The following are questions tabled by Members for written response and the ministerial replies as received on the day from the Departments [unrevised].

Employment Levels.

Martin Ferris

Ceist:

1 Deputy Martin Ferris asked the Tánaiste and Minister for Enterprise, Trade and Employment if she will provide a list of the top 20 companies operating here in 2008 in terms of numbers employed. [14771/09]

My Department does not retain such a list as requested by the Deputy. Any information that is available to the Enterprise Development Agencies is maintained on a confidential basis.

Job Creation.

Seymour Crawford

Ceist:

2 Deputy Seymour Crawford asked the Tánaiste and Minister for Enterprise, Trade and Employment the number of inward investment visits carried out in each of the two counties of Cavan and Monaghan over the past 12 months; if she is satisfied herself sufficient efforts are being made to create employment in these areas; and if she will make a statement on the matter. [14790/09]

IDA Ireland is the agency with statutory responsibility for the attraction of foreign direct investment (FDI) to Ireland and its regions. The marketing of individual areas for new or expansion FDI investments and jobs is a day-to-day operational matter for the Agency.

I have been informed by the Agency that, over the past 12 months, there has been one site visit by potential investors to Cavan and there have been no site visits to Monaghan. While IDA Ireland can and does encourage clients to visit particular locations, the final decision on where to visit or locate is taken in all cases by the clients.

Through its network of overseas offices, IDA Ireland is actively marketing the counties of Monaghan and Cavan for new and expansion investments across a wide range of sectors. In line with the National Spatial Strategy, the Agency is concentrating on the hub towns of Cavan and Monaghan.

In the case of Cavan, IDA is working to secure new investment in the medical devices area for Cavan Town as it believes that the town is particularly suited to such a sector.

IDA Ireland is currently planning to have a new 25,000 sq ft state of the art advanced technology building erected on its Cavan Business Park, to attract new inward investment. In addition IDA is actively promoting fully serviced sites for new Greenfield investments on its 40 acre fully serviced Park.

As regards Monaghan, The Agency is promoting its Business Park in Monaghan Town for new knowledge intensive inward investment. The completion of the new Monaghan by-pass has vastly improved access to the existing IDA Park and the ongoing work on the N2 is improving access to Dublin Airport and city. This continues to add to the attractiveness of the location for new inward investment.

In the present competitive global market, as Ireland competes for new investments at the highest end of the value chain, the concept of scale is crucial to our economic destiny. Leading corporations require a significant population of highly qualified talent, effective physical and digital infrastructure coupled with availability of sophisticated professional support services. If we are to continue being successful in realising a large proportion of our investments outside of the larger cities, all economic and social stakeholders will need to adhere to the framework on which the NSS is constructed. IDA has in recent years set a high level target to deliver in excess of 60% of investments outside the Greater Dublin Area. In 2008 this target was achieved.

Financial Institutions Support Scheme.

Seymour Crawford

Ceist:

3 Deputy Seymour Crawford asked the Minister for Finance if he had a meeting with the moderator of the Presbyterian Church regarding a situation (details supplied); his views on discussing this all-Ireland organisation with the British Prime Minister, Mr. Gordon Brown, in an effort to solve the problem brought about to some extent by the guarantees given to other banking organisations by both Governments; and if he will make a statement on the matter. [14794/09]

As the Deputy will be aware, the mutual society he refers to is not one of the institutions covered by the Government's Bank Guarantee Scheme.

The Government's decision to safeguard deposits and specified funding instruments in systemically important credit institutions was taken to maintain financial stability for the benefit of depositors and business in the best interests of the Irish economy. In the period since that decision, similar and further actions have been taken throughout Europe, including the UK, to protect the stability of the financial system.

While I understand that the Presbyterian Church is an all-Ireland church, the Financial Regulator has advised that the mutual society is not registered in this jurisdiction.

As the investors in the mutual Society have voted in favour of an orderly run-down of the Society it would not be appropriate for me to become involved in the decision of that organisation. I have not met with the Reverend Doctor Donald Patton on this matter.

I understand the matter has been raised with the British Government and the Northern Ireland Executive and has also been the subject of contacts between the British Prime Minister and the First Minister and deputy First Minister.

Tax Rebates.

Ned O'Keeffe

Ceist:

4 Deputy Edward O’Keeffe asked the Minister for Finance if he will arrange to make a refund to a person (details supplied) in County Cork who was studying with FÁS recently. [14804/09]

I have been informed by the Revenue Commissioners that the person in question is not entitled to a refund of tax at present as income tax has not been paid in this tax year. A claim for a refund of PRSI cannot be made until year end. Claims are submitted to: Dept of Social & Family Affairs, Oisin House, 212-213 Pearse St, Dublin 2.

Departmental Staff.

Pat Breen

Ceist:

5 Deputy Pat Breen asked the Minister for Finance his plans to develop and enhance a site (details supplied) in County Clare; and if he will make a statement on the matter. [14826/09]

A caretaker has been employed for the past number of years at Quin Abbey for the period May to September. His duties include opening the site on weekdays, excluding Tuesdays, between 10am and 4.30pm and on weekends from 9.30am to 3.30pm. This post is subject to the embargo on public sector appointments, and the filling of the post is being examined in this context. The provision of information panels will be considered and implemented as a priority.

EU Directives.

Mary Upton

Ceist:

6 Deputy Mary Upton asked the Minister for Finance the reason for the delay in the implementation of the Insurance Mediation Directive two; and if he will make a statement on the matter. [14837/09]

The Insurance Mediation Directive was transposed into Irish law by way of the European Communities (Insurance Mediation) Regulations 2005 (S.I. No. 13 of 2005), so I assume that the Deputy is referring to the current proposal to amend those Regulations.

Although it had been hoped to finalise the amending Regulations before now, a number of significant policy issues arose which delayed finalisation. The most recent issue that arose related to the treatment of accountants who perform insurance mediation business on an incidental basis.

A Regulatory Impact Assessment performed by my Department, had recommended that the current Approved Professional Body regime for accountants performing insurance mediation business on an incidental basis should be retained. However, one of the brokers' associations did not agree with that assessment and, following a meeting with the association on 17 February last, I offered to ask the Financial Regulator to review the position in light of the comments I received. I expect to hear from the Financial Regulator on this matter in the near future.

As soon as that issue has been addressed, discussions will re-commence with the Financial Regulator and the Office of the Parliamentary Counsel with a view to producing a further draft of the Regulations. That draft will be circulated to all stakeholders before finalisation. I have asked my officials to treat this as a priority.

Pension Provisions.

Róisín Shortall

Ceist:

7 Deputy Róisín Shortall asked the Minister for Finance if he will provide an explanation of the concerns raised by the covered institution remuneration oversight committee in respect of the section dealing with pensions in its report of 27 February 2009; the practice identified in which cash allowances were paid to compensate for the effects of the pension cap imposed by the Finance Act 2006; and the steps he will take to address these matters. [14881/09]

The Deputy will be aware that the report of the Covered Institution Remuneration Oversight Committee (CIROC) considered that pension arrangements for top management should be reviewed.

Specifically, the Report stated that: "We have become aware of a practice in which cash allowances were paid to compensate for the effects of the "pensions cap" imposed by the Finance Act, 2006. Pension schemes should reflect public policy and tax law and it is unacceptable that arrangements should be put in place which would be inconsistent with the intent of the relevant legislation."

Finance Act 2006 introduced a number of measures aimed at preventing abuse of tax relief arrangements in the private pensions area, including the introduction of a maximum allowable pension fund on retirement for tax purposes. The above extract from the CIROC Report would indicate that the pension fund cap is working as intended. From a tax perspective, the only concern relates to the tax implications of any alternative means of remuneration referred to. If an individual is paid a ‘cash allowance' these amounts would be taxable in a manner similar to the tax treatment of any paid remuneration. My Department is examining the matter to ensure that this is the case.

Child Care Services.

Brian O'Shea

Ceist:

8 Deputy Brian O’Shea asked the Minister for Health and Children his views on the proposals to protect the most vulnerable citizens here as outlined in correspondence (details supplied). [14810/09]

As the Deputy is aware, I have responsibility for the National Childcare Investment Programme (NCIP) 2006 -2010, under which the Community Childcare Subvention Scheme is implemented.

Under the previous childcare support scheme, the EU/Exchequer co-funded Equal Opportunities Childcare Programme (EOCP) 2000 -2006, community-based, not for profit childcare providers with a strong focus on disadvantage were awarded grant aid towards their staffing costs to allow them to charge reduced fees to disadvantaged parents. This arrangement was largely self-reported. As a result, the key objective of the funding (to enable participating services to charge lower fees to disadvantaged and low income parents) was not, in many cases being realised, with many groups charging a flat rate, regardless of parental circumstances.

Under the Community Childcare Subvention Scheme (CCSS), funding is adjusted on an annual basis, and takes account of changes in parental profiles as well as changes in the level of service being provided. In addition, services may apply for a mid-year review of their funding, if they believe that they would benefit from additional funding as a result of catering for additional numbers of parents who qualify for subvention. It should also be noted that the mid-year review is optional and that services with fewer qualifying parents are not required to seek a reduction in their grant level. I am satisfied that the current arrangements are satisfactory, and provide for much greater flexibility than was the case under the EOCP, which allocated a set amount of funding for a period of three years thus not providing for any changes in the profile of the parents availing of the service during this period.

The CCSS is based on clear and transparent criteria which measure the actual level of service provision as well as the level of disadvantage of the parents availing of the participating service. Funding is provided to each service on this basis and, because the grant is based on subvention rates for qualifying parents, the funding must be used for the purpose for which it is provided. The CCSS also assists services in ensuring that they operate on the basis of a sustainable business model based on a fee structure which is appropriate to their actual operating costs.

It should be noted that funding provided under the previous EOCP scheme amounted to €37 million in 2007. Funding provided under the CCSS amounted to €52m in 2008, and is expected to increase to €56m in 2009. The September 2008 service returns indicated that there had been a significant increase in the number of children attending services, not just in the disadvantaged cohort, but also among middle and upper-income families.

In relation to the collection of certain data (including the Personal Public Service Number) in respect of parents using the participating services, this data is essential in order to confirm the profile of each qualifying parent and to ensure that the service receives the appropriate subvention to which they are entitled. All such data is used in accordance with the requirements of the Data Protection Acts.

The Deputy will be aware of the announcement in yesterday's Budget speech of the introduction of a free pre-school year for eligible children from January next. I very much welcome this important investment in our children's futures as a mark of this Government's ongoing commitment to children. The provision of a year's free pre-school will promote equality of opportunity at the most important developmental stage of children's lives. The development will also help to sustain thousands of jobs in the childcare sector.

Tobacco Products.

Dan Neville

Ceist:

9 Deputy Dan Neville asked the Minister for Health and Children the outcome of her decision to change the way tobacco products are displayed in shops. [14814/09]

On 9 July 2008, I announced that further provisions of the Public Health (Tobacco) Acts 2002 and 2004 are to be commenced on 1 July 2009. From that date, there will be no advertising or display of tobacco products in retail outlets; all tobacco products must be out of view and stored within a closed container only accessible by the retailer; all retailers of tobacco products will be required to register with the Office of Tobacco Control and self-service vending machines will be permitted in licensed premises or registered clubs only.

I have since signed the Public Health (Tobacco) (Registration) Regulations 2009, the Public Health (Tobacco) (Self Service Vending Machines) Regulations 2009, the Public Health (Tobacco) (Retail Signs) Regulations 2009 and the Public Health (Tobacco) (Product Information) Regulations 2009. These Regulations give further effect to the provisions that are to be commenced on 1 July 2009.

These measures, which have been anticipated for a considerable time, are needed to further de-normalise tobacco and to protect children in particular but also adults from the dangers of tobacco consumption.

Hospital Services.

Willie Penrose

Ceist:

10 Deputy Willie Penrose asked the Minister for Health and Children if she will take steps to have a person (details supplied) in County Westmeath admitted to Athlone General Hospital; and if she will make a statement on the matter. [14768/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply.

Health Services.

Bernard Allen

Ceist:

11 Deputy Bernard Allen asked the Minister for Health and Children the reason a person (details supplied) in County Cork is not allowed to meet their son; and if she will review the situation. [14781/09]

As this is a service matter it has been referred to the HSE for direct reply.

Seymour Crawford

Ceist:

12 Deputy Seymour Crawford asked the Minister for Health and Children the position regarding the proposed extension and restructuring of the health care centre in Killeshandra, County Cavan; if funding has been made available for this work to be carried out in 2009; and if she will make a statement on the matter. [14786/09]

As the Deputy's question relates to a service matter it has been referred to the Health Service Executive for direct reply.

Accident and Emergency Services.

Seymour Crawford

Ceist:

13 Deputy Seymour Crawford asked the Minister for Health and Children the use which will be made of the high quality wards, treatment and accident and emergency room, theatre and other facilities at Monaghan General Hospital when she removes many of the high quality nurses, doctors and other staff from the hospital; if she will provide a 13 bed rehabilitation unit in the hospital; if this means the closure of the pathways unit in Cavan General Hospital; and if she will make a statement on the matter. [14787/09]

The Transformation Programme for the North East region has been informed by the Teamwork Report to the Health Service Executive which demonstrated that the service configuration in the region was unsustainable. A series of focused and necessary service changes are being implemented across the region.

My Department has requested the Parliamentary Affairs Division of the Executive to reply directly to the Deputy in relation to the specific service issues raised.

Vaccination Programme.

Ned O'Keeffe

Ceist:

14 Deputy Edward O’Keeffe asked the Minister for Health and Children if a grant is available from her Department or from the Health Service Executive to cover a matter (details supplied). [14803/09]

The National Immunisation Advisory Committee guidelines recommend the HBV vaccination for various categories of persons. Vaccination is recommended for, among others, "security and emergency services personnel" including search and rescue teams.

There is no charge for either the vaccine or the administration of the vaccine for those for whom vaccination is recommended who have a medical card or GP visit card. Where the patient does not have a medical card or GP visit card, there is no charge for the actual vaccine as the vaccine is supplied free of charge to GP's by the HSE. The fee for administering the vaccine is a matter between the GP and the patient.

Health Services.

Dan Neville

Ceist:

15 Deputy Dan Neville asked the Minister for Health and Children the cost of a supplement (details supplied) to the Health Service Executive. [14815/09]

The supplement referred to by the Deputy was published at the request of the Health Service Executive (HSE). I have been advised by the HSE that, in its view, in the past mental illness was fraught with taboo and stigma, thanks to more awareness, openness, education and progressive treatments, things are changing. This supplement provided increased awareness as well as important information to both service users and the general public on mental health services available today.

The supplement also highlighted that with the right supports and lifestyle choices, such as controlling our stress and alcohol consumption, we can protect ourselves from some mental illnesses. It is important that the public are aware that the backbone of the HSE approach is to move away from institutions towards providing more care, using modern approaches, locally within people's own communities.

The supplement in the Sunday Independent of 22nd March 2009, "Vision for Change — Reshaping Mental Health in Ireland" is the third in a series of supplements which the HSE has sponsored. The mental health services in the HSE and their voluntary partners in mental health were invited to submit articles demonstrating the innovative work they were engaged in modernising the mental health services in line with the recommendations of A Vision for Change. The supplement is distributed via the Sunday Independent to over 300,000 readers and additional copies were retained for services users, carers, GPs, libraries and other community services on request. The total cost for the editorial, design, layout, printing and distribution of the supplement is €40,000 including 21.5% VAT which works out at .13 cent per copy.

The supplement was designed to acknowledge the innovative work and modern practice of mental health colleagues throughout the country and to showcase their efforts and encourage all services to adopt the more modern service approaches described in A Vision for Change. It is important for the public as service funders to understand that their investment in mental health bears a dividend and that service quality, choice and recovery are real options. For example as part of the HSE programme to build local care teams for every 10,000 people across the country, it is establishing teams of experts that will concentrate on providing community based mental health care. It is also establishing teams that will look after the mental health needs of children and adolescents. About one quarter of the population will experience a mental health difficulty at some stage in their life. 90% of the care they may ever need could be provided within their local communities.

The HSE believes that this supplement highlights some of the important developments taking place in Mental Health Services today in line with "A Vision for Change".

Hospital Services.

Willie Penrose

Ceist:

16 Deputy Willie Penrose asked the Minister for Health and Children if she will take steps to ensure a person (details supplied) in County Westmeath is admitted to hospital; and if she will make a statement on the matter. [14821/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply.

National Treatment Purchase Fund.

Michael Kennedy

Ceist:

17 Deputy Michael Kennedy asked the Minister for Health and Children her views on the offer of orthopaedic services under the National Treatment Purchase Fund from the Sports Surgery Clinic in Santry, Dublin; and if she will make a statement on the matter. [14834/09]

The National Treatment Purchase Fund (NTPF) has an agreement in place with the Sports Surgery Clinic in Santry, Dublin for the provision of orthopaedic procedures. I understand that the agreement does not guarantee a particular level of referral. A small number of patients have received surgery through the NTPF at the Clinic to date.

Health Repayment Scheme.

Dara Calleary

Ceist:

18 Deputy Dara Calleary asked the Minister for Health and Children when the health repayment scheme will be awarded to a person (details supplied) in County Mayo. [14842/09]

As this is a service matter it has been referred to the HSE for direct reply.

Dara Calleary

Ceist:

19 Deputy Dara Calleary asked the Minister for Health and Children when the health repayment scheme will be awarded to a person (details supplied) in County Mayo. [14843/09]

As this is a service matter it has been referred to the HSE for direct reply.

Health Services.

Fergus O'Dowd

Ceist:

20 Deputy Fergus O’Dowd asked the Minister for Health and Children the assistance which will be offered to children who suffer from Hirschsprung’s disease; and if she will make a statement on the matter. [14844/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply.

Finian McGrath

Ceist:

21 Deputy Finian McGrath asked the Minister for Health and Children if she will support the case of a person (details supplied) in Dublin 2. [14848/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply.

Ned O'Keeffe

Ceist:

22 Deputy Edward O’Keeffe asked the Minister for Health and Children if she will assist in having additional home help hours approved in respect of a person (details supplied) in County Cork who resides alone. [14860/09]

As this is a service matter it has been referred to the Health Service Executive for direct reply.

Parliamentary Questions.

Caoimhghín Ó Caoláin

Ceist:

23 Deputy Caoimhghín Ó Caoláin asked the Minister for Health and Children when a reply will issue from the Health Service Executive to Parliamentary Question No. 203 of 3 March 2009. [14865/09]

I am informed by the Health Service Executive that a reply issued to the Deputy on 23 March 2009.

Suicide Incidence.

Charlie O'Connor

Ceist:

24 Deputy Charlie O’Connor asked the Minister for Health and Children if she will confirm plans to provide for services dealing with the challenge of suicide; and if she will make a statement on the matter. [14873/09]

Reach Out — A National Strategy for Action on Suicide Prevention, provides a policy framework for suicide prevention activities in Ireland. Implementation of the strategy is the responsibility of the Health Service Executive.

Initiatives funded by the HSE's National Office for Suicide Prevention (NOSP) include developing and implementing national training programmes, completing the availability of self-harm services through A&E departments, implementing recommendations arising from a review of bereavement services, dedicated suicide officers, supporting voluntary organisations working in the field of suicide prevention and developing mental health awareness campaigns. It should also be emphasised that a range of services such as mental health and primary care services are important in helping to prevent suicide.

Once-off funding of €1m has been provided in 2009 for further suicide prevention initiatives which brings the total funding available to NOSP in 2009 to €4.3m. The funding will be used to develop campaigns aimed at young people and to further develop services for those bereaved by suicide.

Hospital Services.

Joanna Tuffy

Ceist:

25 Deputy Joanna Tuffy asked the Minister for Health and Children if her attention has been drawn to the difficulties faced by patients referred to St. Luke’s Hospital, Dublin, for radiotherapy treatment and the long delays they have to endure before having this treatment carried out; and if she will make a statement on the matter. [14875/09]

The matter raised by the Deputy relates to the provision of healthcare services and accordingly, I have asked the HSE to respond directly to the Deputy on the matter.

State Airports.

Finian McGrath

Ceist:

26 Deputy Finian McGrath asked the Minister for Transport if he will support a matter (details supplied). [14846/09]

The carriage of munitions of war, weapons into or through Irish airspace or into Irish airports is prohibited under the Air Navigation (Carriage of Munitions of War, Weapons and Dangerous Goods) Orders 1973 and 1989, unless an exemption has been issued by the Minister for Transport.

All applications under the above Orders by civilian aircraft are submitted to the Irish Aviation Authority (IAA) by my Department for their observations in respect of hazardous or dangerous goods or materials. The IAA ensures that all such requests are compliant with current safety regulations for the safe transport including packing of these goods by air as approved by International Civil Aviation Organisation (ICAO).

In considering whether to grant an exemption my Department also consults with the Departments of Justice, Equality and Law Reform, Defence and Foreign Affairs.

Limited quantities of dangerous goods may be carried into and through Irish airspace without special exemption under the provision of Annex 18 to the Chicago Convention and provided that they meet the limitations of the ICAO "Technical Instructions for the Safe Transport of Dangerous Goods by Air".

Foreign military aircraft may only land in or overfly Irish territory with the permission of the Minister for Foreign Affairs.

Pension Provisions.

Finian McGrath

Ceist:

27 Deputy Finian McGrath asked the Minister for Transport if he will support a matter (details supplied). [14852/09]

The Irish Airlines (General Employees) Superannuation Scheme is a multi-employer scheme in which the Dublin Airport Authority, Aer Lingus and SR Technics participate.

Pension entitlements under this scheme are primarily matters for the Trustees, the members of the scheme and the companies participating in the schemes and I have no function in the matter or in the other issues raised by the Deputy.

Proposed Legislation.

Michael McGrath

Ceist:

28 Deputy Michael McGrath asked the Minister for Transport when he will publish the Public Transport Regulation Bill; the implications of the Bill for the existing public transport service providers, both financially and operationally; the implications for existing public transport services provided to the general public; and if he will make a statement on the matter. [14862/09]

In January 2009, the Government approved the General Scheme of the Public Transport Regulation Bill which contains proposals for a new bus licensing regime which will replace the Road Transport Act 1932, which applies to the licensing of private bus operators, and the provisions of the Transport Act 1958 that relate to the provision of bus services by the State bus companies. In accordance with the Programme for Government commitment, the proposed licensing regime will provide a level playing field for all bus market participants.

The new licensing structure will apply in respect of all commercial bus passenger services, including those provided by Dublin Bus and Bus Éireann. It will establish a clear structure against which applications for bus route licences will be considered as well as a modern system of penalties and associated powers for revocation of licences.

The General Scheme of the Bill also contains proposals for extending nationally the provisions of the Dublin Transport Authority Act 2008 in relation to the provision of public service obligations that are consistent with EU Regulation No. 1370/2007 on public passenger transport services by rail and by road. The Regulation creates a framework regulating how exclusive rights are to be awarded and compensation paid for services deemed to be ‘public service obligations' on a transparent basis. The Regulation will put into effect for the first time in Irish transport law a contracting regime to govern public service obligations. Future growth in the market for subvented transport services will also be pursued by way of open tendering processes in accordance with the EU Regulation.

The Bill will assign responsibility to the Dublin Transport Authority for bus route licensing and public transport services contracts nationwide and provide for the amalgamation of the Commission for Taxi Regulation into the DTA, as well as the renaming of the DTA as the National Transport Authority given its proposed national focus in relation to commercial bus licensing, bus and rail subvention and the regulation of small public service vehicles.

In the light of the Government approval of the General Scheme of the Public Transport Regulation Bill, the Bill is now being drafted and it will be published as soon as possible.

Coast Guard Service.

Fergus O'Dowd

Ceist:

29 Deputy Fergus O’Dowd asked the Minister for Transport the number of volunteers in the coast guard here by location; and if he will make a statement on the matter. [14878/09]

I refer the Deputy to my previous answer to Parliamentary Question 193 of the 4th February 2009, which stated the number of Volunteers in each Coast Guard Station. The position remains unchanged, except for one retirement at the Youghal Station.

Proposed Legislation.

Olwyn Enright

Ceist:

30 Deputy Olwyn Enright asked the Minister for Justice, Equality and Law Reform when legislation to deal with management companies will be brought before Dáil Éireann; if there is a timeframe within which to have same completed; and if he will make a statement on the matter. [14824/09]

Legislation to address the Law Reform Commission's recommendations on multi-unit developments is in the course of being drafted by the Parliamentary Counsel as a matter of priority. The aim is to publish the Bill in the next Session.

The principal focus of the new Bill will be on ensuring good governance of property management companies and similar bodies which comprise the owners of units within multi-unit developments and which exercise management functions in relation to such developments. It is also intended to include provisions for the resolution of disputes arising in relation to such matters. The policy aspects extend to my Department, the Department of Enterprise, Trade and Employment and the Department of the Environment, Heritage and Local Government.

Road Closures.

Seymour Crawford

Ceist:

31 Deputy Seymour Crawford asked the Minister for Justice, Equality and Law Reform the number of times the national primary road, known as a concession road, between Clones and Cavan has been closed for security reasons during the past 12 months; the length of time it has been closed on each occasion; the contact made between him and his opposite number in Northern Ireland-UK in order that he can make a joint approach to deal with those responsible and minimise the inconvenience caused; the position in relation to the same issue regarding the national primary road from Clones through Northern Ireland and Enniskillen to Donegal in view of the fact that this road has also been closed for similar reasons; and if he will make a statement on the matter. [14788/09]

I understand that the closure of the roads in question arose in the context of security operations and, as it is not the policy of An Garda Síochána to disclose security information, I am not in a position to give further information to the Deputy on the details surrounding closures. I can say, however, that close co-operation exists at all levels between An Garda Síochána and its counterparts in Northern Ireland in the context of countering and investigating the activities of groups which pose a security threat.

I have also discussed security matters with the Secretary of State for Northern Ireland and Minister of State for Northern Ireland on a number of occasions in recent months, and I met most recently with the Secretary of State in the immediate aftermath of the fatal terrorist attacks in Antrim and Craigavon. The two Governments are united in our absolute determination to combat the continuing threat posed by dissident republican groups.

Grant Payments.

Ned O'Keeffe

Ceist:

32 Deputy Edward O’Keeffe asked the Minister for Justice, Equality and Law Reform if a grant is available from his Department to cover a matter (details supplied). [14802/09]

I have been informed by the Garda authorities that voluntary groups, including the group referred to by the Deputy, assist An Garda Síochána, from time to time, in search and rescue operations. While such community spirit displayed by these organisations is invaluable and has, on many occasions, assisted in achieving successful outcomes, An Garda Síochána does not, however, have a grant available to any voluntary grouping for the purpose proposed.

Garda Stations.

Michael Creed

Ceist:

33 Deputy Michael Creed asked the Minister for Justice, Equality and Law Reform the latest position of the proposed construction of a new Garda station (details supplied) in County Cork; and if he will make a statement on the matter. [14833/09]

Under the Capital Works Programme Framework, all public sector construction projects are required to comply with ‘New Conditions of Contract for Public Works Contracts'. It is necessary, therefore, for the Office of Public Works to re-tender for the construction project referred to by the Deputy. I am advised that the tender documentation is currently being revised to comply with the new form of tender. The award of a contract will be subject to the availability of funding for Garda Building Projects.

Security Industry.

Bobby Aylward

Ceist:

34 Deputy Bobby Aylward asked the Minister for Justice, Equality and Law Reform if he will liaise with the Private Security Authority on the matter of the annual fee paid to them by persons employed in the security industry; and if he will ask them to consider reducing or waiving the fee for self employed persons in the current economic climate in view of the fact that they also pay an annual fee to the National Standards Authority; and if he will make a statement on the matter. [14841/09]

The Private Security Authority, established under the Private Security Services Act 2004 is the regulatory body with responsibility for regulating and licensing the private security industry in the State. The Authority is an independent body under the aegis of the Department of Justice, Equality and Law Reform. My Department has no role, therefore, in the issuing of private security licences. This is a matter for which the Private Security Authority has sole statutory responsibility. It would be inappropriate for me to interfere in the exercise of these statutory functions.

I am informed by the Authority that the current licence fee structure, in so far as it applies to self-employed contractors, reflects the differences which exist between the different sectors within the private security industry. It comprises of two elements, an administration fee of €1,000 and a turnover fee based on the annual turnover of a contractor. The licence issued by the Authority is valid for a two year period.

While the provision of a regulatory environment for the industry understandably leads to structured cost implications, the Authority is currently monitoring and reviewing the licence fee structure for contractors. However, any revision of fees will have to comply with Government policy, which seeks to ensure that regulation be funded by the industry.

Departmental Appointments.

Finian McGrath

Ceist:

35 Deputy Finian McGrath asked the Minister for Justice, Equality and Law Reform the reason a tender competition was held to appoint presenting officers to attend hearings of the Refugee Appeals Tribunal; the further reason existing civil service resources were not deployed to deal with outstanding cases; the budget for this project; the length of time this panel will last; the number of cases that it will deal with; if he is satisfied that this is a cost efficient way of the State being represented at hearings rather than using civil service resources; the reason this tender was not advertised on the public procurement e-tender site; if he is further satisfied that the Codes of Practice of the Commission for Public Appointments was fully adhered to; the breakdown of the expenses and fees paid to each member of the assessment board; the way these were calculated; if he will name the 42 successful applicants detailing if they are barristers, solicitor or legal graduates; if these persons will be accompanied to hearings of the Refugee Appeals Tribunal by officials of his Department or the Office of the Refugee Applications Commissioner; if he has consulted or will consult with the Revenue Commissioner or the Department of Social and Family Affairs on the PRSI and tax treatment of the successful applicants to ensure his Department complies with its various responsibilities; and if he will make a statement on the matter. [14850/09]

I refer the Deputy to my replies to Parliamentary Questions 232 of 3 March and 270 of 31 March, 2009 which are relevant to this question also.

The background to the holding of the competition in question involves a Supreme Court judgement in the case of Atanasov in July 2006 which required the Refugee Appeals Tribunal to provide greater access to past decisions of the Tribunal for the purpose of assisting legal representatives with the preparation of appeals on behalf of applicants for refugee status. In the immediate aftermath of that decision a considerable backlog of some 1,500 cases built up in the Tribunal while new access arrangements were being put in place. While these arrangements are now fully operational, the backlog still requires to be cleared off by means of oral appeals hearings.

The speedy clearance of the backlog of cases in the Tribunal is essential in the context of both the number of appeals on hands but particularly in the context of the planned implementation of the Immigration, Residence and Protection Bill 2008, as it will allow for a considerably greater number of appeals to be cleared by the Tribunal prior to the coming into effect of the new processes provided for in the Bill. As the Deputy will be aware, the Bill which is currently awaiting Report Stage in Dáil Éireann, provides for the functions currently undertaken by the Tribunal to be taken over by a new body, the Protection Review Tribunal (PRT) which will have expanded responsibilities to consider not only appeals in respect of refugee status, but also appeals in respect of subsidiary protection. The new Tribunal will also, under the transitional arrangements provided for in the Bill, have responsibility for dealing with appeals on hand in the existing Tribunal which will continue to be dealt with under the existing legislative framework. There are therefore obvious and very practical reasons for clearing cases in the old system as quickly as possible, so that Members of the new Tribunal will be able to focus on the new legislative framework coming forward under the Bill.

I would also add that there are significant costs associated with maintaining appellants in RIA accommodation and providing other relevant services. Therefore, there is a considerable financial saving to be made by processing these cases as quickly as possible.

Under the Refugee Act 1996, provision is made for the Refugee Applications Commissioner to be represented at appeals hearings before the Refugee Appeals Tribunal. This is to ensure, inter alia, that the Tribunal Member is fully aware of the Commissioner's reasons for not recommending that an applicant be granted refugee status. This representational work is currently carried out by 14 Presenting Officers at Higher Executive Officer level, some of which workshare, in the Commissioner's Office. Bearing in mind the considerations outlined above, following an analysis of the possible options available for clearing the backlog as quickly as possible, which included the possibility of the existing Presenting Officers undertaking the work, it was decided that the establishment of the Presenting Panel of persons to be paid on a fee per case completed basis, was the most cost effective and time efficient method. Given the challenging and complex nature of the work in question and the considerable preparation required in advance of appeals hearings, redeploying other staff from within the Commissioner's Office to undertake the work was not possible.

The Presenting Panel will remain in place until the backlog in question has been cleared. The estimated maximum cost of servicing this backlog was €450,000 at the time when the Panel was established. However, as indicated in my reply to PQ 270 of 31 March, 2009, the Government Decision relating to professional fees has been applied to the schedule of fees to be paid to Panel Members which will serve to reduce the costs involved. I am satisfied that the establishment of the Panel is a cost efficient use of resources, particularly when account is taken of my earlier comment regarding the significant costs associated with maintaining asylum seekers while in Ireland.

Persons appointed to the panel are not civil servants and are not employees of either the Commissioner or the Department. They are service providers and are paid on a fee per case completed basis. Having said that, the Commissioner ensured that current best recruitment practice was used in the process, including public advertisement (on the Office of the Refugee Application Commissioner‘s website and in the national press and details provided to the Bar Council and Law Society) followed by shortlisting and interview. As regards taxation matters, withholding tax is applied to all payments to panel members and they are required to have a current tax clearance certificate.

With regard to the breakdown of expenses and fees paid to members of the assessment board, I would refer the Deputy to my reply to Parliamentary Question no. 232 of 3 March, 2009.

The details requested in relation to the members of the Panel are set out in Table 1. The Refugee Applications Commissioner has informed me that on taking up their duties on the Panel and as part of the induction training provided, Panel members were accompanied to their first appeal hearing by an experienced Presenting Officer. Since then they are not accompanied to hearings but have access to the advice of the Commissioner's staff in the Presenting Unit as and when required.

Table 1 — Members of the ORAC Presenting Panel

Name

Qualification

1. Ciara Bradshaw

Barrister at Law, Kings Inns

2. Finbar O’Connor

Barrister at Law, Kings Inns

3. Mary Feeney

Barrister at Law, Kings Inns

4. Eanna Hickey

Barrister at Law, Kings Inns

5. Sile Rooney

Barrister at Law, Kings Inns

6. Owen Donnelly

Barrister at Law, Kings Inns

7. Elizabeth Donovan

Barrister at Law, Kings Inns

8. Brian Conroy

Barrister at Law, Kings Inns

9. Nicholas Hosey

Barrister at Law, Kings Inns

10. Ciaran Smith

Barrister at Law, Kings Inns

11. Catriona McDonagh

Barrister at Law, Kings Inns

12. Kevin Callan

Barrister at Law, Kings Inns

13. Peter O’Sullivan

Barrister at Law, Kings Inns

14. Katherine Mahon

Barrister at Law, Kings Inns

15. Martina Jackson

Barrister at Law, Kings Inns

16. Lucy Scaife

Barrister at Law, Kings Inns

17. Conal Ellis

Barrister at Law, Kings Inns

18. Lalita Morgan Pillay

Barrister at Law, Kings Inns

19. Deirdre Creighton

Barrister at Law, Kings Inns

20. Niamh McGowan

Barrister at Law, Kings Inns

21. Helen Johnson

Barrister at Law, Kings Inns

22. Kevin Healy

Barrister at Law, Kings Inns

23. Cathy Cruess Callaghan

Barrister at Law, Kings Inns

24. Susie O’Brien

Barrister at Law, Kings Inns

25. Ciara Durnin

Barrister at Law, Kings Inns

26. Sonya Donnelly

Barrister at Law, Kings Inns

27. Geraldine Biggs

Barrister at Law, Kings Inns

28. Paul Hughes

Barrister at Law, Kings Inns

29. Garth Fitzmaurice

Barrister at Law, Kings Inns

30. Erica Coughlan

Barrister at Law, Kings Inns

31. Patricia O’Sullivan

Barrister at Law, Kings Inns

32. Nicola Malone

Barrister at Law, Kings Inns

33. Sarah Lalor

Bachelor of Laws, (BL) TCD

34. Deirdre Gallagher

Bachelor of Laws (LLB) NUIG

35. Darrelle Conway

Bachelor of Laws (LLB) NUIG

36. Deirdre Fallon

Bachelor of Business & Legal Studies, UCD

37. Wayne Costello

BCL, UCC

38. Frank McNamara

Bachelor of Laws (LLB) NUIG

39. Hilda Clare O’Shea

Solicitor

40. Kevin Gallager

Solicitor

41. James McMahon

Solicitor — BCL UCD

Proposed Legislation.

Thomas Byrne

Ceist:

36 Deputy Thomas Byrne asked the Minister for Justice, Equality and Law Reform his plans for further legislation to stem and prevent crime here. [14855/09]

Legislation clearly has an important role to play in the fight against crime and this Government has not been found wanting in bringing forward legislation that updates our law and that enables us to gain maximum benefit from new technology. I would draw the Deputy's attention to, for example, the new legislation I expect to publish soon that will provide for the establishment of a comprehensive DNA database. This database will not only provide the Gardaí with an enhanced intelligence resource, it will also lead to greater efficiency in the use of Garda time and resources. The Deputy will also be aware of my plans to introduce new legislation on covert surveillance and money laundering.These and several other similar developments in recent years, ensure we are in a position to respond to new patterns of crime.

While legislation represents a necessary and vital part of our response, as a Government we have also recognised that a multifaceted approach to the problem of crime is required. As a result, we have undertaken extensive development and modernisation programmes such as the major package of Garda reforms, the extensive prison building and improvement programmes, with additional educational and training programmes, as well as the enhanced, targeted intervention by the Probation Services, to mention but some aspects of the Government's response to crime within my area of responsibility.

While I will continue to support a strong legislative response, I will also continue to bring forward measures that will divert people, especially young people, from crime and prevent it from getting a hold over communities. In this regard, I would mention the White Paper on Crime, the preparation of which I announced earlier this year. It provides us with an opportunity to undertake a far reaching review and it will chart a framework for criminal justice policy in the longer term.

Deportation Orders.

Catherine Byrne

Ceist:

37 Deputy Catherine Byrne asked the Minister for Justice, Equality and Law Reform the status of an application for subsidiary protection by a person (details supplied) in Dublin 8; the length of time this person is entitled to remain in the State; and if he will make a statement on the matter. [14866/09]

The person concerned applied for asylum on 24 April 2001. His application was refused following consideration of his case by the Office of the Refugee Applications Commissioner and, on appeal, the Refugee Appeals Tribunal.

Subsequently, in accordance with Section 3 of the Immigration Act, 1999 (as amended), the person concerned was informed, by letter dated 22 May 2003, that the Minister proposed to make a Deportation Order in respect of him. He was given the options, to be exercised within 15 working days, of leaving the State voluntarily, of consenting to the making of a Deportation Order or of making representations to the Minister setting out the reasons why he should be allowed to remain temporarily in the State. Representations were received on his behalf. Following consideration of his case, under Section 3(6) of the Immigration Act, 1999 (as amended) and Section 5 of the Refugee Act, 1996 (as amended) on the prohibition of refoulement, a Deportation Order was signed in respect of the person concerned on 12 March 2004. Notice of this Order was served by registered letter dated 20 April 2004 requiring the person concerned to present himself to the Garda National Immigration Bureau (GNIB) on a specified date in order to make travel arrangements for his deportation from the State. The person concerned failed to ‘present' as required and was therefore classified as a person who was evading his deportation. This position continued to obtain for more than three years.

The person concerned, through his legal representative, subsequently lodged a request under Regulation 4(2) of the European Communities (Eligibility for Protection) Regulations 2006 (S.I. No. 518 of 2006) seeking the permission of the Minister to make an application for Subsidiary Protection in the State in accordance with those Regulations which came into force on 10 October 2006. This request was approved following which the person concerned formally applied for Subsidiary Protection in the State. This application is under consideration at present. When consideration of this application has been completed, the person concerned will be notified in writing of the outcome.

The person concerned remains the subject of a valid Deportation Order. However, the Deputy may be assured that this Order will not be enforced pending the determination of the Subsidiary Protection application.

Visa Applications.

Catherine Byrne

Ceist:

38 Deputy Catherine Byrne asked the Minister for Justice, Equality and Law Reform the status of an application for family reunification by a person (details supplied); when a decision will be made in this case; and if he will make a statement on the matter. [14867/09]

I am informed by the Immigration Division of my Department that the person referred to by the Deputy made a Family Reunification application in March 2007 on behalf of her son and her daughter and that a decision issued to the person in question on 21st January 2009.

Arts Funding.

Seymour Crawford

Ceist:

39 Deputy Seymour Crawford asked the Minister for Arts, Sport and Tourism the role his Department has in the oversight and running of a centre (details supplied) in County Monaghan; the annual funding made available from his Department towards this all Ireland centre; and if he will make a statement on the matter. [14791/09]

The Arts Council operates the centre in question jointly with the Northern Ireland Arts Council as a cross-border initiative. The Arts Council is a statutorily independent body, funded by my Department and independent in its day-to-day operations, and I have no role to play in relation to its funding decisions. My Department is not involved in either the funding or operation of this facility.

Sports Capital Programme.

Pat Rabbitte

Ceist:

40 Deputy Pat Rabbitte asked the Minister for Arts, Sport and Tourism when the five year strategic plan to inform the future development of sporting facilities will be completed and published; the way, in the event of payments not being made under the sports capital programme during 2009, it is intended to allocate revenue from lottery ticket sales under section 5(1) of the National Lottery Act 1986; and if he will make a statement on the matter. [14864/09]

Work on the five-year National Sports Facilities Strategy is at an advanced stage of preparation in my Department. It is my intention to publish the strategy once it has been completed and considered by the Government.

A provision of €56m has been made in the Vote of the Department for 2009 under subhead C1 for the payment of grants for sporting bodies and the provision of sports and recreational facilities, which includes the Sports Capital Programme. This provision is intended to meet commitments made under the Sports Capital Programme in 2008 and previous years. While the distribution of monies under the National Lottery Act is a matter for the Minister for Finance I would point out that the €56m provided to my Department is part funded from the proceeds of the National Lottery.

Tourism Industry.

Olwyn Enright

Ceist:

41 Deputy Olwyn Enright asked the Minister for Arts, Sport and Tourism the number of inquiries made under the mid-Shannon tourism investment scheme; the number of applications for the scheme; and if he will make a statement on the matter. [14879/09]

The Mid-Shannon Tourism Infrastructure Investment Scheme, which was introduced in section 29 of the Finance Act 2007 and launched in June 2008, provides tax incentives for investment in tourism attractions and facilities in the designated Mid-Shannon Corridor. The approval and certification of projects under the Scheme is a matter for the Mid-Shannon Tourism Infrastructure Board in accordance with the guidelines issued by the Minister for Arts, Sport and Tourism in consultation with the Minister for Finance.

The Mid-Shannon Board and the executive teams within Fáilte Ireland and Shannon Development have extensively promoted the Scheme since its commencement date. Information seminars have been held with industry groups throughout the targeted region and local authorities have also been engaged to ensure their support for the Scheme and projects that might result from it.

I am advised that the executive teams have received a wide range of enquiries and expressions of interest from industry practitioners and are actively working with up to 15 promoters to bring projects to the application stage. To date there have been no formal applications to the Board.

Grant Payments.

Seymour Crawford

Ceist:

42 Deputy Seymour Crawford asked the Minister for Community, Rural and Gaeltacht Affairs if he will re-introduce the grant towards the three-phase electricity supply to agricultural and small industries in rural areas; if so, when he expects it would commence; and if he will make a statement on the matter. [14785/09]

The Farm Electrification Grants Scheme to Disadvantaged Areas is still open for applications for both single phase and 3-phase supply.

Against the background of the current economic climate I am reviewing the CLÁR programme as a whole, having regard to demand, the funding available and the level of outstanding commitments. In this context, I will consider the reintroduction of a modified single to three-phase electricity conversion measure when circumstances allow.

Designated Areas.

Willie Penrose

Ceist:

43 Deputy Willie Penrose asked the Minister for Community, Rural and Gaeltacht Affairs if he will take the appropriate steps to have a geographical area (details supplied) in County Westmeath included in the designated RAPID areas in view of the fact that it fulfils all the necessary eligibility criteria for such inclusion; and if he will make a statement on the matter. [14820/09]

In terms of reviewing the RAPID programme, my attention at present is focused on an analysis of recent Census data with a view to ensuring that the boundaries of existing RAPID areas are appropriate.

I hope to be able to make an announcement in relation to this matter shortly.

Local Development Social Inclusion Programme.

Caoimhghín Ó Caoláin

Ceist:

44 Deputy Caoimhghín Ó Caoláin asked the Minister for Community, Rural and Gaeltacht Affairs the reason that Meath Partnership has no social inclusion scheme or personnel in place as part of its remit. [14857/09]

The process of awarding the new LDSIP contract to the company mentioned by the Deputy, which will apply to the whole county of Meath, has not yet been completed. My Department, in conjunction with Pobal, is seeking to finalise some issues with the process of awarding the contract and I am hopeful that this can be brought to a conclusion shortly.

Social and Affordable Housing.

Brian O'Shea

Ceist:

45 Deputy Brian O’Shea asked the Minister for the Environment, Heritage and Local Government his views on the proposals to protect the most vulnerable citizens here as outlined in correspondence (details supplied). [14810/09]

My Department's commitment to supporting the voluntary and co-operative housing sector as part of our overall approach to meeting housing need remains strong and I welcome the valuable contribution made by the sector in recent years in helping to meet the ambitious targets for social housing set out under Towards 2016.

Under the social housing investment programme (SHIP) local authorities have traditionally met social housing needs mainly through the construction of housing in local authority estates. In recent years the supply channels have been expanded to include an increased number of acquisitions, in particular under Part V agreements, and through arrangements with private landlords under the Rental Accommodation Scheme. At the same time there has also been a significant expansion in the volume of accommodation provided by voluntary and co-operative housing bodies.

As part of a further restructuring of the SHIP, I recently announced new arrangements for the delivery of social housing under which housing authorities may enter into long-term leases of private dwellings as a means of meeting housing need. The new leasing initiative, under which authorities will procure properties on long term leases of 10 to 20 years, is designed further to widen the sources of supply and thereby help create a flexible range of delivery mechanisms for local authorities to meet social housing needs.

The use of leasing arrangements will allow for a substantial increase in the number of households who will have their housing needs met compared with what would otherwise be possible were the €20 million to be provided for the initiative in 2009 to be used to fund additional build/acquisition programmes. It is expected that through this measure at least 2,000 additional homes will be procured this year, and I certainly see potential for voluntary and cooperative housing bodies to play a role under the initiative.

In relation to Building Energy Rating (BER) Certificates, the European Communities (Energy Performance of Buildings) Regulations 2006-2008, which transposed the EU Directive on the Energy Performance of Buildings into Irish Law, require a building of any class which is offered for sale or letting since 1 January 2009 to have a BER Certificate, unless otherwise exempted by the Regulations.

Article 10 of the Directive requires Member States to ensure that the certification of buildings is carried out in an independent manner. For this reason Sustainable Energy Ireland's mandatory Code of Practice for Registered BER Assessors specifically prohibits a registered BER assessor from undertaking a BER assessment on a building which is owned by the assessor or by a connected person (defined to include employment relationships). Consequently, a registered BER assessor who is employed by a voluntary housing agency may not undertake a BER assessment for a building owned by the agency. It should however be noted that the Regulations do not prevent BER assessors from conducting BER assessments for other parties, including assessors from other voluntary housing agencies.

Water and Sewerage Schemes.

Phil Hogan

Ceist:

46 Deputy Phil Hogan asked the Minister for the Environment, Heritage and Local Government if he will confirm that the necessary finance to proceed with sewerage schemes at Johnstown, Freshford and Goresbridge, County Kilkenny is available for work to commence in 2009 as announced some months ago; and if he will make a statement on the matter. [14766/09]

The Freshford/Johnstown/Goresbridge Sewerage Scheme is included in my Department's Water Services Investment Programme 2007-2009 at an estimated cost of €7.9 million. I approved the Preliminary Report for the scheme last November and it is now a matter for Kilkenny County Council to progress the preparation of contract documents.

Social and Affordable Housing.

Bobby Aylward

Ceist:

47 Deputy Bobby Aylward asked the Minister for the Environment, Heritage and Local Government if he will approve the application (details supplied) to transfer ten houses to Kilkenny County Council under Part V of the Planning and Development Act 2000 in view of the fact that this application is with his Department for some time. [14772/09]

Approval issued to Kilkenny County Council on 3 April 2009 in relation to this proposal.

Paul Kehoe

Ceist:

48 Deputy Paul Kehoe asked the Minister for the Environment, Heritage and Local Government if, with regard to section 96 of the Planning and Development Act 2000 on the provision of social and affordable housing, he has satisfied himself that the county councils have sufficient finance to acquire the 20% of the various developments that are underway in each county; if any county council has notified him that they do not have enough money to pay developers as part of their compliant requirement of Part V of the Planning and Development Act 2000; and if he will make a statement on the matter. [14773/09]

My Department met with each local authority in early March as part of the annual Housing Action Plan process. The purpose of these meetings was to discuss the direction and content of authorities' proposed Social Housing Investment Programmes, including Part V social housing, and particularly to consider the prioritisation of projects and the reconfiguration of the programme as a whole, so that it can be sustained and consolidated in the changed economic and budgetary circumstances.

On foot of information furnished in the course of this round of Action Plan meetings I am considering the 2009 Social Housing Investment Programme allocations, including funding for Part V social housing, and these should be announced in the coming weeks.

Based on these allocations it will be a matter for housing authorities to finalise their plans for the composition, management and delivery of their programmes, taking into account existing commitments, identifying priority projects and proposals and providing a time line for delivery and a sustainable funding plan for each project and their programme as a whole.

The acquisition of affordable housing under Part V pending its onward sale to affordable purchasers is funded by means of borrowings through the Housing Finance Agency.

Local Authority Housing.

Jan O'Sullivan

Ceist:

49 Deputy Jan O’Sullivan asked the Minister for the Environment, Heritage and Local Government if people in local authority rented accommodation can qualify for grants provided by his Department for people with disabilities and older persons; if there is a means by which such people can have central heating installed in their homes if they are not living in an area in which there is a scheme in place to provide this facility; and if he will make a statement on the matter. [14780/09]

Under the Housing Management Initiative, from 1 January 2007, local authorities were given direct control over their Internal Capital Receipts from the sale of local authority dwellings, subject to certain conditions, to be used primarily for planned maintenance programmes and the improvement of their housing stock. Improvements necessary to facilitate older people or people with a disability would generally fall to be progressed under these arrangements.

Funding is also provided to local authorities by my Department for the installation of central heating and energy efficiency improvement measures for local authority stock. The National Central Heating Programme 2004-2008 has, to date, seen the installation of central heating, and associated insulation and energy efficiency improvements, in some 26,000 local authority dwellings. Exchequer funding of some €125 million has been provided, on a co-funding basis, to support this ambitious programme, with a further €12 million to be provided in 2009 to complete the installation of the 2,100 units commenced in 2008.

The central heating programme, which ends this year, has substantially addressed the stock of local authority dwellings without any form of central heating and is being replaced with a programme further to improve the energy efficiency of local authority stock. Announced as part of a national initiative to improve the energy efficiency of the Irish housing stock, this programme is designed to improve the energy rating of local authority dwellings due to be re-let and to enhance overall energy efficiency in local authority apartment complexes. The funding to be made available for these purposes will be finalised following the publication of the Revised Estimates for Public Services 2009.

Seymour Crawford

Ceist:

50 Deputy Seymour Crawford asked the Minister for the Environment, Heritage and Local Government when he will allow Monaghan Town Council to deal with phase two of the Mullaghmatt restoration scheme; his views on whether this is a structure that will in turn not only facilitate the residents concerned but also the many builders, plumbers, electricians and so on; and if he will make a statement on the matter. [14784/09]

My Department continues to work closely with Monaghan Town Council on the delivery of its ambitious remedial works project at Mullaghmatt. Following completion of the initial pilot phase, approval was given in October 2007 to proceed to tender for the refurbishment of a further 60 houses. A report on the procurement process was received by my Department in February 2009 and is being considered. The funding to be made available for this project is subject to Departmental approval of the tender price, and will be finalised following the publication of the Revised Estimates for Public Services 2009.

Local Authority Funding.

Sean Fleming

Ceist:

51 Deputy Seán Fleming asked the Minister for the Environment, Heritage and Local Government the allocation on a local authority basis from his Department for 2008 and the recoupment by each local authority in 2008 in respect of the disabled persons grant scheme, essential repairs grant scheme, disability housing grant, mobility aid grant and housing aid for older people; and if he will make a statement on the matter. [14792/09]

The Housing Adaptation Grant Schemes for Older People and People with a Disability are funded by 80% recoupment from my Department together with a 20% contribution from the resources of the local authority. In the case of the old Disabled Persons and Essential Repairs Grants these were funded by 67% recoupment from my Department together with a 33% contribution from the resources of the local authority. The detailed administration of the schemes, including the assessment and approval of applications, are the responsibility of the appropriate local authority.

Details of the combined Exchequer/local authority expenditure allocations in 2008 together with details of the amounts recouped to local authorities by my Department under the old Disabled Persons and Essential Repairs Grants and the new Housing Adaptation Grant Schemes for Older People and People with a Disability are set out in the following table.

Local Authority

Combined Expenditure Allocations

Exchequer Recoupment

Carlow Co. Co.

2,210,243

1,534,923

Cavan Co. Co.

2,263,429

1,568,060

Clare Co. Co.

2,994,391

2,100,790

Cork Co. Co.

8,190167

5,784,957

Donegal Co. Co.

4,498,646

3,112,498

Dun Laoghaire/Rathdown Co. Co.

2,363,216

1,692,890

Fingal Co. Co.

1,810,511

1,331,236

Galway Co. Co.

2,507,826

1,671,884

Kerry Co. Co.

3,438,930

2,320,709

Kildare Co. Co.

2,717,064

1,822,582

Kilkenny Co. Co.

842,574

596,350

Laois Co. Co

2,644,159

1,829,228

Leitrim Co. Co.

1,899,501

1,310,551

Limerick Co. Co.

1,694,938

1,190,035

Longford Co. Co.

1,370,815

966,847

Louth Co. Co.

3,003,308

2,030,581

Mayo Co. Co.

2,873,236

2,011,125

Meath Co. Co.

4,925,214

3,283,476

Monaghan Co. Co.

2,091,780

1,470,218

North Tipperary Co. Co.

2,098,483

1,432,124

Offaly Co. Co.

1,490,016

993,344

Roscommon Co. Co.

2,352,706

1,579,457

Sligo Co. Co.

683,521

493,490

South Dublin Co. Co.

4,366,756

2,975,713

South Tipperary Co. Co.

1,899,916

1,358,885

Waterford Co. Co.

2,198,353

1,690,822

Westmeath Co. Co.

1,928,541

1,361,958

Wexford Co. Co.

2,325,647

1,656,321

Wicklow Co. Co.

2,045,305

1,416,332

Cork City Co.

2,159,250

1,546,070

Dublin City Co.

13,500,685

9,227,259

Galway City Co.

1,319,395

922,136

Limerick City Co.

1,099,910

791,513

Waterford City Co.

662,286

481,126

Sligo Borough Co.

414,376

300,894

Water and Sewerage Schemes.

Bernard Allen

Ceist:

52 Deputy Bernard Allen asked the Minister for the Environment, Heritage and Local Government if he has received a request for funding to connect the residents of Clash and Well Road, Little Island, County Cork, to the waste water treatment plant nearby; when the request was submitted; and when a decision will be made on the funding request. [14807/09]

The Little Island Sewerage Scheme, which will serve the Clash and Well Road areas, is approved for funding under my Department's Water Services Investment Programme 2007-2009 at a cost of €1.76 million. My Department approved Cork County Council's design review report in 2007 and I understand that the Council is currently seeking tenders for the scheme.

Local Authority Housing.

Caoimhghín Ó Caoláin

Ceist:

53 Deputy Caoimhghín Ó Caoláin asked the Minister for the Environment, Heritage and Local Government further to Parliamentary Question No. 893 of 24 March 2009, if a decision has been made to pass on in full the European Central Bank interest rate cut of 0.5%, announced on 5 March 2009, to local authority mortgage holders; when he anticipates a decision will be reached in relation to the 0.25% cut announced on 2 April 2009; and if he will make a statement on the matter. [14831/09]

I refer to the reply to Question No. 893 of 24 March 2009. In general, following consideration by the Board of the Housing Finance Agency (HFA) the rates charged to local authority borrowers are normally adjusted by the Board, in line with movements in European Central Bank (ECB) rates. However, given that the correlation between ECB rates and interbank rates (i.e. the rates at which the Agency itself borrows) is atypical and volatile at present, the Agency, in responding to movements in ECB rates, must give careful consideration, on each occasion, to the fluctuating relationship between its lending rates and the cost of funds.

The Agency notified local authorities last month of its decision to pass on, in full, the 0.5% decrease announced by the ECB on 5 March. The effective rate for local authority borrowers from 1 May 2009 is 2.5% — a cumulative rate decrease since October 2008 of 2.75%.

While it is hoped that it will be possible to pass on the further 0.25% cut announced by the ECB on 2 April, as with previous rate reductions, it will be necessary closely to monitor the impact of the cut on interbank rates before a decision can be made. I anticipate that, in common with the situation following the previous cuts which were passed on in full to local authority borrowers, the position in relation to possible movement in the HFA's lending rates should be clear within a number of weeks.

Proposed Legislation.

Finian McGrath

Ceist:

54 Deputy Finian McGrath asked the Minister for the Environment, Heritage and Local Government if he will support the needs of an association (details supplied) in the Housing (Miscellaneous Provisions) Bill 2008. [14851/09]

I have been in correspondence with the association in question in relation to the Housing (Miscellaneous Provisions) Bill 2008 and I have noted their suggested amendments which will be examined as part of the consideration of the Bill during its passage through the Oireachtas.

Water and Sewerage Schemes.

John O'Mahony

Ceist:

55 Deputy John O’Mahony asked the Minister for the Environment, Heritage and Local Government when he will progress the treatment plant for a sewerage scheme (details supplied) in County Mayo; and if he will make a statement on the matter. [14861/09]

The Kiltimagh Sewerage Scheme is included for funding in my Department's Water Services Investment Programme 2007-2009.

Mayo County Council's tender recommendation for the proposed wastewater treatment plant is currently being examined by my Department.

Social and Affordable Housing.

Michael McGrath

Ceist:

56 Deputy Michael McGrath asked the Minister for the Environment, Heritage and Local Government when a decision will be made on an application by a local authority (details supplied) in County Cork. [14863/09]

An application by Cork County Council for approval to proceed with the project at Fellowship House, Spur Hill, under the Capital Assistance Scheme was received in my Department on 24 February 2009 and has since been examined. Having regard to the existing high level of commitments under the Capital Assistance Scheme, it is not possible to approve the project at this time. The application will be kept under review with a view to approving it at the earliest possible date, having regard to available resources.

Broadcasting Services.

Paul Kehoe

Ceist:

57 Deputy Paul Kehoe asked the Minister for Communications, Energy and Natural Resources the provision or stipulation he has placed on the owners and operators of wind farms to remediate the problems associated with wind farms on the television signals for private householders; and his plans to assist persons in an area (details supplied) who have their television signal interfered with by wind turbines. [14795/09]

The construction of commercial scale wind farms is subject to planning approval by the relevant Local Authority or An Bord Pleanála. The Department of the Environment Heritage and Local Government has published "Planning Guidelines for Windfarms" which includes provisions on avoiding interference with broadcast communications including television signals. Any complaint of interference with television signals contrary to a planning decision should be addressed to the appropriate Planning Authority and any recurring difficulty in receiving television signals should be addressed to the Reception Investigation Unit within RTÉ. I have no statutory functions in these matters.

Grant Payments.

Ned O'Keeffe

Ceist:

58 Deputy Edward O’Keeffe asked the Minister for Agriculture, Fisheries and Food if assistance will be given to a person (details supplied) in County Cork. [14800/09]

The person named is not the registered owner of the herd-number listed and consequently is not the legal owner of any Single Payment Scheme entitlements that are held under that herd-number. If the person named wishes to obtain further information regarding transfer or consolidation of entitlements he may contact officials in my Department at lo-call 1890 200 560.

Brian O'Shea

Ceist:

59 Deputy Brian O’Shea asked the Minister for Agriculture, Fisheries and Food his proposals to seek a ewe subsidy for all sheep farmers; and if he will make a statement on the matter. [14811/09]

Subsequent to the outcome of the recent CAP Health Check, which allows Ireland to fund measures that are targeted at specific sectors in need of assistance, I recently announced my decision to allocate the extra funds available under the National Reserve in 2009 to hill sheep farmers, in the form of an Uplands Sheep Payment. This payment will be made in December of this year.

In reaching my decision to allocate this funding to hill sheep farmers, I recognised the difficulties and costs, including compliance costs, facing this sector. I also wanted to ensure that this aid would not create any additional administrative burden for hill sheep farmers. Subject to Commission approval, payments will commence on 1 December 2009, the first date that payments can commence under the EU Regulations. Based on the estimated National Reserve funds of €7 million for 2009 and the eligible area declared by farmers in 2008, approximately 14,000 hill sheep farmers will benefit from this payment. It has also been estimated from data available for 2008, that the level of aid will be €35 per hectare. The maximum payment per farmer will be €525.

This measure is solely for 2009. A decision on the use of the unspent CAP funds and modulation monies, from 2010 onwards, will be made when further information is available on the detailed rules that will apply to these measures. The EU Commission will shortly table its proposals for the detailed rules for the use of the unused funds and it is expected that they will be finalised in May/June of this year. It is important that these funds are used efficiently for the development of Irish agriculture. All sectors, including in particular, both hill and lowland sheep production, will be considered in this regard.

Brian O'Shea

Ceist:

60 Deputy Brian O’Shea asked the Minister for Agriculture, Fisheries and Food if he will approve and award all farm waste management scheme grants by June 2009; and if he will make a statement on the matter. [14812/09]

The payment on a phased basis of grants under the Farm Waste Management Scheme continues within my Department as claims are approved. It is hoped that all approved claims will have been paid their first instalment by end-June 2009.

Brian O'Shea

Ceist:

61 Deputy Brian O’Shea asked the Minister for Agriculture, Fisheries and Food if he will award the REP scheme amounts due; and if he will make a statement on the matter. [14813/09]

Given the level of participation in REPS 4 and the pressures on the public finances and having considered other alternatives I have decided to reverse the 17% increase in REPS 4 payments. Applications received in 2007 and 2008 will, if valid, be paid at existing rates in respect of those years. REPS applications will continue to be accepted up to the predetermined closing date of 15th May and, depending on the number of applications received, I will then review the payment level for REPS 3 participants. I will be also be carrying out a review of the scheme in the context of the overall level of participation, the funding which is likely to be available to me and the flexibility provided by the additional funding which I negotiated in the recent CAP "Health Check".

In the context of 2010, I intend to look at and discuss with our stakeholders how we can use unused CAP funds and modulated monies, including the options in relation to REPS, to achieve the maximum benefit for Irish farmers and the agrifood sector.

Michael Ring

Ceist:

62 Deputy Michael Ring asked the Minister for Agriculture, Fisheries and Food when a person (details supplied) in County Mayo will be awarded the remaining amount under the suckler cow welfare scheme. [14823/09]

The person named has 47 animals for consideration under the 2008 Suckler Welfare Scheme. Payments totalling €1900.00 have issued in respect of 25 eligible animals. One cow will not qualify for payment under the Terms and Conditions, as she was aged less than 22 months at the date of calving. There were 17 cows, which calved for the first time during 2008, and of these 5 were aged between 22 and 24 moths of age at the dates of calving. Under the Terms and Conditions a tolerance applies to this age group, and 2 of these cows have qualified for payment, while the other 3 will not qualify. The remaining 18 animals have errors mainly relating to disbudding and castration issues. There has been ongoing correspondence regarding these errors since November 2008, with the latest letter issuing on 6 April 2009. An officer from the Suckler Welfare Section of my Department in Portlaoise will be in contact shortly with the applicant with a view to resolving the matter.

Schools Building Projects.

Ruairí Quinn

Ceist:

63 Deputy Ruairí Quinn asked the Minister for Education and Science further to Parliamentary Question No. 139 of 1 April 2009, the progress made by him to date on agreeing a memorandum of understanding with the County and City Managers’ Association on the timely and efficient acquisition of school sites; when he expects the memorandum to be completed; and if he will make a statement on the matter. [14769/09]

My Department has had a series of meetings with representatives of the City and County Managers' Association (CCMA) to agree on the terms of a Memorandum of Understanding on the acquisition of sites for school planning purposes. I understand that a detailed draft has been jointly prepared and was to be discussed at a CCMA meeting on the final terms of the Memorandum. While a formal response is awaited from the CCMA, I am hopeful that an agreement can be reached in the coming months.

Paul Kehoe

Ceist:

64 Deputy Paul Kehoe asked the Minister for Education and Science if a primary school can apply for a grant towards the furnishing of a new classroom and school office; if there are plans to withdraw these grants; if a decision is being or has been taken to discontinue these grants; the date from which the decision is effective; when and how this was communicated to affected schools; if applications submitted in good faith will be honoured by his Department; and if he will make a statement on the matter. [14774/09]

My Department's School Building and Modernisation Programme is divided into a number of component elements or sub programmes, including a sub programme for the provision for Furniture and Equipment. Appropriate classroom furniture is provided as part of extension/new school buildings funded by my Department. There are no plans to withdraw these grants at present. Schools requiring additional classroom furniture should make application to my Department in the matter.

School Enrolments.

Sean Fleming

Ceist:

65 Deputy Seán Fleming asked the Minister for Education and Science his position in relation to a child (details supplied) born in a marriage in which one of the parents has joint and equal guardianship and custody and this parent has not given consent for their child to be enrolled in a particular school and the child has been enrolled without the signature of the said parent; his views and guidelines to schools on these matters; and if he will make a statement on the matter. [14793/09]

The selection and enrolment of pupils in schools is the responsibility of the authorities of the individual school. Under section 15(2)(d) of the Education Act 1998, each school is legally obliged to disclose its enrolment policy and to ensure that as regards that policy that principles of equality and the right of parents to send their children to a school of the parents choice are respected.

Article 42 of the Constitution provides for the right of parents to choose the form of education they provide or to have provided to their children. Primary legislation gives effect to this right and includes the Education Act 1998 and the Education (Welfare) Act 2000.

None of the foregoing legislation specifically distinguishes between parents who act in concert and those who disagree and are separated, divorced or unmarried. However each provides that "parent" shall be interpreted to include "a foster parent, a guardian appointed under the Guardianship of Children Acts, 1964 to 1997, or other person acting in loco parentis who has a child in his or her care subject to any statutory power or order of a court and, in the case of a child who has been adopted under the Adoption Acts, 1952 to 1998, or, where the child has been adopted outside the State, means the adopter or adopters or the surviving adopter".

My Department has not issued guidelines to schools in relation to school enrolment policies. Enrolment of children is, in the first instance, a matter for Boards of Management rather than my Department and Boards must address the circumstances of each case while respecting any order made by the Court in relation to the custody and welfare of the child.

Higher Education Grants.

Paul Kehoe

Ceist:

66 Deputy Paul Kehoe asked the Minister for Education and Science the financial assistance available to a person who is going to do a masters in Northern Ireland; and if he will make a statement on the matter. [14798/09]

Under the terms of my Department's third level maintenance grants schemes, grant assistance is available to eligible students attending approved third level courses in approved institutions. An approved course for the purpose of the schemes means a full-time undergraduate course of not less than two years duration and a full time postgraduate course of not less than one year duration pursued in an approved institution.

In order to qualify for grant assistance, a candidate must, satisfy the prescribed conditions of the schemes including those relating to residence, means, nationality and previous academic attainment.

Students pursuing approved postgraduate courses in Northern Ireland can apply for assistance under the terms of the Schemes in respect of maintenance grants and also, grants in respect of the cost of their tuition fees, subject to a maximum fee limit, which is currently €6,270.

Section 473A Taxes Consolidation Act, 1997 also provides for tax relief on tuition fees, at the standard rate of tax in respect of approved courses at approved colleges of higher education including certain approved undergraduate and postgraduate courses in EU and non-EU member states.

School Transport.

Beverley Flynn

Ceist:

67 Deputy Beverley Flynn asked the Minister for Education and Science the reason a person (details supplied) in County Mayo has been informed that if they participate in their school’s after school study programme they will have to pay an additional €5.90 per day in order that they be brought home by Bus Éireann’s passenger service. [14805/09]

My Department has been advised by the Transport Liaison Officer for County Mayo that the family referred to by the Deputy in the details pay an annual total of €402 for two children. The two pupils can then avail of the dedicated school transport service which operates on a standard timetable, morning and afternoon to and from the school in question.

It would not be economically viable to accommodate individual pupils who do not avail of the school bus timetabled services either in the morning or afternoon. For this reason the pupils in question will have to make their own transport arrangements after the school study programme which involves additional cost to the family.

Schools Building Projects.

Bobby Aylward

Ceist:

68 Deputy Bobby Aylward asked the Minister for Education and Science if he will approve the application by a national school (details supplied) in County Kilkenny under the summer works scheme. [14808/09]

Applications submitted for the Summer Works Scheme in 2008, including one from the school in question, are currently being assessed. The school authority in question will be notified of the outcome of this assessment in due course.

Bobby Aylward

Ceist:

69 Deputy Bobby Aylward asked the Minister for Education and Science when it is intended to reintroduce the summer works scheme; and when applications will be accepted by his Department. [14809/09]

My Department focused on delivering as many large projects as possible in 2008, with a particular emphasis on providing sufficient school places in developing areas, while also delivering improvements in the quality of existing primary and post-primary school accommodation throughout the country. Accordingly, funding was not made available for a Summer Works Scheme in 2008.

I recognise the benefits of the Scheme in addressing the needs of schools and it is my intention to have a Summer Works Scheme in 2009. The details of the operation of the scheme in 2009 and the level of funding to be made available under the scheme are currently being finalised and will be notified to schools as soon as possible.

Legislative Programme.

Ruairí Quinn

Ceist:

70 Deputy Ruairí Quinn asked the Minister for Education and Science when he will bring forward legislation to commence section 30 of the Teaching Council Act 2001; the type of legislation needed; and if he will make a statement on the matter. [14827/09]

Section 30 of the Teaching Council Act requires a Ministerial Order to provide for its commencement. However, I have indicated my intention to amend Section 30 so that a school may employ unregistered personnel on a time limited basis in limited circumstances.

I believe this proposed legislative arrangement reflects the situation facing schools today where it is not always possible, for a variety of reasons, to engage a registered teacher for substitution duty.

I intend that this amendment be facilitated under the Education (Patronage) Bill which will be published in the near future.

School Staffing.

Seán Ardagh

Ceist:

71 Deputy Seán Ardagh asked the Minister for Education and Science his views on the appeal of a school (details supplied) in Dublin 24 to keep their teaching staff at its current level in view of the fact that this school is in a disadvantaged area; and if he will make a statement on the matter. [14828/09]

The budget measures will impact on individual schools in different ways depending on whether enrolment is rising or declining and the degree to which any one school has more teachers than it is entitled to under the allocation processes.

In terms of the position at individual school level the key factor for determining the level of resources provided by my Department is the pupil enrolment at 30 September 2008. The annual process of seeking this enrolment data from schools took place in the autumn and the data have since been received and processed in my Department enabling the commencement of the processes by which teaching resources are allocated to schools for the school year that begins next September.

My Department has written to the primary schools that are projected to have a net loss or gain in classroom teaching posts in September, 2009. As part of my efforts to ensure that relevant information is openly available to the public detailed information on the opening position for primary schools is now published on my Department's website. This provisional list sets out the details on individual schools that, taken collectively, are projected to gain 128 posts and to lose 382 posts — a net reduction of 254 posts. It is my intention to have this information updated and ultimately to set out the final position when the allocation processes are completed.

These allocations are provisional at this stage and reflect the initial allocation position. The final position for any one school will depend on a number of other factors such as additional posts for schools that are developing rapidly and posts allocated as a result of the appeals processes. The operation of redeployment arrangements also impacts on the final position as a teacher can remain in his or her existing school where a suitable redeployment position does not exist. The final staffing position for all schools will therefore not be known until the autumn. At that stage the allocation process will be fully completed for mainstream classroom teachers and appeals to the Staffing Appeals Board will have been considered.

Details of the criteria and application dates for appeal are contained in the staffing schedule, Circular 0002/2009, available on my Department's website. The application form for appeal is also available on my Department's website. The Appeal Board operates independently of the Department and its decision is final.

State Examinations.

Caoimhghín Ó Caoláin

Ceist:

72 Deputy Caoimhghín Ó Caoláin asked the Minister for Education and Science if arrangements will be made to allow a person (details supplied) sit their exam in June 2009. [14830/09]

The State Examinations Commission has statutory responsibility for operational matters relating to the certificate examinations. I suggest that the parent contacts the State Examinations Commission (Entries Section) to discuss arrangements for her son to sit the Junior Certificate at 009064-42702/42703/42706 or by e-mail: entries@examinations.ie.

Section 29 of the Education Act 1998, provides parents with an appeal process where a Board of Management of a school or a person acting on behalf of the Board expels a student. The school is obliged to inform parents of their right under Section 29 of Education Act 1998 to appeal that decision to either the relevant Vocational Educational Committee or to the Secretary General of my Department. In the case of the latter, only where an appeal under Section 29 is upheld can the Secretary General of my Department direct a school to re admit a pupil.

The National Educational Welfare Board (NEWB) is the statutory agency which can assist parents who are experiencing difficulty in securing a school place for their child. The Board can be contacted at National Educational Welfare Board, National Headquarters, 16-22 Green Street, Dublin 7 or by telephone at 01-8738700.

Special Educational Needs.

Finian McGrath

Ceist:

73 Deputy Finian McGrath asked the Minister for Education and Science if he will clarify a matter (details supplied). [14847/09]

My Department provides a range of supports to second level schools to enable them cater for pupils with special educational needs. Such supports may include learning/resource teaching support, special needs assistant support and funding for the purchase of specialised equipment.

Resource-teacher hours are allocated on behalf of individual students with special educational needs. The core task of the resource teacher is the teaching of students with special educational needs, whether this is done one-to-one, in small groups, in special classes or through co-operative teaching with colleagues. The way in which the resource teacher implements the teaching role depends to a considerable extent on the model of organisation that has been adopted in the school.

Schools have been advised, in my Department's publication "Inclusion of Students with Special Educational Needs: Post-Primary Guidelines", to adopt an open policy in relation to the sharing with parents of information about their child with special educational needs. If a parent has a specific concern in relation to the use of resource teaching hours, he or she should raise the matter with the Principal of the School.

School Curriculum.

Finian McGrath

Ceist:

74 Deputy Finian McGrath asked the Minister for Education and Science if he will support a matter (details supplied). [14849/09]

A Transition Year offers pupils a broad educational experience with a view to the attainment of increased maturity, before proceeding to further study and/or vocational preparation. It provides a bridge to help pupils make the transition from a highly-structured environment to one where they will take greater responsibility for their own learning and decision making. Pupils will participate in learning strategies which are active and experiential and which help them to develop a range of transferable critical thinking and creative problem-solving skills. The Transition Year should also provide an opportunity for pupils to reflect on and develop an awareness of the value of education and training in preparing them for the ever-changing demands of the adult world of work and relationships.

The 2009 budget required difficult choices to be made across all areas of public expenditure. These decisions were made to control public expenditure and to ensure sustainability in the long run. In this respect, education, while protected to a much greater extent than most other areas of public expenditure, could not be totally spared. The various impacts at school level were included in the budget day announcements.

The budget measures will impact on individual schools in different ways depending on whether enrolment is rising or declining and the degree to which any one school has more teachers than it is entitled to under the allocation processes. Across the school system generally, there will of course be some impact on class sizes, and the changes may impact on the capacity of individual second-level schools to offer as wide a range of subject choices as heretofore.

Teacher allocations to all second level schools are approved annually by my Department in accordance with established rules based on recognised pupil enrolment. In accordance with these rules, each school management authority is required to organise its subject options within the limit of its approved teacher allocation. The deployment of teaching staff in the school, the range of subjects offered and ultimately the quality of teaching and learning are in the first instance a matter for the school management authorities.

In terms of the position at individual school level, the key factor for determining the level of resources provided by my Department is the pupil enrolment at 30 September 2008. The annual process of seeking this enrolment data from schools took place in the autumn, and the data have since been received and processed in my Department, enabling the commencement of the processes by which teaching resources are allocated to schools for the school year that begins next September.

Initial allocation letters have issued to all post primary schools. The allocation is provisional at this stage and reflects the initial allocation position. The final position for any one school will depend on a number of other factors, such as the allocation of support teachers, additional posts for schools that are developing rapidly and posts allocated as a result of the appeals processes.

In accordance with existing arrangements, where a school management authority is unable to meet its curricular commitments within its approved allocation, my Department considers applications for additional short term support, i.e. curricular concessions. This concession is available as a short-term support to enable essential curricular provision to continue.

The allocation processes also include appellate mechanisms under which schools can appeal against the allocation due to them under the staffing schedules. The Board of Management of a school can submit an appeal under certain criteria to an independent Appeal Board, which was established specifically to adjudicate on appeals on staffing allocations in post-primary schools. This Board operates independently of my Department.

Discrete allocations are also made to post-primary schools to cater for pupils with special educational needs and those with language difficulties, for example, and these allocations can alter the ultimate position of the school in relation to any over quota position.

Finian McGrath

Ceist:

75 Deputy Finian McGrath asked the Minister for Education and Science if he will support a matter (details supplied). [14853/09]

Teachers will be fully supported to implement the reforms in Mathematics in second level schools.

The Project Maths initiative is designed to encourage better understanding of maths, to reinforce the practical relevance of maths to everyday life, and to ensure better continuity between primary and second level, and junior and senior cycle. It is being led by the National Council for Curriculum and Assessment, working in collaboration with my Department and the State Examinations Commission. The initiative started in 2008 and is being piloted in 24 schools. The curriculum changes will be phased in over three years and mainstreaming will begin in 2010/11 in all schools, prefaced by a national programme of professional development for teachers beginning in 2009-10 which will continue to at least 2013.

Students in the 24 schools involved in the initial implementation from September 2008 are experiencing mathematics in a new way. Teachers are being provided with classroom materials to enable them to adopt the new approaches and will be supported professionally in embracing change. These materials and supports will include lesson plans, with teacher guides and student worksheets, online exemplars and a range of assessment materials.

The NCCA website www.ncca.ie. sets out the draft syllabus for Strands 1 and 2 at junior and senior cycle, a draft common mathematics course for the first year in junior cycle, and a Geometry course. The website www.ProjectMaths.ie sets out additional supports in the form of teaching and learning plans, a forum for teachers, and additional resources. These resources will expand over time.

Project Maths will be supported by intensive investment in professional development for teachers. A Maths Support Team has been appointed and is currently supporting the project schools, as well as preparing for mainstream in-service development which will start in September 2009, followed by mainstream implementation starting in Sept 2010. Some €3 million has been provided for the programme in 2009 alone, and investment in professional development for teachers will continue in a rolling programme of reform. Project Maths is being implemented on a phased basis covering the following five strands of mathematics:

Phase 1 Strand 1 statistics and probability; Strand 2 geometry and trigonometry

Phase 2 Strand 3 number; Strand 4 algebra

Phase 3 functions

Phase 3 will have begun in all schools in 2012, and will be fully implemented in all class groups by 2015.

Finian McGrath

Ceist:

76 Deputy Finian McGrath asked the Minister for Education and Science if he will clarify a matter in relation to a school (details supplied) in Dublin 5. [14854/09]

Eamon Gilmore

Ceist:

78 Deputy Eamon Gilmore asked the Minister for Education and Science the reason the performing arts module, which contains a strand for dance, cannot be modified for inclusion in the mainstream leaving certificate, as many students who attend these art subjects outside school are high achievers and confining this to the leaving certificate applied discriminates against them; if he will meet and have meaningful discussion with recognised dance bodies to rectify this situation, meaning that these students would be able to continue studying dance alongside their other studies; and if he will make a statement on the matter. [14871/09]

I propose to take Questions Nos. 76 and 78 together.

Dance is included in the strands in the Physical Education curriculum in primary and post primary schools. In addition, students may choose dance as one of the courses available within the Arts component of the Leaving Certificate Applied programme (LCA). The LCA is taken by some 7% of the student cohort and a maximum of four credits from a total of 200 credits in the assessment of the LCA is available for the dance component. The LCA does not provide for direct entry into higher education, but students may progress to post leaving certificate courses and from there to higher education.

My Department is faced with an extensive range of competing needs for investment in education, ranging from addressing educational disadvantage, inclusion of pupils with special needs and newcomer students, meeting the demands of a growing population, strengthening the mathematical, science, and technology aspects of provision, enhancing the professional development of teachers, investing in research and development and promoting second chance learning. Within that context, investment in mainstreaming of dance education as a subject for points for the purpose of third level entry is not a priority at the current time.

School Accommodation.

Brian Hayes

Ceist:

77 Deputy Brian Hayes asked the Minister for Education and Science when this Deputy will obtain information from his Department, regarding the number of prefabs where his Department has spent over €50,000 and over €100,000 in rental costs; and when this information will be provided. [14856/09]

The information sought by the Deputy in today's question and in Priority Question No. 36 of 25 March 2009 and Parliamentary Question No. 1079 of 24 March 2009 regarding the rental costs of prefabricated buildings is given in the following tabular statement. The Deputy should note that the schools identified with asterisks denote total cumulative rental costs in excess of €100,000. Those without this denotation reflect cumulative rental costs in excess of €50,000.

It should also be noted that the Department records as one unit each prefabricated building that is supplied to a school, whereas the unit may consist of one or more single classrooms or other ancillary accommodation such as toilets etc. The new policy of purchasing prefabs where the need is likely to exist for more than three years should reduce the instance of long term rental and deliver better value for money.

In addition, my Department has initiated a review of rental policy. Among the issues the review will cover will be a review of the contract terms to incorporate buy out and relocation options to allow maximum flexibility and value for money to the school and the Department according to local circumstances. All existing rental contracts will also be assessed to determine how to reduce overall rental costs for the Department. Separately, arrangements are being made to conduct a survey of accommodation at primary and post-primary level and this will establish the position relating to the extent of all accommodation. The specifications for this inventory are being drafted and my Department will be in contact with the education partners in relation to this later this year.

County

School

No. of Units

Carlow

61140K St. Leo’s College *

6

11135K St Mary’s NS

1

13607M St Columba’s NS

1

04077I St Brigids NS

1

Cavan

19983B St Clare’s NS *

10

19608V St Kilian’s NS*

7

16083T St Mary’s NS *

8

61051L St Clare’s College *

4

17625L Knocktemple NS

2

08453H Crubany NS

2

08143P Scoil Mhuire

1

18857O Carrigabruise NS

1

08490N St. Clare’s PS

3

17326B St Felim’s NS

1

Clare

19849U GS Donncha Rua *

4

19559L Scoil Chriost Rí *

9

17583V Knockanean NS *

5

14830U Barefield NS *

3

16677C CBS Bunscoil Inis Senior School *

4

16908S Sixmilebridge NS *

4

20086B Ennis Educate Together NS *

9

19274S St. Conaire’s NS

3

20245S Scoil Mhainchin, Ennistymon NS

4

20041C St. Senan’s Conv

3

16946D Parteen NS

2

Cork

20006A GS Chloch na gCoillte *

16

19993E GS an Ghoirt Alainn *

16

20025E GS Droichead na Banndan *

4

18829J SN Chobh Chionn tSaile *

5

17609N Scoil Bhríde *

8

20106E Scoil Niocláis *

7

13889C Shanbally NS *

7

10047I Macroom Convent NS (St Joseph’s) *

5

15594Q Grange NS *

3

12473M Greenmount Monastery NS *

5

16746S Ballygarvan NS *

6

13450F Rushbrooke NS *

7

15484J SN an Chroí Naofa *

5

19760E Scoil Triest *

3

19415K Scoil an Athar Tadhg *

4

18217B Scoil Padre Pio *

2

07242M Cloghroe NS *

4

20049S Ringaskiddy Lower Harbour NS *

3

00512D St. Brigid’s Presentation Convent Primary *

7

19881Q GS Charraig Uí Leighin *

6

12447L Baltydaniel NS *

1

19351K Cill Chriodain *

4

18535P St John’s GNS *

6

62170B Sacred Heart Sec School *

1

19839R GS Uí Ríordáin *

3

17639W CBS PS *

3

18483W School of the Divine Child

2

17600S Scartleigh NS

5

62460K St Francis College

4

18000W Scoil Mhuire Naofa

3

20088F Scoil Mhuire NS

5

17112F Ballyhea NS

2

19637F Scoil Fhionnbarra

2

13375R Scoil Bhríde

2

17667E Whitechurch NS

2

12041G St. John the Baptist, Midleton NS

2

20107G Gaelscoil Mhainistir na Corann

6

18428O Bailenóra NS

3

17360B SN Mhuire

2

15563F Lisheen NS

2

11992I Whitegate Mixed NS

4

13234W Cloughduv NS

2

13512B Scoil Mhuire Lourdes

4

16087E Kealkil NS

2

20265B Gaelscoil Chionn tSaile

2

17103E Scoil Chlochair Mhuire

2

15165Q Ballintotas NS

2

17993R Scoil Mhuire Gan Smál (B) (Glasheen BNS)

3

15597W St Colman’s BNS

2

02452V St Colman’s NS

2

19801P Drimoleague Junior School

2

13728B Castletownshend NS

3

Donegal

16672P St Patricks NS *

10

20096E Gaelscoil na gCeithre Maistri *

6

19967D Scoil Iosagain *

6

20235P Letterkenny Educate Together *

9

19927O Scoil Mhuire *

4

16821G St Patricks GNS *

3

19313C Glenswilly NS *

3

12077E Scoil Naomh Fiachra *

4

19971R Gaelscoil Adhamhnain *

2

17728V SN Talamh na Coitle

2

71140Q Crana College

3

19724A Little Angels Special School

3

18052S Scoil Mhuire Gan Smal

1

17268N Creevy NS

1

17057A Scoil Phadraig

1

07143K Monreagh NS

1

Dublin

16970A St Molagas NS *

9

17944E St Mary’s School for deaf girls *

2

20015B Gaelscoil Bhaile Munna *

3

17914S St Oliver Plunkett *

13

20020R Gaelscoil Thaobh na Coille *

4

20161M Donabate/Portrane Educate Tog NS *

12

20056P Gaelscoil Phadraig *

7

19949B Muslim NS *

3

19878E Holy Rosary PS *

7

20047O Gaelscoil Bharra *

2

20190T Holy Trinity NS *

7

17961E Lusk NS *

12

20202A Balbriggan Educate Together *

14

19545A St Patricks JNS *

1

19660A Rush NS *

4

07546J Our Lady of Lourdes NS *

7

17912O St John Boscos SBS *

3

09492W Balscadden School *

2

17978V Naiscoil Ide *

2

19624T St Catherine’s NS *

3

19355S Ballyowen Meadows *

8

76085N Gaelcholaiste Reachrann *

4

18977B St Colmcilles GNS *

3

19535U St Cronan’s SNS *

6

18210K St Michaels House Special School *

4

18778S St. Mochta’s NS *

5

16461C St Finian’s NS *

5

19472W St Marks JNS *

5

60092U Clonkeen College *

3

17928G SN N Sailbheastar NFA *

6

19865S Archbishop Ryan JNS *

1

19515O St. Teresa’s NS *

4

15618E Sandford Parish NS *

2

19898K Scoil an Duinninigh *

1

19877C Holy Family SNS *

2

16577V St Brigid’s GNS *

3

17569E St Oliver Plunkett NS *

2

18046A Scoil Bhride BNS *

4

17055T Scoil Naomh Mhuire *

4

19782O St Brigids JNS *

5

19834H St Aidans NS *

4

00697S St. Brigid’s Mixed NS *

4

17820J Rolestown NS

1

16972E SS Peter & Paul JNS

3

19605P Scoil Mhuire JNS

1

19676P Scoil Aine Naofa

2

19319O St Olafs NS

3

12014D St Andrew’s NS

3

19757P St Michaels Special NS

1

19643A St Philips SNS

3

19435Q St Francis Xavier JNS

3

19259W St. Patricks GNS

1

18047C Scoil Bhride GNS

3

19221U Scoil Aine

3

18411U St Marys NS

2

19636D St Patricks SNS

5

19817H Scoil Mhuire

3

19374W Our Lady’s Grove NS

3

18623M Castleknock NS

1

17683C Scoil Mhuire Ogl 2

3

60343T St Josephs Sec School

3

18976W St Colmcilles BNS

2

18671A St Michaels House

1

70010V Balbriggan Community College

2

01170G Naul National School

3

19601H St Philip the Apostle JNS

2

Galway

19998O GS De hIde *

8

20070J Rosedale School *

6

62870G Presentation College *

8

19994G GS Mhic Amhlaigh *

3

19468I Scoil Chaitriona Senior *

7

12706J Scoil Sailearna *

2

19858V GS Dara *

8

13365O Scoil Mhuire *

8

19241D Scoil Rois *

1

04506F Oranmore BNS *

11

17782E Scoil Bhride *

6

71330V Colaiste na Coirbe *

3

13686L St Joseph’s NS *

1

13914V SN Sheosaimh *

1

17613E Scoil Chaitriona Naofa *

2

05754G SN Chreachmhaoil *

3

15027E Eglish NS

1

18112K Scoil Eanna

3

20237T Gaelscoil Riada

4

14377D St Gabriel’s NS

3

20123E Gaelscoil Riabhach

4

16804G SN Chlair na Gaillimhe

2

18125T St Marys NS

2

19965W Scoil Mhuire

2

13856K St James’ NS

4

16293H Kilrickle NS

1

201990O Oughterard NS

1

20000L Galway Educate Together

2

20042E Scoil an Chroi Naofa Ballinasloe

6

17444H Scoil Seosaimh NS

2

15900U The Glebe NS

1

19803T Scoil Sheamais Naofa

1

08512U SN Iomair

3

18514H Scoil Cholmcille

2

19401W Scoil Chaitriona Jnr

4

19996K St Brendan’s NS

1

Kerry

17646T O’Brennan NS *

2

19512I St Oliver’s NS *

7

18247K CBS Tralee *

8

19547E St Francis Spec School

1

06227L Scoil Mhaolcheadair

1

20013U GS Lios Tuathail

1

Kildare

18288B Scoil Mhichil Naofa *

5

18654A Caragh NS *

11

20177E Newbridge Educate Together *

8

20058T Gaelscoil Ui Fhiaich *

8

20271T Scoil Na Naomh Uilig *

16

15040T Mercy Convent Primary School *

6

20292E Maynooth ET *

8

08099P St. Laurences N S *

4

17968S Two Mile House NS *

3

01821V Scoil Cheile Chriost, Rathmore N S *

2

20087D Killashee Multi D and European L NS *

1

20192A Gaelscoil Atha I *

6

19597T Scoil an Lenbh Iosa *

4

18449W St. Conleth’s NS *

6

16845U St Mochuo’s N S *

4

16706G St Joseph B.N.S *

3

19675N Scoil Bhride

4

11976K Scoil Choca Naofa

3

13350B Scoil Bride

1

19550Q Scoil Mhuire Junior

2

16707I St Peter’s BNS

3

17254C St Corbans

3

19796C Scoil Phadraig

2

70710D St. Patrick’s Sec School

5

19786W Scoil Diarmada

3

13328I St Patricks NS

1

12747A Scoil na Mainistream De La Salle

2

09414C St. Laurences N S

2

Kildare (Laois)

17064U St Patricks NS *

3

Kilkenny

19523N School of the Holy Spirit (SS) *

6

19856R Gaelscoil Osraí *

5

17108O St Johns Junior NS *

1

15160G Marymount NS *

1

19626A St Canices Co-Ed NS

2

Laois

63440J Patrician College *

11

19747M Scoil Bhride NS *

6

13643Q Emo NS *

7

18828H St Pauls Primary *

6

17604D Ratheniska NS *

3

17617M Scoil Chomhghain Naofa

1

18150S Scoil an Fraoich Mhoir

3

20224K Gaelscoil an tSli Dala

2

13741Q Rath NS

1

14838N Maryboro NS

1

14260F South NS

1

Leitrim

20212D Gaelscoil Liatroma *

5

20203C Mohill NS

3

17233R St Clare’s NS

2

Limerick

19894C An Mhodhscoil *

4

18177P St Annes Primary *

3

20148U Gaelscoil Chaladh an Treoigh *

8

19336O St Pauls NS *

7

20181S Gaelscoil an Raithin *

5

19931F Gaelscoil Sheoirse Clancy *

3

18991S John F. Kennedy Memorial School *

2

18653V St Josephs BNS *

1

17445J Scoil Lile Naofa

1

19475F St Brigids NS

2

16444C St Patricks GNS

2

18367U Tineteriffe NS

1

20185D St Marys Boys National School

2

Longford

20083S Gaelscoil Longfoirt *

1

20124G St Marys NS *

4

19467G St Mels *

1

07518E Melview NS *

2

19987J Scoil Mhuire

1

20128O St Matthews NS

2

Louth

20146Q Le Cheile Educate Together NS *

19

18069M St Josephs NS *

4

19479N Rathmullen NS *

6

19673J St Josephs NS *

7

19215C SN Ard Mhuire *

6

19598V Scoil Mhuire na nGael *

4

20171P Ardee Educate Together NS *

3

17726R Tullyallen NS

3

19678T St Pauls Senior NS

5

17195M CBS Primary Dundalk

3

15259C St Malachys Girls Sch

3

15101N St Mary’s NS

4

18635T St Buite’s NS

2

16208N Termonfeckin Mixed NS

2

01554B Ballapousta NS

3

20259G St Francis NS

3

19223B SN Padraig Naofa

2

14207B Scoil Mhuire Gan Smal

1

18098T Scoil N Bhride C

2

Mayo

20084U Scoil na gCeithre Maol *

8

19972T GS Uileog de Burca *

7

07054L Scoil Naomh Bríd *

4

18922W Cloonliffen NS *

1

64570E Our Lady’s Sec School *

4

20230F Scoil Iosa *

2

11725I Behymore NS

4

16122D Scoil Mhuire

1

04796R Brackloon NS

2

Meath

00885T Ratoath Junior NS (653m2) *

1

19671F St Pauls NS *

4

19476H St Oliver Plunkett NS *

7

20180Q Scoil Naomh Eoin *

11

18762D Realt na Mara BNS *

3

17821L St Marys, Enfield *

9

20215J St Pauls NS *

8

20200T Ratoath Senior NS *

9

20191V St Peters National School, Church Of Ireland *

7

15104T Scoil Bhride *

2

17705J Whitecross Primary School *

6

17623H O’Growney NS *

4

16100Q St Josephs Mercy P.S *

6

18767N Realt na Mara GNS *

8

01309L St Patricks NS *

1

18106P Lismullen NS

3

17520U Robinstown NS

2

20033D Dunboyne Senior Primary School

3

17088L Scoil Ui Chramhnaigh

3

19253K Scoil Naomh Barra

2

19560T Saint Marys Special School

2

12488C Gilson NS

2

20032B Dunboyne Junior School

2

18650P Newtown NS

2

18016O St Columbanns

3

17839H Duleek BNS

2

10801Q Drumbarragh NS

1

Monaghan

17150N St Mary’s BNS

1

17686I Scoil Mhuire BNS

2

Offaly

20267F Scoil Bhride PS *

3

16013V St Mary’s NS *

5

17827A St Patrick’s NS

4

Roscommon

16034G Tulsk NS

2

01607T Cornafulla NS

2

15083O Scoil Mhuire

3

Sligo

20044I Gaelscoil Chnoc Na Re *

6

19495L Carbury *

5

18575E Scoil Naomh Molaise *

4

14636B Scoil Naomh Eanna

1

18979F Scoil Ursula

3

15571E Kilglass NS

1

04487E Achonry NS

1

Tipperary

20085W GS Charraig Na Siuire *

6

17779P Powerstown NS *

4

11872V Presentation Primary School *

3

18135W Scoil Angela *

1

18345K Scoil Iosef Naofa *

4

18538V Scoil Mhuire *

2

19230V Scoil Chormaic *

5

16276H Carrig NS

2

18716T Cahir BNS

3

Waterford

19629G Holy Cross School *

20

64970U Presentation Secondary School *

4

15318P Glenbeg NS *

2

19885B Gaelscoil Philib Barun *

5

68078U Gaelcholáiste Phort Láirge *

8

20170N Bunscoil Chill Mhic Thomaisin

1

17535K S.N. Fionnabhair (Fenor NS)

4

18094L Scoil Mhuire

2

18380M Faithlegg NS

1

19108B St Martins Special School

2

Westmeath

17327D Curraghmore NS *

4

20238V GS an Choillin *

3

18505G St Clares NS *

2

18640M St Josephs NS *

3

18864L Coosan NS

2

17903N Cornamaddy NS

1

20063M Scoil an Chlochair

2

19650U St Colmans

1

19205W St Tolas NS

1

Wexford

08221J St Senans Primary *

19

19240B St. Patrick’s Special School *

7

20003R St Aidans Primary *

13

17017L St Patricks NS *

2

18558E Piercestown NS *

2

03633H Our Lady of Lourdes NS *

3

19739N Scoil Mhuire *

5

17800D Bree NS *

2

05070W Scoil Chroi Ro Naofa

2

17768K Castletown NS

2

16828U Oylegate NS

2

19317K Rathangan NS

2

17913Q Our Lady of Fatima NS

3

15407O Ballythomas NS

3

18280I St Josephs Boys Primary

3

11986N Mercy National School

3

Wicklow

17181B St Joseph’s NS *

10

20045K Gaelscoil Chill Mhantain *

10

19522L St Catherine’s Spec School *

6

14398L Glebe NS *

3

13597M St Andrew’s NS *

3

16573N St Brigid’s NS *

4

10683N St Brigid’s NS

2

70790E Colaiste Bhride

5

17826V Na Coroine Mhuire Mixed

2

20243O GS Na Lochanna

4

20080M GS An Inbhir Mhoir

4

19734D St Francis’s NS

2

Note: *Denotes schools where cumulative rental has exceeded €100,000.

Question No. 78 answered with Question No 76.

Schools Building Projects.

Brian Hayes

Ceist:

79 Deputy Brian Hayes asked the Minister for Education and Science if he will confirm that following a directive (details supplied), relating to the capital programme for 2009, that no new contracts for school buildings will be agreed in 2009; and the percentage of the capital budget for school building in 2009 within his Department which remains uncommitted. [14872/09]

My Department, like all Departments, was instructed that no further contractual commitments in respect of Exchequer capital expenditure could be entered into without the approval of the Department of Finance. The Department of Finance requests on a quarterly basis a composite application for those capital expenditure items that my Department wishes to enter into. The first such application has already been submitted and covers the period to the end of June.

Where sanction is urgently needed before submitting a quarterly proposal, a separate submission can be made to the Department of Finance on an exceptional basis. My Department has already availed of this facility and on 12 March 2009 received sanction for eight large scale building projects. Since then contractual commitments have been entered into on six of these large scale projects.

Just over 30% of the 2009 capital allocation of €613.8 million for the Primary and Post-Primary sectors is contractually committed to date. As quarterly requests for approval are submitted to the Department of Finance, this process will allow the remaining part of the 2009 capital allocation to be contractually committed. As in the case of the eight projects for which my Department received approval last month and of which six are now contractually committed, likewise, when approval of the quarterly applications is received contractual commitments will be entered into as projects are deemed ready to commence.

Charlie O'Connor

Ceist:

80 Deputy Charlie O’Connor asked the Minister for Education and Science if he will confirm that active consideration is being given in his Department to the need to fund the building programme of a school (details supplied) in Dublin 24; and if he will make a statement on the matter. [14874/09]

The building project for the school to which the Deputy refers is currently at an early stage of architectural planning. The progression of all large scale building projects, including this project, from initial design stage through to construction phase will be considered in the context of my Department's multi-annual School Building and Modernisation Programme. However, in light of current competing demands on the capital budget of the Department, it is not possible to give an indicative timeframe for the progression of the project at this time.