Léim ar aghaidh chuig an bpríomhábhar
Gnáthamharc

Hospital Services

Dáil Éireann Debate, Thursday - 22 November 2018

Thursday, 22 November 2018

Ceisteanna (131)

Mick Wallace

Ceist:

131. Deputy Mick Wallace asked the Minister for Health the status of the University Hospital Waterford second cath laboratory project (details supplied). [48689/18]

Amharc ar fhreagra

Freagraí scríofa

As the Deputy is aware, I have decided to proceed with the provision of a second cath lab in University Hospital Waterford based on the HSE’s preferred option for its location and operation. It is intended that the cost of progressing the project to design, planning and construction stages will be considered in the context of the HSE’s Capital Plan for 2019.

Barr
Roinn