Tuesday, 19 May 2015

Written Answers Nos. 398 to 417

Consular Services Provision

Questions (398)

Seán Crowe

Question:

398. Deputy Seán Crowe asked the Minister for Foreign Affairs and Trade his views on concerns for the well-being of an Irish citizen (details supplied) who was arrested in the Philippines in July 2013, given that the person and his family strongly maintain his innocence, and that he was sentenced to 12 years in prison, but is currently out on bail; if his Department is providing the person with consular assistance; and if he has discussed the issue with his Filipino counterpart. [19486/15]

View answer

Written answers

My Department is aware of this case and has been providing consular assistance to the citizen and his family since July 2013.

The Embassy of Ireland in Singapore, which is accredited to the Philippines, as well as the Honorary Consulate General in Manila have provided ongoing assistance to this citizen, including providing a list of lawyers; making representations to the prison service on the citizen’s welfare after the person was detained; and facilitating the safe retrieval of personal belongings after the person’s release on bail.

It is important to bear in mind the role of the Irish Government where citizens are imprisoned abroad. When an Irish citizen is charged with an offence under the law of a foreign country, it is the foreign law that applies and it is the relevant foreign court which decides matters such as bail. As the Deputy will be aware the Irish Government cannot intervene directly in matters before foreign courts.

The Department of Foreign Affairs and Trade will continue to provide consular assistance as necessary and to make appropriate representations to the government of the Philippines to request that the citizen’s appeal be processed as soon as possible.

Israeli Settlements

Questions (399)

Seán Crowe

Question:

399. Deputy Seán Crowe asked the Minister for Foreign Affairs and Trade if he is aware that the Israeli Government has approved the building of 900 new illegal colonial settlement units in east Jerusalem, that this is in complete violation of international law, and that it is exacerbating the huge tension in the region, and is clearly working against a two-state solution; if he will raise concerns with his Israeli counterpart; and in view of continued expansion of illegal settlements, if he will officially recognise the State of Palestine. [19487/15]

View answer

Written answers

I have very clearly expressed my condemnation of Israeli settlement expansion in the occupied Palestinian territory on a number of occasions, and I have also focused strongly on this issue in discussions at EU level and bilaterally. The issue informed our discussions at the Foreign Affairs Council in Brussels yesterday. It is clear that continued settlement expansion is gravely damaging to the prospects for a peaceful resolution of the conflict. I will continue to raise this issue. Israeli authorities are in no doubt whatever of our strong views on the issue. The question of recognition of Palestine, or of any state, is an important issue to be considered on its own merits, and not as a punishment or reward for one side or the other.

Cyprus Reunification

Questions (400)

Seán Crowe

Question:

400. Deputy Seán Crowe asked the Minister for Foreign Affairs and Trade if he is aware of recent elections in northern Cyprus, and that the newly elected leader, Mr. Mustafa Akinci, has strongly stated that he wants reconciliation, and an agreement on the reunification of Cyprus; if he has spoken to his Cypriot counterpart on the issue; and if he will inform his Cypriot counterpart of his support for the resumption of peace talks, which begin on 15 May 2015. [19488/15]

View answer

Written answers

Ireland fully supports the aim to find a solution that provides for a comprehensive settlement in Cyprus, based on a bicommunal, bizonal federation with political equality, as set out in the relevant UN Security Council resolutions. Ireland remains supportive of all efforts to assist in the search for a mutually acceptable settlement to this long-standing problem. In this context, the resumption of the negotiations last Friday between the leaders of the two communities in Cyprus is very much to be welcomed. I was pleased to see that President Anastasiades welcomed the choice of Mr Mustafa Akinci as the new leader of the Turkish Cypriot community and that Mr Akinci has said that he is eager to bolster an atmosphere of trust between the two communities.

This, I hope, is an encouraging sign for the outcome of the negotiations ahead. As Special Adviser Eide, the UN facilitator, has said, the resumption of talks ‘is a unique opportunity’. I share his hope that it is ‘an opportunity that will be grasped’ and I understand that discussions have begun in an open and constructive way.

I wish both leaders well in their on-going negotiations, and hope that the goodwill expressed on both sides results in a sustainable, peaceful solution.

While I have not yet had the opportunity to discuss the issue directly with my Cypriot colleague, my officials have on-going dialogue with representatives of the Cypriot Government, including through our respective Embassies, and our support for the peace talks is long understood and appreciated.

Question No. 401 answered with Question No. 389.

Good Friday Agreement

Questions (402)

Brendan Smith

Question:

402. Deputy Brendan Smith asked the Minister for Foreign Affairs and Trade his views on plans to scrap the Human Rights Act in the United Kindgom, and the possibility of this breaching the Good Friday Agreement; and if he will make a statement on the matter. [19601/15]

View answer

Written answers

The commitment of Ireland to the promotion and protection of human rights is an underlying principle of Ireland’s foreign policy and is a priority for the Government. Ireland is currently a member of the United Nations Human Rights Council and we pursue our human rights priorities in many international fora. Ireland is a firm supporter of the European Court of Human Rights and the European Convention of Human Rights system and liaises regularly with the UK in relation to the Council of Europe Committee of Ministers’ supervision of states’ implementation of Court judgments. I should note clearly at the outset there is not at this time any legislation before the British Parliament at Westminster to repeal the 1998 UK Human Rights Act. Indeed the new British Government has not yet published its legislative programme for this parliamentary term, although it is expected to do so later this month. In the absence of any detailed proposal it is difficult to speculate on potential consequences. Obviously were any proposal to be made it would have to be carefully analysed. On the broad question of human rights and the Good Friday Agreement, the views of the Government are clear and unchanged. The protection of human rights in Northern Ireland law, predicated on the European Convention of Human Rights, is one of the key principles underpinning the Agreement. As a guarantor of the Good Friday Agreement, the Government takes very seriously its responsibility to safeguard its institutions and principles. The fundamental role of human rights in guaranteeing peace and stability in Northern Ireland cannot be taken for granted and must be fully respected. The Good Friday Agreement is clear that there is an obligation to incorporate the European Convention on Human Rights into Northern Ireland law and this is an ongoing obligation.

Placing human rights at the heart of the peace process in Northern Ireland has helped to ensure the participation and trust of all communities. A shared emphasis on human rights and all that this implies is part of what makes the peace process credible and effective. The Government will work closely with the UK Government and with the power-sharing Executive in Belfast to ensure that the protection of human rights remains at the heart of civic life, politics and ongoing societal change in Northern Ireland.

We will follow closely all developments in this regard. I plan to raise this matter with the Secretary of State for Northern Ireland when I meet her later today.

Human Rights Issues

Questions (403)

Finian McGrath

Question:

403. Deputy Finian McGrath asked the Minister for Foreign Affairs and Trade if he will support the release of a person (details supplied); and if he will make a statement on the matter. [19809/15]

View answer

Written answers

I am aware of the advocacy work by a number of international NGOs in relation to this difficult case, including by Amnesty International. While we do not interfere in the internal judicial proceedings of other countries, we would of course urge that the case be resolved in accordance with Mexican law. The promotion and protection of human rights is a core principle of Ireland's foreign policy and we have prioritised the protection of trades unionists, human rights defenders and others who are in immediate danger. Our Embassy in Mexico participates actively in the EU-Mexico Human Rights Dialogue, which took place most recently in Mexico City on 15-16 April. In addition to consulting with civil society organisations, EU and Mexican human rights experts discussed a wide range of human rights issues, including challenges relating to the rule of law, the fight against impunity, and human rights defenders. The Embassy also maintains an active dialogue with international and local civil society partners in Mexico, including Amnesty, on a range of development and human rights issues.

Departmental Legal Costs

Questions (404)

Dominic Hannigan

Question:

404. Deputy Dominic Hannigan asked the Minister for Foreign Affairs and Trade the amount spent by his Department in legal fees in 2012, 2013, and 2014 in appealing decisions taken by the High Court; and if he will make a statement on the matter. [20161/15]

View answer

Written answers

My Department has not incurred any expenditure on legal fees in appealing decisions taken by the High Court for any of the years 2012, 2013 and 2014.

Apprenticeship Programmes

Questions (405)

John McGuinness

Question:

405. Deputy John McGuinness asked the Minister for Education and Skills as the lead Minister for the Action Plan for Jobs, if she will provide details of all Government agencies that have apprenticeship schemes in place; the number of persons currently enrolled on these; and if she will make a statement on the matter. [19264/15]

View answer

Written answers

The SOLAS apprentice register indicates there are 17 state and semi state bodies, currently employing and supporting 449 apprentices through their apprenticeships. The data requested by the Deputy is set out below.

Employer Name

No of Apprentices

AER LINGUS LTD.

48

DUBLIN AIRPORT AUTHORITY

7

AIR CORPS

4

IRISH NAVAL SERVICES

22

PERMANENT DEFENCE FORCES(ARMY)

61

BORD NA MONA (LEABEG - T'MORE)

25

BUS ATHA CLIATH

31

BUS EIREANN

57

IARNROD EIREANN

24

CORK COUNTY COUNCIL

4

PORT OF CORK

2

ESB

133

HSE WEST, SLIGO LEITRIM MENTAL HEALTH SERVICES

2

NATIONAL REHABILITATION HOSPITAL

2

ST JAMES HOSPITAL

3

OPW

22

UCD COLLEGE DUBLIN

2

Grand Total

449

Schools Building Projects Applications

Questions (406)

Tom Fleming

Question:

406. Deputy Tom Fleming asked the Minister for Education and Skills if she will examine an application in respect of a school (details supplied) in County Kerry for a general purpose room, which will finalise the development project, as per plans submitted to her Department; and if she will make a statement on the matter. [19165/15]

View answer

Written answers

As the Deputy is aware the school was approved funding, on a devolved basis, in December 2014 last for the provision of three general classrooms, one resource room and ancillary accommodation to replace existing prefabs. Funding was also provided for the associated prefab removal costs. The school subsequently requested that the project approved would be reviewed to allow the provision of two specialist rooms instead of two general classrooms, as previously agreed. I wish to advise the Deputy that the revised application from the school did not include for a General Purpose room. The revised application is currently under consideration by my Department and a decision will be conveyed to the school, in question, in due course.

Schools Building Projects Status

Questions (407)

Alan Shatter

Question:

407. Deputy Alan Shatter asked the Minister for Education and Skills in relation to the Dublin South constituency, the new works sanctioned for schools since 9 March 2011; the funding provided, to date, for such works; the schools that received such funding; the new schools, school buildings and-or school extensions completed from March 2011 to date in 2015; the works currently being undertaken, and works expected to commence within the next 12 months; the position regarding school projects for which sanction has been sought; the current stage in respect of each such project, and the schools concerned. [19248/15]

View answer

Written answers

The records maintained by my Department in respect of large scale building projects are retained on a county basis. The first table provides a list of new schools and large scale extensions/refurbishments in Dublin that were completed in the period 2011 to 2014. The five year plan for new schools and large scale extensions was announced in March 2012 and information in respect of these schools is available on my Department's website and this information is updated on a monthly basis. The most recent updates to the appropriate files are included in the tables numbered 1 to 7. Under the Infrastructure and Capital Investment Framework 2012-2016 announced in November 2011, a total of €1.5 billion funding is assigned to the delivery of new schools and large scale extensions.

Ongoing Projects from 2014 - updated beginning June 2015

.

.

Projects to go to Construction 2013 (announced 10th December 2012) - Current Status Updated beginning May 2015

Projects to Construction 2013 (announced December 2012) - Current Status updated beginning June 2015

Project No

County

Roll No

School Name & Address

School Type

Brief

Current Status

Contractor Name

Contract Start Date

Duration (In Months)

Architect

Quantity Surveyor

Structural Engineer

Building Services Engineer

1

Cork

91388S

Carrigaline Community School, Waterpark Road, Carrigaline.

Post Primary

Extension

Stage 5 - Handover to School (Substantial Completion)

Mythen Construction Ltd

11/02/2013

15

Kelly Barry O'Brien Whelan

Brendan Merry & Partners

Malone O'Regan

Michael J. Walshe & Co. Ltd

2

Cork

20310D

Carrigaline Educate Together NS.

Primary

New School

Stage 5 - Handover to School (Substantial Completion)

Western Building Systems

11/02/2013

7

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

3

Cork

19993E

Gaelscoil An Ghort Alainn, Aibinne Murmont, Gort Alainn, Corcaigh.

Primary

New School

Stage 2b - (Detailed Design) in progress

N/A

Mahoney Architects

Lawlor & Partners

Malone O'Regan

Mott MacDonald

4

Cork

13828F

Douglas BNS, Douglas.

Primary

Extension

Stage 2b - (Detailed Design) in progress

N/A

Reddy O'Riordain Staehli Architects

Brendan Merry & Partners

Malachy Walsh & Partners

Mott O'Mahoney Associates

5

Cork

17600S

SN na Scairte Leithe, Saleen, Cloyne, Midleton.

Primary

Extension

Stage 5 - Handover to School (Substantial Completion)

Noel Regan & Sons

11/11/2013

10

Office of Public Works

Tom McNamara

Office of Public Works

Office of Public Works

6

Cork

04572S / 14403B

St Joseph's NS & St John's NS, Kinsale (Now known as Scoil Eltin - New Roll 20435A)

Primary

New School

Stage 5 - Handover to School (Substantial Completion)

MMD Construction

29/10/2013

9

Office of Public Works

Tom McNamara

Office of Public Works

Office of Public Works

7

Cork

14052V / 17087J

Kanturk BNS & SN an Chlochair, Kanturk.

Primary

New School

Stage 2a Developed Design

N/A

Office of Public Works

Tom McNamara

PHM Consulting

Office of Public Works

8

Dublin

16567S/ 17279S

St Brigid's Convent NS & Scoil Mhuire NS, Haddington Road, Dublin 4.

Primary

New School

Stage 2b - (Detailed Design) in progress

N/A

Coady Partnership Architect

John J Casey & Company

Downes Associates

NJ O'Gorman & Associates

9

Dublin

76213T

Lusk Community College, Lusk - Phase 1

Post Primary

New School

Stage 5 - Handover to School (Substantial Completion)

ABM Design and Build

05/11/12

9

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Dublin

76213T

Lusk Community College, Lusk - Phase 2

Post Primary

New School

Stage 2b - (Detailed Design) in progress

N/A

Kennedy Fitzgerald Architects

Kane Crowe Kavanagh

ARUP

BDP

10

Dublin

20137P

Mary Mother of Hope NS, Castaheaney.

Primary

Extension

Stage 5 - Handover to School (Substantial Completion)

M & L Quinn Construction Ltd

15/07/2013

8

Opperman Associates

Rogerson Reddan & Associates

DBFL

VMRA

11

Dublin

20274C

Esker Educate Together NS, Lucan.

Primary

New School

Stage 5 - Handover to School (Substantial Completion)

ABM Design and Build

11/12/2013

8

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

12

Dublin

20307O

Skerries Educate Together NS, Barnageeragh Cove, Kellys Bay, Skerries.

Primary

Extension

Stage 5 - Handover to School (Substantial Completion)

ABM Design and Build

20/11/12

7

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

13

Dublin

20241K

Scoil Choilm, Porterstown Rd, Clonsilla, Dublin 15.

Primary

Extension

Stage 5 - Handover to School (Substantial Completion)

Western Building Systems

01/08/12

12

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

14

Dublin

20386N

Flemington-Balbriggan NS.

Primary

New School

Complete (Currently occupied on a temporary basis by Scoil Chormaic CNS Roll No 20269J)

N/A

N/A

N/A

N/A

N/A

15

Dublin

68083N

Mulhuddart Secondary School, Mulhuddart, Dublin 15.

Post Primary

New School

Stage 3 - At Tender Stage

N/A

McCarthy O'Hora

McGahon Surveyors

Thomas Garland & Partners

Marr O'Mahony & associates

16

Dublin

68082L

Coláiste Glór na Mara, Stephenstown.

Post Primary

New School

Stage 3 - At Tender Stage

N/A

Kennedy Fitzgerald Architects

Kane Crowe Kavanagh

ARUP

BDP

17

Dublin

76130P

Phase 2 - Luttrellstown Community College, Blanchardstown, Dublin 15 (See 2012 List of Projects for Phase 1)

Post Primary

Extension

Stage 2a Developed Design

N/A

Coady Partnership Arch.

McGahon Surveyors

Downes Associates

Varmings

18

Dublin

68101M

Hansfield Educate Together Secondary School, Dublin 15.

Post Primary

New School

Stage 4 - On-Site

Ganson Building & Civil Engineering Ltd

10//11/2014

18

Todd Architects

Bruce Shaw Partnership

Malone O'Regan

Homan O'Brien

19

Dublin

81001L

Newpark Comprehensive, Newtownpark Avenue, Blackrock.

Post Primary

Extension

Stage 5 - Handover to School (Substantial Completion)

Duggan Brothers Ltd

09/07/2013

18

Edward N. Smith & Kennedy

Bruce Shaw Partnership

O'Connor Sutton Cronin

BDP Dublin

20

Dublin

13217W

Holy Family NS, Rathcoole.

Primary

Extension

Stage 4 - On-Site

Ganson Building & Civil Engineering Ltd

17/11/2014

15

McCullogh Mulvin Architects

Rogerson Reddan Associates

Hayes Higgins Associates

BDP

21

Dublin

19624T

SN Caitríona NS, Kenure, Rush.

Primary

New School

Stage 2b - (Detailed Design) in progress

N/A

Department of Education & Skills

Brendan Merry & Partners

HGL O'Connor

Varmings

22

Dublin

12014D

St. Andrew's NS, Lucan.

Primary

New School

Stage 4 - On-Site

K& J Townmore Construction

19/08/2014

12

Office of Public Works

Healy, Kelly, Turner & Townsend

Office of Public Works

Office of Public Works

23

Dublin

76152C

Clonburris Post-Primary School, Clonburris, Lucan.

Post Primary

New School

Stage 4 - On-Site

JJ Rhatigan

26/03/2014

18

McCullough Mulvin Ltd

Brendan Merry & Partners Ltd

Thomas Garland & Partners

Building Design Partners LTd

24

Galway

17759J

Scoil Bhríde, Menlo, Castlegar, Galway City.

Primary

New School

Stage 5 - Handover to School (Substantial Completion)

Gildoc Ltd

11/11/2013

10

Office of Public Works

Tom McNamara

Office of Public Works

Office of Public Works

25

Galway

71330V

Coláiste na Coiribe, Bóthar Thuama, Co. na Gaillimhe.

Post Primary

New School

Stage 4 - On-Site

JSL Group/Stewart

21/07/2014

13

Coady Partnership Arch.

Henley Kavanagh McGowan

Harewood Malone O'Regan

Malachy Walsh & Partners

26

Kildare

11893G

St David's NS, Piper's Hill, Naas.

Primary

New School

Stage 4 - On-Site

K& J Townmore Construction

22/10/2014

9

MCOH

MJ Turley

D O'Keeffe

J Geaney & Assoc

27

Kildare

20403K

Kildare Educate Together NS, Kildare Town.

Primary

New School

Stage 4 - On-Site

Glasgiven McAvoy JV Ltd

10/11/2014

8

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

28

Kilkenny

20255V

Bunscoil McAuley Rice, West St, Callan.

Primary

New School

Stage 5 - Handover to School (Substantial Completion)

Mythen Construction Ltd

02/07/2013

15

John P Delaney Architects Ltd

MacMinn O' Reilly Mahon Partnership

Kilgallen & Partners Consulting

Noel Lawlor Building Services

29

Laois

20347D/ 20081D/ 14838N

Portlaoise Educate Together NS, Gaelscoil Phortlaoise, Maryborough NS, Portlaoise.

Primary

New Schools

Stage 5 - Handover to School (Substantial Completion)

Western Building Systems

19/11/12

9

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

30

Laois

20270R

Portlaoise Primary School (St Paul's, Sacred Heart & Scoil Mhuire) Portlaoise Rd, Portlaoise.

Primary

New School

Stage 4 - On-Site

Sammon Contracting Ireland Ltd.

28/10/2014

15

McCarthy O'Hora

Healy, Kelly Turner & Townsend

Hayes Higgins

BDP Dublin

31

Limerick

20148U

Gaelscoil Chaladh an Treoigh, Chaladh an Treoigh, Luimneach.

Primary

New School

Stage 5 - Handover to School (Substantial Completion)

T&J Townmore Construction

04/11/2013

10

Office of Public Works

Tom McNamara

Office of Public Works

Office of Public Works

32

Limerick

71840V

Coláiste Chiarain, Croom.

Post Primary

New School

Stage 2b - (Detailed Design) in progress

N/A

Healy Partners Arch.

Davis Langdon Ltd.

DBFL Cons. Eng.

JODA Engineering

33

Louth

76195U

Cú Chulainn Community College, Dundalk.

Post Primary

New School

Stage 2b - (Detailed Design) in progress

N/A

Newenham Mulligan & Associates

McGahon Surveyors

Malone O' Regan

Homan O'Brien

34

Louth

19673J

St Joseph's NS , Avenue Road, Dundalk.

Primary

Extension

Stage 3 - At Tender Stage

N/A

Coady Partnership Architects

McGahon Surveyors

DBFL

Varming Consulting Engineers

35

Louth

91573N

Ballymakenny College, Drogheda.

Post Primary

New School

Stage 4 - On-Site

O'Hare & McGovern

17/02/2014

20

Cody Partnership

A.Reddy

DBFL

Building Design Partners LTd

36

Meath

76173K

Coláiste na Mí, Navan. ( Phase 1)

Post Primary

New School

Stage 5 - Handover to School (Substantial Completion)

Sammon Contracting Ltd.

20/12/12

10

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

37

Meath

20179I

St Stephen's NS, c/o St Martha's College, Johnstown.

Primary

New School

Stage 5 - Handover to School (Substantial Completion)

Sammon Contracting Ltd.

20/12/12

10

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

38

Meath

76196W

Ashbourne Post Primary School, Ashbourne. (Phase 1)

Post Primary

New School

Stage 3 - At Tender Stage

N/A

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

39

Meath

20382F

Gaelscoil Na Mí, c/o Donaghmore Ashbourne GAA, Ashbourne.

Primary

New School

Stage 3 - At Tender Stage

N/A

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

20396Q

Ashbourne ETNS

Primary

New School

Stage 3 - At Tender Stage

N/A

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

40

Monaghan

07751K

Monaghan Model School, Monaghan Town.

Primary

Extension

Stage 4 - On-Site

Francis Haughey Building & Civil Engineering Contractor

19/03/2014

12

Sean Harrington Architects

McGahon surveyors

CS Pringle

Semple & McKillop

41

Offaly

20267F

Scoil Bríde, Carrick Rd, Edenderry.

Primary

New School

Stage 4 - On-Site

Sammon Contracting Ltd.

06/01/2014

13

Office of Public Works

Healy, Kelly, Turner & Townsend

Office of Public Works

Office of Public Works

42

Offaly

20332N

Gaelscoil Éadan Doire, Club Sacair Bhaile Éadain Doire, Éadan Doire, Co. Uíbh Fháilí.

Primary

New School

Stage 5 - Handover to School (Substantial Completion)

Sammon Contracting Ltd.

06/01/2014

9

Office of Public Works

Healy, Kelly, Turner & Townsend

Office of Public Works

Office of Public Works

43

Westmeath

19848S

St Etchen's NS., Kinnegad.

Primary

Extension

Stage 5 - Handover to School (Substantial Completion)

K& J Townmore Construction

11/11/2013

12

Kenny Lyons & Associates

Eamonn Traynor & Company

Semple & Mc Killop

Eamonn Doyle Associates

44

Wexford

20057R

Gaelscoil Inis Corthaidh, Bothar Ros Mhic Thriuin, Inis Corthaidh, Co Loch Garman.

Primary

New School

Stage 5 - Handover to School (Substantial Completion)

ABM Design and Build

15/06/12

7

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

45

Wexford

20165U

Gaelscoil Moshíólóg, An Chraobhach, Bothar Charn an Bhua, Guaire, Co Loch Garman.

Primary

Extension

Stage 5 - Handover to School (Substantial Completion)

Stewart

31/10/12

7

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

46

Wicklow

20080M

Gaelscoil an tInbhir Mhóir, Fernbank Park, Cemetary Rd, An tInbhear Mhóir, Co. Chill Mhantain.

Primary

New School

Site acquisition on-going

N/A

N/A

N/A

N/A

N/A

47

Wicklow

20300A

Greystones Educate Together NS, Blacklion, Greystones.

Primary

New School

Stage 5 - Handover to School (Substantial Completion)

Stewart

31/01/13

8

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

48

Wicklow

20301C

Gaelscoil na gCloch Liath, Blacklion, Greystones.

Primary

Extension

Stage 5 - Handover to School (Substantial Completion)

Stewart

31/01/13

8

Design & Build - Healy, Kelly, Turner & Townsend Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

49

Wicklow

68081J

Temple Carrig Secondary School, Greystones.

Post Primary

New School

Stage 4 - On-Site

Sammon Contracting Ireland Ltd.

12/05/2014

15

McCarthy O'Hora Architects

McGahon surveyors

Thomas Garland & Partners

Mathew O Mahony & Associates

50

Wicklow

70740M

Arklow Community College, Coolgreaney Rd, Arklow.

Post Primary

New School

Stage 4 - On-Site

Sammon Contracting Ireland Ltd.

22/07/2014

15

Reddy Associates

Healy Kelly & Partners

JP Byrne & Partners

BDP

Announced 19th December 2011 : Projects to go to construction in 2012 - Current Status Updated beginning June 2015

County

Roll Number and School Name

Current Status

Contractor Name

Contract Start Date

Duration (In Months)

Architect

Quantity Surveyor

Structural Engineer

Building Services Engineer

Carlow

20295K Carlow Educate Together NS

Stage 5 - Handover to School (Substantial Completion)

Sammon Contracting Ltd

21/01/2013

7

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Cavan

18857O S N Carraig A Bruis

Stage 5 - Handover to School (Substantial Completion)

O'Hanlon & Farrell Contracts Ltd

30/07/2012

15

Cooney (Cavan)

Seamus Fagan

Quinn, John V.

Semple & Mc Killop

Clare

15042A Ennis N S

Stage 5 - Handover to School (Substantial Completion)

JSL Group

07/06/2012

18

Dept. of Education & Skills

Lawlor & Partners

Punch, Michael & Partners

O'Malley Don & Partners

Cork City

20106E Grange Frankfield NS

Stage 5 - Handover to School (Substantial Completion)

MMD Construction Cork Ltd

24/06/2013

18

Reddy O Riordan Staehli Architects

Davis Langdon PKS

O'Connell Harley O'Dwyer

VMRA (Cork)

Cork City

62690E Scoil Mhuire, Sidney Place

Stage 5 - Handover to School (Substantial Completion)

Midland Construction & Engineering Ltd

20/02/2012

26

O'Sullivan Declan

Henley & Kavanagh

Twomey, Paul

Matt O'Mahony & Associates

Cork City

81008W Ashton Comprehensive School

Stage 5 - Handover to School (Substantial Completion)

Duggan Brothers (Contractors) ltd

23/04/2012

18

Newenham Mulligan

Healy Kelly & Partners,Co

EG Petit & Co.

Callaghan Engineering

Cork County

17609N Rathcormac N S

Stage 5 - Handover to School (Substantial Completion)

Midland Construction & Engineering Ltd

28/03/2012

12

Thompson John & Partners

Cuddy, John

Garland Thomas & Partners

Matt O'Mahony & Associates

Cork County

19839R Gael Scoil Ui Riordain

Stage 5 - Handover to School (Substantial Completion)

Glenman Corporation Limited

05/01/2012

7

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Cork County

20006A Gaelscoil Chloich Na Coillte

Stage 5 - Handover to School (Substantial Completion)

Western Building Systems

04/02/2013

6

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Cork County

20335T Rochestown Primary School

Stage 5 - Handover to School (Substantial Completion)

Western Building Systems

04/02/2013

6

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Donegal

16672P St Patricks N S

Stage 5 - Handover to School (Substantial Completion)

Dorrian Construction

09/01/2012

12

McGinley Doherty & Deery

OLM Consultancy Ltd

HGL O'Connor & Company

White Young Green

Donegal

19971R Gaelscoil Adhamhnain

Stage 5 - Handover to School (Substantial Completion)

Boyle Construction Ltd

03/09/2012

12

Donnelly & O'Neill

Mulcahy McDonagh &Partners

White Young Green (Derry)

White Young Green

Dublin City

09932B Stanhope St Convent

Stage 5 - Handover to School (Substantial Completion)

Purcell Construction Ltd

29/04/2013

22

C. J. Falconer & Assoc.

Mulcahy McDonagh & Partners

T.J. O'Connor & Associates

J.V. Tierney & Co

Dublin City

20139T Inchicore NS. Sarsfield Rd., Dublin 10

Stage 5 - Handover to School (Substantial Completion)

K & J Townmore Construction

30/10/2012

12

Donaghy & Dimond Architects

Lawlor & Partners

Roughan & ODonovan

BDP

Dublin Fingal

16675V Mulhuddart NS

Stage 5 - Handover to School (Substantial Completion)

Western Building Systems

09/01/2012

7

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Dublin Fingal

18046A Scoil Bride B - Linked To 18047C

Stage 5 - Handover to School (Substantial Completion)

Purcell Construction Ltd

07/08/2012

18

Reddy Architecture

Bruce Shaw Partnership

Moylan Consulting Engineers

Callaghan Engineering

Dublin Fingal

18047C Scoil Bride C - Linked To 18046A

Stage 5 - Handover to School (Substantial Completion)

Purcell Construction Ltd

07/08/2012

18

Reddy Architecture

Bruce Shaw Partnership

Moylan Consulting Engineers

Callaghan Engineering

Dublin Fingal

20241K Scoil Choilm NS

Stage 5 - Handover to School (Substantial Completion)

Western Building Systems

01/08/2012

12

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Dublin Fingal

20269J Scoil Chormaic

Stage 5 - Handover to School (Substantial Completion)

Western Building Systems

16/04/2012

7

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Dublin Fingal

20302E Thornleigh ETNS, Swords

Stage 5 - Handover to School (Substantial Completion)

ABM Construction Ltd

10/01/2012

7

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Dublin Fingal

20348F Holywell ETNS

Stage 5 - Handover to School (Substantial Completion)

ABM Construction Ltd

10/01/2012

7

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Dublin Fingal

20383H Blanchardstown West ETNS

Stage 5 - Handover to School (Substantial Completion)

Ganson Building & Civil Engineering ltd

29/07/2013

14

HKTT Project Managers - Todd Architects

Bruce Shaw Partnership

(as for Architect)

(as for Architect)

Dublin Fingal

76129H Ardgillan Community College, Balbriggan

Stage 4 - On-Site

Purcell Construction Ltd

01/07/2013

18

Kennedy Fitzgerald LLP

Bruce Shaw Partnership

DBFL

Mastercad T/A Noel Lawler Consulting Engineers

Dublin Fingal

76130P Luttrellstown Community College -Phase 1 (See 2013 list of projects for Phase 2)

Stage 5 - Handover to School (Substantial Completion)

Western Building Systems

01/08/2012

12

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Dun Laoghaire Rathdown

20190T Holy Trinity National School

Stage 5 - Handover to School (Substantial Completion)

Mythen Construction Ltd

19/07/2013

18

Walshe Assoc.

Kerrigan Sheanon Newman

Muir Associates

VMRA

Dun Laoghaire Rathdown

70030E Senior College Dunlaoghaire

Stage 5 - Handover to School (Substantial Completion)

Collen Construction

30/07/2012

18

McCullough Mulvin

Kerrigan Sheanon Newman

Horgan Lynch

BDP

Galway City

19795A Tirellan Heights N S

Stage 5 - Handover to School (Substantial Completion)

P.J McLoughlin & Sons Ltd

05/06/2012

18

Healy & Partners

Patrick A. Butler & Partners

Patrick J. Newell

Don O Malley & Partners

Galway City

62970K Colaiste Iognaid SJ, Bothar na Mara

Stage 5 - Handover to School (Substantial Completion)

Purcell Construction Ltd

07/08/2012

15

Taylor Partnership Architects

Peter F. Costello & Partners

HGL O'Connor & Company

Heavey Kenny Associates

Galway County

20199O Oughterard NS

Stage 5 - Handover to School (Substantial Completion)

J.J. Rhatigan & Company

18/06/2012

15

Simon J. Kelly

Peter F. Costello & Partners

Ryan Hanley

Heavey Kenny Associates

Laois

15556I Portarlington Convent NS

Stage 5 - Handover to School (Substantial Completion)

Western Building Systems

06/01/2012

7

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Laois

17064U Scoil Padraig, Ballylinan, Athy

Stage 5 - Handover to School (Substantial Completion)

Purcell Construction Ltd

09/07/2012

12

Reddy Architecture

Erinaceous

HGL O'Connor

Matt O'Mahony & Associates

Limerick

13026P Kilfinane NS

Stage 5 - Handover to School (Substantial Completion)

DPB Construction Ltd

23/04/2012

4

Dept. of Education & Skills

Nolan Ryan

ORS Consulting

Davis Associates

Limerick City

64201T Ard Scoil Ris, Nth Circular Rd.

Stage 5 - Handover to School (Substantial Completion)

L& M Keating Ltd

05/11/2012

12

Healy & Partners

Rogerson Reddan & Associated Ltd

Arup Consulting Engineers

Arup Consulting Engineers

Limerick City

64240G St Munchin's College

Stage 5 - Handover to School (Substantial Completion)

L& M Keating Ltd

13/02/2012

26

Healy & Partners

Rogerson Reddan & Associated Ltd

Thomas Garland and Partners

Arup & Partners(Cork)

Longford

20124G Edgeworthstown N.S..

Stage 4 - On-Site

PJ Mc Loughlin & Sons Ltd

28/05/2013

18

Kenny Lyons & Assoc.

Seamus Fagan and Associates

O'Keeffe, Dermot

Burke Morrison

Longford

20128O St Matthews National School

Stage 5 - Handover to School (Substantial Completion)

Brendan Sammon Aughnasheelin Ltd

24/05/2013

12

O'Neill, Eugene G.

Colm D'Arcy and Company

Concannon Healy Heffernan

Delap & Waller

Louth

20259G St. Francis National School

Stage 5 - Handover to School (Substantial Completion)

Stewart

01/02/2013

6

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Mayo

64570E Our Lady's Secondary School

Stage 5 - Handover to School (Substantial Completion)

Kilcawley Building and Civil Engineering (Sligo) Ltd

30/07/2013

18

Taylor Partnership Architects

McCauls

Concannon Healy Heffernan

Heavey Kenny Associates

Meath

18762D S N Realt Na Mara (B), Mornington - Linked to 18767N

Stage 5 - Handover to School (Substantial Completion)

Glasgiven Contracts Ltd

04/01/2013

18

HKR Architects

Lawlor & Partners

HGL O'Connor & Company

Homan O'Brien

Meath

18767N S N Realt Na Mara (C.) Mornington - Linked to 18762D

Stage 5 - Handover to School (Substantial Completion)

Glasgiven Contracts Ltd

04/01/2013

18

HKR Architects

Lawlor & Partners

HGL O'Connor & Company

Homan O'Brien

Meath

71960I Dunshaughlin Community College

Stage 5 - Handover to School (Substantial Completion)

J.J. Rhatigan & Company

10/09/2012

18

Coady Partnership Architects

Fergal Coghlan & Associates

DBFL

Delap & Waller

Sth Dublin

19817H St Marys N S, Airlie Heights, Woodlawn, Lucan

Stage 5 - Handover to School (Substantial Completion)

Ganson Building & Civil Engineering ltd

14/05/2012

20

H.J. Lyons Architects

McNamara, Tom

O'Connor Sutton Cronin

J.V. Tierney & Co

Sth Dublin

19878E Ballycragh N S

Stage 5 - Handover to School (Substantial Completion)

Ganson Building & Civil Engineering ltd

26/11/2012

18

Mallon Architects

Kerrigan Sheanon Newman

Muir Associates

Ray Grimason

Sth Dublin

20223I Gaelscoil Eiscir Riada

Stage 5 - Handover to School (Substantial Completion)

Western Building Systems

06/01/2012

8

Design & Build - HKTT Project Managers

(as for Architect)

(as for Architect)

(as for Architect)

Tipperary S.R.

65240L Scoil Mhuire Presentation Secondary School

Stage 5 - Handover to School (Substantial Completion)

Kilcawley Building and Civil Engineering (Sligo) Ltd

04/07/2013

18

Bluett & O'Donoghue

McGarry Associates

Hayes Higgins Consulting Engineers

PBM Limited

Waterford City

20050D Gaelscoil Na nDeise, Grace Dieu Rd., Waterford - Linked to 20160K

Stage 4 - On-Site

Ganson Building & Civil Engineering ltd

30/12/2013

16

Coady Partnership Architects

MacMinn O'Reilly Mahon Partnership

Malone O'Regan

Delap & Waller

Waterford City

20160K Waterford Educate Together NS - Linked to 20050D

Stage 4 - On-Site

Ganson Building & Civil Engineering ltd

30/12/2013

16

Coady Partnership Architects

MacMinn O'Reilly Mahon Partnership

Malone O'Regan

Delap & Waller

Wicklow

19522L St Catherines Spec Sch

Stage 3 - At Tender Stage

N/A

Fleming John

Hogan, Joseph C.

JP Byrne and Partners Ltd

Jerry Geaney Building Services Ltd.

"Investing in Infrastructure & Jobs" Package 2013 updated beginning June 2015

Roll No

School Name

County

Brief

School Type

Stage

Contractor Name

Contract Start Date

Duration (In Months)

Architect

Quantity Surveyor

Structural Engineer

Building Services Engineer

1

11135K

St Mary's National School, Bagnelstown

Carlow

Replacement School

Primary

Stage 4 - Construction

John Somers Construction Ltd

16/06/2014

12

Hamilton Young Architects

HKTT

Bowe Consulting Engineers

Ronan Meally Consulting Engineers

2

16083T

Virginia Mixed NS (St Marys), Virginia

Cavan

Extension / Refurbishment

Primary

Stage 4 - Construction

Brendan Sammon (Aughnasheelin) ltd

23/06/2014

12

Samuel Stephens Architects

Mulcahy McDonagh & Partners

DBFL

BDP

3

17848I

SN Mhuire, Glenville

Cork

Replacement school

Primary

Stage 4 - Construction

Tom O'Brien Construction Ltd

15/09/2014

10

MRG Consulting

HKTT

Mott McDonald

EDC Engineering

4

18786R

Scoil Iosagáin, Farranree

Cork City

Extension / Refurbishment

Primary

Stage 4 - Construction

Murphy & O'Sullivan Ltd

09/04/2014

12

Boyd Barrett Murphy O'Connor

David McGrath & Associates

E G Pettit

Mott McDonald

5

19351K

SN Cill Criodain, Ladysbridge

Cork County

Extension / Refurbishment

Primary

Stage 5 - Handover and Final Account

MMD Construction (Cork) ltd

24/02/2014

12

ABK Architects

Michael Barrett Partnership

Niall Fitzsimons & Company

Matt O'Mahony & Associates

6

20150H

Holy Family National School, Carrickboy, Ballyshannon

Donegal

Extension / Refurbishment

Primary

Stage 4 - Construction

Dorrian Construction Ltd

14/04/2014

12

McGinley Doherty Deery

McGahon Surveyors

Waterman Moylan Consulting Engineers

Gillespie & Cummings

7

60341P

Sancta Maria College, Ballyroan, Rathfarnham

Dublin

Extension / Refurbishment

Post Primary

Stage 3 - Tender Action

Coady Partnership

Mulcahy McDonagh & Partners

Nicholas O' Dwyer & Partners

J.V. Tierney & Co

8

13447Q

Scoil Mhuire, Lucan

Dublin Belgard

Extension / Refurbishment

Primary

Stage 2b - Detailed Design

John M Morris Architect

John McKinney

Once Civil & Structural

under remit of John M Morris

9

19727G

St Mary's Central NS, Belmount Avenue, Donnybrook, D4

Dublin City

Extension / Refurbishment

Primary

Stage 3 - Tender Action

Donal Walsh & Associates

Basil Conroy & Co

EDPM

Abbott & Partners

10

19819L

St. Laurence O'Tooles Special School, Seville Place, D1.

Dublin City

Replacement School

Primary

Stage 2b - Detailed Design

Sean Harrington

McGahon Surveyors

Michael Punch & Partners

Delap & Waller

11

76062B

Castleknock Community College

Dublin Fingal

Extension / Refurbishment

Post Primary

Stage 4 - Construction

Ganson Building & Civil Engineering Ltd

26/03/2014

15

A & D Wejchert

Henley Kavanagh McGowan

Lee McCullough & Partners

OLM Consultancy

12

91412M

Scoil Phobail, Clifden

Galway

Replacement school

Post Primary

Stage 3 - Tender Action

De Blacam & Meagher

Bruce Shaw Partnership

Waterman Moylan Consulting Engineers

Callaghan Engineering

13

12706J

SN Sailearna, Indreabhán

Galway

Extension / Refurbishment

Primary

Stage 3 - Tender Action

Hamilton Young Architects

Peter F. Costello & Partners

Malone O'Regan

Heavey Kenny Associates

14

63070C

St Raphaels College, Loughrea

Galway

Replacement school

Post Primary

Stage 3 - Tender Action

Niall J Kearns

Peter F. Costello & Partners

O'Brien & O'Keeffe Associates

Heavey Kenny |Associates

15

63090I

Holy Rosary College, Mountbellew

Galway

Extension / Refurbishment

Post Primary

Stage 4 - Construction

Coolsivna Construction Group ltd

06/08/2014

18

OKM Architects

McCauls

Tobin Consulting Engineers

Heavey Kenny |Associates

16

18089S

Scoil Naomh Mhuire, Oranmore

Galway

Extension / Refurbishment

Primary

Stage 5 - Handover and Final Account

John McNamara & Sons Ltd

10/02/2014

12

Simon J Kelly

Davis Langdon

Malone O Regan

Semple & McKillop

17

09414C

St Laurence's National School, Crookstown

Kildare

Replacement School

Primary

Stage 4 - Construction

Purcell Construction Ltd

26/03/2014

13

Todd Architects

MacGinn O'Reilly Mahon

Waterman Moylan Consulting Engineers

MacArdle McSweeney

18

20193C

Scoil Mocheallóg, Kilmallock

Limerick

Replacement School

Primary

Stage 3 - Tender Action

O'Donnell & Tuomey

Lawlor & Partners

Thomas Garland & Partners

Heavey Kenny |Associates

19

19479N

Rathmullan National Schools (St Johns & St Pauls), Drogheda

Louth

Replacement school

Primary

Stage 4 - Construction

Felix O Hare & Co. Ltd

28/10/2014

32

Coady Partnership

McGahon Surveyors

Malone O Regan

BDP

20

02905J

SN Naomh Padraig, Enfield

Meath

Extension / Refurbishment

Primary

Stage 4 - Construction

Ganson Building & Civil Engineering Ltd

21/08/2014

12

Opperman Associates

Sean McCann

Malachi Cullen Partners

SNC Engineering

21

91508C

Boyne Community School, Trim

Meath

Extension / Refurbishment

Post Primary

Stage 4 - Construction

C.F. Hoey Construction Ltd

12/09/2014

10

McKevitt Architects

JMQS

Doherty Finnegan Kelly

Burke Morrison

22

72190N

Ardscoil Lorgan, Castleblayney

Monaghan

Extension / Refurbishment

Post Primary

Stage 4 - Construction

Ganson Building & Civil Engineering Ltd

14/01/2015

18

Mahoney Architecture

Bruce Shaw Partnership

Nicholas O' Dwyer & Partners

Varming Consulting Engineers

23

65440T

Our Lady's Secondary School, Templemore

Tipperary N.R.

Extension / Refurbishment

Post Primary

Stage 4 - Construction

Duggan Brothers (Contractors) Ltd

04/09/2014

15

RKD Architects

Nollag MacCarthy

Hayes Higgins

Noel Lawlor

24

17932U

Odhran Naofa NS, Slanemore, Mullingar

Westmeath

Replacement School

Primary

Stage 5 - Handover and Final Account

Rathcorbally Construction Ltd

28/06/2014

12

John Madden & Associates

Nolan Construction

John Madden & Associates

John Madden & Associates

25

71600B

Coláiste Abbain, Enniscorthy

Wexford

Extension / Refurbishment

Post Primary

Stage 4 - Construction

Ganson Building & Civil Engineering Ltd

22/09/2014

15

Coady Partnership

Mulcahy McDonagh & Partners

O'Connor Sutton Cronin

Douglas Carroll

26

17913Q

SN Mhuire, Barntown

Wexford

Replacement school

Primary

Stage 5 - Handover and Final Account

Mythen Construction Ltd

06/03/2014

12

Thompson Architects

Michael G. Mahon & Co.

Hayes Higgins

JAK

27

20003R

St Aidan's Parish School, Enniscorthy

Wexford

Extension / Refurbishment

Primary

Stage 4 - Construction

Ganson Building & Civil Engineering Ltd

01/09/2014

18

Conroy Architects

MacMinn O'Reilly Mahon

Hayes Higgins

MacArdle McSweeney

28

61790D

St Brendan's College, Bray

Wicklow

Replacement School

Post Primary

Stage 4 - Construction

Sammon Contracting Ireland Ltd

16/07/2014

15

Smith & Kennedy Architects

O'Reilly Hyland Tierney

Nicholas O' Dwyer & Partners

Varming Consulting Engineers

New Primary Schools completed 2011-2014

-

County

Roll No

School

Year

1

Dublin

09932B

Stanhope Street Convent Primary school

2014

2

Dublin

17055T

Naomh Mhuire NS, Saggart

2014

3

Dublin

18047C

Scoil Bhride C, Blanchardstown

2014

4

Dublin

19474D

St. Colmcille's Junior NS, Knocklyon, Templeogue, Dublin 16

2014

5

Dublin

19742C

St. Colmcille's Senior NS, Knocklyon, Templeogue, Dublin 16

2014

6

Dublin

19878E

Ballycragh NS, Ballycragh, Firhouse, Tallaght, Dublin 24

2014

7

Dublin

20190T

Holy Trinity NS

2014

8

Dublin

20274C

Esker ETNS, Lucan, Co. Dublin.

2014

9

Dublin

20383H

Blanchardstown West ETNS

2014

10

Dublin

18046A

Scoil Bhride B, Blanchardstown

2013

11

Dublin

16675V

Mulhuddart National School

2012

12

Dublin

19373U

St. Michael's House Special School, Kish House, Greendale Road, D5

2012

13

Dublin

20223I

Gaelscoil Eiscir Riada, Lucan

2012

14

Dublin

20348F

Holywell ET, Swords

2012

15

Dublin

20269J

Scoil Chormaic, Balbriggan

2012

16

Dublin

19898K

Gaelscoil an Duinnigh, Feltrim, Swords

2011

17

Dublin

20161M

Donabate\Portrane Educate Together

2011

18

Dublin

20201V

Tyrrelstown Educate Together

2011

19

Dublin

20274C

Esker ET, Adamstown, Lucan

2011

20

Dublin

20095C

Gaelscoil Bhrian Bóroimhe

2011

21

Dublin

20145O

Swords Educate Together NS

2011

Large Scale Primary Extensions/Refurbishments completed 2011-2014

-

County

Roll No

School

Year

1

Dublin

19817H

St. Mary's NS, Airlie Heights, Woodlawn, Lucan

2014

2

Dublin

20137P

Mary Mother of Hope NS, Castaheaney.

2014

3

Dublin

20139T

Inchicore NS, Sarsfield Road, Dublin 10

2014

4

Dublin

20241K

Scoil Choilm, Diswellstown,Porterstown (see also 76130P)

2013

5

Dublin

20307O

Skerries Educate Together NS, Kelly's Bay

2013

6

Dublin

00697S

St. Brigid's NS, Castleknock, Dublin 15

2012

7

Dublin

17936F

Scoil Eoin Baisde Snr, Clontarf (see also 19006Q)

2012

8

Dublin

18324C

Scoil Bride C, Palmerstown

2012

9

Dublin

19006Q

Scoil Eoin Baisde B Sois, Clontarf (see also 17936F)

2012

10

Dublin

19374W

Garran Mhuire, Goatstown, Dublin 14

2012

11

Dublin

20302E

Thornleigh Educate Together NS, Thornleigh Green, Swords

2012

12

Dublin

15315J

St. George's NS, Naul Road, Balbriggan, Dublin 15

2011

13

Dublin

16964F

Scoil Mhuire Ogh 1, Crumlin Rd, Dublin 12

2011

14

Dublin

20252P

GS Bhaile Brigín, Castlelands, Balbriggan

2011

15

Dublin

20282B

Bracken Educate Together, Castlelands, Balbriggan

2011

16

Dublin

20303G

Lucan East Educate Together, Clonburris

2011

New Post-Primary Schools completed 2011-2014

-

County

Roll No.

School

Year

1

Dublin

76130P

Luttrellstown CC

2013

2

Dublin

76213T

Lusk Community College

2013

3

Dublin

60450U

Coláiste Mhuire na mBráithre, Cabra

2012

4

Dublin

76098W

Pobail Scoil Setanta, Phibblestown

2011

5

Dublin

76104O

Donabate Community College

2011

Large Scale Post-Primary Extensions/Refurbishments completed 2011-2014

-

County

Roll No.

School

Year

1

Dublin

70030E

Senior College, Dún Laoghaire, Eblana Avenue, Dún Laoghaire

2014

2

Dublin

81001L

Newpark Comp, Blackrock

2014

3

Dublin

60010P

Loreto Secondary School, Balbriggan

2012

4

Dublin

60860Q

Our Lady's School, Templeogue Road, Terenure, Dublin 6W

2011

final table

Large Scale Primary Extensions/Refurbishments completed 2011-2014

County

Roll No

School

Year

1

Dublin

19817H

St. Mary's NS, Airlie Heights, Woodlawn, Lucan

2014

2

Dublin

20137P

Mary Mother of Hope NS, Castaheaney.

2014

3

Dublin

20139T

Inchicore NS, Sarsfield Road, Dublin 10

2014

4

Dublin

20241K

Scoil Choilm, Diswellstown,Porterstown (see also 76130P)

2013

5

Dublin

20307O

Skerries Educate Together NS, Kelly's Bay

2013

6

Dublin

00697S

St. Brigid's NS, Castleknock, Dublin 15

2012

7

Dublin

17936F

Scoil Eoin Baisde Snr, Clontarf (see also 19006Q)

2012

8

Dublin

18324C

Scoil Bride C, Palmerstown

2012

9

Dublin

19006Q

Scoil Eoin Baisde B Sois, Clontarf (see also 17936F)

2012

10

Dublin

19374W

Garran Mhuire, Goatstown, Dublin 14

2012

11

Dublin

20302E

Thornleigh Educate Together NS, Thornleigh Green, Swords

2012

12

Dublin

15315J

St. George's NS, Naul Road, Balbriggan, Dublin 15

2011

13

Dublin

16964F

Scoil Mhuire Ogh 1, Crumlin Rd, Dublin 12

2011

14

Dublin

20252P

GS Bhaile Brigín, Castlelands, Balbriggan

2011

15

Dublin

20282B

Bracken Educate Together, Castlelands, Balbriggan

2011

16

Dublin

20303G

Lucan East Educate Together, Clonburris

2011

New Post-Primary Schools completed 2011-2014

County

Roll No.

School

Year

1

Dublin

76130P

Luttrellstown CC

2013

2

Dublin

76213T

Lusk Community College

2013

3

Dublin

60450U

Coláiste Mhuire na mBráithre, Cabra

2012

4

Dublin

76098W

Pobail Scoil Setanta, Phibblestown

2011

5

Dublin

76104O

Donabate Community College

2011

Large Scale Post-Primary Extensions/Refurbishments completed 2011-2014

County

Roll No.

School

Year

1

Dublin

70030E

Senior College, Dún Laoghaire, Eblana Avenue, Dún Laoghaire

2014

2

Dublin

81001L

Newpark Comp, Blackrock

2014

3

Dublin

60010P

Loreto Secondary School, Balbriggan

2012

4

Dublin

60860Q

Our Lady's School, Templeogue Road, Terenure, Dublin 6W

2011

Projects in Architectural Planning - not on the 5 Year Programme or Investing In Infrastructure & Jobs Package - Updated beginning June 2015

Roll No

School Name

Town / Area

County

Brief

Level

Stage

1

07546J

Goldenbridge Convent

Inchicore, Dublin 8

Dublin City

Extension / Refurbishment

Primary

Stage 2b Detailed Design

2

12954F

SN Bhride

Turloughmore

Galway County

Extension / Refurbishment

Primary

Stage 2b Detailed Design

3

13815T

Howth Road Mixed National School

Clontarf Road, Clontarf D3

Dublin City

Extension / Refurbishment

Primary

Stage 2b Detailed Design

4

14069P

Dun Dealgan National School

Dundalk

Louth

New School

Primary

Stage 2b Detailed Design

5

14386E

Stonepark National School

Stonepark

Longford

Extension / Refurbishment

Primary

Stage 2b Detailed Design

6

14839P

Clondrohid National School

Macroom

Cork County

Extension / Refurbishment

Primary

Stage 2b Detailed Design

7

16208N

Termonfeckin Mixed National School

Termonfeckin

Louth

Extension / Refurbishment

Primary

Stage 2b Detailed Design

8

17444H

SN Seosamh Naofa

Carrabane

Galway County

New School

Primary

Stage 2b Detailed Design

9

17472M

Baile Falbach

Hedgestown, Lusk Co Dublin

Dublin Fingal

New School

Primary

Stage 2b Detailed Design

10

17807R

SN Cathair Geal

Cahergal

Galway County

New School

Primary

Stage 2b Detailed Design

11

18106P

SN Na Trionoide Naofa

Lismullen

Meath

Extension / Refurbishment

Primary

Stage 2b Detailed Design

12

18625Q

Scoil Choilmcille

Letterkenny

Donegal

Extension / Refurbishment

Primary

Stage 2b Detailed Design

13

18778S

SN Naomh Mochta

Clonsilla

Dublin Fingal

Extension / Refurbishment

Primary

Stage 2b Detailed Design

14

19032R

Stewarts Hospital Special School

Palmerstown

Dublin Belgard

New School

Primary

Stage 2b Detailed Design

15

19336O

Scoil Phoil Naofa

Dooradoyle

Limerick County

Extension / Refurbishment

Primary

Stage 2b Detailed Design

16

19415K

Scoil An Athar Tadhg

Carrignavar

Cork County

New School

Primary

Stage 2b Detailed Design

17

19542R

Esker National School

Lucan

Dublin Belgard

Extension / Refurbishment

Primary

Stage 2b Detailed Design

18

19545A

Corduff National School

Blanchardstown, D 15

Dublin Fingal

New School

Primary

Stage 2b Detailed Design

19

19813W

Kildalkey Central National School

Kildalkey

Meath

New School

Primary

Stage 2b Detailed Design

20

20042E

Scoil An Chroi Naofa

Ballinasloe

Galway County

New School

Primary

Stage 2b Detailed Design

21

64660F

Sancta Maria College

Louisburgh

Mayo

Extension / Refurbishment

Post Primary

Stage 2b Detailed Design

22

01554B

Baile an Phusta National School

Ardee

Louth

Extension / Refurbishment

Primary

Stage 2a Developed Design

23

08490N

St Clare's Primary School

Cavan

Cavan

Extension / Refurbishment

Primary

Stage 2a Developed Design

24

16908S

Six MileBridge NS

Sixmilebridge

Clare

New School

Primary

Stage 2a Developed Design

25

18505G

Naomh Clar NS

Tobberclair

Westmeath

Extension / Refurbishment

Primary

Stage 2a Developed Design

26

18746F

SN Muine Mhea

Athenry

Galway County

Extension / Refurbishment

Primary

Stage 2a Developed Design

27

19215C

SN Ard Mhuire C

Marymount, Drogheda

Louth

New School

Primary

Stage 2a Developed Design

28

19313C

Glenswilly National School

Glenswilly

Donegal

Extension / Refurbishment

Primary

Stage 2a Developed Design

29

19439B

Holy Family Special School

Cootehill

Cavan

Extension / Refurbishment

Primary

Stage 2a Developed Design

30

19535U

Brackenstown Senior National School

Swords Co Dublin

Dublin Fingal

Extension / Refurbishment

Primary

Stage 2a Developed Design

31

19660A

Rush National School

Rush Co Dublin

Dublin Fingal

Extension / Refurbishment

Primary

Stage 2a Developed Design

32

19927O

Scoil Mhuire

Stranorlar

Donegal

New School

Primary

Stage 2a Developed Design

33

19967D

Scoil Iosagain

Buncrana

Donegal

New School

Primary

Stage 2a Developed Design

34

20032B

Dunboyne Junior National School

Dunboyne

Meath

Extension / Refurbishment

Primary

Stage 2a Developed Design

35

20033D

Dunboyne Senior National School

Dunboyne

Meath

New School

Primary

Stage 2a Developed Design

36

20116H

Glor na Mara

Convent Hill, Tramore

Waterford County

Extension / Refurbishment

Primary

Stage 2a Developed Design

37

20187H

Divine Mercy Senior NS

Lucan

Dublin Belgard

Extension / Refurbishment

Primary

Stage 2a Developed Design

38

76085N

Colaiste Reachrann Donaghmede

Donaghmede

Dublin City

New School

Post Primary

Stage 2a Developed Design

39

81002K

Mount Temple Comprehensive

Clontarf Road, Clontarf D3

Dublin Fingal

Extension / Refurbishment

Post Primary

Stage 2a Developed Design

40

12077E

Illistrim No 1 National School

Illistrim, Letterkenny

Donegal

Extension / Refurbishment

Primary

Stage 1 Preliminary Design

41

15769C

Monasterevan Convent

Monasterevan

Kildare

New School

Primary

Stage 1 Preliminary Design

42

15781P

Ballintemple National School

Ballintemple

Cork City

New School

Primary

Stage 1 Preliminary Design

43

16100Q

Mercy Convent National School

Navan

Meath

Extension / Refurbishment

Primary

Stage 1 Preliminary Design

44

18671A

St Michael's House Special School

Rathgar

Dublin City

New School

Primary

Stage 1 Preliminary Design

45

20170N

Kilmacthomas

Kilmacthomas

Waterford County

Extension / Refurbishment

Primary

Stage 1 Preliminary Design

46

71980O

O'Carolan College

Nobber

Meath

Extension / Refurbishment

Post Primary

Stage 1 Preliminary Design

47

07054L

Cullen NS

Ballina

Mayo

New School

Primary

Design Team Appointment

48

20007C

Gaelscoil Cluain Meala

Clonmel

Tipperary

Extension / Refurbishment

Primary

Design Team Appointment

49

20070J

Rosedale Special School

Rosedale

Galway City

New School

Special School

Design Team Appointment

50

64520M

St Mary's Secondary School

Ballina

Mayo

New School

Post Primary

Design Team Appointment

51

91508C

Boyne Community School

Trim

Meath

Extension / Refurbishment

Post Primary

Design Team Appointment

table

Projects to go to construction in 2015 (announced 18-12-2014) updated beginning June 2015

School Enrolments Data

Questions (408)

Alan Shatter

Question:

408. Deputy Alan Shatter asked the Minister for Education and Skills in relation to Dublin South constituency, the number of pupils currently attending primary school or secondary school in 2015, compared to 2010; in respect of each school, the enrolment numbers expected in September 2015; in respect of each school, as compared to 2011, the current number of teachers, resource teachers, and special needs assistants; and in respect of each school, the numbers sanctioned for the next school year. [19249/15]

View answer

Written answers

Data on the number of pupils enrolled in each school are available on the Statistics Section of my Department's website at http://www.education.ie/en/Publications/Statistics/Data-on-Individual-Schools/. The most recent published information is provisional data for the 2014/2015 school year. Final data in relation to the 2014/15 school year will be published later in the current school year.

The teacher allocation and redeployment process for the 2015/16 school year is currently underway in my Department. The allocation processes at both primary and post primary level also include an appeals mechanism under which schools can appeal against the allocation due to them under the staffing schedules. The Appeal Boards operate independently of the Department and their decisions are final. The final staffing position for all schools at primary and post primary level will ultimately not be known until the Autumn. At that stage the allocation process will be fully completed and any appeals to the Staffing Appeal Boards will have been considered.

The National Council for Special Education (NCSE) is responsible, through its network of local Special Educational Needs Organisers (SENOs), for allocating resource teaching and Special Needs Assistant (SNA) support to schools to support children with special educational needs and additional care needs respectively. The NCSE operates within my Department's criteria in allocating such support.

As part of Budget 2015, I announced that an additional 365 Special Needs Assistant (SNA) posts are being provided for in 2015, as well as an additional 480 Resource Teachers, to take into account increased demand and demographic growth and to ensure that children can continue to have access to additional supports in school. This is the highest number of Resource Teaching and SNA support that we have ever had.

These increases, building on increases which have already been provided in recent years, will ensure that children with special educational needs can continue to participate in education and be supported in a manner appropriate to their needs.

Details of resource teaching and SNA allocations which have been made to each school for 2014/15 are available on the NCSE website www.ncse.ie.

The NCSE is currently processing applications from schools for resource teaching and SNA support for the coming school year. Schools will be notified of their 2015/16 allocations shortly.

I will arrange to have the Deputy's question forwarded to the NCSE for their direct reply in respect of information which has been requested regarding allocations to schools in 2011.

Equality Issues

Questions (409)

Jonathan O'Brien

Question:

409. Deputy Jonathan O'Brien asked the Minister for Education and Skills if she is aware that SIPTU has advised its members on the National University of Ireland Galway campus not to co-operate with the university's gender task force, as it was not engaged in consultations regarding its establishment; that there are concerns that the task force lacks transparency, and was not independently constituted, and no assurances have been provided with regard to confidentiality; and her plans to urgently address these matters. [19250/15]

View answer

Written answers

The very serious shortcomings identified by the Equality Tribunal in its ruling last November in the case of Dr. Micheline Sheehy Skeffington must be acknowledged. Discrimination against women in the workplace is unacceptable in any setting and the issues brought to light in that case are of serious concern to me. For that reason, I have welcomed the response of NUI Galway in unreservedly accepting the ruling of the Tribunal and in establishing a Task Force to address related issues.

However, it is important that this taskforce has the confidence of both the student body and the staff. I am aware of concerns about the proposed composition of the taskforce in Galway. I want to repeat my view that having the broadest possible support for the taskforce at the outset is central to its important work, and I would urge NUIG to ensure that every effort is made to achieve that goal.

More broadly, the Higher Education Authority is actively considering how best to support the improvement of gender equality across the Irish higher education system as a whole and is developing a database of staff employed in the sector, so that we can ensure gender-equality at all levels within the academic profession in Ireland becomes a reality.

SOLAS Funding

Questions (410)

Jonathan O'Brien

Question:

410. Deputy Jonathan O'Brien asked the Minister for Education and Skills the cost of reinstating the SOLAS training allowance. [19270/15]

View answer

Written answers

The payment of an additional training allowance of €31.80 per week for the long term unemployed was introduced during a period of high employment levels as an incentive for the long term unemployed to participate in former-FÁS training courses and VTOS courses. The payment of this allowance was later extended to those persons in receipt of social welfare disability payments to introduce equality of treatment for all people in training.

The payment was reduced from €31.80 per week to €20 per week as part of Budget 2011 and as part of Budget 2014 it was decided to cease this payment for all SOLAS participants commencing courses after 1st January 2014.

The cost of re-instating this long term bonus payment is estimated at €6.7 million in a full year.

Teacher Recruitment

Questions (411)

Jonathan O'Brien

Question:

411. Deputy Jonathan O'Brien asked the Minister for Education and Skills the cost of employing an additional 1,000 resource teachers. [19271/15]

View answer

Written answers

I wish to advise the Deputy that the cost of employing an additional 1,000 resource teachers would be approximately €60 million per year, based on current average salary rates.

Teacher Recruitment

Questions (412)

Jonathan O'Brien

Question:

412. Deputy Jonathan O'Brien asked the Minister for Education and Skills the projected recruitment of additional teachers, additional resource teachers, and additional special needs assistants, over the next five years; and if she will make a statement on the matter. [19272/15]

View answer

Written answers

I wish to advise the Deputy that my focus in Budget 2015 was on obtaining the additional funding that was necessary to provide for demographic growth. The last Budget included an increase in spending on education for the first time in recent years, amounting to additional funding of €60m during 2015. This funding will be used to provide 1,700 additional teachers and SNAs for our schools, as well as to fund prioritised reforms, such as implementation of the literacy and numeracy strategy, reform of junior cycle, and the introduction of education focussed pre-school inspections. The improvements in the Primary Staffing Schedule for small schools which I announced in February last are the only changes that I will be making to the staffing arrangements for schools for the 2015/16 school year.

I also wish to advise the Deputy that an additional 365 Special Needs Assistant (SNA) posts have been provided for in 2015, as well as an additional 480 Resource Teachers, which takes into account increased demand and demographic growth.

11,300 SNA posts are available for allocation in 2015. 6705 resource teaching posts are also available to the NCSE to allocate to schools. This is the highest number of Resource Teaching and SNA support that we have ever had and has ensured that children can continue to have access to additional supports in school.

The number of posts which will be required for allocation in future years will be considered as part of the annual budgetary and estimate process which takes place each year.

The Deputy will also be aware that the National Council for Special Education (NCSE) has recommended the development of a new model for delivering teaching resources to schools to support students with special needs.

Through consultations, there was a broad welcome for the proposed new model from Parents, disability groups, schools and stakeholders. However, there has not been sufficient time to address all of the concerns which have been raised in advance of the 2015 school year.

My Department is, however, continuing to develop the new allocation model for schools and is currently working to devise a pilot of the new model. Issues regarding the number of resource teachers which will be required in future years will therefore be considered in the context of the development of a new allocation model.

The Government's approach to restoring the economy has helped Ireland to return to a position where we are seeing economic growth. It is a continuing improvement in our economic growth over a sustained period that will enable us to move to a point where we can look again at providing for additional teacher resources in schools which could bring about further improvement in PTR, class size and support for classroom teachers.

Capitation Grants

Questions (413)

Jonathan O'Brien

Question:

413. Deputy Jonathan O'Brien asked the Minister for Education and Skills the cost of reversing cuts to the capitation grants for primary and post primary schools. [19273/15]

View answer

Written answers

The last Budget included an increase in spending on education for the first time in recent years, amounting to additional funding of €60 million during 2015. That increase has provided funding for 1,700 additional teachers and SNAs to be recruited for our schools, as well as funding important reforms. However, it was not possible to secure the funding which would be required to also increase the rates of capitation paid to our schools.

The school funding measures introduced in Budget 2011 provided for a 5% reduction in funding for capitation and related grants to primary and second level schools. This was applied to schools by a 5% reduction across the range of per capita grants.

The multi annual school funding measures introduced in Budget 2012, provided for a 6% overall reduction in the funding for capitation and related grants to primary and second level schools. The reduction was introduced on a phased basis and applied by a 2% reduction in 2012 and 2013 and a further reduction of 1% in 2014 and 2015.

In total these measures have resulted in capitation and related funding to the primary and second level school sector being reduced by 11%. Increasing overall funding at present would cost approx. €3.7m per percentage point.

I am determined that education will be prioritised for further investment in future years, and I believe that increasing the staffing and funding of our schools should be priorities for such investment.

Capitation Grants

Questions (414)

Jonathan O'Brien

Question:

414. Deputy Jonathan O'Brien asked the Minister for Education and Skills the cost of reversing cuts to the capitation grants for the vocational training opportunities scheme, the Youthreach scheme, the back to education initiative, post-leaving certificate courses and adult literacy centres. [19274/15]

View answer

Written answers

The estimated cost of reversing the reductions in capitation grants over the last four years to VTOS, Youthreach, Back to Education Initiative, Post Leaving Certificate and Adult Literacy programmes is €2 million.

Private Schools

Questions (415)

Jonathan O'Brien

Question:

415. Deputy Jonathan O'Brien asked the Minister for Education and Skills the value of the State subsidy to private schools. [19275/15]

View answer

Written answers

The latest figures available are for the 2012/2013 school year and are included in the following table.

CAPITAL EXPENDITURE PAID FEE CHARGING SCHOOLS January - December 2013

€4,004,291.19

SALARIES - FEE CHARGING SCHOOLS 2012 - 2013 (SCHOOL YEAR)

Teacher - Gross

Clerical - Gross

SNA - Gross

€96,981,176.20

€246,266.13

€2,000,829.88

Schools Refurbishment

Questions (416)

Seán Ó Fearghaíl

Question:

416. Deputy Seán Ó Fearghaíl asked the Minister for Education and Skills if she will provide funding for the replacement of windows in a school building (details supplied) in County Kildare; and if she will make a statement on the matter. [19292/15]

View answer

Written answers

The management authority of the school referred to by the Deputy submitted an application for funding under my Department's Emergency Works Scheme to replace windows at their school.

As replacement of windows is outside the terms of the scheme it cannot be considered for funding. The school authority has been requested to submit a revised application to address immediate health and safety issues only. As soon as this application is received it will be assessed and the school authority notified of the outcome.

School Accommodation

Questions (417)

Seán Ó Fearghaíl

Question:

417. Deputy Seán Ó Fearghaíl asked the Minister for Education and Skills if she will provide funding to replace temporary accommodation in respect of a school (details supplied) in County Kildare, that has been in place for over thirty years; and if she will make a statement on the matter. [19293/15]

View answer

Written answers

I wish to advise the Deputy that my Department has no record of receiving an application from the school to which he refers for funding to replace temporary accommodation.

It is open to the school management to submit an application to my Department for consideration. Any application received will be considered in the context of competing demands on my Department's capital budget and other competing priority projects.