Written Answers. - Fishing Harbour Development Funding.

Cecilia Keaveney

Ceist:

310 Cecilia Keaveney asked the Minister for the Marine the way in which the funds available for fishing harbour developments in 1996 were allocated. [18498/96]

Cecilia Keaveney

Ceist:

311 Cecilia Keaveney asked the Minister for the Marine the projects which have benefited from the 1996 allocation of the fishing harbour development funding; and if he will make a statement on the matter. [18499/96]

I propose to take Questions Nos. 310 and 311 together. The fishery harbour projects being assisted this years are as follows:

Cost Estimate

Fishery Harbour Centres

Killybegs

Provide lights, beacons and bollards — Study on harbour development needs — Wharf subsidence and syncrolift — New watermain under Town Pier and works to storage area at syncrolift.

516,000

Castletownbere

Effluent network, provision of power points and syncrolift cradles — Fendering —Repair Dinish pier erosion — Resurface harbour entrance — Site investigation for capital dredging at syncrolift — Provision of hydrants.

269,000

Dumore East

Chloride contamination monitoring, computer study on structural requirement — Galvanised steel safety kerbs — Fendering — Syncrolift improvements, breakwater repair — bollards, lights and upgrading of electrics — Drainage, improvements to pontoons and repair of damaged columns.

595,000

Rossaveel

Navigation beacon — Renew moorings on navigation buoys, upgrade harbour launch, dredge berthage at end of main pier, shore marking and upgrade leading lights; Upgrade fenders, resurface broken section of old pier — Remove old toilet block and clear site.

121,000

Howth

Pier re-surfacing and syncrolift improvements.

50,000

Secondary Harbours

Burtonport

Dredging.

195,000

Keelbeg

Pier development.

40,000

Kilmore Quay

Major Harbour Development.

405,000

Crosshaven

Pier development.

50,000

Ahakista

Pier extension.

150,000

Bunowen

Ladders, leading lights and breakwater repairs.

45,000

Crumpan

Beacon.

15,000

Rathmullan

Ladders.

20,000

Clogherhead

Various improvements to include minor dredging, surfacing pier, improved water and lighting supply, reclaim slipway, remove foul berth and provide two manually operated derricks.

150,000

Leahanbeg

Pier extension and improved services.

38,000

Dingle

Safety work including improvement to electrical supply, lighting, replacement of damaged ladders and safety kerbing.

20,000

Derryinver

Improvements.

30,000

Spiddal

Pier renewal

28,000

Adrigole

Slipway.

19,000

Aquaculture Landing Places

Ardgroom

Pier development.

260,000

Roaring Water Bay

New quay, crane, breakwater.

250,000

Cromane

Study of requirements.

20,000

Killary

Study of requirements.

20,000

Barr
Roinn