344 Dr. Cowley asked the Minister for Communications, Marine and Natural Resources if he will provide the maximum permissible operating pressure of the 9 km upstream Corrib gas pipeline; and if he will make a statement on the matter. [22456/05]

View answer

Written answers

The normal operating pressure at the start of production will be 120 bar and the absolute maximum operating pressure will be 150 bar.