Skip to main content
Normal View

Dáil Éireann debate -
Wednesday, 25 Apr 1990

Vol. 397 No. 9

Written Answers. - Vehicular Traffic.

Bernard J. Durkan

Question:

223 Mr. Durkan asked the Minister for the Environment , having regard to his reply to Parliamentary Question No. 128 of 27 March 1990, if he has available to his Department four surveys carried out by the various local authorities on average traffic counts in respect of main and county roads throughout the respective local authority areas, with particular reference to regional roads; the average volume of vehicles per day on such roads in Counties Kildare, Wicklow, Meath, Dublin, Roscommon, Leitrim, Longford, Westmeath, Mayo and Sligo; and if he will make a statement on the matter.

The results of the traffic counting programme operated by the environmental research unit of my Department on regional and county roads in the ten counties in question for 1988 (the latest year for which data are available) are set out in the following table. Similar counts are available (for the same count locations) for 1980, 1986 and 1987.

The traffic count was carried out by roadside enumerators who visually classified the traffic into the classes (bicycle, motorcycle, car, van, tractor, bus, rigid-truck, articulated-truck, truck and trailer or miscellaneous). For each count location, the table lists the total number of each of these vehicles classes observed by the enumerator during the seven hour period 9 a.m.-1 p.m. and 2 p.m.-5 p.m. on the stated date and the total of these observations. The right hand column lists the estimated AADT (24 hour vehicular volume on an average day) obtained by converting the seven hour volume to 24 hour volume using expansion factors obtained from information given by mechanical traffic counters. The count locations are identified by their road numbers as listed in the local authority's road schedule or, in the case of counts in County Dublin, by road name.

Since the count locations were selected as part of a sampling system designed to provide a single estimate of total vehicle miles of travel on all regional and county roads in the country and since separate sample frames were not set up for regional and for county roads, the counts listed in the table do not give reliable figures of the average traffic counts or the average volume of vehicles per day on regional roads or on county roads in individual local authority areas.

Rural Seven Hour Volume Counts

County/Location

Hour

Date

1Cycle

2M/C

3Car

4Van

5Tractor

6Misc

7Bus

8Rigid

9Artic

10T+Trl

Grand Total

Estimated

AADT

%HCV

Kildare

Road No. 81

9-1 & 2-5

Wed 28 Sep 88

2

3

671

66

9

3

13

99

12

7

885

1,825

16%

Road No. 449

9-1 & 2-5

Tue 27 Sep 88

9

3

21

221

2

2

6

19

6

0

289

582

13%

Road No. 470

9-1 & 2-5

Thu 29 Sep 88

4

2

562

92

28

1

11

109

63

0

872

1,781

24%

Road No. 302

9-1 & 2-5

Tue 20 Sep 88

13

3

406

33

8

1

30

43

13

0

550

1,116

18%

Road No. 343

9-1 & 2-5

Fri 23 Sep 88

12

5

233

30

23

0

6

42

9

0

360

667

23%

Road No. 354

9-1 & 2-5

Fri 30 Sep 88

3

1

81

4

0

0

1

3

1

0

94

174

5%

Wicklow

Road No. 146

9-1 & 2-5

Mon 19 Sep 88

11

3

35

4

11

1

2

2

0

3

72

127

31%

Road No. 147

9-1 & 2-5

Tue 20 Sep 88

3

6

290

73

9

3

13

63

26

1

487

1,006

24%

Road No. 18

9-1 & 2-5

Thu 22 Sep 88

16

5

289

61

0

0

11

13

0

0

395

778

6%

Road No. 183

9-1 & 2-5

Thu 22 Sep 88

1

1

61

20

1

0

2

5

0

0

91

185

9%

Meath

Road No. 53

9-1 & 2-5

Tue 27 Sep 88

2

0

192

31

6

0

2

9

7

0

249

513

10%

Road No. 439

9-1 & 2-5

Mon 26 Sep 88

11

3

66

53

3

2

0

75

1

0

214

421

40%

Road No. 319

9-1 & 2-5

Fri 23 Sep 88

5

3

90

13

10

0

0

16

6

0

143

265

23%

Dublin County

White Hart Road

9-1 & 2-5

Tue 20 Sep 88

9

2

80

15

5

0

0

10

3

0

124

239

16%

Tobersoole La

9-1 & 2-5

Mon 19 Sep 88

14

0

79

9

10

1

0

28

3

0

144

270

32%

Strand R Rush

9-1 & 2-5

Thu 22 Sep 88

36

2

104

7

1

0

1

7

0

0

158

250

7%

Reg/L90

9-1 & 2-5

Mon 3 Oct 88

5

15

1,930

320

6

0

24

206

24

0

2,530

5,550

10%

O Connaught A

9-1 & 2-5

Fri 30 Sep 88

23

11

828

173

2

0

32

31

0

0

1,100

2,065

6%

Millview Road

9-1 & 2-5

Fri 23 Sep 88

55

7

976

93

1

0

27

32

0

0

1,191

2,254

5%

Mulvey Park

9-1 & 2-5

Thu 29 Sep 88

143

13

352

57

0

2

4

17

0

0

588

913

5%

F Stat Newcas

9-1 & 2-5

Tue 27 Sep 88

2

3

21

1

0

0

2

1

0

0

30

58

11%

Blackwood Road

9-1 & 2-5

Mon 26 Sep 88

94

6

1,558

147

8

2

7

54

4

0

1,880

3,708

4%

Br to Castlek

9-1 & 2-5

Wed 28 Sep 88

5

0

36

2

2

0

1

0

0

0

46

85

7%

Roscommon

Road No. 675

9-1 & 2-5

Tue 20 Sep 88

3

2

43

1

15

0

0

0

0

0

64

127

25%

Road No. 680

9-1 & 2-5

Thu 22 Sep 88

4

0

178

15

9

0

9

0

0

0

215

433

9%

Road No. 460

9-1 & 2-5

Wed 21 Sep 88

5

1

68

7

1

0

1

0

0

0

83

161

3%

Road No. 32

9-1 & 2-5

Mon 19 Sep 88

14

9

115

30

22

0

4

17

16

9

236

461

31%

Leitrim

Road No. 627

9-1 & 2-5

Thu 22 Sep 88

5

2

30

5

8

1

3

2

0

0

56

105

27%

Road No. 423

9-1 & 2-5

Mon 26 Sep 88

2

0

9

2

2

0

0

0

0

0

15

27

15%

Road No. 496

9-1 & 2-5

Fri 18 Sep 87

16

4

230

38

7

1

11

5

3

0

315

573

9%

Road No. 398

9-1 & 2-5

Wed 21 Sep 88

2

0

67

5

0

0

0

2

1

1

78

157

5%

Longford

Road No. 30

9-1 & 2-5

Wed 21 Sep 88

2

4

44

10

8

0

0

3

0

0

71

143

16%

Road No. 396

9-1 & 2-5

Mon 19 Sep 88

3

0

79

8

8

0

0

4

0

0

102

206

12%

Road No. 259

9-1 & 2-5

Tue 20 Sep 88

5

1

54

6

14

0

0

3

0

0

83

162

22%

Road No. 118

9-1 & 2-5

Fri 30 Sep 88

18

0

129

16

8

0

5

2

1

0

179

309

10%

Westmeath

Road No. 467

9-1 & 2-5

Fri 23 Sep 88

6

8

354

30

13

0

11

44

24

3

493

934

20%

Road No. 243

9-1 & 2-5

Mon 26 Sep 88

2

0

41

1

2

0

1

2

5

0

54

108

19%

Road No. 280-2

9-1 & 2-5

Thu 22 Sep 88

14

4

343

73

10

1

2

47

13

2

509

1,016

15%

Mayo

Road No. 817

9-1 & 2-5

Fri 19 Sep 86

15

1

61

1

3

0

0

1

0

0

82

128

6%

Road No. 579

9-1 & 2-5

Wed 16 Sep 87

17

0

83

9

7

0

1

2

1

0

120

213

11%

Road No. 1159

9-1 & 2-5

Thu 22 Sep 88

26

3

985

153

4

4

20

49

2

0

1,246

2,503

6%

Road No. 1349

9-1 & 2-5

Mon 19 Sep 88

3

3

344

49

2

0

3

29

2

0

435

897

8%

Sligo

Road No. 229

9-1 & 2-5

Tue 27 Sep 88

12

0

115

35

8

0

2

8

1

1

182

353

12%

Notes:
Road No. = Road Number in the Authority's Road Schedule on which the visual traffic count was held.
Date = Date on which the visual traffic count was held.
Grand Total = Total number of vehicles plus bicycles passing the observer during the seven hours 9 a.m.-1 p.m. and 2 p.m.-5 p.m.
Estimated AADT = Estimated 24 Hour Vehicular Traffic Volume on an average day at the location.
%HCV = Percentage of Heavy Commercial Vehicles in the traffic.
Top
Share