Skip to main content
Normal View

Office of Public Works

Dáil Éireann Debate, Tuesday - 8 November 2022

Tuesday, 8 November 2022

Questions (323)

Catherine Murphy

Question:

323. Deputy Catherine Murphy asked the Minister for Public Expenditure and Reform the refurbishment works that the OPW plans to carry out at Garda stations within the DMR over the next six months; the nature of these works; and when these projects will commence in tabular form. [55514/22]

View answer

Written answers

I can confirm that the Office of Public Works has a number of scheduled refurbishment works to Garda Stations within the DMR to be carried out over the next six months. The Garda Stations and the nature of the works to be carried out are outlined in the table below and include works valued in excess of €100,000 which are funded either by the OPW or Garda Estate Management.

The Commencement dates for the scheduled works are subject to the final sign off of operational and design requirements by An Garda Síochána and where necessary, a successful tendering process.

Garda Station

Nature of the works

Works Due for Commencement

Bray Garda Station

Atrium Roof Replacement

Q2/3-2023

Cabinteely Garda Station

Painting, including repairs to plaster

Agreed to be carried out in phases over the next year

Cabinteely Garda Station

Showers on Ground Floor

On Site

Crumlin Garda Station

Repurpose Radio Workshops

Work to commence Q4-2022

Dun Laoghaire Garda Station

UA Works to Public Area and Ancillary Works

On Site

Ronanstown Garda Station

New Changing Facilities

On Site

Enniskerry Garda Station

Fabric Upgrade Works

On Site

Kevin Street Garda Station

Glazing Replacement

Q2-2023

Kilmainham Garda Station

Fabric Upgrade Works the “The Stables” building

Q2-2023

Pearse Street Garda Station

Roof Works

On Site

Cabra Garda Station

Refurb/Reconfigure Portacabins

Q2/Q3 2023 tbc

Coolock Garda Station

Conversion of Container to Storage

Q3-2023 tbc

Coolock Garda Station

Refurb Existing External Outhouses

Q3-2023 tbc

Finglas Garda Station

Repair of Tower Glass Façade

Q3 2023

13 A O’Connell Street

Refurbishment and Fitout Works

On Site

Malahide Garda Station

Attic Maintenance and Repairs to Roof

Q2 2023

Garristown Garda Station

Driveway Resurface and possible Accessibility Works

Q1/Q2 2023

Swords Garda Station

Canteen Refurbishment

Q1/Q2 2023

Top
Share