My Department entered into a contract with "3", a Hutchinson Whampoa company, for the delivery of the National Broadband Scheme (NBS) in late December 2008. Since then, 3 has progressed its network roll-out and since October 2010, NBS broadband services are available in all of the 1,028 designated Electoral Divisions (ED) covered under the Scheme, in line with contractual commitments.
3's primary contractual obligation centred on ensuring that service was available in all NBS areas by October last. In order to ensure the successful delivery of this obligation, 3 extended and enhanced its network and now has 390 sites across the NBS areas. I have provided a table below which details the breakdown of these sites.
Breakdown of Structures for NBS
|
Total
|
Greenfield Sites (new build structures)
|
197
|
Co-location on existing structures
|
186
|
Buildings
|
7
|
Total
|
390
|
My Department has put in place robust monitoring arrangements to ensure that the NBS network delivers the minimum specified service or better to all users. Performance delivery data, which is submitted to my Department on a monthly basis or as required, is critically analysed by independent technical consultants, Analysys Mason Ltd.
On the basis of the information provided to my Department, I am satisfied that the specified service levels required under the NBS contract are being met.