576. Deputy Joe O'Brien asked the Minister for Education if her Department anticipates that the improved walking and cycling access to schools (details supplied) from Waterside along the reservation indicated in the Greater Dublin Area Cycle Network Plan will be available for students to use from the opening of the schools. [32547/22]

View answer

Written answers

Planning permission for the Secondary School to which the Deputy refers has been granted and phase 1 of the building is currently under construction. It is anticipated that the school will occupy the building in late August. There is no building project under way or planned for the primary school to which the Deputy refers.

My Department will shortly be applying for a further planning permission to relocate ball courts on the secondary school site. As part of this process, the Local Authority has requested the introduction of a pedestrian and cycle path through the school site. Once planning permission is granted and works commence the installation of the pathway through the school site will be undertaken.

Any works related to footpaths and cycle paths outside of the school site fall under the remit of the local authority and are not a matter for my Department.