The information sought by the Deputy is as follows:
(1) The smolts which are temporarily stocked at trial sites in Mulroy Bay and Lough Swilly will be transferred back to the company's existing licensed site at Lough Swilly. The permitted harvested tonnage is 1,000 tonnes.
(2) The smolts which are temporarily stocked at a trial site in Doonbeg will be transferred to the company's licensed site at Roancarrig. The permitted harvested tonnage is 600 tonnes.
(3) The smolts which are temporarily stocked at a trial site in Travarra will be transferred to the company's licensed site at Inishfarnard. The permitted harvested tonnage is 500 tonnes.