Skip to main content
Normal View

Schools Building Projects

Dáil Éireann Debate, Tuesday - 21 March 2023

Tuesday, 21 March 2023

Questions (714)

John Paul Phelan

Question:

714. Deputy John Paul Phelan asked the Minister for Education if she will provide an update on any proposed works at a school (details supplied); and if she will make a statement on the matter. [13196/23]

View answer

Written answers

As the Deputy is aware responsibility for delivering a major project for the school in question has been devolved to Dublin and Dún Laoghaire Education & Training Board (DDLETB). The Department of Education originally approved the construction of a standalone extension of just over 4,000m2 in area to include a 2-classroom Special Education needs base. Some works to the existing building were also included in this approval. A number of significant issues have unfortunately arisen, including delays in obtaining statutory consents from the local authority and delays to the finalisation of the detailed design process for the project as it was originally approved. The project was brought to Stage 2B. However, at that point it was agreed between DDLETB and the Department to proceed with an alternative proposal for the progression of the project as set out by DDLETB. This alternative involves the demolition and replacement of the existing building but also allows the provision of accommodation for another school on the site. Based on a report provided by DDLETB, it was agreed following meetings between the Department and DDLETB that the project should be redesigned on that basis. The Department is now in a position to instruct DDLETB’s design team to develop a masterplan for the school in question and a second 1,000 pupil post primary school on the same site. The masterplan can develop the initial project in line with the DDLETB proposals previously advised in that respect, and provide a footprint for a second school based on a standard 1,000 pupil Schedule of Accommodation. Following receipt of the masterplan, a decision on the optimum way forward will be taken as quickly as possible, subject to all relevant information being available. The Department will continue to engage with the patron in respect of the project, including in respect of the proposed delivery method. If the masterplan demonstrates that this proposal is feasible, it is then anticipated that the project will progress on that basis. DDLETB can then be expected to proceed with the appointment of a Design Team to progress the redesign of the buildings, obtain the necessary statutory planning permissions and move the project onward to construction in due course. As the project is at an early stage in the delivery process, it is not possible at this time to give a date for completion.Pending completion of the main building project, the Department has approved the provision of a Home Economics Room, an Art Room, and a Toilet Block through the Department’s Framework of Modular Accommodation Providers. The school has put contingency arrangements in place to make best use of existing accommodation until the modular accommodation is ready to be occupied.

Top
Share