Robert Molloy
Question:278 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Leenane sewerage scheme, County Galway. [1160/96]
Vol. 460 No. 3
278 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Leenane sewerage scheme, County Galway. [1160/96]
279 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Oranmore sewerage scheme, County Galway. [1161/96]
280 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Oughterard regional water supply scheme, stage 1, phase 2. sludge treatment and disposal, County Galway. [1162/96]
281 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Rosmuc water supply scheme, County Galway. [1163/96]
282 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Tully, Letterfrack, Clifden water supply scheme, County Galway. [1164/96]
283 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Carraroe village water and sewerage scheme, County Galway. [1165/96]
284 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Round-stone water supply scheme, County Galway. [1166/96]
285 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Round-stone sewerage scheme, County Galway. [1167/96]
286 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Spiddal/Rossaveal trunk main water scheme, County Galway. [1168/96]
287 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Tully sewerage scheme, Connemara, County Galway. [1169/96]
288 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Inis Meáin water supply scheme, County Galway. [1170/96]
289 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Inis Oirr water supply scheme, County Galway. [1171/96]
290 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Inis Mór water supply scheme, stage 3, phase 1A, County Galway. [1172/96]
291 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Kilronan sewerage scheme, County Galway. [1173/96]
292 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Carna/Kilkerrin water scheme, County Galway. [1174/96]
293 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Costelloe regional water supply reservoir, County Galway. [1175/96]
294 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Headford sewerage scheme, County Galway. [1176/96]
295 Mr. Molloy asked the Minister for the Environment the current position regarding the proposed Portumna town sewerage scheme, County Galway. [1177/96]
I propose to take Questions Nos. 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, 291, 292, 293, 294 and 295, inclusive, together.
The information requested is set out in the following table:
Scheme |
Current Position |
Leenane Sewerage Scheme. |
Preliminary Report with Department. |
Oranmore Sewerage. |
Approved for Cohesion funding. Construction expected to commence early 1996. |
Oughterard Regional Water Supply Scheme — Stage 1, Phase 2 — Sludge Treatment and Disposal. |
Contract Documents with Department. |
Rosmuc Water Supply. |
Contract Documents with Department. |
Tully, Letterfrack, Clifden Water Supply Scheme. |
Preliminary Report with Department. |
Carraroe Village Water and Sewerage Scheme — Small Scheme. |
Scheme under construction. |
Roundstone Water Supply Scheme. |
Scheme under construction. |
Roundstone Sewerage Scheme. |
Preliminary Report with Department. |
Spiddal Rossaveal Trunk Main Water. |
Application submitted for Cohesion funding. Contract Documents with Department. |
Tully Sewerage Scheme. |
Brief with Department. |
Inis Meáin Water Supply Scheme. |
Grants approved. Scheme under construction. |
Inish Oirr Water Supply Scheme. |
Application submitted for Cohesion funding. Brief with Department. |
Inishmore Water Supply Scheme, Stage 3, Phase 1A. |
Application submitted for Cohesion funding. Contract Documents being prepared by local authority. Site Investigations and groundwater augmentation almost complete. |
Kilronan Sewerage Scheme. |
Preliminary Report with Department. |
Carna/Kilkieran Water Supply. |
Preliminary Report with Department. |
Costello Regional Water Supply — Reservoir. |
Contract Documents with Department. |
Headford Sewerage Scheme. |
Contract Documents with Department. |
Portumna Sewerage Scheme. |
Approved for Cohesion funding. Revised Preliminary Report being prepared by local authority. |