Housing Policy

Dáil Éireann Debate, Tuesday - 1 February 2022

Tuesday, 1 February 2022

Questions (349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360, 361, 362, 363, 364, 365, 366, 367, 368, 369, 370, 371, 372, 373, 374, 375, 376, 377, 378, 379, 380, 381, 382, 383, 384, 385, 386, 387, 388, 389, 390, 391, 392, 393, 394, 395, 396, 397, 398, 399, 400, 401, 402, 403, 404, 405, 406, 407, 408, 409, 410, 411, 412, 413, 414, 415, 416, 417)

Peadar Tóibín

Question:

349. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 1.2 in Housing for All; if the quarter 3 2021 deadline was met; and the projected time to implement these measures fully. [4916/22]

View answer

Peadar Tóibín

Question:

350. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 1.5 in Housing for All; if the quarter 3 2021 deadline was met; and the projected time to implement these measures fully. [4917/22]

View answer

Peadar Tóibín

Question:

351. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 1.6 in Housing for All; if the quarter 4 2021 deadline was met; and the projected time to implement these measures fully. [4918/22]

View answer

Peadar Tóibín

Question:

352. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 1.8 in Housing for All; if the quarter 3 2021 deadline was met; and the projected time to implement these measures fully. [4919/22]

View answer

Peadar Tóibín

Question:

353. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 1.10 in Housing for All; if the quarter 4 2021 deadline was met; and the projected time to implement these measures fully. [4920/22]

View answer

Peadar Tóibín

Question:

354. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 1.11 in Housing for All; if the quarter 4 2021 deadline was met; and the projected time to implement these measures fully. [4921/22]

View answer

Peadar Tóibín

Question:

355. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 1.12 in Housing for All; if the quarter 4 2021 deadline was met; and the projected time to implement these measures fully. [4922/22]

View answer

Peadar Tóibín

Question:

356. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 1.13 in Housing for All; if the quarter 4 2021 deadline was met; and the projected time to implement these measures fully. [4923/22]

View answer

Peadar Tóibín

Question:

357. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 2.1 in Housing for All; if the quarter 4 2021 deadline was met; and the projected time to implement these measures fully. [4924/22]

View answer

Peadar Tóibín

Question:

358. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 2.7 in Housing for All; if the quarter 3 2021 deadline was met; and the projected time to implement these measures fully. [4925/22]

View answer

Peadar Tóibín

Question:

359. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 3.2 in Housing for All; if the quarter 4 2021 deadline was met; and the projected time to implement these measures fully. [4926/22]

View answer

Peadar Tóibín

Question:

360. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 3.3 in Housing for All; and if the quarter 4 2021 deadline was met. [4927/22]

View answer

Peadar Tóibín

Question:

361. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 3.8 in Housing for All; and if the quarter 4 2021 deadline was met. [4928/22]

View answer

Peadar Tóibín

Question:

362. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 4.7 in Housing for All; and if the quarter 4 2021 deadline was met. [4929/22]

View answer

Peadar Tóibín

Question:

363. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 4.8 in Housing for All; and if the quarter 4 2021 deadline was met. [4930/22]

View answer

Peadar Tóibín

Question:

364. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 4.12 in Housing for All; if the December 2021 deadline was met; and if not, the local authorities that have failed to meet the deadline. [4931/22]

View answer

Peadar Tóibín

Question:

365. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 5.2 in Housing for All; and if the quarter 4 2021 deadline was met. [4932/22]

View answer

Peadar Tóibín

Question:

366. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 5.4 in Housing for All; and if the quarter 4 2021 deadline was met. [4933/22]

View answer

Peadar Tóibín

Question:

367. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 5.5 in Housing for All; and if the quarter 4 2021 deadline was met. [4934/22]

View answer

Peadar Tóibín

Question:

368. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 6.2 in Housing for All; and if the quarter 4 2021 deadline was met. [4935/22]

View answer

Peadar Tóibín

Question:

369. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 6.4 in Housing for All; and if the quarter 4 2021 deadline was met. [4936/22]

View answer

Peadar Tóibín

Question:

370. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 7.1 in Housing for All; and if the quarter 4 2021 deadline was met. [4937/22]

View answer

Peadar Tóibín

Question:

371. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 7.2 in Housing for All; and if the quarter 4 2021 deadline was met. [4938/22]

View answer

Peadar Tóibín

Question:

372. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 7.4 in Housing for All; and if the quarter 4 2021 deadline was met. [4939/22]

View answer

Peadar Tóibín

Question:

373. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 7.5 in Housing for All; and if the quarter 4 2021 deadline was met. [4940/22]

View answer

Peadar Tóibín

Question:

374. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 8.2 in Housing for All; and if the quarter 4 2021 deadline was met. [4941/22]

View answer

Peadar Tóibín

Question:

375. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 9.1 in Housing for All; and if the quarter 4 2021 deadline was met. [4942/22]

View answer

Peadar Tóibín

Question:

376. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 11.1 in Housing for All; and if the quarter 4 2021 deadline was met. [4943/22]

View answer

Peadar Tóibín

Question:

377. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 11.2 in Housing for All; and if the quarter 4 2021 deadline was met. [4944/22]

View answer

Peadar Tóibín

Question:

378. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 12.1 in Housing for All; and if the quarter 4 2021 deadline was met. [4945/22]

View answer

Peadar Tóibín

Question:

379. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 12.2 in Housing for All; and if the quarter 4 2021 deadline was met. [4946/22]

View answer

Peadar Tóibín

Question:

380. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 12.3 in Housing for All; and if the quarter 4 2021 deadline was met. [4947/22]

View answer

Peadar Tóibín

Question:

381. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 13.4 in Housing for All; and if the quarter 4 2021 deadline was met. [4948/22]

View answer

Peadar Tóibín

Question:

382. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 13.5 in Housing for All; and if the quarter 4 2021 deadline was met. [4949/22]

View answer

Peadar Tóibín

Question:

383. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 13.7 in Housing for All; and if the quarter 4 2021 deadline was met. [4950/22]

View answer

Peadar Tóibín

Question:

384. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 15.1 in Housing for All; and if the quarter 4 2021 deadline was met. [4951/22]

View answer

Peadar Tóibín

Question:

385. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 15.2 in Housing for All; and if the quarter 4 2021 deadline was met. [4952/22]

View answer

Peadar Tóibín

Question:

386. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 17.1 in Housing for All; and if the quarter 4 2021 deadline was met. [4953/22]

View answer

Peadar Tóibín

Question:

387. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 17.3 in Housing for All; and if the quarter 4 2021 deadline was met. [4954/22]

View answer

Peadar Tóibín

Question:

388. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 18.1 in Housing for All; and if the quarter 4 2021 deadline was met. [4955/22]

View answer

Peadar Tóibín

Question:

389. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 18.2 in Housing for All; and if the quarter 3 2021 deadline was met. [4956/22]

View answer

Peadar Tóibín

Question:

390. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 18.3 in Housing for All; and if the quarter 4 2021 deadline was met. [4957/22]

View answer

Peadar Tóibín

Question:

391. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 19.1 in Housing for All; and if the quarter 4 2021 deadline was met. [4958/22]

View answer

Peadar Tóibín

Question:

392. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 19.5 in Housing for All; and if the quarter 4 2021 deadline was met. [4959/22]

View answer

Peadar Tóibín

Question:

393. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 19.6 in Housing for All; and if the quarter 4 2021 deadline was met. [4960/22]

View answer

Peadar Tóibín

Question:

394. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 19.7 in Housing for All; and if the quarter 3 2021 deadline was met. [4961/22]

View answer

Peadar Tóibín

Question:

395. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 19.8 in Housing for All; and if the quarter 4 2021 deadline was met. [4962/22]

View answer

Peadar Tóibín

Question:

396. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 19.9 in Housing for All; and if the quarter 4 2021 deadline was met. [4963/22]

View answer

Peadar Tóibín

Question:

397. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 19.11 in Housing for All; and if the quarter 4 2021 deadline was met. [4964/22]

View answer

Peadar Tóibín

Question:

398. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 20.3 in Housing for All; and if the quarter 4 2021 deadline was met. [4965/22]

View answer

Peadar Tóibín

Question:

399. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 21.2 in Housing for All; and if the quarter 4 2021 deadline was met. [4966/22]

View answer

Peadar Tóibín

Question:

400. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 21.3 in Housing for All; and if the quarter 4 2021 deadline was met. [4967/22]

View answer

Peadar Tóibín

Question:

401. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 21.8 in Housing for All; and if the quarter 4 2021 deadline was met. [4968/22]

View answer

Peadar Tóibín

Question:

402. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 22.1 in Housing for All; and if the quarter 3 2021 deadline was met. [4969/22]

View answer

Peadar Tóibín

Question:

403. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 23.1 in Housing for All; and if the quarter 4 2021 deadline was met. [4970/22]

View answer

Peadar Tóibín

Question:

404. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 23.3 in Housing for All; and if the quarter 4 2021 deadline was met. [4971/22]

View answer

Peadar Tóibín

Question:

405. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 23.4 in Housing for All; and if the quarter 4 2021 deadline was met. [4972/22]

View answer

Peadar Tóibín

Question:

406. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 23.5 in Housing for All; and if the quarter 4 2021 deadline was met. [4973/22]

View answer

Peadar Tóibín

Question:

407. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 23.12 in Housing for All; and if the quarter 4 2021 deadline was met. [4974/22]

View answer

Peadar Tóibín

Question:

408. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 24.4 in Housing for All; and if the quarter 4 2021 deadline was met. [4975/22]

View answer

Peadar Tóibín

Question:

409. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 24.5 in Housing for All; and if the quarter 4 2021 deadline was met. [4976/22]

View answer

Peadar Tóibín

Question:

410. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 24.7 in Housing for All; and if the quarter 4 2021 deadline was met. [4977/22]

View answer

Peadar Tóibín

Question:

411. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 25.5 in Housing for All; and if the quarter 4 2021 deadline was met. [4978/22]

View answer

Peadar Tóibín

Question:

412. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 26.1 in Housing for All; and if the quarter 4 2021 deadline was met. [4979/22]

View answer

Peadar Tóibín

Question:

413. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 27.6 in Housing for All; and if the end of 2021 deadline was met. [4980/22]

View answer

Peadar Tóibín

Question:

414. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 29.1 in Housing for All; and if the quarter 4 2021 deadline was met. [4981/22]

View answer

Peadar Tóibín

Question:

415. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 30.1 in Housing for All; and if the quarter 3 2021 deadline was met. [4982/22]

View answer

Peadar Tóibín

Question:

416. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 30.2 in Housing for All; and if the quarter 3 2021 deadline was met. [4983/22]

View answer

Peadar Tóibín

Question:

417. Deputy Peadar Tóibín asked the Minister for Housing, Local Government and Heritage the status of housing policy objective 30.3 in Housing for All; and if the quarter 3 2021 deadline was met. [4984/22]

View answer

Written answers

I propose to take Questions Nos. 349 to 417, inclusive, together.

Housing for All is the Government’s plan to increase the supply of housing to an average of 33,000 per year over the next decade. Over 300,000 new homes will be built by the end of 2030, including a projected 90,000 social homes, 36,000 affordable purchase homes and 18,000 cost rental homes.

The Plan is backed by historic levels of investment with in excess of €20bn through the Exchequer, the Land Development Agency and the Housing Finance Agency over the next 5 years. This will provide the sector with the stability and certainty it needs.

Housing for All is a whole-of-Government Plan, encompassing numerous policy areas across the four pathways to a sustainable housing system. My Department is working in close collaboration with all relevant Government Departments, State Agencies and other stakeholders, with a strong focus on implementation and delivery.

Good progress has been made since the plans publication in September 2021: of the 213 actions set out in Housing for All, a total of 123 have either been completed already or are being delivered on an ongoing basis.

As the Deputy may be aware, the Government has committed to publishing a Housing for All progress report each quarter throughout the lifetime of the plan. These detail the progress made on all Housing for All actions and policy objectives that have a delivery timeline relevant to the publication. Ongoing actions will be reported on in the Q2 and Q4 reports of each year to ensure continued focus and delivery of all actions.

The first of these progress reports, for Q3 2021, was published on 20 October 2021 and can be accessed at the following link: www.gov.ie/en/publication/44df1-housing-for-all-q3-2021-progress-report/.

The second progress report, for Q4 2021, was published on 26 January 2022 and can be accessed at the following link: www.gov.ie/en/publication/84e61-housing-for-all-q4-2021-progress-report/.

Future Housing for All quarterly progress reports will also be published on the dedicated Housing for All webpage which can be accessed at the following link: www.gov.ie/en/campaigns/dfc50-housing-for-all/.

Question No. 350 answered with Question No. 349.
Question No. 351 answered with Question No. 349.
Question No. 352 answered with Question No. 349.
Question No. 353 answered with Question No. 349.
Question No. 354 answered with Question No. 349.
Question No. 355 answered with Question No. 349.
Question No. 356 answered with Question No. 349.
Question No. 357 answered with Question No. 349.
Question No. 358 answered with Question No. 349.
Question No. 359 answered with Question No. 349.
Question No. 360 answered with Question No. 349.
Question No. 361 answered with Question No. 349.
Question No. 362 answered with Question No. 349.
Question No. 363 answered with Question No. 349.
Question No. 364 answered with Question No. 349.
Question No. 365 answered with Question No. 349.
Question No. 366 answered with Question No. 349.
Question No. 367 answered with Question No. 349.
Question No. 368 answered with Question No. 349.
Top
Share