Skip to main content
Normal View

North-South Interconnector

Dáil Éireann Debate, Friday - 7 September 2018

Friday, 7 September 2018

Questions (1057)

Brendan Smith

Question:

1057. Deputy Brendan Smith asked the Minister for Communications, Climate Action and Environment when his Department received the two independent reports relating to the proposed North-South interconnector; when it is planned to publish these reports; and if he will make a statement on the matter. [36757/18]

View answer

Written answers

In 2017 I commissioned two studies designed to address the main points of the motions passed in Dáil and Seanad Éireann as well as key concerns expressed by the parties opposed to the development of the North South Interconnector as an overhead line. The first is an independent study to examine the technical feasibility and cost of undergrounding the interconnector. The second study is focused on the levels of compensation provided to land and property owners in proximity to high-voltage transmission lines in a European context. Both studies are now completed and have been submitted to me. I expect to bring both reports to Government in the coming weeks and will publish them as soon as possible thereafter.

Top
Share