Léim ar aghaidh chuig an bpríomhábhar
Gnáthamharc

Harbours and Piers.

Dáil Éireann Debate, Wednesday - 5 July 2006

Wednesday, 5 July 2006

Ceisteanna (59)

Róisín Shortall

Ceist:

52 Ms Shortall asked the Minister for Communications, Marine and Natural Resources if he will provide information on the €7.9 million funding for coastal protection and small harbours during 2006; if this funding will increase in 2007; and if he will make a statement on the matter. [26629/06]

Amharc ar fhreagra

Freagraí scríofa

Under the Small Fishery Harbours Programme 2006 €4.186 million has been allocated for the improvement of facilities at small harbours and landing places with a key role in maintaining jobs in fishing, aquaculture and ancillary activities. €3.721 million has been allocated under the Coastal Protection Programme 2006 to address priority coast protection works around the coastline.

A number of the projects are being co-funded with the Department of Community, Rural and Gaeltacht Affairs and this Department under the CLÁR scheme. This scheme is to facilitate minor repairs and safety works on small piers, slipways and coastal erosion in CLÁR areas, including Gaeltacht areas and islands.

A list of projects under the Coastal Protection and the Small Harbours Programmes showing breakdown of funding is attached.

The financial envelope including funding requirements for the fishery harbours and coast protection measures under the NDP 2007-2013 is currently being formulated.

Small Harbours Programme 2006

Project

Project Description

DCMNR Cost 75%/ 37.5%

Co-funded DCRGA 37.5%

Total cost 100%

€000’s

€000’s

€000’s

Wexford

Courtown

Grouting and structural repairs to harbour wall

37.5

50

Kilmore Quay

Site investigation to complement hydrographic survey

135

180

Killurin Pier

Slipway reconstruction and safety works

22.5

30

Slade Harbour

Structural improvements to old pier wall

30

40

Cahore

Protection works

18.75

25

Waterford

Ardmore Pier

Raising of the Deck Level

12

16

Blackwater

Construction of slipway and turning circle

45

60

Cork

Knockadoon

Redecking & reproofing of slipway

75

100

Schull Pier

Relocation of services and new lighting

33.75

33.75

90

Kerry

Caherciveen Pier

Additional fendering

7.5

7.5

20

Renard

Repair and stabilisation of pier (study)

75

100

Tarbert

Structural assessment

8

10

Limerick

Kilteery

Surface decking

19

25

Clare

Ballyvaughan

Pier Repairs

44.625

44.625

119

Doonbeg

Pier extension and dredging (SI and design)

22.5

30

Carrigaholt

Repairs to old pier & dredging

64

64

170

Galway

Cleggan Pier

New Berthage & access (preliminary report)

54.75

73

Blackweir, Maree

Holding tank & breakwater

120

160

Rosroe

New key wall and slipway

74.55

74.55

198.80

Ballyconnelly

Construction of access road

60

60

160

Wallace Quay

Construction of access road, new deck slab and parapet wall

75

75

200

Parkmore Pier, Kinvara

Essential repairs

22.5

30

Mayo

Purteen

New development options study

75

100

Newport

Repairs to quay and dredging

37.5

50

Roigh pier

New Slipway

75

75

200

Cloghmore

Re-deck old pier and structural improvements

56.25

56.25

150

Sligo

Raghly Pier

Harbour Improvement works

202.5

280

Donegal

Dungloe

Slipway and turning area

67.5

67.5

180

Burtonport

Dredging

585

780

Buncrana

Breakwater

225

300

Woodquarter

Lighting

7.5

10

Portnoo

Urgent safety works

22.5

30

Arranmore, Stacamore Pier

Re-decking and mooring rings

7.5

7.5

20

Donegal Town

Pontoons for small craft and waterbus with slipway extension

150

200

Totals

2,568.17

565.67

4,186.80

Coast Protection Programme 2006

Project

Project Description

DCMNR Cost 75%/ 37.5%

Co-funded DCRGA 37.5%

Total cost 100%

€000’s

€000’s

€000’s

Louth

Port Beach

Study

29.25

39

Annagasssan

Rock revetment Phase 3 (Continuation)

97.5

130

Meath

Mornington

Armour Protection

75

100

Bettystown-Laytown

Coastal Protection Study

9

12

Laytown-Seafield Road

Coastal Protection study

9

12

Dublin (Fingal)

Portrane

Repairs to dunes at the Borrow

75

100

Dublin City Council

Clontarf

Studies/advanced design/site investigations

187.5

250

Dún Laoghaire-Rathdown

Killiney

Gabions at Killliney Beach (continuation)

215.981

287.975

Wicklow

The Murrough

Coastal Studies

41.25

55

Bray

Flood prevention works work to promenade

4.5

6

Bray to Greystones

Protection works to cliff walk (continuation)

69.085

92.113

Wexford

Courttown

Project planning and design stage for major protection scheme

75

100

Rosslare

Rock revetment

375

500

Ballinamona

Restore access to beach

37.5

50

Carne

Rock revetment

75

100

Rosslare

Study of coastal dynamics and protection requirements

150

200

Rosslare

Maintenance work at Rosslare Strand

45

45

Waterford

Bonmahon

Reconstruction of sand dunes Protection works scheme design

656.2

875

Ballyquin

Rock armour and Gabion wall

75

100

Cork

Glyeen

Cliff protection works (Continuation)

206.25

275

Kerry

Rossbeigh

Cliff and road protection studies and design. Linked to dredging at Cromane Pier project

15

20

Maharees

Revetment works

14

18

Baile an Rannaig

Protection to sand dunes in Smerwick Harbour

26.25

26.25

70

Cooncrome

Protection works to car park

18.75

18.75

50

Gleesk

Repairs and strengthen sea wall

11.25

11.25

30

Mayo

Mulranny Beach

Repairs to causeway and bridge

37.5

37.5

100

Donegal

Bundoran

Construction of retaining wall

78.375

104.500

Total

2,709.94

93.75

3,721.588

Barr
Roinn