carrying tasks. A contract for the supply of two C295 Maritime Patrol Aircraft was entered into with Airbus Defence and Space in December 2019, with delivery of the aircraft expected in 2023. The cost of the contract including ancillary support is €229m inclusive of VAT. The project is progressing well. No decisions have been made for the acquisition of additional aircraft such as the 2 Jordanian C295s mentioned in Deputy O’Callaghan’s question.

I am satisfied that the Defence Forces have the necessary resources available to them, including a modern and effective range of equipment which is line with best international standards in order to fulfil all roles assigned to them by Government.

Top
Share