Peter Barry
Ceist:183 Mr. Barry asked the Minister for the Environment the estimated cost of the proposed enquiry into the lower river crossing of the River Lee.
Vol. 398 No. 10
183 Mr. Barry asked the Minister for the Environment the estimated cost of the proposed enquiry into the lower river crossing of the River Lee.
The public inquiry on the downstream crossing of the river Lee will be reopened on 24 July 1990. It is not possible, at this stage, to indicate the estimated cost involved.