The following are questions tabled by Members for written response and the ministerial replies received from the Departments [unrevised].
Questions Nos. 1 to 15, inclusive, answered orally.
Questions Nos. 16 to 88, inclusive, resubmitted.
Questions Nos. 89 to 98, inclusive, answered orally.
Paul McGrath
Question:
823
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34331/04]
Paul McGrath
Question:
839
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34347/04]
Paul McGrath
Question:
866
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34374/04]
Paul McGrath
Question:
871
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34379/04]
Paul McGrath
Question:
914
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34422/04]
Paul McGrath
Question:
985
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34493/04]
Paul McGrath
Question:
1054
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34562/04]
I propose to take Questions Nos. 823, 839, 866, 871, 914, 985 and 1054 together.
The projects referred to by the Deputy were listed to proceed to tender and construction as part of the 2004 school building programme. These projects did not proceed as quickly as envisaged due mainly to issues relating to planning permission, design teams being slower than anticipated in progressing projects and the need to revise briefs with reference to special needs requirements. It is envisaged that these projects will proceed as quickly as possible in 2005.
The day-to-day management of projects is a matter for each school and their design teams. The specific information requested by the Deputy is not readily available in my Department in the format requested by him.
Paul McGrath
Question:
824
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34332/04]
Paul McGrath
Question:
829
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34337/04]
Paul McGrath
Question:
830
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34338/04]
Paul McGrath
Question:
853
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34361/04]
Paul McGrath
Question:
855
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34363/04]
Paul McGrath
Question:
858
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34366/04]
Paul McGrath
Question:
860
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34368/04]
Paul McGrath
Question:
873
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34381/04]
Paul McGrath
Question:
874
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34382/04]
Paul McGrath
Question:
875
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34383/04]
Paul McGrath
Question:
885
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34393/04]
Paul McGrath
Question:
886
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34394/04]
Paul McGrath
Question:
887
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34395/04]
Paul McGrath
Question:
890
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34398/04]
Paul McGrath
Question:
891
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34399/04]
Paul McGrath
Question:
892
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34400/04]
Paul McGrath
Question:
893
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34401/04]
I propose to take Questions Nos. 824, 829, 830, 853, 855, 858, 860, 873 to 875, inclusive, 885 to 887, inclusive, 890 to 893, inclusive, together.
Construction is under way on the projects referred to by the Deputy. It is envisaged that many of these projects will be completed in the latter half of 2005.
The day-to-day management of projects is a matter for each school authority and their design teams. The specific information requested by the Deputy in relation to each project is not readily available in my Department in the format requested by him.
Paul McGrath
Question:
825
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34333/04]
Paul McGrath
Question:
834
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34342/04]
Paul McGrath
Question:
838
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34346/04]
Paul McGrath
Question:
845
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34353/04]
Paul McGrath
Question:
846
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34354/04]
Paul McGrath
Question:
847
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34355/04]
Paul McGrath
Question:
848
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34356/04]
Paul McGrath
Question:
849
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34357/04]
Paul McGrath
Question:
863
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34371/04]
Paul McGrath
Question:
864
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34372/04]
Paul McGrath
Question:
880
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34388/04]
Paul McGrath
Question:
911
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34419/04]
Paul McGrath
Question:
917
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34425/04]
Paul McGrath
Question:
925
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34433/04]
Paul McGrath
Question:
927
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34435/04]
Paul McGrath
Question:
928
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34436/04]
Paul McGrath
Question:
929
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34437/04]
Paul McGrath
Question:
935
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34443/04]
Paul McGrath
Question:
950
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34458/04]
Paul McGrath
Question:
954
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34462/04]
Paul McGrath
Question:
957
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34465/04]
Paul McGrath
Question:
958
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34466/04]
Paul McGrath
Question:
961
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34469/04]
Paul McGrath
Question:
967
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34475/04]
Paul McGrath
Question:
984
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34492/04]

I propose to take Questions Nos. 825, 834, 838, 845 to 849 inclusive, 863, 864, 880, 911, 917, 925, 927 to 929 inclusive, 935, 950, 954, 957, 958, 961, 967 and 984 together.
As part of the expansion of the devolved schemes initiatives for primary school building works the schools referred to by the Deputy were allocated a predetermined grant to enable the school management authorities to provide additional accommodation and/or improvements works.
The initiatives facilitate the boards of management by allowing them to address their accommodation and building priorities. It also provides a guaranteed amount of funding and gives boards of management control and responsibility for the building project.
As the initiatives are devolved it is the responsibility of each school management authority to determine the date the project proceeds to tender, the date the tender is accepted, the duration of the contract period and most importantly to manage the post contract control in respect of both costs and provision.
Paul McGrath
Question:
826
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34334/04]
Paul McGrath
Question:
827
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34335/04]
Paul McGrath
Question:
828
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34336/04]
Paul McGrath
Question:
831
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34339/04]
Paul McGrath
Question:
832
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34340/04]
Paul McGrath
Question:
835
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34343/04]
Paul McGrath
Question:
841
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34349/04]
Paul McGrath
Question:
842
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34350/04]
Paul McGrath
Question:
843
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34351/04]
Paul McGrath
Question:
844
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34352/04]
Paul McGrath
Question:
862
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34370/04]
Paul McGrath
Question:
867
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34375/04]
Paul McGrath
Question:
868
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34376/04]
Paul McGrath
Question:
869
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34377/04]
Paul McGrath
Question:
870
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34378/04]
Paul McGrath
Question:
877
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34385/04]
Paul McGrath
Question:
878
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34386/04]
Paul McGrath
Question:
879
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34387/04]
Paul McGrath
Question:
881
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34389/04]
Paul McGrath
Question:
883
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34391/04]
I propose to take Questions Nos. 826 to 828, inclusive, 831, 832, 835, 841 to 844, inclusive, 862, 867 to 870, inclusive, 877 to 879, inclusive, 881 and 883 together.
Construction is well under way on the projects referred to by the Deputy. It is envisaged that these projects will be completed in the latter half of 2005.
The day-to-day management of projects is a matter for each school and their design teams. The specific information requested by the Deputy in relation to each project is not readily available in my Department in the format requested by him.
Questions Nos 829 and 830 answered with Question No. 824.
Questions Nos. 831 and 832 answered with Question No. 826.
Paul McGrath
Question:
833
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34341/04]
Paul McGrath
Question:
851
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34359/04]
Paul McGrath
Question:
852
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34360/04]
Paul McGrath
Question:
854
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34362/04]
Paul McGrath
Question:
859
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34367/04]
Paul McGrath
Question:
872
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34380/04]
Paul McGrath
Question:
888
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34396/04]
Paul McGrath
Question:
889
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34397/04]
Paul McGrath
Question:
903
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34411/04]
Paul McGrath
Question:
905
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34413/04]
Paul McGrath
Question:
910
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34418/04]
Paul McGrath
Question:
946
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34454/04]
Paul McGrath
Question:
997
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34505/04]
Paul McGrath
Question:
1016
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34524/04]
Paul McGrath
Question:
1030
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34538/04]
Paul McGrath
Question:
1042
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34550/04]
Paul McGrath
Question:
1052
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34560/04]
Paul McGrath
Question:
1059
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34567/04]
Paul McGrath
Question:
1060
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34568/04]
Paul McGrath
Question:
1062
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34570/04]
I propose to take Questions Nos. 833, 851, 852, 854, 859, 872, 888, 889, 903, 905, 910, 946, 997, 1016, 1030, 1042, 1052, 1059, 1060 and 1062 together.
Construction is completed on all of the projects referred to by the Deputy. All of these projects commenced construction prior to 2004.
Question No. 834 answered with QuestionNo. 825.
Question No. 835 answered with QuestionNo. 826.
Paul McGrath
Question:
836
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34344/04]
Paul McGrath
Question:
840
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34348/04]
Paul McGrath
Question:
882
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34390/04]
Paul McGrath
Question:
899
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34407/04]
Paul McGrath
Question:
915
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34423/04]
Paul McGrath
Question:
916
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34424/04]
Paul McGrath
Question:
936
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34444/04]
Paul McGrath
Question:
937
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34445/04]
Paul McGrath
Question:
1031
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement in the matter.
[34539/04]
Paul McGrath
Question:
1063
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34571/04]
I propose to take Questions Nos. 836, 840, 882, 899, 915, 916, 936, 937, 1031 and 1063 together.
The projects referred to by the Deputy were listed to proceed to tender and construction as part of the 2004 school building programme. The tendering process is either under way or completed on these projects and it is envisaged that they will proceed to construction as early as possible in 2005.
The day-to-day management of projects is a matter for each school and their design teams. The specific information requested by the Deputy in relation to each project is not readily available in my Department in the format requested by him. In broad terms there are many reasons which can cause unexpected delays in the pace at which some projects advance. These include an appeal of planning permission by third parties to An Bord Pleanála, contractors withdrawing tenders and design teams being slower than anticipated in getting projects tendered.
Paul McGrath
Question:
837
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34345/04]
Paul McGrath
Question:
850
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34358/04]
Paul McGrath
Question:
865
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34373/04]
Paul McGrath
Question:
908
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34416/04]
Paul McGrath
Question:
938
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34446/04]
Paul McGrath
Question:
943
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34451/04]
Paul McGrath
Question:
962
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34470/04]
Paul McGrath
Question:
966
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34474/04]
Paul McGrath
Question:
970
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34478/04]
Paul McGrath
Question:
972
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34480/04]
Paul McGrath
Question:
977
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34485/04]
Paul McGrath
Question:
981
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34489/04]
Paul McGrath
Question:
996
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34504/04]
Paul McGrath
Question:
1003
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34511/04]
Paul McGrath
Question:
1015
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34523/04]
Paul McGrath
Question:
1022
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34530/04]
Paul McGrath
Question:
1024
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34532/04]
Paul McGrath
Question:
1025
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34533/04]
Paul McGrath
Question:
1036
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34544/04]
Paul McGrath
Question:
1041
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34549/04]
Paul McGrath
Question:
1056
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34564/04]
I propose to take Questions Nos. 837, 850, 865, 908, 938, 943, 962, 966, 970, 972, 977, 981, 996, 1003, 1015, 1022, 1024, 1025, 1036, 1041 and 1056 together.
Construction is completed on all of the projects referred to by the Deputy. Most of these projects commenced construction prior to 2004.
Question No. 838 answered with QuestionNo. 825.
Question No. 839 answered with QuestionNo. 823.
Question No. 840 answered with QuestionNo. 836.
Questions Nos. 841 to 844, inclusive, answered with Question No. 826.
Questions Nos. 845 to 849, inclusive, answered with Question No. 825.
Question No. 850 answered with QuestionNo. 837.
Questions Nos. 851 and 852 answered with Question No. 833.
Question No. 853 answered with QuestionNo. 824.
Question No. 854 answered with QuestionNo. 833.
Question No. 855 answered with QuestionNo. 824.
Paul McGrath
Question:
856
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34364/04]
The current position relating to proposed works at the school referred to by the Deputy is that the school applied for and was successful in securing funding under the 2004 summer works scheme, SWS, for the first phase of the replacement of the roof. This was completed in 2004. An application under the 2005 SWS has been received from the school management for the second phase of roof replacement. As I outlined in early December, when setting out details of the schools building and modernisation programme, I will announce in February details of the schools that will receive funding based on the applications being processed by my officials.
Paul McGrath
Question:
857
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34365/04]
My Department is in consultation with the school authority referred to by the Deputy regarding the delivery of this project. Documentation received in December from the school's design team is being reviewed. Officials in the school building section of my Department will communicate with the school authority shortly.
Question No. 858 answered with QuestionNo. 824.
Question No. 859 answered with QuestionNo. 833.
Question No. 860 answered with QuestionNo. 824.
Paul McGrath
Question:
861
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34369/04]
Tenders for the project to which the Deputy refers were not agreed and, therefore, work did not start. The original plan was to locate this project on a greenfield site. Since then other options have been considered. When a decision is made on the most appropriate delivery method for this project, I will inform the parties concerned.
Question No. 862 answered with QuestionNo. 826.
Questions Nos. 863 and 864 answered with Question No. 825.
Question No. 865 answered with QuestionNo. 837.
Question No. 866 answered with QuestionNo. 823.
Questions Nos. 867 to 870, inclusive, answered with Question No. 826.
Question No. 871 answered with QuestionNo. 823.
Question No. 872 answered with QuestionNo. 833.
Questions Nos. 873 to 875, inclusive, answered with Question No. 824.
Paul McGrath
Question:
876
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34384/04]
Paul McGrath
Question:
901
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34409/04]
Paul McGrath
Question:
904
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34412/04]
Paul McGrath
Question:
906
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34414/04]
Paul McGrath
Question:
923
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34431/04]
Paul McGrath
Question:
932
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34440/04]
Paul McGrath
Question:
960
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34468/04]
Paul McGrath
Question:
975
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34483/04]
Paul McGrath
Question:
976
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34484/04]
Paul McGrath
Question:
983
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34491/04]
Paul McGrath
Question:
1005
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34513/04]
Paul McGrath
Question:
1008
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34516/04]
Paul McGrath
Question:
1061
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34569/04]
Paul McGrath
Question:
1065
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34573/04]
I propose to take Questions Nos. 876, 901, 904, 906, 923, 932, 960, 975, 976, 983, 1005, 1008, 1061 and 1065 together.
The projects referred to by the Deputy were listed to proceed to tender and construction as part of the 2004 school building programme. These projects did not proceed as quickly as envisaged due mainly to issues relating to planning permission, sites or design teams being slower than anticipated in progressing projects. It is envisaged that these projects will proceed as quickly as possible in 2005. The day-to-day management of projects is a matter for each school authority and their design teams. The specific information requested by the Deputy is not readily available in my Department in the format requested by him.
Questions Nos. 877 to 879, inclusive, answered with Question No. 826.
Question No. 880 answered with QuestionNo. 825.
Question No. 881 answered with QuestionNo. 826.
Question No. 882 answered with QuestionNo. 836.
Question No. 883 answered with QuestionNo. 826.
Paul McGrath
Question:
884
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34392/04]
Paul McGrath
Question:
895
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34403/04]
Paul McGrath
Question:
896
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34404/04]
Paul McGrath
Question:
897
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34405/04]
Paul McGrath
Question:
898
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34406/04]
Paul McGrath
Question:
907
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34415/04]
Paul McGrath
Question:
909
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34417/04]
Paul McGrath
Question:
912
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34420/04]
Paul McGrath
Question:
913
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34421/04]
Paul McGrath
Question:
918
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34426/04]
Paul McGrath
Question:
919
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34427/04]
Paul McGrath
Question:
921
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34429/04]
Paul McGrath
Question:
924
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34432/04]
Paul McGrath
Question:
926
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34434/04]
Paul McGrath
Question:
930
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34438/04]
Paul McGrath
Question:
933
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34441/04]
Paul McGrath
Question:
934
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34442/04]
Paul McGrath
Question:
939
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34447/04]
Paul McGrath
Question:
940
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34448/04]
Paul McGrath
Question:
941
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34449/04]
I propose to take Questions Nos. 884, 895 to 898, inclusive, 907, 909, 912, 913, 918, 919, 921, 924, 926, 930, 933, 934, 939, 940 and 941 together.
Construction on the projects referred to by the Deputy commenced in 2004. It is envisaged that most of these projects will be completed in the latter half of 2005. The day-to-day management of projects is a matter for each school and its design team. The specific information requested by the Deputy regarding each project is not available in my Department in the format requested by him.
Questions Nos. 885 to 887, inclusive, answered with Question No. 824.
Questions Nos. 888 and 889 answered with Question No. 833.
Questions Nos. 890 to 893, inclusive, answered with Question No. 824.
Paul McGrath
Question:
894
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34402/04]
Paul McGrath
Question:
900
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34408/04]
Paul McGrath
Question:
902
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34410/04]
Paul McGrath
Question:
922
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34430/04]
Paul McGrath
Question:
931
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34439/04]
Paul McGrath
Question:
947
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34455/04]
Paul McGrath
Question:
948
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34456/04]
Paul McGrath
Question:
951
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34459/04]
Paul McGrath
Question:
952
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34460/04]
Paul McGrath
Question:
953
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34461/04]
Paul McGrath
Question:
956
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34464/04]
Paul McGrath
Question:
974
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34482/04]
Paul McGrath
Question:
1006
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34514/04]
Paul McGrath
Question:
1007
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34515/04]
Paul McGrath
Question:
1037
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34545/04]
Paul McGrath
Question:
1038
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34546/04]
Paul McGrath
Question:
1051
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34559/04]
I propose to take Questions Nos. 894, 900, 902, 922, 931, 947, 948, 951, 952, 953, 956, 974, 1006, 1007, 1037, 1038 and 1051 together.
Construction is under way on the projects referred to by the Deputy. It is envisaged that many of these projects will be completed in the latter half of 2005.
The day-to-day management of projects is a matter for each school authority and their design teams. The specific information requested by the Deputy with regard to each project is not readily available in my Department in the format requested by him.
Questions Nos. 895 to 898, inclusive, answered with Question No. 884.
Question No. 899 answered with QuestionNo. 836.
Question No. 900 answered with QuestionNo. 894.
Question No. 901 answered with QuestionNo. 876.
Question No. 902 answered with QuestionNo. 894.
Question No. 903 answered with QuestionNo. 833.
Question No. 904 answered with QuestionNo. 876.
Question No. 905 answered with QuestionNo. 833.
Question No. 906 answered with QuestionNo. 876.
Question No. 907 answered with QuestionNo. 884.
Question No. 908 answered with QuestionNo. 837.
Question No. 909 answered with QuestionNo. 884.
Question No. 910 answered with QuestionNo. 833.
Question No. 911 answered with QuestionNo. 825.
Questions Nos. 912 and 913 answered with Question No. 884.
Question No. 914 answered with QuestionNo. 823.
Questions Nos. 915 and 916 answered with Question No. 836.
Question No. 917 answered with QuestionNo. 825.
Questions Nos. 918 and 919 answered with Question No. 884.
Paul McGrath
Question:
920
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34428/04]
Paul McGrath
Question:
986
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34494/04]
Paul McGrath
Question:
988
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34496/04]
Paul McGrath
Question:
990
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34498/04]
Paul McGrath
Question:
992
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34500/04]
Paul McGrath
Question:
994
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34502/04]
Paul McGrath
Question:
1000
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34508/04]
Paul McGrath
Question:
1017
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34525/04]
Paul McGrath
Question:
1021
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34529/04]
Paul McGrath
Question:
1023
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34531/04]
Paul McGrath
Question:
1032
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34540/04]
Paul McGrath
Question:
1033
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34541/04]
Paul McGrath
Question:
1039
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34547/04]
Paul McGrath
Question:
1040
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34548/04]
Paul McGrath
Question:
1058
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34566/04]
I propose to take Questions Nos. 920, 986, 988, 990, 992, 994, 1000, 1017, 1021, 1023, 1032, 1033, 1039, 1040 and 1058 together.
As part of the expansion of the devolved schemes initiatives for primary school building works, the schools referred to by the Deputy were allocated a predetermined grant to enable the school management authorities to provide additional accommodation and-or improvements works. The initiatives facilitate the boards of management by allowing them to address their accommodation and building priorities. It also provides a guaranteed amount of funding and gives boards of management control and responsibility for the building project.
As the initiatives are devolved, it is the responsibility of each school management authority to determine the date the project proceeds to tender, the date the tender is accepted, the duration of the contract period and most importantly to manage the post contract control in respect of both costs and provision.
Question No. 921 answered with QuestionNo. 884.
Question No. 922 answered with QuestionNo. 894.
Question No. 923 answered with QuestionNo. 876.
Question No. 924 answered with QuestionNo. 884.
Question No. 925 answered with QuestionNo. 825.
Questions Nos. 926 answered with QuestionNo. 884.
Questions Nos. 927 to 929, inclusive, answered with Question No. 825.
Question No. 930 answered with QuestionNo. 884.
Question No. 931 answered with QuestionNo. 894.
Question No. 932 answered with QuestionNo. 876.
Questions Nos. 933 and 934 answered with Question No. 884.
Question No. 935 answered with QuestionNo. 825.
Questions Nos. 936 and 937 answered with Question No. 836.
Question No. 938 answered with QuestionNo. 837.
Questions Nos. 939 to 941, inclusive, answered with Question No. 884.
Paul McGrath
Question:
942
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if the project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34450/04]
Paul McGrath
Question:
944
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34452/04]
Paul McGrath
Question:
945
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34453/04]
Paul McGrath
Question:
949
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34457/04]
Paul McGrath
Question:
955
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34463/04]
Paul McGrath
Question:
959
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34467/04]
Paul McGrath
Question:
963
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34471/04]
Paul McGrath
Question:
964
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34472/04]
Paul McGrath
Question:
965
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34473/04]
Paul McGrath
Question:
968
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34476/04]
Paul McGrath
Question:
969
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34477/04]
Paul McGrath
Question:
971
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34479/04]
Paul McGrath
Question:
973
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34481/04]
Paul McGrath
Question:
978
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34486/04]
Paul McGrath
Question:
979
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34487/04]
Paul McGrath
Question:
982
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34490/04]
Paul McGrath
Question:
987
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34495/04]
Paul McGrath
Question:
989
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34497/04]
Paul McGrath
Question:
991
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34499/04]
Paul McGrath
Question:
993
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34501/04]
I propose to take Questions Nos. 942, 944, 945, 949, 955, 959, 963, 964, 965, 968, 969, 971, 973, 978, 979, 982, 987, 989, 991 and 993 together.
Construction on the projects referred to by the Deputy commenced in 2004 and it is envisaged that these projects will be completed in the latter half of 2005. The day-to-day management of projects is a matter for each school and their design teams. The specific information requested by the Deputy on each project is not readily available in my Department in the format requested by him.
Question No. 943 answered with QuestionNo. 837.
Questions Nos. 944 and 945 answered with Question No. 942.
Question No. 946 answered with QuestionNo. 833.
Questions Nos. 947 and 948 answered with Question No. 894.
Question No. 949 answered with QuestionNo. 942.
Question No. 950 answered with QuestionNo. 825.
Questions Nos. 951 to 953, inclusive, answered with Question No. 894.
Question No. 954 answered with QuestionNo. 825.
Question No. 955 answered with QuestionNo. 942.
Question No. 956 answered with QuestionNo. 894.
Questions Nos. 957 and 958 answered with Question No. 825.
Question No. 959 answered with QuestionNo. 942.
Question No. 960 answered with QuestionNo. 876.
Question No. 961 answered with QuestionNo. 825.
Question No. 962 answered with QuestionNo. 837.
Questions Nos. 963 to 965, inclusive, answered with Question No. 942.
Question No. 966 answered with QuestionNo. 837.
Question No. 967 answered with QuestionNo. 825.
Questions Nos. 968 and 969 answered with Question No. 942.
Question No. 970 answered with QuestionNo. 837.
Question No. 971 answered with QuestionNo. 942.
Question No. 972 answered with QuestionNo. 837.
Question No. 973 answered with QuestionNo. 942.
Question No. 974 answered with QuestionNo. 894.
Questions Nos. 975 and 976 answered with Question No. 876.
Question No. 977 answered with QuestionNo. 837.
Questions Nos. 978 and 979 answered with Question No. 942.
Paul McGrath
Question:
980
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34488/04]
The authorities of the school in question were offered grant aid under the 2004 devolved permanent accommodation initiative to provide additional permanent classroom accommodation but declined to take part in the scheme.
The level of accommodation required at the school is currently being reassessed by the planning section of my Department. The school authorities will be contacted on the matter in due course.
Question No. 981 answered with QuestionNo. 837.
Question No. 982 answered with QuestionNo. 942.
Question No. 983 answered with QuestionNo. 876.
Question No. 984 answered with QuestionNo. 825.
Question No. 985 answered with QuestionNo. 823.
Question No. 986 answered with QuestionNo. 920.
Question No. 987 answered with QuestionNo. 942.
Question No. 988 answered with QuestionNo. 920.
Question No. 989 answered with QuestionNo. 942.
Question No. 990 answered with QuestionNo. 920.
Question No. 991 answered with QuestionNo. 942.
Question No. 992 answered with QuestionNo. 920.
Question No. 993 answered with QuestionNo. 942.
Question No. 994 answered with QuestionNo. 920.
Paul McGrath
Question:
995
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34503/04]
Paul McGrath
Question:
998
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34506/04]
Paul McGrath
Question:
999
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34507/04]
Paul McGrath
Question:
1001
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34509/04]
Paul McGrath
Question:
1002
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34510/04]
Paul McGrath
Question:
1004
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34512/04]
Paul McGrath
Question:
1009
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34517/04]
Paul McGrath
Question:
1010
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34518/04]
Paul McGrath
Question:
1011
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34519/04]
Paul McGrath
Question:
1012
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34520/04]
Paul McGrath
Question:
1013
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34521/04]
Paul McGrath
Question:
1014
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34522/04]
Paul McGrath
Question:
1018
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34526/04]
Paul McGrath
Question:
1019
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34527/04]
Paul McGrath
Question:
1020
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34528/04]
Paul McGrath
Question:
1026
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34534/04]
Paul McGrath
Question:
1027
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34535/04]
Paul McGrath
Question:
1028
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34536/04]
Paul McGrath
Question:
1029
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34537/04]
I propose to take Questions Nos. 995, 998, 999, 1001, 1002, 1004, 1009 to 1014, inclusive, 1018 to 1020, inclusive, and 1026 to 1029, inclusive, together.
Construction is well under way on the projects referred to by the Deputy. It is envisaged that these projects will be completed in the latter half of 2005.
The day-to-day management of projects is a matter for each school and their design teams. The specific information requested by the Deputy in regard to each project is not readily available in my Department in the format requested by him.
Question No. 996 answered with QuestionNo. 837.
Question No. 997 answered with QuestionNo. 833.
Questions Nos. 998 and 999 answered with Question No. 995.
Question No. 1000 answered with QuestionNo. 920.
Questions Nos. 1001 and 1002 answered with Question No. 995.
Question No. 1003 answered with QuestionNo. 837.
Question No. 1004 answered with QuestionNo. 995.
Question No. 1005 answered with QuestionNo. 876.
Questions Nos. 1006 and 1007 answered with Question No. 894.
Question No. 1008 answered with QuestionNo. 876.
Questions Nos. 1009 to 1014, inclusive, answered with Question No. 995.
Question No. 1015 answered with QuestionNo. 837.
Question No. 1016 answered with QuestionNo. 833.
Question No. 1017 answered with QuestionNo. 920.
Questions Nos. 1018 to 1020, inclusive, answered with Question No. 995.
Question No. 1021 answered with QuestionNo. 920.
Question No. 1022 answered with QuestionNo. 837.
Question No. 1023 answered with Question No. 920.
Questions Nos. 1024 and 1025 answered with Question No. 837.
Questions Nos. 1026 to 1029, inclusive, answered with Question No. 995.
Question No. 1030 answered with QuestionNo. 833.
Question No. 1031 answered with QuestionNo. 836.
Questions Nos. 1032 and 1033 answered with Question No. 920.
Paul McGrath
Question:
1034
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34542/04]
Paul McGrath
Question:
1035
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34543/04]
Paul McGrath
Question:
1043
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34551/04]
Paul McGrath
Question:
1044
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34552/04]
Paul McGrath
Question:
1045
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34553/04]
Paul McGrath
Question:
1046
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34554/04]
Paul McGrath
Question:
1047
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34555/04]
Paul McGrath
Question:
1048
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34556/04]
Paul McGrath
Question:
1049
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34557/04]
Paul McGrath
Question:
1050
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34558/04]
Paul McGrath
Question:
1055
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34563/04]
Paul McGrath
Question:
1057
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34565/04]
Paul McGrath
Question:
1064
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34572/04]
I propose to take Questions Nos. 1034, 1035, 1043 to 1050, inclusive, 1055, 1057 and 1064 together.
Construction on the projects referred to by the Deputy commenced in 2004 and it is envisaged that these projects will be completed in the latter half of 2005.
The day-to-day management of projects is a matter for each school and its design team. The specific information requested by the Deputy in regard to each project is not readily available in my Department in the format requested by him.
Question No. 1036 answered with Question No. 837.
Questions Nos. 1037 and 1038 answered with Question No. 894.
Questions Nos. 1039 and 1040 answered with Question No. 920.
Question No. 1041 answered with QuestionNo. 837.
Question No. 1042 answered with QuestionNo. 833.
Questions Nos. 1043 to 1050, inclusive, answered with Question No. 1034.
Question No. 1051 answered with QuestionNo. 894.
Question No. 1052 answered with QuestionNo. 833.
Paul McGrath
Question:
1053
Mr. P. McGrath
asked the
Minister for Education and Science
the date on which the tenders for a project (details supplied) were agreed; the date on which work started on the project; the reason for delays between these respective dates; the estimated construction period; if this project is on schedule; if it is behind schedule; if behind schedule, the reason for the delays; and if she will make a statement on the matter.
[34561/04]

The school referred to by the Deputy was listed as a refurbishment-extension project for proceeding to tender and construction as part of the 2004 school building programme. Following discussions and correspondence with the Department, the board of management has advised the Department that it will purchase a site for a new school provided the project is changed to a new school. The Department has agreed to facilitate this request being explored provided it can be achieved within the existing budget set for the project.
The Department has made it clear to the board of management that the onus is on it to explore the new school option within an indicative timescale set by the Department. It is envisaged that interaction with the Department will be kept to a minimum. However, in the event of it not proving possible to progress the new school option for reasons such as site acquisition, budget issues etc., the project will revert back to a refurbishment-extension of the existing school. The board of management has accepted this and is currently working on the acquisition of a site following which they have been authorised to engage a design team to commence design work on the school.
Question No. 1054 answered with QuestionNo. 823.
Question No. 1055 answered with QuestionNo. 1034.
Question No. 1056 answered with QuestionNo. 837.
Question No. 1057 answered with QuestionNo. 1034.
Question No. 1058 answered with QuestionNo. 920.
Questions Nos. 1059 and 1060 answered with Question No. 833.
Question No. 1061 answered with QuestionNo. 876.
Question No. 1062 answered with QuestionNo. 833.
Question No. 1063 answered with QuestionNo. 836.
Question No. 1064 answered with QuestionNo. 1034.
Question No. 1065 answered with QuestionNo. 876.
Question No. 1066 answered with QuestionNo. 816.
Phil Hogan
Question:
1067
Mr. Hogan
asked the
Minister for Education and Science
the names of all primary and post primary schools that are the subject of an application for financial resources to extend, amalgamate or construct a new school for Counties Carlow and Kilkenny; and if she will make a statement on the matter.
[1043/05]
The information sought by the Deputy is not readily available in my Department. However, if the Deputy has a query about any specific school, I would be happy to provide the information for him.