Schools Building Projects.

Dáil Éireann Debate, Wednesday - 26 September 2007

Wednesday, 26 September 2007

Ceisteanna (731, 732)

Emmet Stagg

Ceist:

822 Deputy Emmet Stagg asked the Minister for Education and Science the number of contractors who have submitted tenders for the design of the new Kill National School in County Kildare; and if it is possible to bring forward the scheduled completion date indicated from September 2009 to September 2008. [21000/07]

Amharc ar fhreagra

Freagraí scríofa

The process of appointing a Design Team to the building project referred to by the Deputy is at an advanced stage. Twenty four design consultants, not contractors, were shortlisted at the pre-qualification stage and were subsequently invited to submit tenders. The closing date for receipt of tender submissions from shortlisted design candidates was Friday, 21 September. After these submissions have been assessed and the Consultants' tax clearance and insurance details have been checked and verified, contracts will be signed with the preferred candidates. I have been advised that the Design Team will be in place and that architectural planning will commence for the proposed new 32-classroom primary school in November. A timeline for the progression of this project through the early design stages, to construction and final completion will be discussed and agreed with the design team during the early stages of design.

Emmet Stagg

Ceist:

823 Deputy Emmet Stagg asked the Minister for Education and Science if a design team has been sought for the required extension to a school (details supplied) in County Kildare. [21001/07]

Amharc ar fhreagra

The Board of Management of the school referred to by the Deputy is the Client/Contracting Authority for their proposed building project. As client, the Board is currently overseeing the appointment of an architectural Design Team and this process is almost halfway towards completion.