Below is the number of permanent staff by grade and by year employed within the Construction Services Unit.
In addition, please see below the number of agency staff employed by Construction Services by grade and by year since 2014.
Agency Staff
2014
|
2015
|
2016
|
2017
|
2018
|
2 Grade 11
1 Grade 8
|
2 Grade 11
1 Grade 8
|
2 Grade 11
1 Grade 8
|
2 Grade 11
1 Grade 8
|
1.5 Grade 11
1 Grade 8 to March
|
Nos. of Staff by Grade in Construction Services from Establishment of SOLAS to Date - Each Year End
|
|
Oct 13*
|
Oct 13*
|
Dec 13*
|
Dec 13*
|
Dec 14
|
Dec 14
|
Dec 15
|
SOLAS GRADE
|
CS EQUIVALENT
|
HC
|
FTE
|
HC
|
FTE
|
HC
|
FTE
|
HC
|
6
|
Asst Principal
|
|
|
|
|
|
|
|
7
|
Mid-way AP/HEO
|
1
|
1
|
1
|
1
|
2
|
2
|
2
|
8
|
HEO
|
5
|
4.8
|
5
|
4.8
|
4
|
3.8
|
4
|
10
|
EO
|
4
|
4
|
4
|
4
|
2
|
2
|
2
|
11
|
CO
|
7
|
6.6
|
7
|
6.6
|
8
|
7.2
|
7
|
TOTAL
|
|
17
|
16.4
|
17
|
16.4
|
16
|
15
|
15
|
Table Contd.
|
|
Dec 15
|
Dec 16
|
Dec 16
|
Dec 17
|
Dec 17
|
June 18
|
June 18
|
SOLAS GRADE
|
CS EQUIVALENT
|
FTE
|
HC
|
FTE
|
HC
|
FTE
|
HC
|
FTE
|
6
|
Asst Principal
|
|
|
|
1
|
1
|
1
|
1
|
7
|
Mid-way AP/HEO
|
2
|
3
|
3
|
1
|
1
|
1
|
1
|
8
|
HEO
|
4
|
4
|
4
|
4
|
3.72
|
5
|
4.72
|
10
|
EO
|
2
|
2
|
2
|
1
|
1
|
2
|
2
|
11
|
CO
|
6.2
|
6
|
6
|
7
|
7
|
7
|
7
|
TOTAL
|
|
14.2
|
15
|
15
|
14
|
13.72
|
16
|
15.72
|
Points to Note:
October 13 and December 13 includes 2 cost-centres Env/Safe Pass and CSCS/QSCS
From December 14 onwards 1 cost-centre Construction Services
HC = Headcount
FTE = Full Time Equivalents.