Questions and answers published after July 2012 can be viewed here. Viewing by Government Department is possible by term or specific dates from March 2016 onwards. Written answers are published as received from departments. To see parliamentary questions published before July 2012, search in Dáil debates.
Questions and answers for all sittings
Page 13 of 54
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
555. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the eight AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40498/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
556. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the four AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40499/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
557. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the ten AHB housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40500/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
558. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 32 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40501/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
559. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40502/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
560. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 20 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40503/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
561. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40504/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
562. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the six local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40505/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
563. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the four local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40506/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
564. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the four local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40507/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
565. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the two local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40508/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
566. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the two local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40509/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
567. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 39 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40510/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
568. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 30 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40511/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
569. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 14 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40512/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
570. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 42 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40513/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
571. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 30 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40514/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
572. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 20 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40515/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
573. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 48 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40516/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
574. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 45 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40517/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
575. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the nine AHB units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40518/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
576. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the seven local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. []
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
577. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the four AHB units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. []
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
578. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the three AHB units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. []
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
579. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the five AHB units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40522/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
580. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the purchase by local authorities of 28 turnkey housing units in a location (details supplied) was proceeded with; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40523/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
581. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the purchase by local authorities of 61 turnkey housing units in a location (details supplied) was proceeded with; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40524/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
582. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the purchase by local authorities of 26 turnkey housing units in a location (details supplied) was proceeded with; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40525/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
583. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the purchase by local authorities of 34 turnkey housing units in a location (details supplied) was proceeded with; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40526/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
584. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 19 AHB units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40527/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
585. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 12 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40528/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
586. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 12 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40529/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
587. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 12 single rural local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40530/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
588. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the four local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40531/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
589. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40532/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
590. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the nine local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40533/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
591. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the ten local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40534/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
592. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the ten local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40535/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
593. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the four local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40536/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
594. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 22 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40537/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
595. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the 20 local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40538/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
596. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40539/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
597. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the six AHB units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40540/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
598. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the two local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40541/23]
Wed, 20 Sep 2023
written
Housing Provision
Duncan Smith
599. Deputy Duncan Smith asked the Minister for Housing, Local Government and Heritage if the eight local authority housing units approved for construction in a location (details supplied) have finished construction; if so, their completion date; the final number of units delivered; the total cost of the project; if the development was officially opened by a Minister; if so, when that happened; if not, the reasons for the project not proceeding; the current status of the project; and if he will make a statement on the matter. [40542/23]
Wed, 20 Sep 2023
written
Mental Health Services
Duncan Smith
895. Deputy Duncan Smith asked the Minister for Health to outline the location of the site on Lusk Main Street referred to in the 2023 Health Capital Plan in 'Appendix 2 - Mental Health' that refers to the "Construction of a 30-bed purpose-built Psychiatry of Later Life facility on Main Street, Lusk including purchase of the site"; and if the site has to date been acquired by the HSE. [39614/23]
Wed, 20 Sep 2023
written
Hospital Staff
Duncan Smith
916. Deputy Duncan Smith asked the Minister for Health the number of WTE clinical nurse specialists in permoneal dialysis at Mayo University Hospital in the years of 2021, 2022 and to date in 2023, in tabular form. [39805/23]
Wed, 20 Sep 2023
written
Hospital Staff
Duncan Smith
917. Deputy Duncan Smith asked the Minister for Health the number of WTE consultant orthopaedic and trauma surgeons at St. James's Hospital in the years of 2021, 2022 and to date in 2023, in tabular form. [39806/23]
Wed, 20 Sep 2023
written
Hospital Staff
Duncan Smith
918. Deputy Duncan Smith asked the Minister for Health The number of WTE Clinical Nurse Specialist in Stroke Services based at Tullamore Regional Hospital in 2022 and to date in 2023, in tabular form. [39807/23]
Wed, 20 Sep 2023
written
Hospital Equipment
Duncan Smith
919. Deputy Duncan Smith asked the Minister for Health the number of MRI scanners in use at Roscommon University Hospital. [39808/23]