The total amount expended in the primary sector on renovation (large scale refurbishments, emergency works, summer works schemes) amounted to €120.7m in 2010 and to date in 2011 amounts to €39.2m (inclusive of jobs initiative).
In the post-primary sector the total amount expended on renovation (large scale refurbishments, emergency works, summer works schemes and the jobs initiative) amounted to €92.7m in 2010 and to date in 2011 amounts to €32.3m.
(a) incurred expenditure on large scale refurbishment projects in 2010 and to date in 2011;
(b) incurred expenditure on emergency works approved in 2010 and approved to date in 2011;
(c) incurred expenditure on the summer works scheme approved in 2010 and the summer works scheme and jobs initiative scheme approved in 2011.
The attachments do not include details of the schools that incurred expenditure in 2010 or to date in 2011 in respect of emergency works or the summer works schemes approved prior to 2010. However, the actual expenditure incurred in 2010 or to date in 2011 on pre-2010 approved schemes is included in the total amounts given above.
I draw the Deputy's attention to the Grant Scheme for Minor Works to National School Properties that issued in November 2010 to all primary schools with full recognition. This grant is spent primarily on the physical infrastructure of schools and cost €28.2m.
The information has been forwarded separately to the Deputy.
Post-Primary Emergency 2010 Scheme
|
|
€
|
CARLOW
|
|
|
ST LEOS COLLEGE
|
Window Replacement
|
410,473.00
|
COLAISTE EOIN HACKETSTOWN
|
Dry Rot
|
27,907.49
|
COLAISTE MHUIRE CARLOW, KNOCKBEG
|
|
362,428.00
|
TOTAL CARLOW
|
|
800,808.49
|
CAVAN
|
|
|
LORETO COLLEGE, CAVAN
|
Boiler Replacement
|
119,410.70
|
ROYAL SCHOOL CAVAN
|
Replace ceilings
|
21,180.00
|
ST BRICKINS BELTURBET
|
Provide Off Street Bus Parking Area Security System Professional Fees & Expenses
|
82,847.33
|
CAVAN VOCATIONAL SCHOOL, COOTEHILL RD, CAVAN
|
Ejector Station & Public Lighting, Refurb Sotres Building & Replace Oil Tank, Replace Water Storage Tanks & Refurb of Central Heating System
|
84,160.04
|
ST AIDANS COMPREHENSIVE SCHOOL, COOTEHILL
|
Refurbish Toilets & Sports Changing Rooms Tarmac Car Park & Student Walkways
|
585,405.20
|
BAWNBOY C C, BELTURBET
|
Replace windows
|
91,685.26
|
TOTAL CAVAN
|
|
984,688.53
|
CLARE
|
|
|
CBS ENNISTYMON
|
Replacement of ceiling & roof
|
31,451.66
|
COLAISTE MHUIRE, ENNIS
|
Provision of safe access/egress to & from the school building & provision of washing/toilet facility for student with physical disability
|
23,315.01
|
MARY IMMACULATE S S LISDOONVARNA
|
Work to Address Subsidence of part of School Site Replace oil burner & boiler Car parking
|
86,810.92
|
ST JOSEPHS, TULLA
|
Alterations to Entrance of New Fence Fire detection system for prefabs to be connected to main building
|
33,349.89
|
ENNISTYMON VS
|
Refurb Home Economics Room, Woodwork Store, Science Lab & Replace Hand Raid & Fill Pot Holes
|
156,158.61
|
ST PATRICKS SHANNON
|
replace 2 existing oil boilers & associated works
|
95,914.04
|
TOTAL CLARE
|
|
427,000.13
|
CORK
|
|
|
SCOIL MHUIRE GAN SMAL
|
replace boiler & piping
|
16,279.29
|
COLAISTE CHROI NAOFA
|
removal of asbestos
|
38,061.80
|
ST ALOYSIUS COLLEGE
|
Replace Fire Alarm & Emergency Lighting
|
94,374.60
|
NAGLE RICE
|
Fire Safety Works
|
177,892.98
|
ST COLMANS COLLEGE
|
Repair Portion of Roof Roof Repairs Leaks in the gas supply line Roof repairs
|
26,177.33
|
PATRICIAN ACADEMY
|
Upgrade of Science labs
|
19,000.00
|
PRESENTATION SECONDARY SCHOOL CORK, MITCHELSTOWN
|
Upgrade ESB
|
26,815.00
|
MOUNT ST MICHAEL, ROSSCARBERY
|
Disabled Access Toilet
|
14,780.96
|
ST FACHTNAS DE LA SALLE, SKIBBEREEN
|
Disabled toilet
|
18,466.95
|
NORTH MONASTERY CBS
|
Replacement External Steps
|
42,115.76
|
NORTH PRESENTATION, FARRANREE
|
Replace Mortar in blocks
|
21,980.00
|
ST ALOYSIUS
|
Replace Gym Ceiling
|
12,257.50
|
ST ANGELAS COLLEGE
|
|
9,000.00
|
CHRIST THE KING, SOUTH DOUGLAS ROAD
|
Fire Safety Works
|
497,833.82
|
ST BROGANS COLLEGE, BANDON
|
Roof Works
|
106,795.00
|
SCOIL MHUIRE BALLINGEARY
|
upgrade electrical services
|
48,837.89
|
COLAISTE TREASA, KANTURK
|
replace 2 boilers
|
54,199.20
|
ST AIDENS BALLYVOLANE, BALLINCOLLY
|
Repairs to roof of PE Hall
|
75,663.54
|
ST JOHNS CENTRAL COLLEGE, SAWMILL STREET
|
Repairs to Spalling Plasterwork
|
61,867.66
|
ASHTON SCHOOL, BLACKROCK
|
Upgrade Electrical Installation
|
54,189.17
|
BOHERBUE COMPREHENSIVE SCHOOL
|
repairs to flat roof
|
16,279.29
|
MILLSTREET COMMUNITY SCHOOL
|
Wall Repairs
|
16,931.26
|
DOUGLAS COMMUNITY SCHOOL
|
replace water storage tank
|
19,523.28
|
BISHOPSTOWN C S
|
Replace Footpath at Main Entrance replace single glazed windows
|
31,280.13
|
MAYFIELD COMMUNITY SCHOOL
|
replace roof & gutters to sports hall
|
143,619.68
|
YOUGHAL C S
|
Disabled Access
|
0.00
|
TOTAL CORK
|
|
1,644,222.09
|
DONEGAL
|
|
|
GORTAHORK ADULT TRAINING
|
Disabled Toilet
|
31,875.00
|
MILFORD ADULT EDUCATION CENTRE AND TRAINING CENTRE
|
Structural Repair Works Electrical Works
|
184,666.76
|
ST COLUMBAS COLLEGE, LIFFORD
|
Upgrade Electrical Access for all improvements
|
365,000.00
|
CRANA COLLEGE
|
upgrade Home Economics Room
|
104,703.00
|
CARRICK VOCATIONAL SCHOOL, CARRICK
|
Roof Works
|
491,552.00
|
ST CATHERINES VOCATIONAL SCHOOL, KILLYBEGS
|
disabled access
|
99,638.87
|
ROYAL & PRIOR SCHOOL, RAPHOE
|
Roof Works Replacement of Boiler
|
224,132.76
|
POBALSCOIL CHLOICH CHEANNFHAOLA
|
Replace Floor Covering
|
31,736.44
|
GWEEDORE COMMUNITY SCHOOL
|
Replacement of Space Heating & Domestic Water Replace water pipework Replacment of floor covering
|
597,538.43
|
BALLYSHANNON COMMUNITY SCHOOL
|
Replace Boiler & Pump
|
7,274.22
|
DONEGAL VEC, LETTERKENNY
|
|
89,500.00
|
TOTAL DONEGAL
|
|
2,227,617.48
|
DUBLIN
|
|
|
ST MARYS SECONDARY SCHOOL, BALDOYLE
|
Ceiling Replacement Repair leaks to gutters Replace oil storage tank
|
34,562.52
|
CLONKEEN COLLEGE, BLACKROCK
|
Disabled Access
|
101,407.00
|
LORETO ABBEY, DALKEY
|
Repair spalling concrete Replace cold water storage tanks
|
85,282.14
|
HOLY CHILD KILLINEY, MILITARY ROAD KILLINEY
|
structural repairs to library bay window
|
23,805.28
|
ST BENILDUS COLLEGE, UPPER KILMACUD RD, BLACKROCK
|
Repairs to Gable Wall Suffering From Water Ingress
|
3,112.50
|
ST LAURENCES COLLEGE, LOUGHLINSTOWN, DUBLIN 18
|
Replacement of oil burner
|
51,911.00
|
COLAISTE PHADRAIG CBS, ROSELAWN
|
Water Supply to Science Rooms
|
1,650.00
|
THE KINGS HOSPITAL, PALMERSTOWN
|
Security cameras
|
9,670.00
|
ST FINTANS HIGH SCHOOL, SUTTON
|
Lift & Ramps
|
17,000.00
|
MANOR HOUSE RAHENY, WATERMILL ROAD, RAHENY
|
Upgrade Heating System
|
127,210.25
|
ST DOMINICS HIGH SCHOOL, GREENFIELD, DUBLIN 13
|
conversion of gas & removal of oil tanks
|
104,694.34
|
ST PAULS CBS, NORTH BURNSWICK STREET
|
Repairs to heating system
|
9,716.60
|
O’CONNELL CBS, NORTH RICHMOND STREET
|
Refurb Toilets Roof Works
|
303,766.45
|
CBS SYNGE STREET
|
Provison of Specialist Teaching Rooms
|
198,246.00
|
MEANSCOIL IOGNAID RIS, WALKINSTOWN
|
Re-surfacing of Tarmac Footpaths
|
39,079.25
|
ST JOHNS COLLEGE DE LA SALLE BALLYFERMOT
|
Refurb 3 Science Rooms
|
470,898.69
|
CHANEL COLLEGE COOLOCK
|
Repairs to Leaking Heating Mains & Incoming Fire Main
|
14,434.31
|
ST KEVINS COLLEGE, EAST FINGLAS
|
Replace of Gas line in science Labs
|
10,673.79
|
ST DOMINIC’S COLLEGE CABRA
|
Drainage
|
28,500.00
|
ST MARY’S, KILLESTER
|
Upgrade Electrical & Installation of Emergency Evacuation System Replace water storage tank
|
389,504.26
|
PRESENTATION CONVENT WARRENMOUNT
|
Drainage & Resurfacing of Ball Courts
|
64,113.29
|
MARYFIELD COLLEGE, DRUMCONDRA
|
Roof Repairs
|
53,721.67
|
ROSARY COLLEGE, CRUMLIN
|
Repair of Gym Floor
|
3,405.00
|
OUR LADY OF MERCY DRIMNAGH
|
Sports Hall Floor
|
36,889.74
|
WESLEY COLLEGE, BALLINTEER
|
replace leaking water services pipes in science block
|
49,272.00
|
STRATFORD COLLEGE, RATHGAR
|
Roof Works
|
27,233.95
|
BALBRIGGAN C C
|
Replacement of Gas Boiler, Replacement of LPG Bottle Gas System for Science Rooms
|
321,551.27
|
GRANGE COMMUNITY COLLEGE, DONAGHAMEDE
|
Electrical upgrade
|
778,670.99
|
DEANSRATH COMMUNITY COLLEGE, CLONDALKIN
|
Replace Floor Covering Removal of Trees
|
101,936.86
|
ST KEVINS COMMUNITY COLLEGE, CLONDALKIN
|
Disabled Toilet
|
26,310.00
|
DUN LAOGHAIRE COLLEGE OF FURTHER EDUCATION
|
Roof Works
|
17,245.00
|
DUNDRUM COLLEGE OF FURTHER EDUCATION
|
Upgrade Electrical, Refurb Toilets
|
389,846.60
|
LUCAN V S
|
Disabled Toilet / Access
|
16,555.96
|
FINGAL COMMUNITY COLLEGE
|
Ramp / Disabled Access Ramp/Disabled Access to Computer Room
|
20,000.00
|
FIRHOUSE COMMUNITY COLLEGE
|
|
305,504.98
|
ST KEVINS COMMUNITY COLLEGE, CRUMLIN
|
|
7,126.88
|
COLAISTE EOIN, FINGLAS
|
Roof Works
|
160,145.45
|
SKERRIES COMMUNITY COLLEGE
|
Roof Works
|
0.00
|
PRESENTATION COLLEGE TERENURE
|
Asbestos Removal & Replacement Flooring
|
192,034.63
|
COLAISTE DHULAIGH
|
Roof Works
|
542,640.16
|
NEWPARK COMPREHENSIVE SCHOOL, BLACKROCK
|
Disabled Access
|
14,522.41
|
MOUNT TEMPLE COMPREHENSIVE SCHOOL
|
Reinstatement of grass pitches & Basketball area Cleanup reinstatment works — diesel spillage
|
357,614.34
|
TRINITY COMPREHENSIVE
|
Roof Works Replacement CCTV
|
529,363.69
|
SCOIL PHOBAIL CHUIL MHIN
|
Heating Works
|
111,685.32
|
BLAKESTOWN COMMUNITY SCHOOL, BLANCHARDSTOWN
|
Repair Water Main
|
16,949.99
|
HOLY CHILD C S SALLYNOGGIN
|
replace fire alarm
|
11,214.43
|
ST MARKS SPRINGFIELD, TALLAGHT
|
Rewiring Replace Boiler
|
480,680.17
|
OLD BAWN COMMUNITY SCHOOL, TALLAGHT
|
Replacement of oil Storage Tank Electrical upgrade
|
76,405.18
|
KILLINARDEN COMMUNITY SCHOOL, TALLAGHT
|
Replacement of oil Storage Tank Electrical upgrade
|
322,564.68
|
ST AIDENS BROOKFIELD, TALLAGHT
|
Roof Works Upgrade Heating System Refurb of water system hot & cold sanitary areas, sinks, toilets Replacement of Floor covering
|
1,544,788.14
|
POBAILSCOIL NEASAIN, BALDOYLE
|
Disabled Access
|
49,976.20
|
ROSMINI COMMUNITY SCHOOL, DROMCONDRA
|
Renovation of Reception Area, Office & Visitors Room & Construction of New Reception Area
|
46,421.82
|
CITY OF DUBLIN YOUTH SERVICES
|
Renovation of Reception Area, Office & Visitors Room & Construction of New Reception Area
|
122,314.00
|
CITY OF DUBLIN VEC PREMISES HERBERT STREET DUBLIN
|
Renovation of Reception Area, Office & Visitors Room & Construction of New Reception Area
|
123,868.40
|
PARNELL ADULT LEARNING CENTRE
|
Renovation of Reception Area, Office & Visitors Room & Construction of New Reception Area
|
230,838.00
|
TOTAL DUBLIN
|
|
9,178,535.58
|
GALWAY
|
|
|
PRESENTATION GALWAY
|
Replacement of Concrete Parapets & 6 Areas of Glazed Windows
|
130,206.00
|
PRESENTATION COLLEGE, ATHENRY
|
Refurb of 2 clrooms for add enrolments
|
347,787.21
|
ST JOSEPHS GARBALLY
|
Upgrade heating system in Technology Room Roof & Ceiling Works Boiler Replacement Replace Two Boilers
|
312,754.13
|
COLAISTE EINDE, THREADNEEDLE ROAD
|
Disabled Access
|
218,076.63
|
MEAN SCOIL MHUIRE, NEWTOWNSMITH
|
Repair of External Concrete Structure & Replacement of Render
|
221,464.23
|
HOLY ROSARY COLLEGE, MOUNTBELLEW
|
Replace Penthouse Water Tank & Structure
|
25,565.00
|
GAIRMSCOIL FHEICHIN NAOFA
|
|
71,250.00
|
COLAISTE NA COIRIBE
|
Replace Damaged Section of Railings & Supporting Wall
|
75,644.84
|
COLAISTE AN EACHREIDH
|
provision of drop off/pick up & car parking
|
177,424.21
|
SCOIL CHUIMSITHEACH CHIARAIN, AN CHEATHRU RUA
|
Replacement of asbestos flooring
|
107,719.95
|
SCOIL POBAIL MHIC DARA
|
Boundary Fence
|
24,336.67
|
GORT COMMUNITY SCHOOL
|
Replace Light Fixtures
|
83,721.56
|
TOTAL GALWAY
|
|
1,795,950.43
|
KERRY
|
|
|
MEAN SCOIL NAOMH JOSEPH, CASTLEISLAND
|
Upgrade Electrical Installation
|
164,450.00
|
ST BRENDANS COLLEGE, CILL AIRNE
|
Roof Works
|
465,829.00
|
PRESENTATION S.S. MILLTOWN, KILLARNEY
|
Disabled access
|
50,519.59
|
TRALEE CC
|
Heating Upgrade Install Gas proving system
|
320,042.50
|
GAELCHOLAISTE CHIARRAI, TRALEE
|
Replacement of Roof of the Sports Hall & Squash Courts
|
0.00
|
CASTLEISLAND V S
|
Disabled access
|
45,848.31
|
CAHIRCIVEEN COMMUNITY COLLEGE
|
roof repairs, replace existing external doors, replace damaged window lever handles & locking mechanisms, replace deteriorated incoming gas pipework & defective floor surface in existing toilet.
|
70,727.00
|
TARBERT COMMUNITY SCHOOL
|
Replace Electrical Distribution boards
|
77,777.56
|
DINGLE CS
|
Fencing & provision of boundary wall
|
7,838.36
|
TOTAL KERRY
|
|
1,203,032.32
|
KILDARE
|
|
|
COLAISTE NAOMH MHUIRE, NAAS
|
Roof Works
|
269,327.00
|
CURRAGH POST PRIMARY
|
Ground clearance works & fencing
|
0.00
|
COLAISTE LORCAIN CASTLEDERMOT
|
|
17,433.60
|
SCOIL DARA KILCOCK
|
Repair of External Rendering
|
39,518.00
|
ST CONLETHS VOCATIONAL SCHOOL, NEWBRIDGE
|
|
63,659.32
|
TOTAL KILDARE
|
|
389,937.92
|
KILKENNY
|
|
|
COLAISTE EAMANN RIS, CALLAN
|
Fire Safety Works
|
42,888.28
|
ST BRIGID’S COLLEGE CALLAN
|
Demolition of Old Building
|
75,863.00
|
ST KIERANS COLLEGE KILKENNY
|
Replace Distribution Boards Eradication of dry rot
|
50,958.66
|
KILKENNY COLLEGE
|
Replace Boiler
|
32,341.53
|
ORMONDE COLLEGE
|
Remedial Work Heating System
|
16,000.00
|
GRENNAN COLLEGE THOMASTOWN
|
Draught Proofing & Insulation
|
25,300.00
|
CBS KILKENNY
|
Upgrade Fire Safety
|
75,665.10
|
TOTAL KILKENNY
|
|
319,016.57
|
LAOIS
|
|
|
LAOIS EDUCATION CENTRE
|
Leaking Roof
|
11,590.62
|
TOTAL LAOIS
|
|
11,590.62
|
LEITRIM
|
|
|
CARRIGALLEN V S
|
Electrical Upgrade
|
67,166.53
|
DRUMSHAMBO V.S.
|
School Lift Lift Transfer science furniture & equipment
|
102,970.73
|
SCOIL CHUIMSITHEACH NAOMH CLAR
|
New Floor in Gym Platform Lift
|
102,295.53
|
DRUMKEERIN VS
|
Replace boiler Replace Oil Tank
|
17,366.78
|
TOTAL LEITRIM
|
|
289,799.57
|
LIMERICK
|
|
|
CBS SEXTON STREET
|
Roof Works Repair Water Main
|
197,439.28
|
ST MUNCHIN’S COLLEGE, CORBALLY
|
Replacement of Main Electrical Switch Board Science Lab
|
19,184.83
|
ARD SCOIL MHUIRE CORBALLY
|
Repair water leak
|
35,964.76
|
JOHN THE BAPTIST COMMUNITY SCHOOL
|
Upgrade Heating System
|
95,471.77
|
LIMERICK SENIOR COLLEGE, MULGRADE STREET
|
Replacement of Water Main System
|
65,561.91
|
COLAISTE POBAIL MHICHIL
|
Repairs to Footpaths
|
2,332.05
|
DRUMCOLLOGHER COMMUNITY COLLEGE
|
Repair to Gym Roof
|
45,568.34
|
SCOIL POL KILFINANE
|
Replacement of Oil Pipework
|
24,439.97
|
CRESCENT COLLEGE COMPREHENSIVE, DOORADOYLE
|
Toilet upgrade
|
30,108.21
|
TOTAL LIMERICK
|
|
516,071.12
|
LONGFORD
|
|
|
MEAN SCOIL MHUIRE
|
Special Needs Access
|
162,671.44
|
CONVENT OF MERCY BALLYMAHON
|
Disabled Access & Upgrade Emergency Fire Exits
|
14,651.37
|
LONGFORD ADULT EDUCATION CENTRE
|
Upgrade M&E under VEC
|
308,400.00
|
CNOC MHUIRE, GRANARD
|
Disabled access
|
216,318.25
|
MOYNE C S
|
Replacement of Damaged Footpath
|
16,116.20
|
TOTAL LONGFORD
|
|
718,157.26
|
LOUTH
|
|
|
ST JOSEPHS, DROGHEDA
|
Security Fencing Replace Boiler House
|
123,582.60
|
ST MARYS DIOCESAN SCHOOL, DROGHEDA
|
|
6,215.96
|
COLAISTE RIS, DUN DEALGAN
|
Works to Valley Gutter & Skylight
|
25,505.60
|
DUNDALK GRAMMAR SCHOOL
|
Replace Boiler
|
30,363.50
|
BUSH POST PRIMARY CC, DUNDALK
|
Replacement of Heating System Disabled Access
|
338,473.04
|
DROGHEDA COLLEGE OF FURTHER EDUCATION
|
Upgrade Internal Aspects of Building to meet Safety Standards
|
163,010.00
|
ST OLIVERS COMMUNITY COLLEGE
|
Refurb Toilet Facilities & Shower Changing Rooms in Gym
|
175,969.01
|
OFIAICH COLLEGE, DUNDALK
|
replacement of heating system in single storey building
|
103,471.20
|
SCOIL UI MHUIRE, DUNLEER
|
Disabled Access
|
43,697.94
|
TOTAL LOUTH
|
|
1,010,288.85
|
MAYO
|
|
|
COLAISTE MHUIRE, TUAR MHIC EADAIGH
|
|
5,154.98
|
SACRED HEART, WESTPORT
|
Disabled Access
|
130,000.00
|
ST MURDEACHS COLLEGE, BALLINA
|
Works to Chimney, Upgrade rear entrance/porch, replace windows in gym, removal of weathered plaster on front of main building
|
45,011.96
|
DAVITT COLLEGE CASTLEBAR
|
Disabled Toilet
|
29,302.73
|
ST MARYS SECONDARY SCHOOL, BALLINA
|
Roof works
|
39,025.00
|
OUR LADYS SECONDARY SCHOOL, BELMULLET
|
Roof Works
|
159,281.44
|
JESUS & MARY S.S. CROSSMOLINA
|
Roof Works on PE Hall & 1920’s Extension
|
180,647.97
|
SCOIL MUIRE & PADRAIG, SWINFORD
|
Window Replacement
|
79,982.90
|
MOYNE V S, BALLINA
|
Roof Works
|
576,454.68
|
ROSSPORT V.S.
|
Replace Heating System
|
177,141.59
|
BALLYHAUNIS COMMUNITY SCHOOL
|
Replace Boiler Replace Ceilings, Carpets, PA System & Office Equipment
|
93,817.29
|
MAYO EDUCATION CENTRE
|
Ramp & Lift
|
36,758.68
|
TOTAL MAYO
|
|
1,552,579.22
|
MEATH
|
|
|
ST OLIVERS POST PRIMARY, KELLS
|
Installation of New Gas Pipework
|
37,786.32
|
SCOIL MHUIRE COM TRIM
|
Replace 2 water tanks Roof Works/repairs to spalling concrete/windows
|
76,486.00
|
DUNSHAUGHLIN V S
|
Replace windows
|
76,766.45
|
O CAROLANS COLLEGE NOBBER
|
Removal of asbestos
|
5,163.95
|
TOTAL MEATH
|
|
196,202.72
|
MONAGHAN
|
|
|
ST LOUIS S.S. MONAGHAN
|
Replace 2 boilers
|
21,961.50
|
OUR LADYS SEC SCHOOL, CASTLEBLANEY
|
Roof Repairs Roof Works (Boiler House & Caretakers Room)
|
49,294.75
|
TOTAL MONAGHAN
|
|
71,256.25
|
OFFALY
|
|
|
SACRED HEART SECONDARY SCHOOL, TULLAMORE
|
Roof Works Replace Heating System
|
73,565.10
|
KILCORMAC VOCATIONAL SCHOOL
|
Remove & Replace oil burner
|
33,670.25
|
TULLAMORE COLLEGE
|
Replace Calorifier in Gym Buildings
|
5,488.21
|
TOTAL OFFALY
|
|
112,723.56
|
ROSCOMMON
|
|
|
CBS ROSCOMMON
|
Works to Water Mains & Sewerage Removal of Chemicals Dry Lining Classrooms Roof
|
222,250.83
|
SCOIL MHUIRE GAN SMAL ROSCOMMON
|
Upgrade Electrical Installation in PE Hall
|
105,973.49
|
TOTAL ROSCOMMON
|
|
328,224.32
|
SLIGO
|
|
|
TUBBERCURRY VS — NORTH CONNAUGHT COLLEGE
|
Disabled Access
|
20,324.70
|
URSULINE COLLEGE
|
Treatment of Rampant Dry Rot
|
78,645.00
|
COOLA V.S., SOOEY, VIA BOYLE
|
Roof repairs & window replacement
|
41,294.47
|
ST MARYS COLLEGE, BALLYSADARE
|
Removal & reinstatement of 2 external Emergency Steel staircases
|
7,727.50
|
SLIGO EDUCATION CENTRE
|
Disabled access, reorganisation of reception area & drain to be installed at fire exit
|
4,235.00
|
TOTAL SLIGO
|
|
152,226.67
|
TIPPERARY
|
|
|
CBS NENAGH
|
Installation of new 4” water main, shut off valves & fire hydrant
|
34,000.00
|
OUR LADYS SECONDARY SCHOOL
|
Refurb boys toilet
|
31,745.00
|
CBS SECONDARY SCHOOL
|
Roof repairs
|
37,131.00
|
THE ABBEY SCHOOL
|
Installation of Fire Alarm & Emergency Lighting
|
76,843.30
|
BORRISOKANE V S
|
Disabled Toilets
|
46,941.00
|
COMERAGH COLLEGE
|
Install lift & disabled toilet
|
93,500.00
|
C T I CLONMEL
|
Science Room Refurbishment
|
130,950.63
|
SCOIL RUAIN
|
Replacement of water tank, repair of leaking pipes Replace existing gas boiler & install gas shut off system
|
27,995.51
|
NEWPORT V S
|
Roof Works Boundary Fence
|
134,940.20
|
TOTAL TIPPERARY
|
|
614,046.64
|
WATERFORD
|
|
|
ST AUGUSTINES COLLEGE
|
Remedial Work on Outer Walls
|
77,235.90
|
C B S TRAMORE
|
Repairs to Roof of Prefabs
|
4,117.28
|
OUR LADY OF MERCY SEC SCHOOL WATERFORD
|
Electrical Works Upgrade Home Economics Room
|
490,403.20
|
CENTRAL TECHNICAL INSTITUTE
|
Roof Works
|
63,917.72
|
ST PAULS C C
|
Repairs to main underfloor & external drainage system
|
265,841.81
|
WOLFE TONE ROAD ED CENTRE
|
Works to Heating System
|
114,865.00
|
WATERFORD CITY VEC, 30 THE MALL
|
Window Replacement
|
104,332.00
|
TOTAL WATERFORD
|
|
1,120,712.91
|
WESTMEATH
|
|
|
COLAISTE MHUIRE
|
Replace Gym Roof
|
193,797.85
|
ST ALOYSIUS COLLEGE
|
Relocation of Mains ESB Meter Board
|
49,596.00
|
CONVENT S S KILBEGGAN
|
Refurb Woodwork Room, Alterations to Form New Machine Area, New Shed for Materials
|
411,965.09
|
ST FINIANS COLLEGE
|
Re-construction of access road
|
50,403.20
|
ST MARYS COLLEGE MULLINGAR
|
Replace canteen ceiling
|
20,423.24
|
LORETO COLLEGE MULLINGAR
|
Roof Works Replace oil tank and pipeworks
|
72,714.18
|
ST JOSEPHS SECONDARY SCHOOL
|
Roof Works
|
22,791.01
|
TOTAL WESTMEATH
|
|
821,690.57
|
WEXFORD
|
|
|
FCJ BUNCLODY
|
Roof Works & Electrical Works In St Brigid’s Block Connection to Foul Drainage to new local authority mains drain
|
169,322.13
|
ST MARY’S CBS ENNISCORTHY
|
New Toilet Block
|
124,967.04
|
COLAISTE BRIDE ENNISCORTHY
|
Roof Works
|
39,500.00
|
CHRISTIAN BROTHERS SS NEW ROSS
|
Roof Works Demolish Old School Building
|
82,217.00
|
GOOD COUNSEL COLLEGE
|
Rainscreen system
|
128,800.00
|
ST MARYS WEXFORD
|
Replace Boilder in Gym
|
18,490.84
|
OUR LADY OF LOURDES
|
Installation of Fire Alarm & Instruder Alarm
|
55,935.66
|
LORETO S.S. SPAWELL RD
|
Replacement of Velux Windows
|
48,200.00
|
PRESENTATION SECONDARY SCHOOL, GROGAN’S ROAD
|
Cracks in the walls from ceiling to ground floor leaks
|
13,023.44
|
ADAMSTOWN VS
|
Refurbish Toilets
|
57,548.57
|
TOTAL WEXFORD
|
|
738,004.68
|
WICKLOW
|
|
|
ST KEVIN’S CBS, ARKLOW
|
Replace Roof in Sports Hall
|
64,080.00
|
ST MARYS COLLEGE, ARKLOW
|
Water Tank Replacement
|
15,397.50
|
LORETO SECONDARY SCHOOL, BRAY
|
Refurb Science Labs
|
557,403.00
|
TOTAL WICKLOW
|
|
636,880.50
|
TOTAL POST PRIMARY SCHOOLS
|
|
27,861,265.00
|
2010 EMERGENCY WORKS SCHEME
COUNTY/SCHOOL
|
PROJECT APPLICATION
|
ACTUAL AMOUNT
|
CARLOW
|
|
|
BAILE AN CHUILINN NS
|
Connection of Sewerage System to Main Sewerage System
|
29,845.00
|
NEWTOWN DUNLECKNEY MXD
|
Upgrade of Sewerage System Replacement of Windows & Doors
|
53,000.00
|
RATHOE NS
|
Replace boiler
|
11,395.50
|
MONASTERY BOYS SCHOOL
|
Security & Fire Safety Works
|
103,147.70
|
BISHOP FOLEY MEMORIAL SCHOOL
|
Fit fire doors & connect prefab to fire alarm
|
30,700.00
|
ST JOSEPHS NS
|
Boiler
|
32,667.19
|
ST BRENDANS NATIONAL SCHOOL
|
Boiler
|
19,990.00
|
ST JOSEPH’S BNS
|
Fire Safety Works
|
18,000.00
|
BHRIDE NS
|
Fire Safety Works
|
0.00
|
GS EOGHAN UI THUAIRISE
|
Boundary wall
|
116,452.00
|
TOTAL CARLOW
|
|
>415,197.39
|
CAVAN
|
|
|
BAILIEBOROUGH MODEL SCHOOL
|
Upgrade Entrance & Access Road
|
27,099.60
|
SN TAMHNACH DHUIBH
|
Replacement of Boundary Fence Yard re-surfacing
|
54,126.25
|
GREAGHRAHAN NS
|
Replacement of boiler and burner
|
9,224.93
|
S N LEITIR
|
Upgrade waste water treatment & percolation area
|
52,527.86
|
CABRA CENTRAL NATIONAL SCHOOL
|
Replace Septic Tank
|
57,500.00
|
KILDALLON NS
|
Repair Front Boundary
|
15,370.00
|
SN CORR LORGAN
|
roof & sewerage works
|
69,500.00
|
TOTAL CAVAN
|
|
285,348.64
|
CLARE
|
|
|
TOONAGH NS
|
repairs to pipes, insulate walls & attic
|
9,800.00
|
LACKEN MIXED NS
|
drain & resurface play area
|
50,955.88
|
SN MHAINISTIR CHUNCHE
|
|
140,000.00
|
BAREFIELD NS
|
Replace Dangerous Perimeter Fencing Roof Works inc Velux Windows
|
72,449.83
|
ENNIS NS
|
Works to Heating System Roof works partial replace or repair
|
37,605.50
|
KILNABOY NATIONAL SCHOOL
|
Repair works to septic tank
|
7,597.00
|
HOLY FAMILY JUNIOR SCHOOL
|
Roof Replacement
|
96,166.29
|
SN CLUAIN MUINGE
|
|
22,075.06
|
SN CNOC DOIRE
|
Sewerage Treatment System, Separate Drains, Pipe Run off water
|
20,203.00
|
S N BAILE AN DROICHID
|
Upgrade of waste water treatment system
|
22,725.89
|
LISSYCASEY NS
|
Boiler Replacement
|
9,960.00
|
MERCY CONVENT KILLALOE
|
Replacement of Boiler
|
47,711.82
|
MILTOWN MALBAY BNS
|
New surface water sewer
|
25,638.81
|
NEW QUAY NATIONAL SCHOOL
|
Upgrade Heating Works
|
62,835.00
|
ST CONAIRES NS
|
replace sewer pipework & manholes
|
13,788.32
|
NAOMH TOLA
|
Replacement of oil burner and boiler
|
52,214.96
|
KILLALOE BNS
|
CCTV
|
70,663.00
|
RUAN CENTRAL NS
|
Replacement of floor coverings
|
25,649.64
|
TOTAL CLARE
|
|
788,040.00
|
CORK
|
|
|
MIDLETON CONVENT NS
|
Repair of heating system
|
13,286.31
|
DROMLEIGH NS
|
Removal of Dangerous Chimney
|
36,815.00
|
SCOIL NAISIUNTA UI LIATHAIN
|
Replacement of Radiators & Piping
|
28,331.40
|
PRESENTATION N S
|
Replace Boiler & Re-surfacing Yard
|
46,464.12
|
SCOIL URSULA
|
Replacement of Boiler
|
190,801.75
|
VICARSTOWN MIXED NS
|
Replacement of Boiler
|
6,450.92
|
CLOGHROE NS
|
Water tank replacement
|
9,659.05
|
ST JOSEPHS NS
|
Replace Boiler
|
53,952.80
|
NEWMARKET BNS
|
Replace Retaining wall, Replace Shed
|
97,089.35
|
DRUIMNE NS
|
Drainage
|
12,508.25
|
ST MOLAGAS TIMOLEAGUE
|
Sewerage Works, Boiler & Heating Replacement, Electrical, Yard Works, Mould Removal
|
49,400.00
|
KILBRITTAIN MIXED NS
|
Installation of fire alarm & emergency lighting
|
10,500.00
|
SCOIL BHRIDE
|
|
5,600.00
|
DERRYCREHA NS
|
Roof Works
|
30,072.00
|
BISHOP OBRIEN NS
|
Replace Windows & Doors
|
51,800.00
|
BALLINTEMPLE NS
|
Replace Boiler
|
33,879.47
|
CONVENT OF MERCY NS
|
Ceiling Replacement
|
14,031.40
|
MITCHELSTOWN CON NS
|
Ceiling Replacement
|
44,200.00
|
S N IOSEF NAOFA
|
Repairs to Prefabs
|
45,776.00
|
BOHERBUE NS
|
Raising of Wall at Front of School
|
16,173.75
|
COPPEEN NS
|
new Treatment Plant & Percolation Area
|
37,000.00
|
ADRIGOLE NATIONAL SCHOOL
|
Replace Boiler & Electrical Works
|
22,971.00
|
S N PADRAIG NAOFA B
|
replace boiler
|
23,296.50
|
ST. PATRICKS BOYS NS
|
replace boiler
|
0.00
|
SCOIL NAOMH AINE
|
Fire Safety Works
|
128,119.90
|
DRIPSEY NATIONAL SCHOOL
|
Repair Roof of GP Room
|
63,089.00
|
SCARTHEIGH NS
|
Development of Playspace
|
37,800.00
|
ST PATRCKS NS
|
Replace boiler
|
7,148.40
|
GURRANE NS
|
Water Treatment System
|
3,214.99
|
SCOIL PADRE PIO NS
|
Upgrade Heating System
|
90,115.00
|
LITTLE ISLAND N S
|
Upgrade Heating System & Insulation Works in Areas of School which have Flat Roof
|
154,467.72
|
SCOIL MHUIRE BROADFORD NS
|
Upgrade Heating System & Insulation Works in Areas of School which have Flat Roof
|
36,561.95
|
SN AN SPIORAID NAOMH C
|
Replace external drainage system
|
152,964.10
|
KILMEEN NS
|
Replace an existing Concrete Roof Cornicing Roof works
|
0.00
|
SN BARRA NAOFA CAILINI
|
Replace an existing Concrete Roof Cornicing Roof works
|
81,482.97
|
SCOIL MUIRE NA NGRAST
|
Replacement of boiler & associated works
|
43,842.86
|
GAELSCOIL DE HIDE
|
Portable toilets
|
3,267.00
|
BANDON BOYS NS
|
replace oil tank
|
20,263.00
|
SN CILL DAIRBHRE
|
replace oil tank
|
68,465.43
|
SCOIL AISEIRI CHRIOST
|
Electrical Works
|
51,100.00
|
BALLYVONGANE MXD NS
|
fencing
|
8,500.00
|
SCOIL BHRIDE
|
upgrade of existing waste water treatment Unit
|
51,440.84
|
SCOIL NAOMH MHUIRE
|
provision of 5 new WC Cublicles & 1 disabled toilet
|
20,775.18
|
KILCONE MIXED NS
|
replace boiler & associated works
|
10,902.00
|
DROMAGH NS
|
Drainage Works
|
14,107.75
|
SCOIL NA MBRAITHRE
|
fire alarm & emergency lighting New boiler system & associated works
|
37,153.45
|
COBH CONVENT
|
fire alarm & emergency lighting New boiler system & associated works
|
63,500.00
|
S N CARRAIG AN IME
|
roof works
|
24,513.36
|
SCOIL MHUIRE
|
roof works
|
40,341.45
|
CAHERMORE NEW CENTRAL S
|
replace existing pipe heating system
|
33,198.81
|
SCOIL AN SPIORAID NAOIMH NS
|
works to repair existing water tower building at school
|
19,585.58
|
TOTAL CORK
|
|
2,145,979.81
|
DONEGAL
|
|
|
SN AN CHEIDIDH
|
Replacement of Septic Tank
|
29,850.00
|
GARTAN NS
|
Replace Boiler, Roof Works
|
75,233.04
|
MURROE NS
|
Roof
|
56,300.00
|
SCOIL NAISIUNTA FHIONNTRA
|
fencing & Repair Playground
|
17,330.89
|
SN GORT AN CHOIRCE
|
Roof and drainage works
|
60,776.04
|
ST PATRICKS GIRLS NS
|
Replace Boiler
|
22,532.60
|
S N GARBHAIN SATHLOIR
|
New Toilet facilities
|
34,499.50
|
S N EADAN FHIONNFHAOICH
|
Bus shelter
|
2,130.00
|
SN DOMHNACH MOR
|
Roof Works
|
88,835.00
|
SCOIL AN LINBH IOSA
|
replace rooflights, windows & external doors
|
34,512.10
|
SN DHUN NA NGALL
|
Car Park & Bus Pull In Bay
|
173,828.33
|
ST CATHERINES SCHOOL
|
Replace Water Storage Tanks
|
6,950.00
|
S N OLIBHEAR PLUINCEID
|
replace boiler & associated works yard works
|
47,220.00
|
SCOIL NAOMH SEOSAMH
|
Replacement of Boiler
|
5,372.17
|
ST PETERS NS
|
Pest Control & Associated Works spraying & treatment of school building dure to fungus gnats
|
5,309.00
|
SCOIL BHRIDE
|
Install CCTV system
|
6,500.00
|
CRANNFORD NATIONAL SCHOOL
|
Dry Lining & Insulation, Replace Heating System
|
57,278.70
|
GLENSWILLY N S
|
Roof Works, New Chimney, New Septic Tank
|
263,372.69
|
ST AENGUES NS
|
Replacement of Boiler & Provision of Services for Connection to a Biomass Plant
|
27,683.48
|
S N BAILE RAIGHIN
|
Replacement of roof
|
81,779.12
|
ST BERNADETTE’S SPECIAL SCHOOL
|
Conversion Works to Toilet Area for Special Needs Pupil
|
33,258.60
|
SN CHILL CHARTAIGH
|
Drainage & fencing
|
33,769.40
|
SCOIL MHUIRE
|
repair defects to walls & ceilings
|
24,500.00
|
SN CAISEAL NA GCORR
|
refurb Office & porch Electrical upgrade
|
32,557.50
|
FROSSES NS
|
new storm porch
|
19,200.00
|
SN BAILE NUA AN PHOBAIL
|
replacement of boiler
|
39,127.50
|
SCOIL MHUIRE
|
replace boiler & water services & replace roof
|
146,227.20
|
S N ADHAMHNAIN
|
Electrical works Replacement of windows & doors
|
128,300.00
|
COMHSCOIL CHONMHA SN
|
Replace windows
|
46,000.00
|
TOTAL DONEGAL
|
|
1,425,932.86
|
DUBLIN
|
|
|
SANDYFORD MXD NS
|
|
20,415.10
|
HOLY FAMILY NS RATHCOOLE
|
|
210,192.96
|
ST BRIGIDS GIRLS NS
|
|
64,020.00
|
ST COLUMBAS CON G&I
|
|
4,775.26
|
SCOIL NA MBRATHAR
|
|
150,182.12
|
SCOIL MHUIRE MARINO
|
|
62,806.49
|
ST BRIGIDS CONVENT NS
|
|
237,195.05
|
ST MOLAGAS
|
|
42,057.83
|
ST LOUIS INFANT SCHOOL
|
|
29,533.63
|
ST FINBARS NS
|
|
6,774.90
|
ST SYLVESTERS INFANT SCHOOL
|
|
65,487.00
|
SCOIL AINE
|
|
63,617.06
|
SCOIL BHRIDE BNS
|
|
3,313.57
|
SN MUIRE NA FREASTOGALA
|
|
288,400.00
|
S N BRIOTAS
|
|
40,888.06
|
S N NMH FIONNAN
|
|
87,500.00
|
MARIST NATIONAL SCHOOL
|
|
513,849.65
|
ST MARYS NS
|
|
45,979.27
|
S N SEOSAMH NA MBRATHAR
|
|
34,889.90
|
BENINCASA SPECIAL SCHOOL
|
|
4,000.00
|
EOIN BAISDE C NAOIDH
|
|
252,765.36
|
LORETO NS
|
|
79,022.96
|
ST JOHN OF GOD SPECIAL SCHOOL
|
|
288,795.00
|
ST KEVINS BOYS NATIONAL SCHOOL
|
|
217,040.50
|
VIRGIN MARY SCHOOL
|
|
109,064.20
|
ST BRIGIDS BNS
|
|
17,012.51
|
OUR LADY OF GOOD COUNSEL GNS
|
|
59,171.25
|
SCOIL CHIARAIN
|
|
9,761.00
|
ST MICHAELS HSE SPECIAL SCHOOL
|
|
7,859.88
|
HOLY TRINITY SEN NS
|
|
7,719.00
|
SCOIL MHUIRE BOYS
|
|
89,870.20
|
ST CRONAN’S JNS
|
|
239,402.40
|
ST MAELRUANS JUNIOR NS
|
|
6,667.41
|
NAOMH MAOLRUAIN SNR
|
|
31,702.83
|
ST KEVINS BOYS & GIRLS NS
|
|
30,930.66
|
ST KEVINS GIRLS NS
|
|
197,140.11
|
ST FRANCIS X SENIOR SCHOOL
|
|
20,884.05
|
ST MARKS JNR & SNR NS
|
|
12,031.00
|
ST FINIANS NS
|
|
26,298.93
|
BISHOP GALVIN NS
|
|
27,078.46
|
SN NAOMH TREASA
|
|
235,217.85
|
ST OLIVER PLUNKETT NS
|
|
127,166.20
|
SCOIL TREASA FIRHOUSE
|
|
192,812.28
|
|
|
178,289.38
|
ST MARYS JNS
|
|
144,916.74
|
ST HELENS JUNIOR NATIONAL SCHOOL
|
|
50,000.00
|
PHYSIC HANDICAPPED S SC
|
|
10,914.90
|
POPE JOHN PAUL 2 SCHOOL
|
|
293,710.00
|
BISHOP SHANAHAN NS
|
|
70,034.34
|
ST GABRIELS NS
|
|
249,242.79
|
SCOIL CHOLMCILLE
|
|
123,007.44
|
ST MICHAELS PRIMARY SCHOOL
|
|
212,988.41
|
ST RAPHAELS NS
|
|
242,984.62
|
CATHERINE McAULEY N SC
|
|
94,919.10
|
ST ATTRACTAS SNR NS
|
|
12,158.70
|
ST BERNADETTES JNR NS
|
|
299,576.37
|
HOLY FAMILY JUNIOR NS
|
|
126,186.35
|
ST BRIGIDS NS
|
|
614,080.89
|
ST BRIGIDS/ST AIDANS
|
|
730,926.79
|
BALLYCRAGH NS
|
|
20,419.50
|
ST. ANNES MIXED NS
|
|
21,392.00
|
SCOIL MHUIR S IOSAF
|
|
42,601.09
|
HOLY CROSS NS
|
|
383,847.12
|
GAELSCOIL MOLOGA
|
|
7,018.80
|
SCOIL NAISIUNTA AN DEA AOIRE
|
|
19,220.52
|
GAELSCOIL NAOMH PADRAIG
|
|
6,340.73
|
ST JOHNS NS BALLYBRACK
|
|
35,521.50
|
ST KEVINS NS
|
|
22,390.00
|
SETANTA SPECIAL SCHOOL
|
|
196,833.51
|
SCOIL PHADRAIG
|
|
164,510.55
|
LUCAN EDUCATE TOGETHER NS
|
|
70,000.00
|
ARCHBISHOP RYAN SENIOR NS
|
|
14,922.69
|
GAELSCOIL UI HEARCAIN
|
|
239,340.70
|
HOLY CHILD NATIONAL SCHOOL 20338C
|
|
431,842.66
|
TOTAL DUBLIN
|
|
9,391,430.08
|
GALWAY
|
|
|
SN NAOMH TREASA
|
Replacement of Boiler / Boiler House
|
6,700.56
|
SN AINDREIS NAOFA
|
Replacement of Boiler / Boiler House
|
7,217.46
|
SCOIL AN LINBH IOSA
|
Replacement of cold water storage tank
|
38,326.00
|
S N CREACHMHAOIL
|
New central heating boiler Car Parking
|
17,754.62
|
ST IOMARS
|
Prefab roof window & ventilation repair
|
10,336.00
|
SN MUIRE GAN SMAL
|
Roof Repairs, Floor Tile Replacement
|
66,000.00
|
SN CILL CONAILL
|
Sewage Treatment & Percolation Area
|
67,220.00
|
AINBHTHIN NAOFA
|
Replace Flooring, Clean & Dry Line above windows & repaint wall, replace tiles in bathroom
|
33,000.00
|
ST. PATRICKS NS
|
Car parking & new entrance
|
43,085.87
|
SN NAOMH UINSEANN
|
Replace Concrete Barges, Fence Boundary Wall, Widen School Gate, Replace Gutters Facia
|
16,013.40
|
CREGMORE NS
|
Car Park
|
38,990.00
|
SCOIL FHURSA
|
Roof Works, Replace 2 Windows
|
22,095.25
|
CARRABANE NS
|
Replace sewerage tank with treatment system
|
85,212.75
|
SCOIL PADRAIG NAOFA
|
Removal of Boundary wall
|
25,010.00
|
SN BREANDAN NAOFA
|
Provide ESB, Watermain & Hydrant, Boundary Wall & Fencing, Demolish Wall in Playarea
|
26,083.50
|
S N NAOMH CIARAIN
|
Water works
|
28,653.59
|
ST CATHERINES
|
Flat roof repairs toilet refurb
|
23,800.00
|
SCOIL BHRIDE MIONLOCH
|
M & E works
|
41,421.90
|
SCOIL BHREANDAIN NAOFA
|
toilet refurb
|
9,344.31
|
SN BAILE AN MHUILINN
|
Installation of new septic tank & percolation area
|
8,139.65
|
MONIVEA NS
|
Sewage Treatment Plant Upgrade Fuseboard
|
74,496.00
|
SCOIL NAOMH EINDE
|
Removal of asbestos floor tiles & replacement flooring
|
107,260.00
|
LAKE VIEW SCHOOL RENMORE
|
Replacement windows & doors
|
52,401.48
|
SCOIL CHAITRIONA
|
Roof Works
|
159,707.00
|
ST OLIVER PLUNKETT NS
|
Sewerage Works
|
95,308.99
|
SCOIL CHAITRIONA SENIOR
|
Removal of asbestos tiles in GP room & New Sports Flooring
|
27,892.63
|
MOYCULLEN CENTRAL SCHOOL
|
Works to Boiler House & Heating Installation
|
123,355.90
|
CARNMORE NS
|
Car parking
|
44,470.15
|
MHIC DARA
|
Upgrade Toilets
|
99,300.00
|
BARNADERG NS
|
traffic management measures
|
72,100.00
|
S N AN CILLIN
|
Treatment of dry rot & replacement of decayed timber
|
16,360.69
|
TOTAL GALWAY
|
|
1,480,357.14
|
KERRY
|
|
|
CLOCHAR DAINGEAN
|
Boiler
|
96,000.00
|
SCOIL EOIN XX111
|
Upgrade Electrics
|
5,675.00
|
S N BHAILE AN CHROSAIGH
|
Repair to ceilings
|
18,061.36
|
SCOIL MHUIRE
|
Water Storage Tanks, Replace Floor, Radon Vents & Extractor
|
465,764.73
|
SCOIL MHUIRE
|
Replace Copper Piping in Attic & Insulate Attic
|
8,789.00
|
SCOIL MHUIRE KILLORGLIN NS
|
Upgrade Electrical
|
22,759.00
|
CAHIRCIVEEN CONVENT
|
Roof Works Replace central heating pipework
|
325,498.15
|
UNION HALL MIXED NATIONAL SCHOOL
|
Roof works
|
55,926.68
|
SCOIL EOIN
|
Security Works
|
25,078.28
|
ST FINIANS AN CORAIN
|
Replacement of windows & Door
|
35,060.60
|
CULLINA NS
|
Drainage
|
11,200.00
|
MUIRE NA MAINISTREACH
|
demolition of pre-fab
|
13,186.23
|
KILCONLY NS
|
Works to Foul Drainage System, Works to Play Area
|
52,093.74
|
S N MHUIRE NA MBRAITHRE
|
Works to Foul Drainage System, Works to Play Area
|
7,552.50
|
SCOIL NAOMH IOSEF
|
roof works
|
39,434.04
|
SN DAR EARCA
|
Refurb Toilets
|
29,322.00
|
HOLY CROSS MERCY SCHOOL
|
Replace Section of Roof, Repair damage to Walls & Floor
|
11,050.00
|
ST OLIVERS NS
|
Yard Works
|
129,043.80
|
SCARTAGLIN NEW CENT SC
|
Replacement of Heating Pipework & Radiators Yard Works
|
90,256.00
|
BALLYDUFF CENTRAL
|
roof works
|
103,943.65
|
REALT NA MAIDNE
|
Electrical upgrade
|
191,465.00
|
GAELSCOIL NAOMH AOGAIN
|
ICT grant re New Classroom Build
|
5,000.00
|
SCOIL ATHA NA MBLATH
|
roof works
|
121,166.10
|
TOTAL KERRY
|
|
1,863,325.86
|
KILDARE
|
|
|
ATHY MODEL NS
|
Refurbishment after fire at school (ongoing bills)
|
36,625.44
|
SN CIANOG NAOFA
|
Yard Works (Concrete Playarea)
|
151,597.82
|
CELBRIDGE NS
|
Conversion works
|
22,750.27
|
HEWETSONS NS
|
Dryline Walls & construct covered walkway
|
13,995.85
|
ST JOSEPH’S BOYS NS
|
Electrical Upgrade
|
207,775.00
|
BRANNOXTOWN NS
|
Instal Emergency Lighting, Upgrade Heating & Hot Water Systems
|
67,780.72
|
SCOIL CHORBAIN
|
Fire Safety Upgrade
|
121,775.31
|
S N AINE NAOFA
|
Electrical Upgrade
|
43,309.86
|
SUNCROFT NS
|
Replace flooring with non slip flooring install door operator for 3 external doors & replace existing door saddlebo
|
21,458.15
|
S N SCOIL TREASA
|
|
32,512.87
|
NEWTOWN NS
|
Upgrade Heating System
|
250,453.43
|
KILDANGAN NS
|
Heating Systems Upgrade
|
160,134.00
|
SCOIL BHRIDE
|
Replace Push Bar open Mechanisms on Doors, Floor Works, Roof Works
|
3,540.00
|
ST ANNES SPECIAL NS
|
Replace Push Bar open Mechanisms on Doors, Floor Works, Roof Works
|
100,954.62
|
SCOIL MHUIRE SOISEARACH
|
Replace Push Bar open Mechanisms on Doors, Floor Works, Roof Works
|
24,359.79
|
SAN CARLO JUNIOR NS
|
Replace Push Bar open Mechanisms on Doors, Floor Works, Roof Works
|
22,104.82
|
GAEL SCOIL CILL DARA
|
installation of fire alarm
|
0.00
|
NAAS NS
|
Conversion works to classroom
|
5,000.00
|
TOTAL KILDARE
|
|
1,286,127.95
|
KILKENNY
|
|
|
CHURCH HILL NS
|
Extend Playground
|
31,747.16
|
SCOIL MHUIRE
|
Wall & Ceiling Repair Works to water storage tanks works to heating syste,
|
75,032.16
|
GRAIGNAMANAGH
|
Replace Boiler
|
58,764.47
|
ST LEONARDS NS
|
Fire Safety upgrade
|
19,903.74
|
S N BHREANAIN NAOFA
|
Roof & ceiling repairs
|
38,322.00
|
SN MUIRE GAN SMAL
|
Disabled Access Works
|
61,383.40
|
S N NAOMH CHIARAIN
|
Drainage works
|
66,250.00
|
S N CHRION CHOILL
|
Water Treatment System
|
6,035.28
|
SN CHIARAIN NAOFA
|
Connect Wastewater System to Public Sewerage System
|
33,615.00
|
ST BRIGIDS CONVENT NS
|
Gym Roof
|
46,753.00
|
LISTERLIN NS
|
Replace boiler, burner & oil tank
|
26,500.00
|
MOTHER OF FAIR LOVE
|
Replacement of existing substnadard non-thermally broken timber non safety glass single glazed windows & external doors.
|
183,011.36
|
ST PATRICKS SPECIAL SCHOOL
|
Replacement of existing substnadard non-thermally broken timber non safety glass single glazed windows & external doors.
|
26,606.88
|
SCOIL BHRIDE
|
Replace Floor of Pre-fab
|
14,843.12
|
SCOIL BHRIDE B7C
|
Replace boiler, burner & oil tank
|
11,102.95
|
TOTAL KILKENNY
|
|
699,870.52
|
LAOIS
|
|
|
SN AN CHROI RO NAOFA
|
Upgrade of water supply system
|
5,974.23
|
CILL AN IUBHAIR NS
|
Upgrade of water supply system
|
17,736.12
|
RATHDOMHNAIGH NS
|
Upgrade of water supply system
|
16,605.00
|
CLONENAGH NS
|
Roof works & disabled toilet
|
71,100.00
|
MHUIRE FATIMA NS
|
Electrical upgrade
|
92,385.00
|
TOTAL LAOIS
|
|
197,826.12
|
LEITRIM
|
|
|
TOTAL LEITRIM
|
|
|
LIMERICK
|
|
|
MHUIRE NAOFA CAILINI
|
Heating works Upgrade Electrics
|
25,761.29
|
S N FIODHNACH
|
Roof Works
|
0.00
|
GRANAGH NATIONAL SCHOOL
|
Roof Works
|
42,849.00
|
PALLASKENRY NS
|
Installation of Security Cameras
|
9,366.02
|
SN GALLBHAILE
|
Replace Roof
|
20,362.50
|
NICKER NATIONAL SCHOOL
|
Upgrade of water & sewerage connections
|
80,903.70
|
SCOIL MHATHAIR TROCAIRE
|
Upgrade of water & sewerage connections
|
19,203.00
|
ROXBORO NS
|
Upgrade of water & sewerage connections
|
23,861.73
|
MEENKILLY NS
|
Replace Boiler
|
10,870.00
|
ATHLACCA NS
|
Toilet Upgrade, Replace Flooring & Upgrade Paths Outside
|
80,253.25
|
SHANAGOLDEN NS
|
Playground
|
21,705.72
|
CAHERCONLISH NS
|
Playground
|
62,741.57
|
QUEEN OF THE PEACE NS
|
Lift, CCTV system and external works
|
48,780.00
|
S N GEAROID UI GHRIOBHTHA
|
Boundary Wall
|
22,848.05
|
SCOIL MHAINCHIN BUACH
|
Roof Works
|
54,253.05
|
SCOIL IDE NAOFA RAHEENAGH
|
Yard works, ramp & removal of shelter
|
57,473.50
|
ASKEATON SENIOR NS
|
Asbestos tile removal Replacement of boiler
|
20,400.00
|
SCOIL IDE
|
Asbestos tile removal Replacement of boiler
|
68,813.22
|
ST AUGUSTINES SPEC SC
|
Replace Boiler M&E & flooring works
|
16,416.87
|
LIMERICK SCHOOL PROJECT
|
Roof Conversion Works
|
7,815.75
|
ST FERGUS PRIMARY SCH
|
Toilet Upgrade
|
6,450.00
|
GAELSCOIL AN RAITHIN
|
Fire Safety Requirements/Vehicular Access Road
|
126,701.24
|
MARY QUEEN OF IRELAND GNS
|
Replace boiler
|
20,512.92
|
SCOIL NAOMH IOSEF
|
Roof repairs
|
37,550.91
|
MONALEEN NATIONAL SCHOOL
|
replace fire alarm system
|
33,763.24
|
TOTAL LIMERICK
|
|
848,342.38
|
LONGFORD
|
|
|
SN AN LEANA MOR
|
Replacement of heating pipework & radiators
|
35,000.00
|
SAMHTHANN NS
|
Sewage Works
|
24,000.00
|
S N MHUIRE
|
Roof Leaks & Ceilings Works
|
9,224.93
|
S N COLMCILLE
|
Car Park
|
97,500.00
|
ST PATRICKS NS
|
Sewage Works
|
65,000.00
|
SCOIL MHUIRE NS
|
Roof Works
|
49,712.56
|
EDGEWOTHSTOWN NS
|
Yard Works, Removal of Old Storage Shed Repair leak in pipework PE Hall Project
|
305,988.65
|
MELVIEW NS
|
New heating system & windows
|
252,048.09
|
LANESBORO NS
|
Provision of car park facilities
|
106,437.00
|
TOTAL LONGFORD
|
|
944,911.23
|
LOUTH
|
|
|
LOUTH MIXED SCHOOL
|
Replacement of Oil Tank
|
6,294.66
|
TALLANSTOWN NS
|
Security Fencing Heating Works
|
43,881.41
|
TERMONFECKIN NS
|
Sewerage works
|
32,500.00
|
TULLYALLEN NS
|
Boiler & Insulation Boundary Wall
|
37,180.82
|
SCOIL DAIRBHE
|
Boiler & Insulation Boundary Wall
|
147,814.40
|
SN NAOMH FHIONAIN
|
Drainage & Associates Works
|
21,402.47
|
SN MUIRE NA TROCAIRE
|
Replacement flooring —
|
115,161.00
|
SCOIL BHRIDE MXD NS
|
Boiler Replacement replacement of heating system
|
159,479.78
|
SCOIL PHADRAIG NAOFA
|
Boiler
|
28,306.90
|
REALT NA MARA
|
Flood Prevention Works
|
11,209.38
|
TOTAL LOUTH
|
|
603,230.82
|
MAYO
|
|
|
BEHYMORE NS
|
|
43,000.00
|
AUGHLEAM NS
|
|
86,892.45
|
ST JOSEPHS NS
|
|
19,096.38
|
SN GLEANN A CHAISIL
|
|
6,000.00
|
BEANNCHOR NS
|
|
45,600.00
|
S N NAOMH PADRAIG
|
|
97,626.93
|
SCOIL NAISIUNTA MUIRE GAN SMAL
|
|
34,811.75
|
CARRAKENNEDY NS
|
|
9,767.58
|
LISANISKA NS
|
|
48,630.00
|
KNOCK NS
|
|
142,571.70
|
MYNA NS
|
|
76,134.55
|
SN REALT NA MARA
|
|
10,000.00
|
DRUMSLIDE NS
|
|
43,000.00
|
ST JOSEPHS NS BALLINA
|
|
14,000.00
|
ST ANGELAS NS
|
|
32,625.30
|
SCOIL IOSA
|
|
44,145.73
|
TOTAL MAYO
|
|
43,000.00
|
MEATH
|
|
|
AINE NAOFA NS
|
Resurface School Yard replace cold water storage tank
|
62,444.52
|
SCOIL MHICHIL NA BUACHAILLI
|
Roof Repairs to Prefab roof works
|
37,500.00
|
RATHKENNY NATIONAL SCHOOL
|
replacement of paths, paving & drainage works
|
50,125.56
|
SCOIL CHOLMCILLE
|
Fire Detection & Alarm System, Emergency Lighting, Signs & Fire Doors
|
77,800.00
|
SCOIL NAIS AN OBAIR
|
Mould Removal & Repair of Eaves Structurtal Repairs
|
79,611.72
|
CARNAROSS NS
|
Ceiling Replacement
|
2,685.00
|
S N MHUIRE
|
Hard Play Area & Rear Access
|
10,658.25
|
ST JOSEPHS DUNDERRY NS
|
Roof
|
21,950.10
|
ST MARYS NS
|
Upgrade of drainage and water mains
|
26,429.55
|
SN MHUIRE
|
Increase ESB Supply, replace fuse board & conversion works
|
38,447.28
|
SN NAOMH PADRAIG
|
Increase ESB Supply, replace fuse board & conversion works
|
15,200.98
|
S N REALT NA MARA (CAILINI)
|
|
21,705.73
|
SCOIL CAITRIONA NAOFA
|
Works to Water Supply
|
4,742.43
|
SCOIL NAIS MAOL HOSAE
|
|
10,242.38
|
S N MHUIRE
|
Upgrading of toilet facilities upgrade heating system & replace oil tank
|
48,485.18
|
DANGAN NS
|
Heating Upgrade & Insulation of External Panels
|
124,749.77
|
CASTLETOWN NS NAVAN
|
Upgrade Electrical
|
121,441.88
|
ST OLIVER PLUNKETT NS
|
upgrade fire alarm, install smoke detectors & emergency lighting
|
17,319.14
|
ST. MARYS SPECIAL SCHOOL
|
Resurface Playground
|
5,675.00
|
DUNBOYNE JUNIOR NS
|
|
89,152.38
|
ST PAULS NS
|
Replacement of leaking oil tank
|
11,084.00
|
TOTAL MEATH
|
|
877,450.85
|
MONAGHAN
|
|
|
DONAGHMOYNE NS
|
Works to Playground including Drainage
|
52,405.00
|
BUN SCOIL LOUIS NAOFA
|
Replace boiler
|
35,800.00
|
CASTLEBLANEY CONVENT
|
CCTV, external intruder protection, security lighting & security fencing
|
100,221.04
|
CASTLEBLANEY CON INFS
|
Upgrade Electrical Installation
|
263,135.00
|
SCOIL MHICHIL
|
Upgrade Electrical Installation
|
29,737.60
|
S N BLAITHIN IOSA
|
Upgrade toilet facilities
|
24,820.10
|
ST JOSEPHS NS
|
Upgrade Heating System
|
95,395.00
|
CLOCHAR LUGHAIDH NAI
|
Removal of concrete shelter
|
9,885.00
|
SCOIL PHADRAIG
|
Removal & Replacement of Floor Tiles Removal of asbestos cement slates and replace Remove & replace asbestos cement slates
|
73,855.00
|
SCOIL MHUIRE B
|
Install fire escape
|
44,442.78
|
SCOIL NAOMH PADRAIG
|
Roof repairs
|
34,516.80
|
SCOIL NAOMH DEAGHA
|
Roof repairs
|
0.00
|
SCOIL EANNA
|
Roof repairs
|
125,387.00
|
TOTAL MONAGHAN
|
|
764,213.32
|
OFFALY
|
|
|
SCOIL NAOMH EOIN
|
|
51,944.06
|
KILCORMAC CONVENT NS
|
|
23,257.46
|
GEASHILL 1 NS
|
Upgrade Heating System
|
116,376.41
|
ST CRONANS NS LUSMAGH
|
Construct bund to oil storage tank and new porch to school entrance
|
16,100.00
|
ST BRENDANS MONASTERY
|
Replace Floor Tiles
|
20,287.00
|
CLONBULLOGUE NATIONAL SCHOOL
|
Heating upgrade
|
75,375.79
|
MOUNTBOLUS NATIONAL SCHOOL
|
Re-inforcement of ceilings Dry Lining, Upgrade Heating System, Ramp at Front Entrance, new Flooring Roof repairs and replace water tank
|
92,220.00
|
MONASTERORIS NS
|
Entrance Works
|
13,566.08
|
CLONEYHURKE NS
|
Replace Heating System, Insulate Roof, Replace Windows, Replace Ceiling
|
40,000.00
|
ST MARYS NS
|
Removal of Asbestos Tiles Electrical Upgrade to cater for ICT Infrastructure
|
105,955.37
|
S N NAOMH PHILOMENA
|
Roof works
|
104,887.13
|
POLLAGH NS
|
Roof works
|
42,176.00
|
SN PHADRAIG
|
Boiler Replacement
|
7,000.00
|
ROSCOMROE NS
|
Boiler replacement
|
14,613.24
|
SCOIL BHRIDE
|
Upgrade Fire Detection System & Emergency Lighting
|
25,011.20
|
COOLANARNEY NS
|
Installation of water treatment system
|
2,903.00
|
ST COLMANS NS
|
Replace Floor Covering, Install 2 New Sinks, Repairs Leaking Pipe
|
6,395.86
|
S N LOMCHLUANA
|
Replace floor in GP Room
|
19,713.74
|
TOTAL OFFALY
|
|
682,867.08
|
ROSCOMMON
|
|
|
S N NAOMH SEOSAMH
|
|
20,250.00
|
LISANISKEY NS
|
Replace boiler
|
25,251.90
|
KILTEEVAN NS
|
Replace Floor with Concrete Slab, Treat Rising Damp & Mould on Internal Perimeter Walls, Construction of New Insulated Stud Walls
|
40,636.00
|
CLOCHAR NA TROCAIRE
|
Roof Works
|
85,864.40
|
ST MARYS CONVENT NS
|
Roof Works
|
87,722.14
|
TIBOHINE NS
|
Replacment Oil burner & upgrade heating system
|
28,217.44
|
BALLINTUBBER NATIONAL SCHOOL 16334S
|
Repair to flat roof — leaks
|
23,734.50
|
SN NAOMH CEITHEACH
|
Roof Works
|
28,846.00
|
S N RATH ARADH
|
Flat roof repair
|
23,876.30
|
ABBEY NS
|
Roof works & Velux windows
|
46,382.20
|
TISRARA NATIONAL SCHOOL
|
Replace water main & install new hydrant, landscape & re-seed play ground area
|
5,379.75
|
S N NAOMH EOIN
|
Replace Windows
|
7,054.36
|
KNOCKCROGHERY NS
|
Fencing & Redamation of Land Repair concrete yard
|
34,750.00
|
STRABAGGAN NS
|
Re-surface play ground
|
8,841.65
|
SCOIL BHRIDE
|
New porch area
|
10,635.81
|
TOTAL ROSCOMMON
|
|
466,806.64
|
SLIGO
|
|
|
COOLOONEY CONVENT NATIONAL SCHOOL
|
Upgrade Electrics
|
81,638.79
|
S N BHRIDE
|
Replace Storm & Foul Sewer
|
13,023.44
|
ST. JOHNS NS
|
Window replacement
|
31,700.00
|
STOKANE NATIONAL SCHOOL
|
Replace boiler
|
8,000.00
|
SLIGO PROJECT SCHOOL
|
Replace pipes
|
8,050.50
|
TOTAL SLIGO
|
|
142,412.73
|
TIPPERARY
|
|
|
MOYGLASS NS
|
Sewerage Treatment & Percolation Area
|
72,210.00
|
REARCROSS NS
|
insulate walls & Attic
|
14,514.42
|
PRESENTATION PRIMARY SCHOOL
|
Removal of Asbestos Flooring & Sinks
|
17,445.71
|
SN MUIRE NA NAINGEAL
|
insulate walls & Attic
|
114,462.36
|
GAILE NS
|
Boundary Fence
|
8,253.06
|
KILLUSTY NATIONAL SCHOOL
|
Roof works
|
33,069.00
|
SCOIL AILBHE
|
conversion of cloakroom to resource room
|
4,610.60
|
SN GLEANN GOILL
|
Roof Works Install New Boiler & Replace Radiators
|
79,090.18
|
S N IOSEF NAOFA
|
Disabled Access, Yard Works, Works to Concrete ink, Replace Asbestos Floor Tiles, Radon Gas
|
136,420.49
|
SCOIL NAISIUNTA CHILL CHUMIN
|
upgrade electrics
|
50,701.10
|
KILLURNEY NATIONAL SCHOOL
|
replace oil tank
|
1,890.57
|
SCOIL MHUIRE KILVEMNON
|
electrical upgrade, install fire alarm system
|
25,276.70
|
TOTAL TIPPERARY
|
|
530,776.92
|
WATERFORD
|
|
|
SN CILL ROSANTA
|
Resurface yard for playarea
|
17,810.00
|
FERRYBANK CONVENT
|
Upgrade to meet H & S Standards & Fire Regulations
|
230,341.17
|
SN URSULA NAOFA
|
Replace pipeline
|
20,143.64
|
OUR LADY OF MERCY N S STRADBALLY
|
Repairs to School Drains
|
113,130.75
|
ST STEPHENS NATIONAL SCHOOL
|
Roof Works, Replace Water Storage Tank replace heating system
|
221,968.18
|
S N DEAGLAN
|
Removal of Roof & Walls of Playground Shelter
|
147,250.00
|
SN MUIRE MAGH DEILGE
|
Upgrade water mains supply
|
0.00
|
SCOIL NAOMH GOBNAIT
|
Fencing creation of new play area
|
20,416.00
|
CHRIST CHURCH N S
|
Works to heating system
|
12,589.32
|
ST MARYS NS
|
re-pipe external water mains to urban council supply
|
23,442.18
|
GLOR NA MARA NS
|
Roof Works
|
75,643.51
|
WATERPARK NS
|
Water Works
|
23,008.07
|
KILMACTHOMAS NS
|
Replace boiler replace boiler
|
21,186.88
|
AGLISH NATIONAL SCHOOL WATERFORD
|
replace boundary fence
|
20,422.11
|
TOTAL WATERFORD
|
|
926,929.70
|
WESTMEATH
|
|
|
MULLINGAR CONVENT (JNR)
|
Electrical Upgrade
|
230,141.93
|
ST PETERS NS SNR
|
Replacement of Section of Damaged Plasterwork on School Wall, Works to Housing & Steel which Supports Water Tank on Roof
|
19,816.50
|
BRIDESWELL NS
|
Replacement of Windows
|
11,380.00
|
ST BRIGIDS PRIMARY SCHOOL
|
Replacement of Windows
|
78,101.30
|
BAILE UI GHEIBHINN
|
Upgrade Fire alarm
|
6,457.50
|
RATH EOGHAN
|
Replace Septic Tank
|
9,655.17
|
S N NAOMH FIONTAN
|
Replace Septic Tank
|
19,000.55
|
SCOIL NA MAIGHDINE MHUIRE
|
Replacement of slates & ridge caps, repair of gutters, replace fire doors
|
53,300.00
|
ST EARNANS
|
Flat roof works
|
24,395.00
|
CHOLMAIN NAOFA
|
replace flat roof on 3 pre-fab units
|
17,483.75
|
GAEL SCOIL MULLINGAR
|
refurbishment works
|
38,797.44
|
TOTAL WESTMEATH
|
|
508,529.14
|
WEXFORD
|
|
|
SN BHANTIARNA
|
Upgrade Electrical, Mechanical & Fire Safety Installations
|
812,939.57
|
BALLYMURN NATIONAL SCHOOL
|
Car Parking
|
42,377.00
|
MICHEAL STREET NS
|
Priority Health & Safety Works
|
179,800.00
|
GLANBRIEN NATIONAL SCHOOL
|
Replacement of Path
|
5,850.78
|
BALLYCANEW NS
|
|
140,000.00
|
KILLEGNEY NATIONAL SCHOOL
|
|
109,630.20
|
NEWBAWN NS
|
Replacement of flooring M & E works
|
16,168.60
|
BALLYGARRETT NS
|
Security fencing around oil tank and repairs to flat roof
|
20,520.00
|
KILRANE NS
|
Fire Safety Works, Disabled Access, Foul Sewerage & Drainage
|
199,552.00
|
OYLEGATE NS
|
Replace Flat Roof
|
48,000.00
|
CLONGEEN NS
|
Condensation & Ventilation, Drainage to Toilets
|
78,120.00
|
SCOIL NAISIUNTA BAILE UI COILEAIN
|
Upgrade of heating system
|
85,954.68
|
SCOIL NA MBRAITHRE
|
|
148,438.75
|
SN MHAODHOIG
|
Replace Windows Replacement of Space Heating Installation
|
226,900.00
|
S N SEOSAIMH
|
Replacement of septic tank
|
70,543.61
|
S N RATH AN IUBHAIR
|
Removal of asbestos floor tiles Upgrade electrical installation
|
168,019.96
|
GALBALLY NS
|
Yard Works
|
26,346.50
|
S N MHUIRE
|
refurb works
|
114,401.70
|
ST CATHERINES NS
|
Upgrade of sewerage drains
|
19,950.00
|
RATHANGAN NS
|
Electrical works
|
156,365.92
|
GOREY CENTRAL SCHOOL
|
Roof Works
|
59,113.16
|
HORESWOOD NS
|
Roof Works
|
24,961.59
|
SCOIL MHUIRE
|
Removal of asbestos floor tiles replace boiler & associated works
|
80,401.71
|
S N NAOMH SEOSAIMH
|
replacement of defective foul drainage
|
35,814.00
|
TOTAL WEXFORD
|
|
2,870,169.73
|
WICKLOW
|
|
|
ST BRIGIDS NS
|
Water Mains Protection
|
42,765.92
|
DELGANY NATIONAL SCHOOL
|
Roof Works
|
147,000.00
|
CARYSFORT MIXED NS
|
new Electrical Supply Board
|
2,831.38
|
MAIN STREET NS
|
CCTV & Fencing
|
34,744.00
|
SHILLELAGH NS
|
Replace Heating Piping
|
24,500.00
|
ST PETERS INFANTS
|
Replace Heating Piping
|
54,125.75
|
SN MUIRE MXD
|
Upgrade ESB Supply, Replacement of Existing Main Distribution Board & ESB Meters
|
80,705.80
|
ST PATRICKS LORETO PRIMARY SCHOOL
|
Replace Fire Alarm System
|
38,929.09
|
PADRAIG NAOFA NS
|
Water Drainage
|
19,710.00
|
KILMACANOGUE NS
|
Roof works
|
78,458.64
|
NAOMH PEADAR N S
|
Roof works
|
90,423.00
|
TOTAL WICKLOW
|
|
523,770.58
|
TOTAL PRIMARY SCHOOLS
|
|
30,712,847.49
|
2011 Emergency Works post-Primary Schools
|
PROJECT
|
CASH YTD 2011
|
CARLOW
|
|
|
ST LEOS COLLEGE
|
OTHER STRUCTURAL IMPROVEMENTS
|
475,878.07
|
PRESENTATION/DE LA SALLE CARLOW, MHUINE BHEAG
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
35,168.00
|
PRESENTATION/DE LA SALLE CARLOW, MHUINE BHEAG
|
CURRICULAR REQUIREMENTS
|
—
|
CARLOW VOCATIONAL SCHOOL, KILKENNY ROAD, CARLOW
|
ROOF WORKS
|
32,802.67
|
TOTAL CARLOW
|
|
543,848.74
|
CAVAN
|
|
|
ST AIDANS COMPREHENSIVE SCHOOL, COOTEHILLE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
TOTAL CAVAN
|
|
—
|
CLARE
|
|
|
ST JOSEPHS SPANISH POINT, MILTOWN MALBAY
|
MECHANICAL WORKS
|
—
|
TOTAL CLARE
|
|
—
|
CORK
|
|
|
SCOIL MHUIRE GAN SMAL
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
COLAISTE CHROI NAOFA
|
MECHANICAL WORKS
|
14,800.00
|
ST COLMANS COLLEGE
|
GAS WORKS
|
10,918.72
|
ST FACHTNAS DE LA SALLE, SKIBBEREEN
|
MECHANICAL WORKS
|
—
|
MERCY HEIGHTS SECONDARY SCHOOL, SKIBBEREEN
|
OTHER STRUCTURAL IMPROVEMENTS
|
36,429.33
|
URSULINE SECONDARY SCHOOL, BLACKROCK, CORK
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
18,696.94
|
COLAISTE GHOBNATAN
|
MECHANICAL WORKS
|
—
|
COLAISTE TREASA, KANTURK
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
15,520.68
|
COLAISTE STIOFAN NAOFA
|
MECHANICAL WORKS
|
—
|
TERENCE MACSWEENEY COLLEGE, KNOCKNAHEENY
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
BISHOPSTOWN C S
|
MECHANICAL WORKS
|
24,689.70
|
KINSALE COMMUNITY SCHOOL
|
MECHANICAL WORKS
|
21,362.88
|
TOTAL CORK
|
|
142,418.25
|
DONEGAL
|
|
|
MILFORD ADULT EDUCATION CENTRE AND TRAINING CENTRE
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
MILFORD ADULT EDUCATION CENTRE AND TRAINING CENTRE
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
BUNCRANA EDUCATION CENTRE
|
OTHER STRUCTURAL IMPROVEMENTS
|
23,261.25
|
CARRICK VOCATIONAL SCHOOL, CARRICK
|
MECHANICAL WORKS
|
10,641.40
|
ST CATHERINES VOCATIONAL SCHOOL, KILLYBEGS
|
CURRICULAR REQUIREMENTS
|
—
|
ST COLUMBAS COMPREHENSIVE SCHOOL, GLENTIES
|
ROOF WORKS
|
8,410.97
|
CARNDONAGH COMMUNITY SCHOOL
|
ELECTRICAL WORKS
|
—
|
TOTAL DONEGAL
|
|
42,313.62
|
DUBLIN
|
|
|
ARD SCOIL LA SALLE
|
MECHANICAL WORKS
|
—
|
SANCTA MARIA COLLEGE, RATHFARNHAM
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
67,827.90
|
MEANSCOIL IOGNAID RIS, WALKINSTOWN
|
OTHER STRUCTURAL IMPROVEMENTS
|
31,134.33
|
ST DOMINIC’S, BALLYFERMOT
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
80,058.64
|
MERCY SECONDARY SCHOOL, INCHICORE
|
GAS WORKS
|
—
|
OUR LADY OF MERCY DRIMNAGH
|
MECHANICAL WORKS
|
52,672.00
|
BALBRIGGAN C C
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
COLLINSTOWN PARK COMMUNITY COLLEGE, CLONDALKIN
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
RINGSEND TECHNICAL INSTITUTE
|
MECHANICAL WORKS
|
—
|
NEWPARK COMPREHENSIVE SCHOOL, BLACKROCK
|
GAS WORKS
|
16,266.00
|
MALAHIDE COMMUNITY SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
23,000.00
|
HOLY CHILD C S SALLYNOGGIN
|
MECHANICAL WORKS
|
14,500.00
|
ST AIDENS BROOKFIELD, TALLAGHT
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
HARTSTOWN C S, CLONSILLA
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
10,193.75
|
TOTAL DUBLIN
|
|
295,652.62
|
GALWAY
|
|
|
PRESENTATION COLLEGE, ATHENRY
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
34,300.00
|
ST JOSEOHS NUNS ISLAND
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
106,358.06
|
TOTAL GALWAY
|
|
140,658.06
|
KERRY
|
|
|
ST BRENDANS COLLEGE, CILL AIRNE
|
MECHANICAL WORKS
|
19,250.00
|
ST MICHAELS COLLEGE
|
MECHANICAL WORKS
|
21,651.00
|
CAHIRCIVEEN COMMUNITY COLLEGE
|
MECHANICAL WORKS
|
—
|
TARBERT COMMUNITY SCHOOL
|
MECHANICAL WORKS
|
30,008.17
|
RATHMORE COMMUNITY SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
TOTAL KERRY
|
|
70,909.17
|
KILDARE
|
|
|
HOLY FAMILY SECONDARY SCHOOL, NEWBRIDGE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
31,147.72
|
CROSS AND PASSION COLLEGE, KILCULLEN
|
GAS WORKS
|
66,150.49
|
COLAISTE LORCAIN CASTLEDERMOT
|
EXTERNAL ENVIRONMENT PROJECTS
|
69,500.00
|
CONFEY COMMUNITY COLLEGE
|
EXTERNAL ENVIRONMENT PROJECTS
|
75,970.04
|
TOTAL KILDARE
|
|
242,768.25
|
KILKENNY
|
|
|
ST BRIGIDS SS, GORESBRIDGE
|
EXTERNAL ENVIRONMENT PROJECTS
|
10,079.30
|
PRESENTATION SS
|
ROOF WORKS
|
—
|
CITY TECHNICAL SCHOOL, NEW STREET, KILKENNY
|
CURRICULAR REQUIREMENTS
|
—
|
CASTLECOMER COMMUNITY SCHOOL
|
MECHANICAL WORKS
|
—
|
TOTAL KILKENNY
|
|
10,079.30
|
LEITRIM
|
|
|
CARRIGALLEN V S
|
GAS WORKS
|
—
|
TOTAL LEITRIM
|
|
—
|
LIMERICK
|
|
|
ASKEATON COMMUNITY COLLEGE
|
MECHANICAL WORKS
|
—
|
TOTAL LIMERICK
|
|
—
|
LONGFORD
|
|
|
LANESBORO COMMUNITY COLLEGE
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
TOTAL LONGFORD
|
|
—
|
LOUTH
|
|
|
ST MARY’S COLLEGE, DUNDALK
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
TOTAL LOUTH
|
|
—
|
MAYO
|
|
|
ST MARYS SECONDARY SCHOOL, BALLINA
|
CURRICULAR REQUIREMENTS
|
84,310.00
|
ST MARYS SECONDARY SCHOOL, BALLINA
|
OTHER STRUCTURAL IMPROVEMENTS
|
14,889.00
|
OUR LADYS SECONDARY SCHOOL, BELMULLET
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
SACRED HEART, WESTPORT
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
29,400.00
|
BALLINROBE COMMUNITY SCHOOL
|
MECHANICAL WORKS
|
19,492.85
|
TOTAL MAYO
|
|
148,091.85
|
MONAGHAN
|
|
|
CASTLEBLANEY COLLEGE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
BEECHILL V S
|
ELECTRICAL WORKS
|
—
|
BEECHILL V S
|
OTHER STRUCTURAL IMPROVEMENTS
|
48,582.81
|
COLAISTE OIRIALL
|
MECHANICAL WORKS
|
—
|
TOTAL MONAGHAN
|
|
48,582.81
|
OFFALY
|
|
|
TULLAMORE COLLEGE
|
MECHANICAL WORKS
|
25,981.75
|
ST BRENDANS C S BIRR
|
MECHANICAL WORKS
|
—
|
ST BRENDANS C S BIRR
|
WINDOW PROJECTS
|
—
|
TOTAL OFFALY
|
|
25,981.75
|
ROSCOMMON
|
|
|
SCOIL MHUIRE GAN SMÁL ROSCOMMON
|
ROOF WORKS
|
32,287.28
|
ELPHIN V S
|
ROOF WORKS
|
—
|
CASTLEREA C.S.
|
MECHANICAL WORKS
|
10,215.00
|
TOTAL ROSCOMMON
|
|
42,502.28
|
TIPPERARY
|
|
|
PRESENTATION SECONDARY SCHOOL
|
MECHANICAL WORKS
|
—
|
TOTAL TIPPERARY
|
|
—
|
WATERFORD
|
|
|
LISMORE COMMUNITY SCHOOL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
24,199.79
|
LISMORE COMMUNITY SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
75,096.43
|
TOTAL WATERFORD
|
|
99,296.22
|
WESTMEATH
|
|
|
ST FINIANS COLLEGE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
206,980.76
|
MULLINGAR COMMUNITY COLLEGE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
49,717.40
|
MOATE COMMUNITY SCHOOL
|
ELECTRICAL WORKS
|
—
|
TOTAL WESTMEATH
|
|
256,698.16
|
WEXFORD
|
|
|
GOOD COUNSEL COLLEGE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
69,325.70
|
LORETO S.S. SPAWELL RD
|
OTHER STRUCTURAL IMPROVEMENTS
|
73,691.10
|
BUNCLODY VOCATIONAL SCHOOL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
NEW ROSS VS
|
CURRICULAR REQUIREMENTS
|
—
|
TOTAL WEXFORD
|
|
143,016.80
|
WICKLOW
|
|
|
ST MARYS COLLEGE, ARKLOW
|
OTHER STRUCTURAL IMPROVEMENTS
|
154,952.00
|
DOMINICAN COLLEGE
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
AVONDALE COMMUNITY COLLEGE, RATHDRUM
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
TOTAL WICKLOW
|
|
154,952.00
|
TOTAL POST PRIMARY SCHOOLS
|
|
2,407,769.88
|
Number of Schools On Site
|
|
|
Number of Schools Complete
|
|
|
Number of Schools Non Start
|
|
|
Number of Schools Overspend
|
|
|
Total Number of Schools
|
|
|
SWS Post-Primary 2010
COUNTY / SCHOOL
|
PROJECT APPLICATION
|
TOTAL PAID
|
CARLOW
|
|
|
ST MARYS ACADEMY, STATION ROAD
|
OTHER STRUCTURAL IMPROVEMENTS
|
235,352.50
|
COLAISTE MHUIRE CARLOW, KNOCKBEG
|
TOILET FACILITIES
|
104,953.00
|
PRESENTATION COLLEGE, ASKEA
|
ROOF WORKS
|
215,447.46
|
PRESENTATION/DE LA SALLE CARLOW, MHUINE BHEAG
|
ROOF WORKS
|
395,360.00
|
CARLOW VOCATIONAL SCHOOL, KILKENNY ROAD, CARLOW
|
TOILET FACILITIES
|
77,555.46
|
VOCATIONAL SCHOOL MUINEBEAG
|
WINDOW PROJECTS
|
50,568.73
|
TOTAL CARLOW
|
|
1,079,237.15
|
CAVAN
|
|
|
ST CLARES COLLEGE, BALLYJAMESDUFF
|
ELECTRICAL WORKS
|
250,918.85
|
ROYAL SCHOOL CAVAN
|
ROOF WORKS
|
52,250.00
|
ST BRICKINS BELTURBET
|
EXTERNAL ENVIRONMENT PROJECTS
|
22,000.00
|
VIRGINIA VOCATIONAL SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
37,764.00
|
CAVAN COLLEGE OF FURTHER STUDIES
|
EXTERNAL ENVIRONMENT PROJECTS
|
79,795.00
|
ST AIDANS COMPREHENSIVE SCHOOL, COOTEHILLE
|
WINDOW PROJECTS
|
226,266.35
|
BAILIEBORO COMMUNITY SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
259,592.22
|
TOTAL CAVAN
|
|
928,586.42
|
CLARE
|
|
|
SCOIL MHUIRE ENNISTYMON
|
ROOF WORKS
|
175,315.33
|
MARY IMMACULATE S S LISDOONVARNA
|
ROOF WORKS
|
131,177.91
|
ST JOSEPHS SPANISH POINT, MILTOWN MALBAY
|
OTHER STRUCTURAL IMPROVEMENTS
|
275,901.00
|
ST JOSEPHS, TULLA
|
MECHANICAL WORKS
|
17,059.69
|
ENNIS COMMUNITY COLLEGE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
337,206.20
|
ENNISTYNOM VS
|
ELECTRICAL WORKS
|
157,058.38
|
ST JOSEPHS COMMUNITY COLLEGE, KILKEE
|
TOILET FACILITIES
|
54,438.00
|
SCARIFF COMMUNITY CLOOEGE
|
ROOF WORKS
|
232,100.46
|
ST ANNES KILLALOE
|
WINDOW PROJECTS
|
178,807.58
|
ST PATRICKS SHANNON
|
WINDOW PROJECTS
|
466,909.80
|
KILRUSH COMMUNITY SCHOOL
|
ROOF WORKS
|
44,565.78
|
TOTAL CLARE
|
|
2,070,540.13
|
CORK
|
|
|
BALLINORA NS
|
WINDOW PROJECTS
|
—
|
ARDSCOIL UI URMOLTAIGH
|
WINDOW PROJECTS
|
22,982.40
|
BANDON GRAMMAR SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
341,919.54
|
SCOIL MHUIRE GAN SMAL
|
WINDOW PROJECTS
|
28,358.69
|
COLAISTE CHROI NAOFA
|
TOILET FACILITIES
|
70,300.00
|
ST ALOYSIUS COLLEGE
|
WINDOW PROJECTS
|
100,000.00
|
SACRED HEART CLONAKILTY
|
EXTERNAL ENVIRONMENT PROJECTS
|
53,800.00
|
COLAISTE MHUIRE COBH
|
OTHER STRUCTURAL IMPROVEMENTS
|
162,454.75
|
LORETO SECONDARY SCHOOL
|
ELECTRICAL WORKS
|
219,766.00
|
COLAISTE AN PHIARSAIGH
|
ROOF WORKS
|
10,723.05
|
MIDLETON COLLEGE
|
ROOF WORKS
|
109,145.87
|
ST MARYS HIGH SCHOOL, MIDLETON
|
WINDOW PROJECTS
|
133,162.90
|
CHRISTIAN BROTHERS, MITCHELSTOWN
|
MECHANICAL WORKS
|
21,887.56
|
PRESENTATION SECONDARY SCHOOL CORK, MITCHELSTOWN
|
EXTERNAL ENVIRONMENT PROJECTS
|
79,759.05
|
ST FRANCIS CAPUCHIN COLLEGE, ROCHESTOWN
|
TOILET FACILITIES
|
78,640.00
|
MOUNT ST MICHAEL, ROSSCARBERY
|
MECHANICAL WORKS
|
229,276.00
|
MERCY HEIGHTS SECONDARD SCHOOL, SKIBBEREEN
|
WINDOW PROJECTS
|
76,341.30
|
GAELCHOLAISTE MHUIRE NORTH MONASTERY
|
EXTERNAL ENVIRONMENT PROJECTS
|
18,431.00
|
DEERPARK CBS CORK
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
157,541.00
|
COLAISTE CHROI RI, CAPWELL ROAD
|
ROOF WORKS
|
48,936.23
|
ST VINCENTS SECONDARY SCHOOL, ST MARYS ROAD
|
MECHANICAL WORKS
|
64,666.29
|
NORTH PRESENTATION, FARRANREE
|
WINDOW PROJECTS
|
108,171.88
|
ST ALOYSIUS
|
ELECTRICAL WORKS
|
161,364.73
|
MOUNT MERCY COLLEGE, MODEL FARM ROAD
|
ELECTRICAL WORKS
|
101,242.44
|
REGINA MUNDI, DOUGLAS ROAD
|
OTHER STRUCTURAL IMPROVEMENTS
|
100,000.00
|
COLAISTE GHOBNATAN
|
EXTERNAL ENVIRONMENT PROJECTS
|
36,209.00
|
SCOIL MHUIRE BALLINGEARY
|
CURRICULAR REQUIREMENTS
|
117,584.48
|
CLONAKILTY COMMUNITY COLLEGE
|
OTHER STRUCTURAL IMPROVEMENTS
|
173,688.29
|
COACHFORD C C
|
TOILET FACILITIES
|
137,490.00
|
CARRIGHNAFOY C C
|
OTHER STRUCTURAL IMPROVEMENTS
|
97,983.66
|
COLAISTE AN CHRAOIBHIN, FERMOY
|
ROOF WORKS
|
336,018.00
|
COLAISTE TREASA, KANTURK
|
EXTERNAL ENVIRONMENT PROJECTS
|
99,249.41
|
DAVIS COLLEGE MALLOW
|
TOILET FACILITIES
|
216,710.00
|
MCEGAN COLLEGE, MACROOM
|
OTHER STRUCTURAL IMPROVEMENTS
|
75,861.24
|
ST FANAHANS COLLEGE
|
OTHER STRUCTURAL IMPROVEMENTS
|
110,084.72
|
SCHULL COMMUNITY COLLEGE, COLLA ROAD
|
OTHER STRUCTURAL IMPROVEMENTS
|
94,565.00
|
NAGLE COMMUNITY COLLEGE, BLACKROCK
|
OTHER STRUCTURAL IMPROVEMENTS
|
116,438.22
|
COLLEGE OF COMMERCE, MORRISON’S BLACKROCK
|
WINDOW PROJECTS
|
51,467.66
|
ST JOHNS CENTRAL COLLEGE, SAWMILL STREET
|
WINDOW PROJECTS
|
81,407.43
|
COLAISTE STIOFAN NAOFA
|
WINDOW PROJECTS
|
119,668.53
|
TERENCE MACSWEENEY COLLEGE, KNOCKNAHEENY
|
ELECTRICAL WORKS
|
179,585.23
|
COLAISTE DAIBHAID, AN T-ARDAN THEAS
|
CURRICULAR REQUIREMENTS
|
167,240.15
|
ASHTON SCHOOL, BLACKROCK
|
WINDOW PROJECTS
|
142,639.22
|
BOHERBUE COMPREHENSIVE SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
68,117.57
|
BEARA COMMUNITY SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
29,500.00
|
MILLSTREET COMMUNITY SCHOOL
|
ROOF WORKS
|
236,177.13
|
ST PETERS COMMUNITY COLLEGE, PASSAGE WEST
|
EXTERNAL ENVIRONMENT PROJECTS
|
141,558.83
|
DOUGLAS COMMUNITY SCHOOL
|
TOILET FACILITIES
|
29,285.82
|
BISHOPSTOWN C S
|
ELECTRICAL WORKS
|
335,150.03
|
TOTAL CORK
|
|
5,692,550.30
|
DONEGAL
|
|
|
SCOIL MHUIRE BUNCRANA
|
CURRICULAR REQUIREMENTS
|
178,355.00
|
LORETO SECONDARY SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
28,000.00
|
ST COLUMBAS COLLEGE, LIFFORD
|
TOILET FACILITIES
|
60,020.00
|
CRANA COLLEGE
|
EXTERNAL ENVIRONMENT PROJECTS
|
81,950.50
|
ABBEY V S
|
EXTERNAL ENVIRONMENT PROJECTS
|
125,235.57
|
DEELE COLLEGE, RAPHOE
|
OTHER STRUCTURAL IMPROVEMENTS
|
324,319.00
|
ST CATHERINES VOCATIONAL SCHOOL, KILLYBEGS
|
EXTERNAL ENVIRONMENT PROJECTS
|
97,790.00
|
GAIRMSCOIL MHIC DIARMADA
|
EXTERNAL ENVIRONMENT PROJECTS
|
66,156.00
|
MOVILLE COMMUNITY COLLEGE
|
MECHANICAL WORKS
|
35,297.55
|
CARNDONAGH COMMUNITY SCHOOL
|
ROOF WORKS
|
461,991.28
|
ROSSES COMMUNITY SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
124,560.84
|
POBALSCOIL CHLOICH CHEANNFHAOLA
|
WINDOW PROJECTS
|
335,955.01
|
GWEEDORE COMMUNITY SCHOOL
|
WINDOW PROJECTS
|
53,746.24
|
BALLYSHANNON COMMUNITY SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
TOTAL DONEGAL
|
|
1,973,376.99
|
DUBLIN
|
|
|
BLACKROCK COLLEGE DUBLIN
|
ROOF WORKS
|
131,650.00
|
COLAISTE EOIN AGUS IOSAGAIN, STILORGAN
|
OTHER STRUCTURAL IMPROVEMENTS
|
35,241.70
|
COLAISTE IOSAGAIN, BAILE AN BHOTHAIR
|
WINDOW PROJECTS
|
50,825.30
|
OATLANDS COLLEGE, MOUNT MERRION
|
ROOF WORKS
|
218,945.00
|
DOMINICAN COLLEGE, SION HILL, BLACKROCK
|
ROOF WORKS
|
248,966.87
|
ROCKFORD MANOR S.S., STRADBROOK ROAD, BLACKROCK
|
WINDOW PROJECTS
|
162,000.00
|
CASTLEKNOCK COLLEGE
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
MOYLE PARK COLLEGE, CLONDALKIN
|
ROOF WORKS
|
211,000.00
|
MOUNT ANVILLE SECONDARY SCHOOL
|
MECHANICAL WORKS
|
48,466.57
|
NOTRE DAME DES MISSIONS, UPPER CHURCHTOWN ROAD
|
MECHANICAL WORKS
|
14,850.00
|
HOLY CHILD KILLINEY, MILITARY ROAD KILLINEY
|
WINDOW PROJECTS
|
106,478.00
|
ST JOSEPHS OF CLUNY, BELLEVUE PARK, BALLINCLEA ROAD
|
MECHANICAL WORKS
|
13,750.00
|
ST BENILDUS COLLEGE, UPPER KILMACUD RD, BLACKROCK
|
TOILET FACILITIES
|
203,500.00
|
ST LAURENCES COLLEGE, LOUGHLINSTOWN, DUBLIN 18
|
ELECTRICAL WORKS
|
328,702.00
|
ST JOSEPHS LUCAN
|
CURRICULAR REQUIREMENTS
|
75,600.00
|
COLAISTE PHADRAIG CBS, ROSELAWN
|
CURRICULAR REQUIREMENTS
|
238,441.46
|
THE KINGS HOSPITAL, PALMERSTOWN
|
WINDOW PROJECTS
|
276,019.00
|
ST PAULS COLLEGE, RAHENY
|
OTHER STRUCTURAL IMPROVEMENTS
|
76,217.17
|
ARD SCOIL LA SALLE
|
EXTERNAL ENVIRONMENT PROJECTS
|
34,950.85
|
MANOR HOUSE RAHENY, WATERMILL ROAD, RAHENY
|
WINDOW PROJECTS
|
195,927.00
|
DE LA SALLE CHURCHTOWN
|
MECHANICAL WORKS
|
446,384.60
|
LORETO HIGH SCHOOL
|
WINDOW PROJECTS
|
21,450.00
|
COLAISTE EANNA CBS, RATHFARNHAM
|
ELECTRICAL WORKS
|
113,320.37
|
ST RAPHAELAS, STILLORGAN
|
TOILET FACILITIES
|
77,511.58
|
ST FINTANS HIGH SCHOOL, SUTTON
|
ROOF WORKS
|
171,417.80
|
ST JAMES CBS, JAMES’S STREET
|
TOILET FACILITIES
|
103,937.00
|
CBS SYNGE STREET
|
MECHANICAL WORKS
|
261,126.87
|
ST DAVIDS CBS, ARTANE
|
ROOF WORKS
|
196,721.39
|
MEANSCOIL IOGNAID RIS, WALKINSTOWN
|
TOILET FACILITIES
|
182,193.00
|
ST DECLANS COLLEGE, CABRA
|
TOILET FACILITIES
|
49,292.35
|
MARIAN COLLEGE, BALLSBRIDGE
|
CURRICULAR REQUIREMENTS
|
184,830.00
|
ST JOHNS COLLEGE DE LA SALLE BALLYFERMOT
|
TOILET FACILITIES
|
96,007.60
|
CHANEL COLLEGE COOLOCK
|
WINDOW PROJECTS
|
143,414.63
|
TEMPLEOGUE COLLEGE
|
ROOF WORKS
|
87,941.26
|
PATRICIAN COLLEGE, FINGLAS WEST
|
CURRICULAR REQUIREMENTS
|
115,301.30
|
ST KEVINS COLLEGE, EAST FINGLAS
|
ELECTRICAL WORKS
|
197,712.80
|
ST PATRICKS CATHEDRAL GRAMMAR SCHOOL, ST PATRICKS CLOSE
|
TOILET FACILITIES
|
35,417.32
|
THE HIGH SCHOOL RATHGAR
|
ROOF WORKS
|
99,125.00
|
SCOIL CATRIONA MOBHI ROAD
|
MECHANICAL WORKS
|
106,467.15
|
ST DOMINIC’S, BALLYFERMOT
|
TOILET FACILITIES
|
179,182.80
|
ST DOMINIC’S COLLEGE CABRA
|
OTHER STRUCTURAL IMPROVEMENTS
|
26,631.74
|
CARITAS COLLEGE, BALLYFERMOT
|
ROOF WORKS
|
47,384.95
|
ST MICHAEL’S HOLY FAITH, FINGLAS
|
CURRICULAR REQUIREMENTS
|
250,148.00
|
HOLY FAITH, CLONTARF
|
ROOF WORKS
|
133,298.18
|
ST MARYS GLASNEVIN
|
OTHER STRUCTURAL IMPROVEMENTS
|
43,363.12
|
PRESENTATION CONVENT WARRENMOUNT
|
TOILET FACILITIES
|
100,000.00
|
LORETO COLLEGE CRUMLIN
|
CURRICULAR REQUIREMENTS
|
82,139.00
|
LORETO SWORDS
|
WINDOW PROJECTS
|
89,805.00
|
LORETO COLLEGE, ST STEPHEN’S GREEN
|
CURRICULAR REQUIREMENTS
|
—
|
MARYFIELD COLLEGE, DRUMCONDRA
|
OTHER STRUCTURAL IMPROVEMENTS
|
390,000.00
|
ST JOSEPHS SECONDARY SCHOOL, STANHOPE STREET
|
MECHANICAL WORKS
|
181,158.63
|
MERCY COLLEGE COOLOCK
|
CURRICULAR REQUIREMENTS
|
130,052.60
|
MERCY SECONDARY SCHOOL, INCHICORE
|
ROOF WORKS
|
254,475.51
|
ST LOUIS HIGH SCHOOL, RATHMINES
|
CURRICULAR REQUIREMENTS
|
208,762.41
|
ST PAULS SECONDARY SCHOOL, GREENHILLS
|
CURRICULAR REQUIREMENTS
|
135,110.00
|
ALEXANDRA COLLEGE, MILLTOWN
|
ROOF WORKS
|
167,066.77
|
OUR LADY OF MERCY DRIMNAGH
|
CURRICULAR REQUIREMENTS
|
92,282.00
|
WESLEY COLLEGE, BALLINTEER
|
MECHANICAL WORKS
|
45,019.00
|
STRATFORD COLLEGE, RATHGAR
|
WINDOW PROJECTS
|
25,069.76
|
BALBRIGGAN C C
|
MECHANICAL WORKS
|
—
|
COLAISTE DE HIDE TALLAGHT
|
ROOF WORKS
|
72,802.88
|
DEANSRATH COMMUNITY COLLEGE, CLONDALKIN
|
MECHANICAL WORKS
|
292,808.43
|
COLLINSTOWN PARK COMMUNITY COLLEGE, CLONDALKIN
|
WINDOW PROJECTS
|
117,863.67
|
ST KEVINS COMMUNITY COLLEGE, CLONDALKIN
|
MECHANICAL WORKS
|
192,315.85
|
DUN LAOGHAIRE COLLEGE OF FURTHER EDUCATION
|
MECHANICAL WORKS
|
15,910.00
|
LUCAN V S
|
WINDOW PROJECTS
|
65,976.97
|
RIVERSDALE COMMUNITY COLLEGE, BLANCHARDSTOWN
|
MECHANICAL WORKS
|
251,205.94
|
COLAISTE CHILLIAN
|
MECHANICAL WORKS
|
191,532.58
|
STILLORGAN COLLEGE OF FURTHER EDUCATION
|
WINDOW PROJECTS
|
104,737.00
|
ST FINIANS C C
|
ROOF WORKS
|
—
|
FINGAL COMMUNITY COLLEGE
|
ELECTRICAL WORKS
|
71,791.35
|
GREENHILLS COLLEGE
|
MECHANICAL WORKS
|
232,950.05
|
FIRHOUSE COMMUNITY COLLEGE
|
WINDOW PROJECTS
|
186,846.35
|
JOBSTOWN COMMUNITY COLLEGE
|
ROOF WORKS
|
140,000.00
|
ST KEVINS COMMUNITY COLLEGE, CRUMLIN
|
TOILET FACILITIES
|
16,629.38
|
CRUMLIN COLLEGE OF FURTHER EDUCATION
|
TOILET FACILITIES
|
58,350.49
|
COLAISTE EOIN, FINGLAS
|
ELECTRICAL WORKS
|
232,400.17
|
COLAISTE IDE, FINGLAS WEST
|
ELECTRICAL WORKS
|
400,157.91
|
RINGSEND TECHNICAL INSTITUTE
|
MECHANICAL WORKS
|
102,020.22
|
KILLESTER COLLEGE OF FURTHER EDUCATION
|
MECHANICAL WORKS
|
270,871.08
|
KYLEMORE COLLEGE BALLYFERMOT
|
TOILET FACILITIES
|
88,835.68
|
MARION COLLEGE, FAIRVIEW
|
TOILET FACILITIES
|
106,464.61
|
ST MACDARAS COMMUNITY COLLEGE, TEMPLEOGUE
|
TOILET FACILITIES
|
215,375.93
|
RATHMINES SENIOR COLLEGE
|
OTHER STRUCTURAL IMPROVEMENTS
|
127,215.40
|
BALLSBRIDGE COLLEGE OF BUSINESS STUDIES
|
MECHANICAL WORKS
|
191,260.75
|
PEARSE COLLEGE, CRUMLIN
|
TOILET FACILITIES
|
174,915.00
|
PLUNKET COLLEGE, WHITEHALL
|
ROOF WORKS
|
94,217.06
|
WHITEHALL HSE SEN SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
66,871.43
|
MARGARET AYLWARD COLLEGE
|
WINDOW PROJECTS
|
145,706.00
|
COLAISTE DHULAIGH, COOLOCK
|
ELECTRICAL WORKS
|
234,466.62
|
LIBERTIES COLLEGE
|
WINDOW PROJECTS
|
186,481.69
|
BALLYFERMOT COLLEGE OF FURTHER EDUCATION
|
MECHANICAL WORKS
|
241,746.13
|
COLAISTE LAN GAEILGE AN GHRAINSEACH
|
ROOF WORKS
|
110,420.94
|
PRESENTATION COLLEGE TERENURE
|
TOILET FACILITIES
|
81,248.44
|
TRINITY COMPREHENSIVE
|
ROOF WORKS
|
237,796.88
|
SCOIL PHOBAIL CHUIL MHIN
|
CURRICULAR REQUIREMENTS
|
311,728.52
|
THE DONAHIES COMMUNITY SCHOOL, STREAMVILLE ROAD
|
WINDOW PROJECTS
|
232,820.87
|
PORTMARNOCK COMMUNITY SCHOOL
|
CURRICULAR REQUIREMENTS
|
72,360.04
|
MALAHIDE COMMUNITY SCHOOL
|
MECHANICAL WORKS
|
147,578.70
|
HOLY CHILD C S SALLYNOGGIN
|
WINDOW PROJECTS
|
57,295.86
|
ST MARKS SPRINGFIELD, TALLAGHT
|
WINDOW PROJECTS
|
200,221.93
|
TALLAGHT COMMUNITY SCHOOL
|
TOILET FACILITIES
|
29,944.79
|
OLD BAWN COMMUNITY SCHOOL, TALLAGHT
|
WINDOW PROJECTS
|
249,952.30
|
ST AIDENS BROOKFIELD, TALLAGHT
|
CURRICULAR REQUIREMENTS
|
68,519.70
|
ST TIERNANS COMMUNITY COLLEGE, BALALLY
|
ELECTRICAL WORKS
|
203,487.35
|
TOTAL DUBLIN
|
|
14,836,155.35
|
GALWAY
|
|
|
PRESENTATION COLLEGE, ATHENRY
|
EXTERNAL ENVIRONMENT PROJECTS
|
178,000.00
|
ST JOSEPHS GARBALLY
|
WINDOW PROJECTS
|
188,842.00
|
COLAISTE MHUIRE, BALLYGAR
|
EXTERNAL ENVIRONMENT PROJECTS
|
113,500.00
|
ST JOSEOHS NUNS ISLAND
|
CURRICULAR REQUIREMENTS
|
266,640.40
|
DOMINICAN COLLEGE TAYLORS’ HILL
|
MECHANICAL WORKS
|
91,303.00
|
JESUS & MARY SECONDARY SCHOOL, THREADNEEDLE ROAD
|
ROOF WORKS
|
52,300.00
|
PRESENTATION COLLEGE, HEADFORD
|
TOILET FACILITIES
|
60,980.23
|
HOLY ROSARY COLLEGE, MOUNTBELLEW
|
TOILET FACILITIES
|
177,000.00
|
CALASANCTIUS COLLEGE ORANMORE
|
EXTERNAL ENVIRONMENT PROJECTS
|
35,056.00
|
ST JARLATH’S COLLEGE, TUAM
|
TOILET FACILITIES
|
—
|
ST BRIGID’S TUAM
|
ROOF WORKS
|
110,160.00
|
PRESENTATION COLLEGE CURRYLEA
|
WINDOW PROJECTS
|
174,000.00
|
ST JARLATHS COLLEGE
|
TOILET FACILITIES
|
94,024.64
|
ST JARLATHS VOCATIONAL SCHOOL, MOUNTBELLEW
|
EXTERNAL ENVIRONMENT PROJECTS
|
49,045.00
|
GAIRM SCOIL CHILLEAIN NAOFA, BALLINASLOE
|
ROOF WORKS
|
56,000.00
|
GAIRMSCOIL FHEICHIN NAOFA
|
MECHANICAL WORKS
|
54,186.00
|
COLAISTE GHOBNAIT INIS OIRR
|
MECHANICAL WORKS
|
77,756.11
|
GALWAY COMMUNITY COLLEGE, WELLPARK
|
WINDOW PROJECTS
|
171,441.92
|
SCOIL CHUIMSITHEACH CHIARAIN, AN CHEATHRU RUA
|
TOILET FACILITIES
|
70,540.68
|
TOTAL GALWAY
|
|
2,020,775.98
|
KERRY
|
|
|
ST JOSEPHS SECONDARY SCHOOL, BALLYBUNION
|
MECHANICAL WORKS
|
58,528.84
|
MEANSCOIL PHADRAIG NAOFA, CASTLEISLAND
|
TOILET FACILITIES
|
54,736.59
|
MEAN SCOIL NAOMH JOSEPH, CASTLEISLAND
|
ROOF WORKS
|
214,362.00
|
ST BRENDANS COLLEGE, CILL AIRNE
|
WINDOW PROJECTS
|
221,650.20
|
INTERMEDIATE SCHOOL KILLORGLIN
|
ELECTRICAL WORKS
|
73,440.00
|
ST MICHAELS COLLEGE
|
WINDOW PROJECTS
|
189,648.48
|
PRESENTATION S.S. MILLTOWN, KILLARNEY
|
ELECTRICAL WORKS
|
100,000.00
|
PRESENTATION SECONDARY SCHOOL TRALEE
|
EXTERNAL ENVIRONMENT PROJECTS
|
50,000.00
|
MOUNT HAWK SCHOOL, TRALEE
|
EXTERNAL ENVIRONMENT PROJECTS
|
234,239.39
|
KILLORGLIN C C
|
ROOF WORKS
|
267,000.00
|
LISTOWEL COMMUNITY COLLEGE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
58,800.00
|
CASTLEISLAND V S
|
ELECTRICAL WORKS
|
16,227.40
|
CAUSEWAY C C, TRALEE
|
MECHANICAL WORKS
|
59,500.00
|
TRALEE CC
|
ELECTRICAL WORKS
|
410,000.00
|
GAELCHOLAISTE CHIARRAI, TRALEE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
RATHMORE COMMUNITY SCHOOL
|
MECHANICAL WORKS
|
21,964.52
|
DINGLE CS
|
EXTERNAL ENVIRONMENT PROJECTS
|
722.93
|
TOTAL KERRY
|
|
2,030,820.35
|
KILDARE
|
|
|
SALESIAN SECONDARY SCHOOL, CELLBRIDGE
|
ROOF WORKS
|
264,930.40
|
CROSS AND PASSION COLLEGE, KILCULLEN
|
ELECTRICAL WORKS
|
216,000.00
|
SCOIL DARA KILCOCK
|
TOILET FACILITIES
|
41,200.00
|
ST PAUL’S MONASTEREVIN
|
ROOF WORKS
|
146,932.97
|
COLAISTE NAOMH MHUIRE, NAAS
|
WINDOW PROJECTS
|
222,575.75
|
CURRAGH POST PRIMARY
|
OTHER STRUCTURAL IMPROVEMENTS
|
11,371.00
|
COLAISTE LORCAIN CASTLEDERMOT
|
WINDOW PROJECTS
|
240,279.00
|
VOCATIONAL SCHOOL KILDARE COLLEGE OF FURTHER STUDIES
|
WINDOW PROJECTS
|
89,421.26
|
CONFEY COMMUNITY COLLEGE
|
WINDOW PROJECTS
|
194,500.00
|
ST FARNANS POST PRIMARY SCHOOL, PROSPEROUS
|
TOILET FACILITIES
|
21,600.00
|
RATHANGAN POST PRIMARY SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
TOTAL KILDARE
|
|
1,448,810.38
|
KILKENNY
|
|
|
COLAISTE EAMANN RIS, CALLAN
|
MECHANICAL WORKS
|
42,524.00
|
CBS KILKENNY
|
ELECTRICAL WORKS
|
100,823.72
|
ST KIERANS COLLEGE KILKENNY
|
CURRICULAR REQUIREMENTS
|
140,607.40
|
KILKENNY COLLEGE
|
MECHANICAL WORKS
|
62,334.49
|
COLAISTE AIREAGAIL BALLYHALE
|
CURRICULAR REQUIREMENTS
|
23,156.07
|
DUISKE COLLEGE GRAIGNAMANAGH
|
OTHER STRUCTURAL IMPROVEMENTS
|
34,100.00
|
COLAISTE MHUIRE JOHNSTOWN VS
|
OTHER STRUCTURAL IMPROVEMENTS
|
51,500.00
|
CITY TECHNICAL SCHOOL, NEW STREET, KILKENNY
|
ROOF WORKS
|
200,000.00
|
CASTLECOMER COMMUNITY SCHOOL
|
ROOF WORKS
|
177,981.35
|
TOTAL KILKENNY
|
|
833,027.03
|
LAOIS
|
|
|
CLONASLEE VOCATIONAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
34,977.45
|
MOUNTMELLICK COMMUNITY SCHOOL
|
CURRICULAR REQUIREMENTS
|
83,565.21
|
HEYWOOD COMMUNITY SCHOOL, BALLINAKILL
|
WINDOW PROJECTS
|
104,792.37
|
TOTAL LAOIS
|
|
223,335.03
|
LEITRIM
|
|
|
CARRIGALLEN V S
|
ROOF WORKS
|
83,474.00
|
DRUMKEERIN VS
|
TOILET FACILITIES
|
72,669.03
|
DRUMSHAMBO V.S.
|
TOILET FACILITIES
|
161,360.85
|
SCOIL CHUIMSITHEACH NAOMH CLAR
|
TOILET FACILITIES
|
63,146.76
|
TOTAL LEITRIM
|
|
380,650.64
|
LIMERICK
|
|
|
SALEASIAN SECONDARY SCHOOL, PALLASKENRY
|
WINDOW PROJECTS
|
89,075.00
|
PRESENTATION CONVENT, SEXTON STREET
|
TOILET FACILITIES
|
81,664.35
|
LAUREL HILL, NORTH CIRCULAR ROAD
|
EXTERNAL ENVIRONMENT PROJECTS
|
76,469.00
|
SALESIAN SEC SCHOOL, NORTH CIRCULAR ROAD
|
MECHANICAL WORKS
|
30,236.12
|
ARD SCOIL MHUIRE CORBALLY
|
CURRICULAR REQUIREMENTS
|
148,278.00
|
SCOIL CARMEL LIMERICK, O’CONNELL AVENUE
|
MECHANICAL WORKS
|
50,353.28
|
ASKEATON COMMUNITY COLLEGE
|
EXTERNAL ENVIRONMENT PROJECTS
|
4,375.00
|
DESMOND COLLEGE, NEWCASTLEWEST
|
OTHER STRUCTURAL IMPROVEMENTS
|
37,750.00
|
LIMERICK SENIOR COLLEGE, MULGRADE STREET
|
WINDOW PROJECTS
|
56,787.94
|
MERCY C C RATHKEALE VS
|
MECHANICAL WORKS
|
36,699.76
|
COLAISTE IOSAEF, KILMALLOCK
|
EXTERNAL ENVIRONMENT PROJECTS
|
17,755.98
|
CRESCENT COLLEGE COMPREHENSIVE, DOORADOYLE
|
WINDOW PROJECTS
|
227,300.72
|
JOHN THE BAPTIST COMMUNITY SCHOOL
|
ROOF WORKS
|
108,205.75
|
TOTAL LIMERICK
|
|
964,950.90
|
LONGFORD
|
|
|
CNOC MHUIRE, GRANARD
|
WINDOW PROJECTS
|
72,300.00
|
ARDSCOIL PHADRAIG, GRANARD
|
WINDOW PROJECTS
|
45,704.00
|
TEMPLEMICHAELCOLLEGE
|
WINDOW PROJECTS
|
73,334.00
|
MOYNE C S
|
ROOF WORKS
|
295,438.82
|
TOTAL LONGFORD
|
|
486,776.82
|
LOUTH
|
|
|
ST JOSEPHS, DROGHEDA
|
ELECTRICAL WORKS
|
378,767.43
|
OUR LADY’S COLLEGE GREENHILLS, DROGHEDA
|
EXTERNAL ENVIRONMENT PROJECTS
|
79,969.00
|
COLAISTE RIS, DUN DEALGAN
|
CURRICULAR REQUIREMENTS
|
358,533.42
|
ST MARY’S COLLEGE, DUNDALK
|
TOILET FACILITIES
|
154,362.12
|
DE LA SALLE COLLEGE
|
ROOF WORKS
|
573,600.00
|
ST VINCENTS SECONDARY SCHOOL
|
ROOF WORKS
|
64,874.34
|
BUSH POST PRIMARY CC, DUNDALK
|
WINDOW PROJECTS
|
243,363.08
|
ST OLIVERS COMMUNITY COLLEGE
|
ELECTRICAL WORKS
|
500,000.00
|
OFIAICH COLLEGE, DUNDALK
|
CURRICULAR REQUIREMENTS
|
213,775.10
|
SCOIL UI MHUIRE, DUNLEER
|
TOILET FACILITIES
|
138,384.81
|
ARDEE COMMUNITY SCHOOL
|
WINDOW PROJECTS
|
365,583.83
|
TOTAL LOUTH
|
|
3,071,213.13
|
MAYO
|
|
|
ST MURDEACHS COLLEGE, BALLINA
|
MECHANICAL WORKS
|
342,200.00
|
OUR LADYS SECONDARY SCHOOL, BELMULLET
|
WINDOW PROJECTS
|
157,555.07
|
ST JOSEPH’S S S, CASTLEBAR
|
CURRICULAR REQUIREMENTS
|
54,834.45
|
ST JOSEPH’S SECONDARY SCHOOL, MARIST CONVENT
|
TOILET FACILITIES
|
14,500.00
|
ST COLMANS COLLEGE, SWINFORD
|
ROOF WORKS
|
194,753.00
|
ST JOSEPHS SECONDARY SCHOOL
|
ROOF WORKS
|
205,161.62
|
COLAISTE MHUIRE, TUAR MHIC EADAIGH
|
WINDOW PROJECTS
|
36,205.07
|
RICE COLLEGE WESTPORT
|
OTHER STRUCTURAL IMPROVEMENTS
|
25,400.00
|
SACRED HEART, WESTPORT
|
ROOF WORKS
|
39,458.75
|
MOYNE V S, BALLINA
|
OTHER STRUCTURAL IMPROVEMENTS
|
33,286.33
|
MC HALE COLLEGE ACHILL
|
WINDOW PROJECTS
|
58,563.32
|
ST TIERNAN’S COLLEGE, CROSSMOLINA
|
TOILET FACILITIES
|
144,000.00
|
WESTPORT V.S.
|
TOILET FACILITIES
|
50,947.31
|
DAVITT COLLEGE CASTLEBAR
|
TOILET FACILITIES
|
86,400.00
|
BALLYHAUNIS COMMUNITY SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
26,149.98
|
BALLINROBE COMMUNITY SCHOOL
|
WINDOW PROJECTS
|
43,985.55
|
ST LOUIS COMMUNITY SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
59,485.61
|
TOTAL MAYO
|
|
1,572,886.06
|
MEATH
|
|
|
ST PATRICKS CLASSICAL, MOATLANDS
|
OTHER STRUCTURAL IMPROVEMENTS
|
49,130.00
|
ST JOSEPHS SECONDARY SCHOOL NAVAN
|
EXTERNAL ENVIRONMENT PROJECTS
|
346,031.43
|
EUREKA SECONDARY SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
107,777.45
|
SCOIL MHUIRE COM TRIM
|
ELECTRICAL WORKS
|
296,437.83
|
ST PETER’S COLLEGE, DUNBOYNE
|
WINDOW PROJECTS
|
196,627.00
|
ST OLIVERS POST PRIMARY, KELLS
|
EXTERNAL ENVIRONMENT PROJECTS
|
13,746.65
|
COLAISTE PHOBAIL
|
ROOF WORKS
|
205,997.17
|
BEAUFORT NAVAN
|
ROOF WORKS
|
159,572.15
|
RATHOATH C C
|
EXTERNAL ENVIRONMENT PROJECTS
|
87,000.00
|
ASHBOURNE COMMUNITY SCHOOL
|
ROOF WORKS
|
540,654.42
|
TOTAL MEATH
|
|
2,002,974.10
|
MONAGHAN
|
|
|
ST LOUIS SS CARRICKMACROSS
|
ELECTRICAL WORKS
|
395,594.94
|
OUR LADYS SEC SCHOOL, CASTLEBLANEY
|
ELECTRICAL WORKS
|
214,002.00
|
ST McCARTANS COLLEGE
|
TOILET FACILITIES
|
172,041.78
|
ST LOUIS S.S. MONAGHAN
|
OTHER STRUCTURAL IMPROVEMENTS
|
40,170.74
|
MONAGHAN COLLEGIATE, CORLATT
|
TOILET FACILITIES
|
116,252.50
|
BALLYBAY COMMUNITY COLLEGE
|
OTHER STRUCTURAL IMPROVEMENTS
|
662,178.81
|
CASTLEBLANEY COLLEGE
|
TOILET FACILITIES
|
273,359.19
|
BEECHILL V S
|
CURRICULAR REQUIREMENTS
|
430,652.43
|
TOTAL MONAGHAN
|
|
2,304,252.39
|
OFFALY
|
|
|
ST MARYS SECONDARY SCHOOL, EDENDERRY
|
ROOF WORKS
|
270,000.00
|
SACRED HEART SECONDARY SCHOOL, TULLAMORE
|
OTHER STRUCTURAL IMPROVEMENTS
|
100,400.00
|
KILLINA, RAHAN, TULLAMORE
|
ROOF WORKS
|
69,448.00
|
CLARA V S
|
ELECTRICAL WORKS
|
52,949.75
|
OAKLANDS COLLEGE, EDENDERRY
|
ROOF WORKS
|
205,876.97
|
TOTAL OFFALY
|
|
698,674.72
|
ROSCOMMON
|
|
|
ELPHIN V S
|
ROOF WORKS
|
21,930.00
|
ROSCOMMON C C
|
CURRICULAR REQUIREMENTS
|
94,826.55
|
CASTLEREA C.S.
|
EXTERNAL ENVIRONMENT PROJECTS
|
27,240.00
|
TOTAL ROSCOMMON
|
|
143,996.55
|
SLIGO
|
|
|
ST MARYS COLLEGE, BALLYSADARE
|
ROOF WORKS
|
39,665.20
|
COLAISTE MHUIRE, BALLYMOTE
|
ROOF WORKS
|
46,859.26
|
JESUS & MARY, ENNISCRONE
|
OTHER STRUCTURAL IMPROVEMENTS
|
181,758.50
|
URSULINE COLLEGE
|
WINDOW PROJECTS
|
36,700.00
|
MERCY COLLEGE SLIGO
|
WINDOW PROJECTS
|
53,143.97
|
SLIGO GRAMMAR SCHOOL, THE MALL
|
EXTERNAL ENVIRONMENT PROJECTS
|
183,000.00
|
COOLA V.S., SOOEY, VIA BOYLE
|
MECHANICAL WORKS
|
120,510.48
|
GRANGE C C
|
ROOF WORKS
|
50,080.18
|
BALLINODE VS
|
EXTERNAL ENVIRONMENT PROJECTS
|
102,878.93
|
TOTAL SLIGO
|
|
814,596.52
|
TIPPERARY
|
|
|
ST JOSEPH’S COLLEGE
|
TOILET FACILITIES
|
17,339.71
|
ROCKWELL COLLEGE
|
ROOF WORKS
|
70,327.59
|
ARD SCOIL NA MBRAITHRE
|
ELECTRICAL WORKS
|
51,070.92
|
LORETO SECONDARY SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
33,021.00
|
PATRICIAN PRESENATION SECONDARY SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
53,644.73
|
ST MARY’S SECONDARY SCHOOL NENAGH
|
ROOF WORKS
|
348,377.47
|
CISTERCIAN COLLEGE
|
OTHER STRUCTURAL IMPROVEMENTS
|
50,014.06
|
PRESENTATION SECONDARY SCHOOL
|
MECHANICAL WORKS
|
279,169.36
|
URSULINE SEC SCHOOL
|
ELECTRICAL WORKS
|
66,099.70
|
ST ANNE’S S.S. ROSANNA RD
|
OTHER STRUCTURAL IMPROVEMENTS
|
100,562.75
|
COMERAGH COLLEGE
|
WINDOW PROJECTS
|
92,600.00
|
SCOIL RUAIN
|
ELECTRICAL WORKS
|
56,561.55
|
NEWPORT V S
|
ELECTRICAL WORKS
|
35,629.28
|
ST SHEELANS TEMPLEMORE
|
WINDOW PROJECTS
|
121,940.40
|
TIPPERARY TOWN VS
|
WINDOW PROJECTS
|
157,400.00
|
THURLES VOCATIONAL SCHOOL
|
ELECTRICAL WORKS
|
45,885.17
|
CAHIR COMMUNITY COLLEGE
|
ELECTRICAL WORKS
|
82,441.74
|
ROSCREA COMMUNITY COLLEGE
|
ELECTRICAL WORKS
|
46,132.88
|
TOTAL TIPPERARY
|
|
1,708,218.31
|
WATERFORD
|
|
|
CBS DUNGARVAN
|
OTHER STRUCTURAL IMPROVEMENTS
|
210,600.00
|
ST AUGUSTINES COLLEGE
|
OTHER STRUCTURAL IMPROVEMENTS
|
140,000.00
|
ARD SCOIL NA NDEISE
|
WINDOW PROJECTS
|
106,553.00
|
DE LA SALLE COLLEGE NEWTOWN
|
WINDOW PROJECTS
|
236,555.00
|
OUR LADY OF MERCY SEC SCHOOL WATERFORD
|
MECHANICAL WORKS
|
421,623.31
|
NEWTOWN SCHOOL
|
WINDOW PROJECTS
|
—
|
ST DECLANS KILMACTHOMAS
|
WINDOW PROJECTS
|
61,950.00
|
CENTRAL TECHNICAL INSTITUTE
|
EXTERNAL ENVIRONMENT PROJECTS
|
44,024.00
|
ST PAULS C C
|
ROOF WORKS
|
809,235.47
|
LISMORE COMMUNITY SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
39,725.00
|
TOTAL WATERFORD
|
|
2,070,265.78
|
WESTMEATH
|
|
|
ST ALOYSIUS COLLEGE
|
ROOF WORKS
|
100,210.05
|
ST JOSEPHS COLLEGE
|
ROOF WORKS
|
17,480.00
|
CONVENT S S KILBEGGAN
|
ROOF WORKS
|
81,017.51
|
ST MARYS COLLEGE MULLINGAR
|
WINDOW PROJECTS
|
128,375.00
|
ST FINIANS COLLEGE
|
OTHER STRUCTURAL IMPROVEMENTS
|
288,020.02
|
ST JOSEPHS SECONDARY SCHOOL
|
WINDOW PROJECTS
|
150,000.00
|
CASTLEPOLLARD COMMUNITY COLLEGE
|
OTHER STRUCTURAL IMPROVEMENTS
|
34,690.50
|
COLUMBA COLLEGE
|
MECHANICAL WORKS
|
228,034.04
|
TOTAL WESTMEATH
|
|
1,027,827.12
|
WEXFORD
|
|
|
FCJ BUNCLODY
|
WINDOW PROJECTS
|
234,000.00
|
ST MARY’S CBS ENNISCORTHY
|
ROOF WORKS
|
196,638.04
|
COLAISTE BRIDE ENNISCORTHY
|
ELECTRICAL WORKS
|
387,232.66
|
CHRISTIAN BROTHERS SS NEW ROSS
|
ELECTRICAL WORKS
|
184,210.50
|
GOOD COUNSEL COLLEGE
|
EXTERNAL ENVIRONMENT PROJECTS
|
97,892.67
|
ST MARYS WEXFORD
|
ROOF WORKS
|
200,000.00
|
OUR LADY OF LOURDES
|
OTHER STRUCTURAL IMPROVEMENTS
|
100,000.00
|
LORETO S.S. SPAWELL RD
|
WINDOW PROJECTS
|
160,172.52
|
PRESENTATION SECONDARY SCHOOL, GROGAN’S ROAD
|
MECHANICAL WORKS
|
391,777.00
|
ADAMSTOWN VS
|
WINDOW PROJECTS
|
140,800.00
|
BRIDGETOWN VS
|
WINDOW PROJECTS
|
179,143.89
|
BUNCLODY VOCATIONAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
44,203.28
|
NEW ROSS VS
|
EXTERNAL ENVIRONMENT PROJECTS
|
93,564.35
|
WEXFORD VS
|
ROOF WORKS
|
178,401.30
|
RAMSGRANGE COMMUNITY SCHOOL
|
WINDOW PROJECTS
|
60,392.00
|
GOREY C S
|
MECHANICAL WORKS
|
18,965.69
|
TOTAL WEXFORD
|
|
2,667,393.90
|
WICKLOW
|
|
|
ST KEVIN’S CBS, ARKLOW
|
WINDOW PROJECTS
|
211,065.38
|
ST MARYS COLLEGE, ARKLOW
|
ROOF WORKS
|
96,482.94
|
LORETO SECONDARY SCHOOL, BRAY
|
WINDOW PROJECTS
|
81,100.00
|
ST DAVIDS, GREYSTONES
|
ELECTRICAL WORKS
|
311,936.82
|
DOMINICAN COLLEGE
|
ROOF WORKS
|
150,112.23
|
ARKLOW V.S.
|
ROOF WORKS
|
126,655.16
|
BLESSINGTON COMMUNITY COLLEGE
|
EXTERNAL ENVIRONMENT PROJECTS
|
18,537.73
|
ST THOMAS COMMUNITY COLLEGE, BRAY
|
OTHER STRUCTURAL IMPROVEMENTS
|
131,611.74
|
CARNEW V S
|
WINDOW PROJECTS
|
61,539.00
|
ST KEVIN’S COMMUNITY COLLEGE, DUNLAVIN
|
OTHER STRUCTURAL IMPROVEMENTS
|
54,203.90
|
ABBEY V S
|
MECHANICAL WORKS
|
75,175.02
|
EAST GLENDALOUGH CS
|
ELECTRICAL WORKS
|
274,455.01
|
ST KILLIANS BALLYWALTRIM
|
MECHANICAL WORKS
|
125,556.30
|
TOTAL WICKLOW
|
|
1,718,431.23
|
TOTAL POST PRIMARY SCHOOLS
|
TOTAL POST PRIMARY SCHOOLS
|
54,770,323.28
|
SWS and Capital Jobs Initiative Post-Primary 2011
COUNTY / SCHOOL
|
PROJECT APPLICATION
|
ACTUAL AMOUNT PAID 2011
|
CARLOW
|
|
|
BORRIS VS
|
WINDOW PROJECTS
|
—
|
COLAISTE EOIN HACKETSTOWN
|
WINDOW PROJECTS
|
—
|
CARLOW VOCATIONAL SCHOOL, KILKENNY ROAD, CARLOW
|
ELECTRICAL WORKS
|
—
|
TULLOW COMMUNITY SCHOOL
|
TOILET FACILITIES
|
60,082.08
|
TOTAL CARLOW
|
|
60,082.08
|
CAVAN
|
|
|
ST BRICKINS BELTURBET
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
CAVAN VOCATIONAL SCHOOL, COOTEHILL RD, CAVAN
|
ROOF WORKS
|
—
|
VIRGINIA VOCATIONAL SCHOOL
|
WINDOW PROJECTS
|
48,638.33
|
ST AIDANS COMPREHENSIVE SCHOOL, COOTEHILLE
|
WINDOW PROJECTS
|
—
|
BAILIEBORO COMMUNITY SCHOOL
|
TOILET FACILITIES
|
189,925.11
|
TOTAL CAVAN
|
|
238,563.44
|
CLARE
|
|
|
ST FLANNANS COLLEGE, ENNIS
|
ROOF WORKS
|
—
|
COLAISTE MHUIRE, ENNIS
|
ROOF WORKS
|
—
|
SCOIL MHUIRE ENNISTYMON
|
TOILET FACILITIES
|
29,673.90
|
ENNIS COMMUNITY COLLEGE
|
MECHANICAL WORKS
|
75,970.04
|
ENNISTYNOM VS
|
WINDOW PROJECTS
|
—
|
ST JOSEPHS COMMUNITY COLLEGE, KILKEE
|
MECHANICAL WORKS
|
44,234.32
|
ST ANNES KILLALOE
|
TOILET FACILITIES
|
54,453.18
|
TOTAL CLARE
|
|
204,331.44
|
CORK
|
|
|
ARDSCOIL UI URMOLTAIGH
|
WINDOW PROJECTS
|
—
|
SCOIL MHUIRE GAN SMAL
|
WINDOW PROJECTS
|
33,615.51
|
ST ALOYSIUS COLLEGE
|
ROOF WORKS
|
—
|
SACRED HEART CLONAKILTY
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
ST COLMANS COLLEGE
|
WINDOW PROJECTS
|
146,264.95
|
LORETO SECONDARY SCHOOL
|
MECHANICAL WORKS
|
44,069.90
|
ST MARY’S SECONDARY SCHOOL, CONVENT OF MERCY MALLOW
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
9,116.41
|
ST MARYS HIGH SCHOOL, MIDLETON
|
ELECTRICAL WORKS
|
—
|
MOUNT ST MICHAEL, ROSSCARBERY
|
WINDOW PROJECTS
|
39,275.03
|
ST FACHTNAS DE LA SALLE, SKIBBEREEN
|
ELECTRICAL WORKS
|
24,842.22
|
NORTH MONASTERY CBS
|
WINDOW PROJECTS
|
—
|
COLAISTE CHROI RI, CAPWELL ROAD
|
TOILET FACILITIES
|
—
|
ST VINCENTS SECONDARY SCHOOL, ST MARYS ROAD
|
WINDOW PROJECTS
|
37,225.32
|
ST ALOYSIUS
|
WINDOW PROJECTS
|
64,246.00
|
ST PATRICK’S GIRLS SCHOOL, GARDINERS HILL
|
ELECTRICAL WORKS
|
34,990.90
|
COLAISTE GHOBNATAN
|
ELECTRICAL WORKS
|
58,132.52
|
CLONAKILTY COMMUNITY COLLEGE
|
MECHANICAL WORKS
|
—
|
COLAISTE AN CHRAOIBHIN, FERMOY
|
ELECTRICAL WORKS
|
124,291.06
|
ST AIDENS BALLYVOLANE, BALLINCOLLY
|
MECHANICAL WORKS
|
144,526.16
|
ST JOHNS CENTRAL COLLEGE, SAWMILL STREET
|
ELECTRICAL WORKS
|
—
|
TERENCE MACSWEENEY COLLEGE, KNOCKNAHEENY
|
ELECTRICAL WORKS
|
225,929.09
|
BOHERBUE COMPREHENSIVE SCHOOL
|
MECHANICAL WORKS
|
27,755.00
|
MAYFIELD COMMUNITY SCHOOL
|
MECHANICAL WORKS
|
88,628.40
|
TOTAL CORK
|
|
1,102,908.47
|
DONEGAL
|
|
|
SCOIL MHUIRE BUNCRANA
|
ROOF WORKS
|
—
|
ST COLUMBAS COLLEGE, LIFFORD
|
ROOF WORKS
|
—
|
LETTERKENNY VOCATIONAL SCHOOL
|
ELECTRICAL WORKS
|
32,334.75
|
DEELE COLLEGE, RAPHOE
|
ROOF WORKS
|
19,942.04
|
ST CATHERINES VOCATIONAL SCHOOL, KILLYBEGS
|
ELECTRICAL WORKS
|
116,506.84
|
ST COLUMBAS COMPREHENSIVE SCHOOL, GLENTIES
|
ROOF WORKS
|
—
|
ROYAL & PRIOR SCHOOL, RAPHOE
|
WINDOW PROJECTS
|
—
|
POBALSCOIL CHLOICH CHEANNFHAOLA
|
ROOF WORKS
|
123,547.07
|
TOTAL DONEGAL
|
|
292,330.70
|
DUBLIN
|
|
|
ROCKFORD MANOR S.S., STRADBROOK ROAD, BLACKROCK
|
ELECTRICAL WORKS
|
91,923.75
|
RATHDOWN SCHOOL
|
ELECTRICAL WORKS
|
—
|
MOYLE PARK COLLEGE, CLONDALKIN
|
MECHANICAL WORKS
|
126,254.43
|
HOLY CHILD KILLINEY, MILITARY ROAD KILLINEY
|
GAS WORKS
|
—
|
ARD SCOIL LA SALLE
|
ROOF WORKS
|
—
|
MANOR HOUSE RAHENY, WATERMILL ROAD, RAHENY
|
WINDOW PROJECTS
|
—
|
COLLEGE OF ST COLUMBA, WHITECHURCH
|
MECHANICAL WORKS
|
57,843.10
|
SANCTA MARIA COLLEGE, RATHFARNHAM
|
GAS WORKS
|
30,656.22
|
COLAISTE EANNA CBS, RATHFARNHAM
|
ROOF WORKS
|
—
|
ST DOMINICS HIGH SCHOOL, GREENFIELD, DUBLIN 13
|
WINDOW PROJECTS
|
—
|
ST JOSEPHS CBS FAIRVIEW
|
MECHANICAL WORKS
|
162,065.88
|
ST PAULS CBS, NORTH BURNSWICK STREET
|
MECHANICAL WORKS
|
129,845.74
|
ST AIDAN’S CBS, WHITEHALL
|
TOILET FACILITIES
|
25,770.53
|
ST DECLANS COLLEGE, CABRA
|
ROOF WORKS
|
—
|
MARIAN COLLEGE, BALLSBRIDGE
|
MECHANICAL WORKS
|
165,604.85
|
ST JOHNS COLLEGE DE LA SALLE BALLYFERMOT
|
MECHANICAL WORKS
|
—
|
CHANEL COLLEGE COOLOCK
|
WINDOW PROJECTS
|
—
|
PATRICIAN COLLEGE, FINGLAS WEST
|
TOILET FACILITIES
|
91,100.04
|
ST KEVINS COLLEGE, EAST FINGLAS
|
MECHANICAL WORKS
|
118,007.26
|
ST CONLETHS COLLEGE
|
MECHANICAL WORKS
|
50,610.00
|
DOMINICAN COLLEGE, DRUMCONDRA
|
ELECTRICAL WORKS
|
91,847.78
|
SCOIL CATRIONA MOBHI ROAD
|
TOILET FACILITIES
|
—
|
CARITAS COLLEGE, BALLYFERMOT
|
ROOF WORKS
|
—
|
HOLY FAITH, CLONTARF
|
ROOF WORKS
|
62,530.60
|
ST MARYS GLASNEVIN
|
ROOF WORKS
|
—
|
LORETO COLLEGE CRUMLIN
|
TOILET FACILITIES
|
—
|
MARYFIELD COLLEGE, DRUMCONDRA
|
ROOF WORKS
|
—
|
ST JOSEPHS SECONDARY SCHOOL, STANHOPE STREET
|
MECHANICAL WORKS
|
131,667.10
|
MOUNT CARMEL SECONDARY SCHOOL, KINGS INN STREET
|
MECHANICAL WORKS
|
163,335.59
|
OUR LADY OF MERCY, BEAUMOUNT
|
ELECTRICAL WORKS
|
50,440.30
|
MERCY COLLEGE COOLOCK
|
ELECTRICAL WORKS
|
97,241.38
|
ST LOUIS HIGH SCHOOL, RATHMINES
|
GAS WORKS
|
61,737.82
|
ST PAULS SECONDARY SCHOOL, GREENHILLS
|
MECHANICAL WORKS
|
20,650.00
|
GRANGE COMMUNITY COLLEGE, DONAGHAMEDE
|
TOILET FACILITIES
|
90,569.30
|
COLAISTE DE HIDE TALLAGHT
|
ROOF WORKS
|
—
|
DEANSRATH COMMUNITY COLLEGE, CLONDALKIN
|
ROOF WORKS
|
188,188.24
|
COLLINSTOWN PARK COMMUNITY COLLEGE, CLONDALKIN
|
MECHANICAL WORKS
|
280,329.46
|
ST KEVINS COMMUNITY COLLEGE, CLONDALKIN
|
TOILET FACILITIES
|
72,429.70
|
LUCAN V S
|
ELECTRICAL WORKS
|
273,112.31
|
GREENHILLS COLLEGE
|
MECHANICAL WORKS
|
113,400.00
|
FIRHOUSE COMMUNITY COLLEGE
|
SPECIAL NEEDS
|
—
|
MOUNT SESKIN COMMUNITY COLLEGE
|
MECHANICAL WORKS
|
241,432.80
|
COLAISTE EANNA, CABRA
|
ELECTRICAL WORKS
|
—
|
ST KEVINS COMMUNITY COLLEGE, CRUMLIN
|
ROOF WORKS
|
—
|
COLAISTE EOIN, FINGLAS
|
ELECTRICAL WORKS
|
68,915.97
|
RINGSEND TECHNICAL INSTITUTE
|
ELECTRICAL WORKS
|
—
|
KYLEMORE COLLEGE BALLYFERMOT
|
ROOF WORKS
|
—
|
MARION COLLEGE, FAIRVIEW
|
ROOF WORKS
|
—
|
ST MACDARAS COMMUNITY COLLEGE, TEMPLEOGUE
|
ELECTRICAL WORKS
|
49,000.00
|
RATHMINES SENIOR COLLEGE
|
ELECTRICAL WORKS
|
—
|
PEARSE COLLEGE, CRUMLIN
|
ELECTRICAL WORKS
|
142,460.19
|
PLUNKET COLLEGE, WHITEHALL
|
MECHANICAL WORKS
|
—
|
MARGARET AYLWARD COLLEGE
|
ELECTRICAL WORKS
|
34,300.00
|
HOLY FAMILY COMMUNITY SCHOOL, KILTEEL ROAD
|
ELECTRICAL WORKS
|
274,112.45
|
CABINTEELY COMMUNITY SCHOOL
|
ELECTRICAL WORKS
|
118,587.00
|
SCOIL PHOBAIL CHUIL MHIN
|
MECHANICAL WORKS
|
232,810.20
|
ST MARKS SPRINGFIELD, TALLAGHT
|
TOILET FACILITIES
|
113,473.41
|
OLD BAWN COMMUNITY SCHOOL, TALLAGHT
|
ROOF WORKS
|
—
|
ST TIERNANS COMMUNITY COLLEGE, BALALLY
|
ELECTRICAL WORKS
|
90,575.98
|
ROSMINI COMMUNITY SCHOOL, DRUMCONDRA
|
ROOF WORKS
|
—
|
TOTAL DUBLIN
|
|
4,112,829.38
|
GALWAY
|
|
|
PRESENTATION COLLEGE, ATHENRY
|
MECHANICAL WORKS
|
—
|
DOMINICAN COLLEGE TAYLORS’ HILL
|
MECHANICAL WORKS
|
74,578.53
|
JESUS & MARY SECONDARY SCHOOL, THREADNEEDLE ROAD
|
ROOF WORKS
|
45,920.00
|
HOLY ROSARY COLLEGE, MOUNTBELLEW
|
ROOF WORKS
|
—
|
ST JARLATH’S COLLEGE, TUAM
|
ROOF WORKS
|
—
|
MERCY COLLEGE
|
SPECIAL NEEDS
|
—
|
COLAISTE CHOLMCILLE
|
MECHANICAL WORKS
|
—
|
GAIRMSCOIL MHUIRE, ATHENRY
|
ROOF WORKS
|
58,400.30
|
GAIRM SCOIL CHILLEAIN NAOFA, BALLINASLOE
|
WINDOW PROJECTS
|
53,025.00
|
COLAISTE NA COIRIBE
|
TOILET FACILITIES
|
—
|
GALWAY COMMUNITY COLLEGE, WELLPARK
|
WINDOW PROJECTS
|
71,399.44
|
SCOIL POBAIL MHIC DARA
|
WINDOW PROJECTS
|
81,396.48
|
DUNMORE COMMUNITY SCHOOL
|
ROOF WORKS
|
139,650.00
|
GORT COMMUNITY SCHOOL
|
MECHANICAL WORKS
|
—
|
TOTAL GALWAY
|
|
524,369.75
|
KERRY
|
|
|
MEAN SCOIL NAOMH JOSEPH, CASTLEISLAND
|
WINDOW PROJECTS
|
—
|
COLAISTE IDE
|
ELECTRICAL WORKS
|
155,206.80
|
INTERMEDIATE SCHOOL KILLORGLIN
|
MECHANICAL WORKS
|
—
|
PRESENTATION SECONDARY SCHOOL TRALEE
|
ELECTRICAL WORKS
|
116,405.10
|
KILLARNEY COMMUNITY COLLEGE
|
ROOF WORKS
|
—
|
KILLORGLIN C C
|
ELECTRICAL WORKS
|
94,848.60
|
TRALEE CC
|
MECHANICAL WORKS
|
15,691.26
|
TOTAL KERRY
|
|
382,151.76
|
KILDARE
|
|
|
PATRICIAN SECONDARY SCHOOL, NEWBRIDGE
|
ROOF WORKS
|
93,100.00
|
CROSS AND PASSION COLLEGE, KILCULLEN
|
GAS WORKS
|
113,783.41
|
SCOIL DARA KILCOCK
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
36,400.00
|
ST PAUL’S MONASTEREVIN
|
MECHANICAL WORKS
|
38,797.70
|
COLAISTE NAOMH MHUIRE, NAAS
|
ELECTRICAL WORKS
|
170,311.20
|
COLAISTE LORCAIN CASTLEDERMOT
|
MECHANICAL WORKS
|
218,137.50
|
ST CONLETHS VOCATIONAL SCHOOL, NEWBRIDGE
|
ELECTRICAL WORKS
|
97,759.38
|
TOTAL KILDARE
|
|
768,289.19
|
KILKENNY
|
|
|
COLAISTE EAMANN RIS, CALLAN
|
ELECTRICAL WORKS
|
39,999.54
|
COLAISTE AIREAGAIL BALLYHALE
|
MECHANICAL WORKS
|
24,265.63
|
DUISKE COLLEGE GRAIGNAMANAGH
|
TOILET FACILITIES
|
17,150.00
|
COLAISTE MHUIRE JOHNSTOWN VS
|
TOILET FACILITIES
|
—
|
COLÁISTE COIS SIÚIRE, MOONCOIN
|
WINDOW PROJECTS
|
25,200.00
|
GRENNAN COLLEGE THOMASTOWN
|
MECHANICAL WORKS
|
72,213.40
|
CASTLECOMER COMMUNITY SCHOOL
|
WINDOW PROJECTS
|
46,036.17
|
TOTAL KILKENNY
|
|
224,864.74
|
LAOIS
|
|
|
COLAISTE IOSAGAIN, PORTARLINGTON
|
ROOF WORKS
|
—
|
MOUNTMELLICK COMMUNITY SCHOOL
|
ROOF WORKS
|
—
|
HEYWOOD COMMUNITY SCHOOL, BALLINAKILL
|
MECHANICAL WORKS
|
159,537.09
|
TOTAL LAOIS
|
|
159,537.09
|
LEITRIM
|
|
|
DRUMKEERIN VS
|
ELECTRICAL WORKS
|
—
|
DRUMSHAMBO V.S.
|
ELECTRICAL WORKS
|
98,880.12
|
VOCATIONAL SCHOOL BALLINAMORE
|
ROOF WORKS
|
14,000.00
|
TOTAL LEITRIM
|
|
112,880.12
|
LIMERICK
|
|
|
ST JOSEPHS SECONDARY SCHOOL
|
TOILET FACILITIES
|
60,776.04
|
SALEASIAN SECONDARY SCHOOL, PALLASKENRY
|
ELECTRICAL WORKS
|
13,405.00
|
CBS SEXTON STREET
|
WINDOW PROJECTS
|
64,203.04
|
ARDSCOIL RIS, NORTH CIRCULAR ROAD
|
TOILET FACILITIES
|
—
|
ST MUNCHIN’S COLLEGE, CORBALLY
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
10,635.81
|
LAUREL HILL COLAISTE FCJ
|
WINDOW PROJECTS
|
—
|
SALESIAN SEC SCHOOL, NORTH CIRCULAR ROAD
|
WINDOW PROJECTS
|
—
|
SCOIL CARMEL LIMERICK, O’CONNELL AVENUE
|
ROOF WORKS
|
—
|
ASKEATON COMMUNITY COLLEGE
|
ELECTRICAL WORKS
|
—
|
LIMERICK SENIOR COLLEGE, MULGRADE STREET
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
MERCY C C RATHKEALE VS
|
WINDOW PROJECTS
|
—
|
CRESCENT COLLEGE COMPREHENSIVE, DOORADOYLE
|
MECHANICAL WORKS
|
285,607.49
|
JOHN THE BAPTIST COMMUNITY SCHOOL
|
ELECTRICAL WORKS
|
64,574.54
|
TOTAL LIMERICK
|
|
499,201.92
|
LONGFORD
|
|
|
CONVENT OF MERCY BALLYMAHON
|
ROOF WORKS
|
—
|
MEAN SCOIL MHUIRE
|
WINDOW PROJECTS
|
73,248.35
|
BALLYMAHON VOCATIONAL SCHOOL
|
WINDOW PROJECTS
|
—
|
ARDSCOIL PHADRAIG, GRANARD
|
ROOF WORKS
|
—
|
LANESBORO COMMUNITY COLLEGE
|
MECHANICAL WORKS
|
—
|
TEMPLEMICHAELCOLLEGE
|
ROOF WORKS
|
—
|
MOYNE C S
|
WINDOW PROJECTS
|
106,229.61
|
TOTAL LONGFORD
|
|
179,477.96
|
LOUTH
|
|
|
OUR LADY’S COLLEGE GREENHILLS, DROGHEDA
|
WINDOW PROJECTS
|
68,500.00
|
COLAISTE RIS, DUN DEALGAN
|
MECHANICAL WORKS
|
154,344.40
|
ST MARY’S COLLEGE, DUNDALK
|
ELECTRICAL WORKS
|
30,388.02
|
DE LA SALLE COLLEGE
|
TOILET FACILITIES
|
147,228.26
|
ST VINCENTS SECONDARY SCHOOL
|
MECHANICAL WORKS
|
—
|
BUSH POST PRIMARY CC, DUNDALK
|
ELECTRICAL WORKS
|
153,744.37
|
ST OLIVERS COMMUNITY COLLEGE
|
WINDOW PROJECTS
|
—
|
TOTAL LOUTH
|
|
554,205.05
|
MAYO
|
|
|
BALLA SECONDARY SCHOOL, CASTLEBAR
|
TOILET FACILITIES
|
183,566.85
|
ST MURDEACHS COLLEGE, BALLINA
|
GAS WORKS
|
165,900.00
|
ST JOSEPH’S S S, CASTLEBAR
|
WINDOW PROJECTS
|
—
|
ST COLMANS COLLEGE, SWINFORD
|
WINDOW PROJECTS
|
—
|
JESUS & MARY S.S. CROSSMOLINA
|
ROOF WORKS
|
49,380.53
|
ST JOSEPHS SS FOXFORD
|
MECHANICAL WORKS
|
—
|
SANCTA MARIA COLLEGE, LOUISBURGH
|
ROOF WORKS
|
59,046.40
|
COLAISTE MHUIRE, TUAR MHIC EADAIGH
|
TOILET FACILITIES
|
—
|
RICE COLLEGE WESTPORT
|
ROOF WORKS
|
—
|
SACRED HEART, WESTPORT
|
ROOF WORKS
|
18,500.00
|
MOYNE V S, BALLINA
|
MECHANICAL WORKS
|
—
|
ST BRENDANS COLLEGE, BELMULLET
|
WINDOW PROJECTS
|
—
|
WESTPORT V.S.
|
WINDOW PROJECTS
|
—
|
ST LOUIS COMMUNITY SCHOOL
|
ROOF WORKS
|
—
|
TOTAL MAYO
|
|
476,393.78
|
MEATH
|
|
|
ST PATRICKS CLASSICAL, MOATLANDS
|
GAS WORKS
|
22,968.02
|
SCOIL MHUIRE COM TRIM
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
107,877.46
|
ST FINTAN’S POST PRIMARY, LONGWOOD, ENFIELD
|
ROOF WORKS
|
—
|
RATHCAIRN V S, ATHBOY
|
ROOF WORKS
|
75,036.35
|
BEAUFORT NAVAN
|
MECHANICAL WORKS
|
299,758.80
|
RATHOATH C C
|
WINDOW PROJECTS
|
—
|
ASHBOURNE COMMUNITY SCHOOL
|
WINDOW PROJECTS
|
—
|
TOTAL MEATH
|
|
505,640.63
|
MONAGHAN
|
|
|
ST LOUIS SS CARRICKMACROSS
|
ELECTRICAL WORKS
|
90,229.62
|
OUR LADYS SEC SCHOOL, CASTLEBLANEY
|
TOILET FACILITIES
|
59,256.63
|
ST MCCARTANS COLLEGE
|
ELECTRICAL WORKS
|
70,619.37
|
MONAGHAN COLLEGIATE, CORLATT
|
ELECTRICAL WORKS
|
105,195.72
|
BEECHILL V S
|
ROOF WORKS
|
—
|
TOTAL MONAGHAN
|
|
325,301.34
|
OFFALY
|
|
|
SACRED HEART SECONDARY SCHOOL, TULLAMORE
|
MECHANICAL WORKS
|
80,528.25
|
KILCORMAC VOCATIONAL SCHOOL
|
WINDOW PROJECTS
|
—
|
CLARA V S
|
TOILET FACILITIES
|
32,083.91
|
ST BRENDANS C S BIRR
|
GAS WORKS
|
40,526.22
|
TOTAL OFFALY
|
|
153,138.38
|
ROSCOMMON
|
|
|
CBS ROSCOMMON
|
ROOF WORKS
|
71,767.50
|
CASTLEREA C.S.
|
TOILET FACILITIES
|
—
|
TOTAL ROSCOMMON
|
|
71,767.50
|
SLIGO
|
|
|
ST MARYS COLLEGE, BALLYSADARE
|
ROOF WORKS
|
40,438.19
|
COLAISTE MHUIRE, BALLYMOTE
|
MECHANICAL WORKS
|
80,357.35
|
SUMMERHILL COLLEGE, SLIGO
|
ROOF WORKS
|
—
|
CORRAN COLLEGE, BALLYMOTE
|
WINDOW PROJECTS
|
36,810.62
|
COOLA V.S., SOOEY, VIA BOYLE
|
MECHANICAL WORKS
|
38,366.30
|
EASKEY C S
|
ROOF WORKS
|
17,796.80
|
GRANGE C C
|
WINDOW PROJECTS
|
10,778.26
|
BALLINODE COLLEGE
|
TOILET FACILITIES
|
—
|
TOTAL SLIGO
|
|
224,547.52
|
TIPPERARY
|
|
|
ST JOSEPH’S COLLEGE
|
MECHANICAL WORKS
|
73,782.23
|
CBS MOUNT ST NICHOLAS
|
WINDOW PROJECTS
|
—
|
SCOIL MHUIRE CARRICK ON SUIR
|
ROOF WORKS
|
—
|
CBS NENAGH
|
ROOF WORKS
|
220,500.00
|
CBS SECONDARY SCHOOL
|
TOILET FACILITIES
|
—
|
THE ABBEY SCHOOL
|
WINDOW PROJECTS
|
—
|
COMERAGH COLLEGE
|
MECHANICAL WORKS
|
—
|
C T I CLONMEL
|
WINDOW PROJECTS
|
—
|
SCOIL RUAIN
|
WINDOW PROJECTS
|
23,240.00
|
NEWPORT V S
|
MECHANICAL WORKS
|
67,114.53
|
ST SHEELANS TEMPLEMORE
|
TOILET FACILITIES
|
—
|
TIPPERARY TOWN VS
|
MECHANICAL WORKS
|
—
|
CAHIR COMMUNITY COLLEGE
|
MECHANICAL WORKS
|
—
|
ROSCREA COMMUNITY COLLEGE
|
WINDOW PROJECTS
|
—
|
TOTAL TIPPERARY
|
|
384,636.76
|
WATERFORD
|
|
|
CBS DUNGARVAN
|
ROOF WORKS
|
78,367.49
|
ARD SCOIL NA NDEISE
|
WINDOW PROJECTS
|
94,260.45
|
CBS SECONDARY SCHOOL SION HILL
|
ELECTRICAL WORKS
|
202,171.48
|
DE LA SALLE COLLEGE NEWTOWN
|
WINDOW PROJECTS
|
382,536.51
|
ST ANGELAS COLLEGE
|
MECHANICAL WORKS
|
127,629.68
|
ST ANGELAS COLLEGE
|
ROOF WORKS
|
—
|
NEWTOWN SCHOOL
|
MECHANICAL WORKS
|
—
|
DUNGARVAN TECHNICAL INSTITUTE
|
ROOF WORKS
|
—
|
ST DECLANS KILMACTHOMAS
|
TOILET FACILITIES
|
—
|
RING V S
|
MECHANICAL WORKS
|
—
|
TOTAL WATERFORD
|
|
884,965.61
|
WESTMEATH
|
|
|
COLAISTE MHUIRE
|
SPECIAL NEEDS FACILITIES
|
—
|
LORETO COLLEGE MULLINGAR
|
ROOF WORKS
|
—
|
WILSON’S HOSPITAL
|
MECHANICAL WORKS
|
145,634.57
|
COLUMBA COLLEGE
|
WINDOW PROJECTS
|
33,389.59
|
MULLINGAR COMMUNITY COLLEGE
|
MECHANICAL WORKS
|
—
|
TOTAL WESTMEATH
|
|
179,024.16
|
WEXFORD
|
|
|
FCJ BUNCLODY
|
MECHANICAL WORKS
|
142,018.40
|
COLAISTE BRIDE ENNISCORTHY
|
ROOF WORKS
|
—
|
GOOD COUNSEL COLLEGE
|
ROOF WORKS
|
—
|
OUR LADY OF LOURDES
|
ELECTRICAL WORKS
|
—
|
OUR LADY OF LOURDES
|
ROOF WORKS
|
—
|
LORETO S.S. SPAWELL RD
|
MECHANICAL WORKS
|
—
|
PRESENTATION SECONDARY SCHOOL, GROGAN’S ROAD
|
ELECTRICAL WORKS
|
82,959.29
|
BRIDGETOWN VS
|
TOILET FACILITIES
|
46,550.00
|
KILMUCKRIDGE C C
|
WINDOW PROJECTS
|
—
|
TOTAL WEXFORD
|
|
271,527.69
|
WICKLOW
|
|
|
ST KEVIN’S CBS, ARKLOW
|
WINDOW PROJECTS
|
50,011.08
|
ST MARYS COLLEGE, ARKLOW
|
ROOF WORKS
|
180,311.64
|
LORETO SECONDARY SCHOOL, BRAY
|
WINDOW PROJECTS
|
—
|
ST DAVIDS, GREYSTONES
|
ELECTRICAL WORKS
|
—
|
DOMINICAN COLLEGE
|
ROOF WORKS
|
—
|
ARKLOW V.S.
|
ROOF WORKS
|
88,519.61
|
BLESSINGTON COMMUNITY COLLEGE
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
TOTAL WICKLOW
|
|
318,842.33
|
TOTAL POST PRIMARY SCHOOLS
|
TOTAL POST PRIMARY SCHOOLS
|
13,211,808.79
|
|
Schools on site
|
|
|
Schools complete
|
|
|
Schools non-Start
|
|
|
Schools amalgamated
|
|
|
Schools with overspend
|
|
|
Total Schools
|
|
2011 Emergency WorksPrimary Schools
COUNTY / SCHOOL
|
PROJECT APPLICATION
|
ACTUAL AMOUNT PAID 2011
|
CARLOW
|
|
|
NEWTOWN DUNLECKNEY MXD
|
MECHANICAL WORKS
|
11,200.00
|
FR CULLEN MEMORIAL NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
17,630.90
|
SCOIL PADRAIG NAOFA
|
ROOF WORKS
|
7,597.00
|
ST LASERIANS MXD NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
TOTAL CARLOW
|
|
36,427.90
|
CAVAN
|
|
|
S N BHAILE AN AIRIDH
|
MECHANICAL WORKS
|
—
|
TOTAL CAVAN
|
|
—
|
CLARE
|
|
|
MULLAGH NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
KILKISHEN NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
ENNIS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
28,906.50
|
ENNIS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
COORACLARE NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
COORACLARE NS
|
ROOF WORKS
|
—
|
ST SENANS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
18,729.00
|
TOTAL CLARE
|
|
47,635.50
|
CORK
|
|
|
BANTEER NS
|
MECHANICAL WORKS
|
3,802.25
|
CLOGHOULA NATIONAL SCHOOL
|
ROOF WORKS
|
—
|
SCOIL MHUIRE LOURDES CARRIGALINE
|
MECHANICAL WORKS
|
—
|
SHANBALLY NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
CONVENT OF MERCY NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
KNOCKSKAGH NS
|
MECHANICAL WORKS
|
—
|
CHURCHTOWN NS
|
MECHANICAL WORKS
|
—
|
SCOIL NAOMH MHUIRE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
S N AN PHAIRC
|
ROOF WORKS
|
—
|
SN CILL MHUIRE B
|
ROOF WORKS
|
—
|
MUIRE GAN SMAL B
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
31,117.80
|
KILMEEN NS
|
MECHANICAL WORKS
|
23,100.00
|
S N BARRA NAOFA BHUACH
|
ROOF WORKS
|
37,628.23
|
BARRYROE NATIONAL SCHOOL
|
MECHANICAL WORKS
|
5,884.00
|
S N SEAN BAILE MOR
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
SCOIL BHRIDE
|
MECHANICAL WORKS
|
—
|
KANTURK B N S
|
TOILET FACILITIES
|
15,582.00
|
S N IOSEF NAOFA
|
ROOF WORKS
|
—
|
ST MARY’S CENTRAL SCHOOL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
13,882.39
|
MHUIRE AR CHNOC HAOINE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
33,971.00
|
TOTAL CORK
|
|
164,967.67
|
DONEGAL
|
|
|
COMHSCOIL CHONMHA SN
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
13,674.61
|
SN ARAINN MHOR 1
|
MECHANICAL WORKS
|
13,955.00
|
KILLYBEGS COMMON NATIONAL SCHOOL 16608G
|
MECHANICAL WORKS
|
—
|
SCOIL NAOMH MHIN TEINEADH DE
|
MECHANICAL WORKS
|
—
|
ST. PATRICKS NS
|
MECHANICAL WORKS
|
17,663.04
|
SN AN LEINBH IOSA
|
ELECTRICAL WORKS
|
13,796.16
|
SCOIL ADHAMHNAIN
|
WINDOW PROJECTS
|
29,770.00
|
SCOIL NAISIUNTA RATH MEALLT
|
MECHANICAL WORKS
|
32,721.38
|
TOTAL DONEGAL
|
|
121,580.19
|
DUBLIN
|
|
|
HOWTH RD MXD NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
14,936.94
|
SCOIL MOIBHI
|
MECHANICAL WORKS
|
10,195.98
|
SCOIL NA MBRATHAR
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
ST LOUIS INFANT SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
11,717.29
|
SN MUIRE AN SEAN BAILE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
7,830.63
|
CILL COSCAIN
|
MECHANICAL WORKS
|
1,169.05
|
GREENLANE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
SCOIL UI CHONAILL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
SCOIL MHUIRE NS
|
CURRICULAR REQUIREMENTS
|
5,000.00
|
MARY QUEEN OF ANGELS 1 NS
|
MECHANICAL WORKS
|
41,240.88
|
KILTERNAN NS
|
MECHANICAL WORKS
|
—
|
ST BRIGIDS BNS
|
OTHER STRUCTURAL IMPROVEMENTS
|
21,000.00
|
SCOIL EOIN
|
MECHANICAL WORKS
|
—
|
SCOIL COLMCILLE SNR
|
EXTERNAL ENVIRONMENT PROJECTS
|
7,319.75
|
BELGARD HEIGHTS NS
|
ROOF WORKS
|
27,705.73
|
SCOIL N AN CROI RO NAOFA
|
MECHANICAL WORKS
|
—
|
DIVINE WORD NATIONAL SCHOOL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
49,700.00
|
POPE JOHN PAUL 2 SCHOOL
|
MECHANICAL WORKS
|
8,435.00
|
ST COLMCILLE JUN NS
|
MECHANICAL WORKS
|
—
|
ST RAPHAELS NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
SCOIL IOSAGAIN/MHUIRE
|
OTHER STRUCTURAL IMPROVEMENTS
|
14,200.00
|
SCOIL IOSAGAIN/MHUIRE
|
ROOF WORKS
|
24,414.86
|
LADYSWELL NS
|
MECHANICAL WORKS
|
—
|
SCOIL COLM
|
ROOF WORKS
|
—
|
HOLY CROSS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
HAROLDS CROSS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
51,541.43
|
ST KEVINS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
DUBLIN NORTH CENTRAL EDUCATE TOGETHER
|
MECHANICAL WORKS
|
16,639.98
|
DUBLIN NORTH CENTRAL EDUCATE TOGETHER
|
ROOF WORKS
|
—
|
RUSH AND LUSK EDUCATE TOGETHER NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
TYRRELSTOWN EDUCATE TOGETHER
|
MECHANICAL WORKS
|
4,670.52
|
DAU 2008 SWORDS
|
MECHANICAL WORKS
|
6,567.50
|
HOLY CHILD NATIONAL SCHOOL 20338C
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
HOLYWELL ENTS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
TOTAL DUBLIN
|
|
337,835.34
|
GALWAY
|
|
|
ST JOSEPHS BNS
|
ELECTRICAL WORKS
|
—
|
TULLOKYNE NS
|
ROOF WORKS
|
—
|
KILCOOLEY NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
SCOIL FHURSA
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
S N MUIRE
|
MECHANICAL WORKS
|
13,457.55
|
SN CILLINI DIOMA
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
50,290.80
|
SCOIL NA MBRAITHRE
|
MECHANICAL WORKS
|
—
|
TOTAL GALWAY
|
|
63,748.35
|
KERRY
|
|
|
ASDEE NS
|
MECHANICAL WORKS
|
16,060.00
|
SCOIL MHUIRE KILLORGLIN NS
|
MECHANICAL WORKS
|
31,595.67
|
DERRYQUAY NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
SCOIL NAOMH PADRAIG MEASC
|
MECHANICAL WORKS
|
—
|
SCOIL NA SRONA
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
MUIRE NA MAINISTREACH
|
ROOF WORKS
|
—
|
SCOIL NAOMH IOSEF
|
MECHANICAL WORKS
|
—
|
TARBERT NS
|
MECHANICAL WORKS
|
27,132.16
|
HOLY CROSS MERCY SCHOOL
|
MECHANICAL WORKS
|
—
|
ST OLIVERS NS
|
MECHANICAL WORKS
|
—
|
NAGLE RICE PRIMARY SCHOOL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
23,003.11
|
TOTAL KERRY
|
|
97,790.94
|
KILDARE
|
|
|
SN MHUIRE C
|
MECHANICAL WORKS
|
13,900.00
|
CLOCHA RINCE NS
|
ROOF WORKS
|
—
|
TOTAL KILDARE
|
|
13,900.00
|
KILKENNY
|
|
|
SEANAN BOYS NATIONAL SCHOOL
|
MECHANICAL WORKS
|
—
|
ST BRENDANS NS
|
MECHANICAL WORKS
|
—
|
GOWRAN NS
|
MECHANICAL WORKS
|
—
|
ST CANICES CO ED.
|
MECHANICAL WORKS
|
18,401.80
|
SN CHOLMCILLE
|
MECHANICAL WORKS
|
—
|
TOTAL KILKENNY
|
|
18,401.80
|
LAOIS
|
|
|
SHANGANMORE NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
23,970.83
|
SCOIL NAISIUNTA MOLAISE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
TOTAL LAOIS
|
|
23,970.83
|
LEITRIM
|
|
|
MARIST GNS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
ST BRIGIDS NATIONAL SCHOOL
|
ROOF WORKS
|
—
|
ACHADH NA SILEANN
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
DRUMSHAMBO CENTRAL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
SN MUIRE NA TOIRBHIRTE
|
MECHANICAL WORKS
|
6,903.25
|
TOTAL LEITRIM
|
|
6,903.25
|
LIMERICK
|
|
|
TEMPLEGLANTINE NS
|
MECHANICAL WORKS
|
8,352.05
|
SCOIL NAIS
|
MECHANICAL WORKS
|
—
|
SCOIL BAILE AN AIRD
|
MECHANICAL WORKS
|
—
|
QUEEN OF THE PEACE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
TOTAL LIMERICK
|
|
8,352.05
|
LONGFORD
|
|
|
ST MELS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
4,938.05
|
SCOIL MHUIRE NS
|
ROOF WORKS
|
22,462.65
|
ST MATTHEW’S MIXED NS
|
MECHANICAL WORKS
|
82,753.25
|
TOTAL LONGFORD
|
|
110,153.95
|
LOUTH
|
|
|
ST BRIGHIDS SPECIAL SCHOOL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
REALT NA MARA
|
EXTERNAL ENVIRONMENT PROJECTS
|
17,017.00
|
TOTAL LOUTH
|
|
17,017.00
|
MAYO
|
|
|
ST JOSEPHS NATIONAL SCHOOL
|
MECHANICAL WORKS
|
5,615.00
|
MEELICKMORE N S
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
BARNATRA NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
31,392.00
|
PULLATHOMAS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
11,395.50
|
MYNA NS
|
ELECTRICAL WORKS
|
12,409.15
|
ST. PAUL’S NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
QUIGNAMANGER NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
33,153.90
|
MUIRE GAN SMAL CONVENT PRIMARY SCHOOL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
ST PATRICKS NS CASTLEBAR
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
69,222.16
|
TOTAL MAYO
|
|
163,187.71
|
MEATH
|
|
|
MERCY CONVENT
|
ROOF WORKS
|
—
|
SCOIL CAITRIONA NAOFA
|
MECHANICAL WORKS
|
17,258.59
|
ST ULTANS SPECIAL SCHOOL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
CASTLEJORDAN NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
10,490.90
|
DUNBOYNE SENIOR NS
|
ROOF WORKS
|
86,291.11
|
TOTAL MEATH
|
|
114,040.60
|
MONAGHAN
|
|
|
ST JOSEPHS NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
37,898.62
|
TOTAL MONAGHAN
|
|
37,898.62
|
OFFALY
|
|
|
ST PATRICKS BNS
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
COOLDERRY CENTRAL NS
|
ROOF WORKS
|
—
|
TOTAL OFFALY
|
|
—
|
ROSCOMMON
|
|
|
AUGHRIM NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
14,392.88
|
GRANLAHAN NATIONAL SCHOOL
|
ROOF WORKS
|
26,197.19
|
STROKESTOWN CON NS
|
MECHANICAL WORKS
|
10,201.69
|
TOTAL ROSCOMMON
|
|
50,791.76
|
SLIGO
|
|
|
ARDKEERAN NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
22,639.07
|
SN MULLACH RUA
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
ST JOSEPHS SPEC SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
TOTAL SLIGO
|
|
22,639.07
|
TIPPERARY
|
|
|
BALLYDREHID NATIONAL SCHOOL
|
MECHANICAL WORKS
|
—
|
PRESENTATION PRIMARY SCHOOL
|
MECHANICAL WORKS
|
—
|
SN MUIRE NA NAINGEAL
|
MECHANICAL WORKS
|
37,985.02
|
ROSCREA NO 2 NS
|
ELECTRICAL WORKS
|
6,384.37
|
ST MARYS JNR BNS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
12,000.00
|
TIPPERARY GIRLS NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
BIRDHILL NS
|
MECHANICAL WORKS
|
—
|
SCOIL NAISIUNTA GORT NA HUAIGHE
|
MECHANICAL WORKS
|
20,692.00
|
GAELSCOIL CHLUAIN MEALA
|
TOILET FACILITIES
|
—
|
S N IOSEF NAOFA
|
TOILET FACILITIES
|
—
|
CLONOULTY CENTRAL NS
|
MECHANICAL WORKS
|
29,047.90
|
TOTAL TIPPERARY
|
|
106,109.29
|
WATERFORD
|
|
|
SN URSULA NAOFA
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
BALLYDUFF B2 NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
41,783.53
|
ST MARYS TOURANEENA NATIONAL SCHOOL
|
MECHANICAL WORKS
|
20,969.00
|
S N AN CHLAIS MHOR
|
ROOF WORKS
|
—
|
ST MARYS NS
|
MECHANICAL WORKS
|
—
|
ST MARTINS SCHOOL
|
ROOF WORKS
|
34,338.46
|
SCOIL NAISIUMTA NA TOIRBHIRTE
|
MECHANICAL WORKS
|
23,400.00
|
TOTAL WATERFORD
|
|
120,490.99
|
WESTMEATH
|
|
|
BRIDESWELL NS
|
MECHANICAL WORKS
|
—
|
CLONBONNY NS
|
ROOF WORKS
|
—
|
SCOIL NA MAIGHDINE MHUIRE
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
83,187.20
|
ST BAOITHINS NS
|
MECHANICAL WORKS
|
36,225.00
|
SN PHOIL NAOFA
|
MECHANICAL WORKS
|
—
|
GAEL SCOIL MULLINGAR
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
TOTAL WESTMEATH
|
|
119,412.20
|
WICKLOW
|
|
|
NUNS CROSS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
NUNS CROSS NS
|
CURRICULAR REQUIREMENTS
|
5,000.00
|
GLENEALY 1 NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
CRONAN NAOFA NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
—
|
GREYSTONES NS
|
ROOF WORKS
|
—
|
TOTAL WICKLOW
|
|
5,000.00
|
TOTAL ’0000000000
|
|
1,808,255.01
|
TOTAL PRIMARY SCHOOLS
|
|
1,808,255.01
|
SWS 2010 Primary Schools
COUNTY / SCHOOL
|
PROJECT APPLICATION
|
TOTAL PAID
|
CARLOW
|
|
|
BORRIS MXD NS
|
ROOF WORKS
|
251,113.25
|
RATHOE NS
|
TOILET FACILITIES
|
68,200.00
|
ST MARY’S NS
|
TOILET FACILITIES
|
31,900.00
|
ST BRIDGETS MONASTERY
|
EXTERNAL ENVIRONMENT PROJECTS
|
193,379.00
|
TULLOW NS
|
MECHANICAL WORKS
|
156,654.42
|
ST COLUMBAS NS
|
ELECTRICAL WORKS
|
64,328.87
|
MONASTERY BOYS SCHOOL
|
ROOF WORKS
|
250,559.94
|
BISHOP FOLEY MEMORIAL SCHOOL
|
WINDOW PROJECTS
|
—
|
S N NMH FHINGIN
|
MECHANICAL WORKS
|
52,757.00
|
ST JOSEPHS NS
|
MECHANICAL WORKS
|
52,138.83
|
Scoil Nais Mhichil
|
ELECTRICAL WORKS
|
48,239.16
|
S N CLUAIN NA GALL
|
WINDOW PROJECTS
|
33,400.00
|
SCOIL PADRAIG NAOFA
|
MECHANICAL WORKS
|
106,801.95
|
BALLINABRANNA MXD NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
28,637.99
|
QUEEN OF UNIVERSE NS
|
ROOF WORKS
|
75,341.00
|
ST JOSEPH’S BNS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
22,900.00
|
SCOIL NAISIUNTA NAOMH PADRAIG
|
EXTERNAL ENVIRONMENT PROJECTS
|
48,011.32
|
HOLY FAMILY GNS
|
TOILET FACILITIES
|
88,894.00
|
ST LASERIANS MXD NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
48,052.00
|
TOTAL CARLOW
|
|
1,621,308.73
|
CAVAN
|
|
|
SCOIL MHUIRE NS
|
TOILET FACILITIES
|
32,690.75
|
ST CLARES NS
|
ROOF WORKS
|
119,976.87
|
CORLISS NS
|
ROOF WORKS
|
15,400.00
|
CAVAN NO 1 SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
21,580.00
|
FARNHAM NS
|
ROOF WORKS
|
63,297.20
|
KILGARRY N S
|
EXTERNAL ENVIRONMENT PROJECTS
|
162,500.00
|
ST MARYS NATIONAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
30,272.00
|
BALLYCONNELL MXD NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
35,800.00
|
SCOIL BHRIDE
|
ELECTRICAL WORKS
|
115,257.00
|
DRUNG 1 NS
|
WINDOW PROJECTS
|
21,579.00
|
SCOIL NAISIUNTA CNOC RUA
|
MECHANICAL WORKS
|
46,796.10
|
ST FELIMS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
29,000.00
|
CNOC AN TEAMPAILL
|
WINDOW PROJECTS
|
39,090.00
|
SN DROM CNAMH
|
EXTERNAL ENVIRONMENT PROJECTS
|
12,600.00
|
BAILIEBORO NS
|
WINDOW PROJECTS
|
79,850.00
|
SN MHUIRE
|
ROOF WORKS
|
16,184.00
|
S N CILLIN
|
WINDOW PROJECTS
|
26,000.00
|
S N LEITIR
|
EXTERNAL ENVIRONMENT PROJECTS
|
20,670.00
|
CARRIGABRUISE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
52,900.00
|
DRUMKILLY NS
|
ELECTRICAL WORKS
|
22,762.93
|
KILMORE CENTRAL NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
39,980.80
|
BUTLERSBRIDGE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
61,792.45
|
MULLAHORAN CENTRAL NS
|
TOILET FACILITIES
|
48,315.29
|
S N BHAILE AN AIRIDH
|
EXTERNAL ENVIRONMENT PROJECTS
|
134,810.03
|
CABRA CENTRAL NATIONAL SCHOOL
|
TOILET FACILITIES
|
61,792.45
|
ST PATRICKS
|
WINDOW PROJECTS
|
25,293.75
|
ST AIDAN’S NATIONAL SCHOOL
|
WINDOW PROJECTS
|
55,911.25
|
ST JOSEPHS NS
|
WINDOW PROJECTS
|
20,000.00
|
ST MICHAELS NATIONAL SCHOOL
|
TOILET FACILITIES
|
221,160.00
|
TOTAL CAVAN
|
|
1,633,261.87
|
CLARE
|
|
|
CRATLOE NS
|
MECHANICAL WORKS
|
34,948.71
|
HOLY FAMILY SCHOOLS
|
TOILET FACILITIES
|
20,534.56
|
ROCKMOUNT MIXED NS
|
ROOF WORKS
|
36,200.00
|
S N NA CORADH
|
MECHANICAL WORKS
|
65,370.00
|
TUBBER NATIONAL SCHOOL
|
ROOF WORKS
|
19,543.79
|
CLOHANBEG NS
|
ELECTRICAL WORKS
|
34,850.00
|
SCOIL NAISIUNTA PADRAIG NAOFA FANOIR
|
TOILET FACILITIES
|
32,300.00
|
CLOHANES NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
7,616.54
|
KILMURRAY NS
|
TOILET FACILITIES
|
4,200.00
|
KILMALEY NS
|
ROOF WORKS
|
29,500.00
|
SN MHAINISTIR CHUNCHE
|
MECHANICAL WORKS
|
57,338.19
|
BAREFIELD NS
|
WINDOW PROJECTS
|
28,051.98
|
ANNAGH NATIONAL SCHOOL
|
WINDOW PROJECTS
|
22,498.00
|
CAHERMURPHY NATIONAL SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
16,814.07
|
STONEHALL NS
|
TOILET FACILITIES
|
30,210.90
|
KILLALOE BNS
|
WINDOW PROJECTS
|
44,083.00
|
INCH NATIONAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
25,837.50
|
CBS PRIMARY SCHOOL
|
ROOF WORKS
|
88,734.00
|
SHRAGH NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
15,436.00
|
SN AN PHAIRTIN MIXED
|
WINDOW PROJECTS
|
91,735.87
|
SCOIL COLM CILLE
|
OTHER STRUCTURAL IMPROVEMENTS
|
15,898.00
|
KNOCKANEAN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
55,484.80
|
BALLYVAUGHAN NS
|
ROOF WORKS
|
13,662.51
|
COORACLARE NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
59,029.80
|
KILNABOY NATIONAL SCHOOL
|
TOILET FACILITIES
|
23,007.00
|
HOLY FAMILY JUNIOR SCHOOL
|
WINDOW PROJECTS
|
29,808.94
|
ST MARYS NATIONAL SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
8,354.83
|
SCOIL IOSEF NAOFA
|
TOILET FACILITIES
|
43,349.28
|
LISCANNOR NS
|
ROOF WORKS
|
24,815.00
|
S N BAILE AN DROICHID
|
WINDOW PROJECTS
|
44,485.65
|
BALLYCAR NS
|
WINDOW PROJECTS
|
5,832.96
|
SN CATHAIR AODHA
|
TOILET FACILITIES
|
54,021.95
|
LISSYCASEY NS
|
WINDOW PROJECTS
|
17,564.91
|
SN MA SHEASTA
|
EXTERNAL ENVIRONMENT PROJECTS
|
130,622.15
|
SHANNON AIRPORT NO 2 NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
26,419.87
|
NEW QUAY NATIONAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
53,701.81
|
FLAGMOUNT CENTRAL NS
|
MECHANICAL WORKS
|
10,000.00
|
CRUSHEEN NS
|
MECHANICAL WORKS
|
11,349.45
|
ST ENDAS NS
|
ROOF WORKS
|
37,500.00
|
ST MOCHULLAS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
19,701.17
|
NEWMARKET-ON-FERGUS NS
|
ELECTRICAL WORKS
|
134,152.54
|
ST FACHNAN & ST ATTRACTAS NS
|
WINDOW PROJECTS
|
33,000.00
|
TOTAL CLARE
|
|
1,557,565.73
|
CORK
|
|
|
BALLINSPITTLE NS
|
WINDOW PROJECTS
|
29,688.00
|
MIDLETON CONVENT NS
|
MECHANICAL WORKS
|
140,000.00
|
FIRMOUNT NS
|
WINDOW PROJECTS
|
21,676.20
|
SCOIL NAISIUNTA UI LIATHAIN
|
TOILET FACILITIES
|
73,731.92
|
PRESENTATION N S
|
TOILET FACILITIES
|
66,977.25
|
ST COLMANS NS
|
ROOF WORKS
|
225,489.75
|
S N SEAN BAILE MOR
|
OTHER STRUCTURAL IMPROVEMENTS
|
26,009.57
|
LEAMLARA MIXED NS
|
WINDOW PROJECTS
|
19,607.00
|
S N CNOC AN BHILE
|
ROOF WORKS
|
4,153.50
|
SCOIL NAOMH EOIN
|
ELECTRICAL WORKS
|
60,587.88
|
CONVENT OF MERCY
|
WINDOW PROJECTS
|
—
|
BALLYHASS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
LARAGH NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
32,451.71
|
DOUGLAS GNS
|
ELECTRICAL WORKS
|
113,000.00
|
DROMAHANE NS
|
ROOF WORKS
|
16,377.25
|
CLOGHROE NS
|
WINDOW PROJECTS
|
19,507.18
|
KILCORNEY MIXED NATIONAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
6,285.65
|
CLOGHOULA NATIONAL SCHOOL
|
WINDOW PROJECTS
|
9,175.25
|
BANTRY 3 NS
|
TOILET FACILITIES
|
98,250.00
|
SOUTH ABBEY NS
|
WINDOW PROJECTS
|
605.00
|
COBH NS
|
WINDOW PROJECTS
|
26,520.01
|
SN CILL MHIC ABHAIDH
|
WINDOW PROJECTS
|
76,261.70
|
WHITEGATE (MXD) NS
|
MECHANICAL WORKS
|
22,440.00
|
ST JOHN THE BAPTIST NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
27,822.70
|
ARDFIELD NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
30,000.00
|
SN NAONH ANTAINE
|
EXTERNAL ENVIRONMENT PROJECTS
|
30,888.00
|
CURRAGLASS NS
|
ROOF WORKS
|
25,000.00
|
RUSHEEN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
35,910.00
|
ST JOSPEHS CONVENT NS
|
WINDOW PROJECTS
|
39,766.00
|
DROMORE NATIONAL SCHOOL
|
MECHANICAL WORKS
|
66,947.05
|
SCOIL BHRIDE
|
TOILET FACILITIES
|
39,200.00
|
DERRINACAHARA N.S.
|
OTHER STRUCTURAL IMPROVEMENTS
|
—
|
CASTLEMARTYR NS
|
MECHANICAL WORKS
|
187,740.00
|
ST LUKES NS
|
WINDOW PROJECTS
|
16,359.00
|
ST MARYS NS
|
TOILET FACILITIES
|
14,580.00
|
SCOIL MHUIRE NAIONAIN DUNMANWAY
|
EXTERNAL ENVIRONMENT PROJECTS
|
24,763.28
|
GLEANNA MAGHAIR IOCHTARAIGH
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
SHANBALLY NS
|
ROOF WORKS
|
54,269.34
|
SCOIL BHRIDE
|
OTHER STRUCTURAL IMPROVEMENTS
|
10,943.25
|
SN B TOGHER CORK
|
TOILET FACILITIES
|
73,693.78
|
SCOIL NAOMH MHUIRE
|
ROOF WORKS
|
37,311.92
|
SN BAILE DEASMUMHAN
|
OTHER STRUCTURAL IMPROVEMENTS
|
190,265.86
|
CASTLETOWNROCHE NS
|
ELECTRICAL WORKS
|
104,741.70
|
KILBRITTAIN MIXED NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
19,068.00
|
NAOMH EOIN EASPAL
|
EXTERNAL ENVIRONMENT PROJECTS
|
46,600.00
|
SCOIL BHRIDE
|
ROOF WORKS
|
49,420.00
|
DERRYCREHA NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
22,060.09
|
ABBEYSTREWRY NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
106,794.00
|
ST. MULTOSE NS
|
ROOF WORKS
|
51,944.00
|
SN B BHLARNA
|
ELECTRICAL WORKS
|
41,822.50
|
SN C BHLARNA
|
EXTERNAL ENVIRONMENT PROJECTS
|
5,500.00
|
ST FINBARRS BOYS NS
|
WINDOW PROJECTS
|
52,400.00
|
BALLINGREE MIXED NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
26,672.50
|
SACRED HEART NS
|
MECHANICAL WORKS
|
17,476.48
|
SCOIL GRANGE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
22,940.00
|
UPPER GLANMIRE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
110,624.11
|
KEALKIL NS
|
ROOF WORKS
|
20,000.00
|
MITCHELSTOWN CON NS
|
WINDOW PROJECTS
|
78,500.00
|
CONVENT OF MERCY NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
7,261.00
|
KILCOLMAN NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
18,627.00
|
WATERGRASSHILL NS
|
ROOF WORKS
|
14,960.50
|
CARRIGBOY NS
|
ROOF WORKS
|
21,250.00
|
SCOIL CHOLMCILLE CBS
|
WINDOW PROJECTS
|
59,560.92
|
SCOIL NA MBRAITHRE
|
OTHER STRUCTURAL IMPROVEMENTS
|
150,000.00
|
SCOIL NA MBRAITHRE
|
WINDOW PROJECTS
|
133,659.71
|
S N PADRAIG NAOFA B
|
MECHANICAL WORKS
|
19,570.37
|
SN MICHEAL NAOFA B
|
OTHER STRUCTURAL IMPROVEMENTS
|
22,449.00
|
SCOIL CHRIOST RI
|
WINDOW PROJECTS
|
93,176.39
|
SN AN CHLOCHAIR KANTURK CONVENT NS
|
ROOF WORKS
|
22,485.00
|
ST MARYS CONVENT G
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
45,516.74
|
S N INIS EOGHANAIN
|
WINDOW PROJECTS
|
10,584.00
|
S N FEARGHAIL NAOFA
|
MECHANICAL WORKS
|
117,041.85
|
SN CILL BONAIN
|
MECHANICAL WORKS
|
12,600.00
|
RATHPEACON NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
132,537.72
|
SCOIL CHILL RHADHAIN
|
EXTERNAL ENVIRONMENT PROJECTS
|
11,100.00
|
S N ATH FHADA
|
WINDOW PROJECTS
|
30,786.70
|
SCOIL NA MBRAITHRE
|
TOILET FACILITIES
|
138,984.48
|
SCOIL NAOMH MHUIRE
|
ROOF WORKS
|
210,700.53
|
S N AN PHAIRC
|
TOILET FACILITIES
|
12,679.66
|
KNOCKNAMANAGH NS
|
TOILET FACILITIES
|
62,081.50
|
SCOIL MHUIRE
|
MECHANICAL WORKS
|
29,297.53
|
SN MOING NA MIOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
12,650.00
|
SHANAGARRY NS
|
WINDOW PROJECTS
|
16,179.00
|
MUIRE GAN SMAL
|
ROOF WORKS
|
49,500.00
|
SN CILL MHUIRE B
|
ELECTRICAL WORKS
|
40,624.36
|
GURRANE NS
|
WINDOW PROJECTS
|
15,578.65
|
SN GLEANNAMHAIN
|
EXTERNAL ENVIRONMENT PROJECTS
|
74,966.50
|
OUR LADY OF GOOD COUNSEL SPECIAL SCHOOL
|
TOILET FACILITIES
|
79,017.50
|
MARIA ASSUMPTA SENIOR GIRLS SCHOOL
|
TOILET FACILITIES
|
54,186.60
|
SCOIL MHUIRE BROADFORD NS
|
ELECTRICAL WORKS
|
84,544.27
|
BALLYGOWN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
98,419.00
|
KINSALEBEG NS
|
TOILET FACILITIES
|
18,580.00
|
IOSEF NAOFA
|
EXTERNAL ENVIRONMENT PROJECTS
|
16,800.00
|
BALLINORA NS
|
WINDOW PROJECTS
|
11,510.00
|
SN DROICHEAD NA BANDAN
|
ELECTRICAL WORKS
|
73,802.15
|
SN CLOGACH
|
TOILET FACILITIES
|
48,940.62
|
SCOIL NAISIUNTA MUIRE NA DOIRINI
|
OTHER STRUCTURAL IMPROVEMENTS
|
130,047.84
|
BALLYNOE NS
|
TOILET FACILITIES
|
49,480.00
|
LITTLE ISLAND N S
|
TOILET FACILITIES
|
35,808.19
|
SN CARRAIG UI LEIGHIN
|
ROOF WORKS
|
232,424.56
|
S N CNOC NA CROIGHE
|
TOILET FACILITIES
|
29,940.97
|
EGLANTINE SCHOOL
|
MECHANICAL WORKS
|
30,144.00
|
SCOIL AN ATHAR MAITIU
|
WINDOW PROJECTS
|
75,000.00
|
INCH NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
3,921.00
|
SCOIL MHUIRE BANRION
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
101,178.63
|
SCOIL NA MBRAITHRE
|
MECHANICAL WORKS
|
12,250.00
|
S N FIONAN NA REANNA
|
EXTERNAL ENVIRONMENT PROJECTS
|
18,760.00
|
SCOIL IOSAGAIN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
45,338.77
|
SN BARRA NAOFA CAILINI
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
3,543.80
|
KILCREDAN NS
|
ELECTRICAL WORKS
|
58,750.00
|
SCOIL MHUIRE
|
EXTERNAL ENVIRONMENT PROJECTS
|
9,161.25
|
ST. MARK’S SCHOOL
|
TOILET FACILITIES
|
75,000.00
|
SN BHREANNDAIN C
|
ROOF WORKS
|
170,000.00
|
CAHERAGH NS
|
ROOF WORKS
|
53,499.88
|
SCOIL NAOMH THERESE
|
ROOF WORKS
|
159,719.35
|
ST MARY’S CENTRAL SCHOOL
|
MECHANICAL WORKS
|
227,065.90
|
MHUIRE AR CHNOC HAOINE
|
MECHANICAL WORKS
|
42,550.00
|
SCOIL OILIBHEIR NS
|
MECHANICAL WORKS
|
119,660.61
|
ST MARYS SPECIAL SCH
|
WINDOW PROJECTS
|
26,500.00
|
SCOIL TREIST
|
ROOF WORKS
|
150,728.60
|
SCOIL BARRA
|
ELECTRICAL WORKS
|
173,095.00
|
ST KEVINS SCHOOL
|
ELECTRICAL WORKS
|
175,689.67
|
DRIMOLEAGUE NS
|
ROOF WORKS
|
15,400.00
|
GAELSCOIL DE HIDE
|
WINDOW PROJECTS
|
33,248.15
|
GAELSCOIL MHACHAN
|
WINDOW PROJECTS
|
53,766.78
|
DRINAGH MIXED NS
|
TOILET FACILITIES
|
73,830.73
|
SCOIL NA MBUACHAILLI
|
WINDOW PROJECTS
|
41,862.33
|
BUN SCOIL MUIRE
|
MECHANICAL WORKS
|
340,420.55
|
RINGASKIDDY
|
WINDOW PROJECTS
|
8,541.18
|
SCOIL MHUIRE FATIMA
|
OTHER STRUCTURAL IMPROVEMENTS
|
26,922.23
|
TOTAL CORK
|
|
7,646,277.60
|
DONEGAL
|
|
|
LOWER ILLIES NS
|
ROOF WORKS
|
18,700.00
|
SN AN CHEIDIDH
|
ROOF WORKS
|
50,000.00
|
ST FRANCIS’ NS
|
WINDOW PROJECTS
|
48,137.80
|
KILBARRON NATIONAL SCHOOL
|
WINDOW PROJECTS
|
10,855.00
|
GARTAN NS
|
WINDOW PROJECTS
|
28,521.25
|
S N TEARMANN
|
WINDOW PROJECTS
|
67,072.50
|
SCOIL MHUIRE DOIRE BEAGA
|
EXTERNAL ENVIRONMENT PROJECTS
|
51,462.00
|
CASTLEFIN 1 BNS
|
TOILET FACILITIES
|
59,300.00
|
CASHELSHANAGHAN NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
18,450.00
|
STRANMORE NS
|
MECHANICAL WORKS
|
73,802.00
|
SN ARAINN MHOR 1
|
EXTERNAL ENVIRONMENT PROJECTS
|
82,000.00
|
St Patrick’s NS
|
ROOF WORKS
|
67,727.96
|
SN BAILE NUA AN PHOBAIL
|
EXTERNAL ENVIRONMENT PROJECTS
|
44,079.00
|
ST BRIGIDS NS
|
MECHANICAL WORKS
|
32,981.39
|
S N GARBHAIN SATHLOIR
|
EXTERNAL ENVIRONMENT PROJECTS
|
29,950.00
|
S N AN BHREACAIGH
|
OTHER STRUCTURAL IMPROVEMENTS
|
56,570.81
|
SCOIL NAOMH MHUIRE
|
OTHER STRUCTURAL IMPROVEMENTS
|
23,045.00
|
CLOONTAGH NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
17,975.00
|
SN DOMHNACH MOR
|
EXTERNAL ENVIRONMENT PROJECTS
|
30,340.00
|
SN GLEANN COIMHEAD
|
EXTERNAL ENVIRONMENT PROJECTS
|
9,522.00
|
SEASSIAGHONEILL NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
24,700.00
|
S N FHIONNAIN
|
EXTERNAL ENVIRONMENT PROJECTS
|
14,179.00
|
SCOIL ADHAMHNAIN
|
ROOF WORKS
|
47,765.00
|
ST MARYS NS
|
ROOF WORKS
|
25,760.99
|
SN MHUIRE GAN SMAL
|
EXTERNAL ENVIRONMENT PROJECTS
|
79,943.21
|
ST PETERS NS
|
WINDOW PROJECTS
|
19,674.00
|
SN MUIRE GAN SMAL
|
ROOF WORKS
|
14,200.00
|
SN DUN CEANNFHAOLAIDH
|
TOILET FACILITIES
|
14,158.00
|
SCOIL NAOMH MHUIRE
|
EXTERNAL ENVIRONMENT PROJECTS
|
27,370.00
|
SCOIL NAISIUNTA AN CHAISEAL
|
WINDOW PROJECTS
|
11,400.00
|
ROBERSTONS NS
|
ROOF WORKS
|
27,900.00
|
SCOIL BHRIDE
|
EXTERNAL ENVIRONMENT PROJECTS
|
14,350.00
|
SCOIL CHOLMCILLE
|
WINDOW PROJECTS
|
30,751.00
|
CRANNFORD NATIONAL SCHOOL
|
WINDOW PROJECTS
|
48,767.00
|
ST AENGUES NS
|
TOILET FACILITIES
|
37,500.00
|
ST BERNADETTE’S SPECIAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
44,572.00
|
SN CHILL CHARTAIGH
|
MECHANICAL WORKS
|
7,920.00
|
ST MACARTANS CENTRAL
|
ROOF WORKS
|
7,500.00
|
SCOIL AODH RUA AGUS NUALA
|
EXTERNAL ENVIRONMENT PROJECTS
|
24,384.00
|
TOTAL DONEGAL
|
|
1,343,285.91
|
DUBLIN
|
|
|
LUCAN BNS
|
WINDOW PROJECTS
|
124,816.05
|
LORETO NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
47,880.00
|
ST JAMES CONVENT NS
|
ROOF WORKS
|
74,500.00
|
BALLYROAN BNS
|
ROOF WORKS
|
199,530.00
|
CLOCHAR SAN DOMINIC
|
MECHANICAL WORKS
|
111,411.00
|
GEORGE’S HILL NS
|
TOILET FACILITIES
|
124,375.98
|
ST MARYS BNS
|
TOILET FACILITIES
|
91,033.20
|
GOLDENBRIDGE CONVENT
|
ROOF WORKS
|
88,354.31
|
BURROW NS
|
TOILET FACILITIES
|
145,231.22
|
ST JOSEPH’S BNS
|
EXTERNAL ENVIRONMENT PROJECTS
|
15,500.00
|
ST PATRICKS NS
|
ELECTRICAL WORKS
|
50,514.33
|
ST ANDREWS NS
|
MECHANICAL WORKS
|
2,724.00
|
SCOIL MHUIRE
|
WINDOW PROJECTS
|
141,112.63
|
GARDINER STREET CONVENT
|
WINDOW PROJECTS
|
227,563.00
|
KILDARE PLACE NS
|
MECHANICAL WORKS
|
261,000.00
|
HOLY FAMILY NS RATHCOOLE
|
WINDOW PROJECTS
|
130,750.00
|
PRESENTATION PRIMARY SCHOOL
|
ROOF WORKS
|
257,889.56
|
HOWTH RD MXD NS
|
WINDOW PROJECTS
|
32,573.20
|
ST COLUMBAS NS MXD
|
ELECTRICAL WORKS
|
85,226.80
|
CARYSFORT NS
|
WINDOW PROJECTS
|
91,332.69
|
RATHGAR NS MXD
|
EXTERNAL ENVIRONMENT PROJECTS
|
4,000.00
|
S N NAOMH PADRAIGH
|
TOILET FACILITIES
|
43,691.00
|
ST VINCENTS INF BOYS
|
OTHER STRUCTURAL IMPROVEMENTS
|
211,395.21
|
LINDSAY ROAD NATIONAL SCHOOL 16177F
|
ROOF WORKS
|
105,117.56
|
ST BRIGIDS BOYS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
277,259.00
|
ST BRIGIDS GIRLS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
97,557.50
|
ST BRIGIDS CONVENT NS
|
ROOF WORKS
|
5,420.39
|
ST CLARES CONVENT NS
|
MECHANICAL WORKS
|
33,400.00
|
ST COLUMBAS CON G&I
|
ROOF WORKS
|
45,350.00
|
SCOIL NA MBRATHAR
|
MECHANICAL WORKS
|
178,872.87
|
ST BRIGIDS
|
MECHANICAL WORKS
|
91,848.00
|
ST JOSEPHS SCHOOL
|
ROOF WORKS
|
81,472.53
|
SCOIL NAISIUNTA
|
MECHANICAL WORKS
|
23,025.00
|
CHRIST THE KING BNS
|
OTHER STRUCTURAL IMPROVEMENTS
|
16,960.00
|
CHRIST THE KING GNS
|
TOILET FACILITIES
|
60,308.53
|
CLOCHAR LUGHAIDH CAILIN
|
ROOF WORKS
|
175,120.00
|
ST LOUIS INFANT SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
100,000.00
|
SAN UINSIONN CBS
|
MECHANICAL WORKS
|
151,413.90
|
SN MUIRE AN SEAN BAILE
|
EXTERNAL ENVIRONMENT PROJECTS
|
52,538.76
|
LARKHILL SCHOOL
|
WINDOW PROJECTS
|
232,018.25
|
OUR LADY OF GOOD COUNSEL GIRLS SCHOOL
|
MECHANICAL WORKS
|
57,383.00
|
MUIRE NA DEA COIRLE INFANTS NS
|
MECHANICAL WORKS
|
57,383.00
|
CHRIST THE KING
|
TOILET FACILITIES
|
—
|
ST FINBARS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
153,569.42
|
ST RAPHAELAS NS
|
TOILET FACILITIES
|
79,484.60
|
SCOIL IOSAGAIN
|
MECHANICAL WORKS
|
265,671.80
|
SCOIL MHUIRE OG
|
EXTERNAL ENVIRONMENT PROJECTS
|
68,495.00
|
GREENLANE NS
|
MECHANICAL WORKS
|
35,270.00
|
SCOIL CHIARAIN
|
EXTERNAL ENVIRONMENT PROJECTS
|
37,000.00
|
ST NICHOLAS OF MYRA NS
|
WINDOW PROJECTS
|
19,029.75
|
SCOIL UI CHONAILL
|
ELECTRICAL WORKS
|
215,625.00
|
ST SYLVESTERS INFANT SCHOOL
|
MECHANICAL WORKS
|
127,135.00
|
SCOIL MAISIUNTA BHAILE EAMOINN
|
EXTERNAL ENVIRONMENT PROJECTS
|
2,200.00
|
SCOIL CAOIMHIN NAOFA
|
ROOF WORKS
|
273,465.72
|
CL SCOIL M NA TROCAIRE
|
OTHER STRUCTURAL IMPROVEMENTS
|
32,863.11
|
ST MICHAELS SPEC SCH
|
TOILET FACILITIES
|
122,870.95
|
SCOIL ASSAIM B
|
WINDOW PROJECTS
|
194,208.24
|
SCOIL AINE
|
WINDOW PROJECTS
|
121,606.49
|
NAI SCOIL IDE
|
ROOF WORKS
|
160,134.00
|
GLEN NA SMOL NS
|
WINDOW PROJECTS
|
8,789.00
|
SCOIL MHUIRE NS
|
WINDOW PROJECTS
|
142,500.00
|
SCOIL NAISIUNTA NAOMH FEARGAL
|
MECHANICAL WORKS
|
237,287.31
|
SN MUIRE NA FREASTOGALA
|
MECHANICAL WORKS
|
107,928.68
|
OUR LADY ASSUMPTION BNS
|
MECHANICAL WORKS
|
107,928.68
|
CENTRAL REMEDIAL CLINIC
|
WINDOW PROJECTS
|
384,137.00
|
SCOIL LORCAIN B
|
MECHANICAL WORKS
|
188,297.53
|
SN LOUISE DE MARILLAC
|
ROOF WORKS
|
217,122.70
|
SCOIL BHRENDAIN
|
ELECTRICAL WORKS
|
202,458.41
|
S N CAITRIONA C
|
ELECTRICAL WORKS
|
107,811.55
|
SCOIL CHAITRIONA INFANTS
|
ELECTRICAL WORKS
|
126,311.55
|
ST MARYS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
36,107.70
|
SN C NAOMH PADRAIG
|
EXTERNAL ENVIRONMENT PROJECTS
|
32,358.77
|
ST JOSEPHS FOR THE BLIND NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
57,712.24
|
OUR LADY OF ASSUMPTION
|
MECHANICAL WORKS
|
107,928.68
|
SCOIL NA MBRATHAR
|
EXTERNAL ENVIRONMENT PROJECTS
|
16,290.56
|
SCOIL MHUIRE
|
WINDOW PROJECTS
|
50,732.00
|
SN SAN TREASA
|
ELECTRICAL WORKS
|
277,091.37
|
ST CANICES GNS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
53,500.00
|
KILTERNAN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
253,622.38
|
SN BRIGHDE
|
ROOF WORKS
|
—
|
BAINRION NA NAINGAL 2
|
ELECTRICAL WORKS
|
170,198.17
|
BENINCASA SPECIAL SCHOOL
|
WINDOW PROJECTS
|
—
|
ST PETERS SPECIAL SCHOOL
|
MECHANICAL WORKS
|
199,750.00
|
BANTIARNA NA MBUANNA B
|
MECHANICAL WORKS
|
181,870.00
|
ST COLMCILLE’S BNS
|
ROOF WORKS
|
84,820.85
|
ST COLMCILLES NS
|
MECHANICAL WORKS
|
202,425.70
|
ST JOHN THE BAPTIST SENIOR AND JUNIOR BOYS SCHOOL
|
WINDOW PROJECTS
|
190,773.90
|
LORETO NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
52,605.00
|
SCOIL NAOMH PADARIG
|
TOILET FACILITIES
|
91,809.09
|
ST JOHN OF GOD SPECIAL SCHOOL
|
ROOF WORKS
|
91,201.05
|
ST PAULS NS GREENHILLS
|
WINDOW PROJECTS
|
174,935.79
|
HOLY SPIRIT B N S
|
TOILET FACILITIES
|
103,878.77
|
HOLY SPIRIT NS
|
TOILET FACILITIES
|
100,345.26
|
SCOIL IDE
|
WINDOW PROJECTS
|
58,777.37
|
SCOIL PADRAIG NAOFA B
|
TOILET FACILITIES
|
251,013.94
|
ST PATRICKS GNS
|
ELECTRICAL WORKS
|
131,547.44
|
SCOIL FHURSA
|
ROOF WORKS
|
49,259.00
|
VIRGIN MARY NS
|
WINDOW PROJECTS
|
284,028.44
|
VIRGIN MARY SCHOOL
|
WINDOW PROJECTS
|
284,028.44
|
ST BRIGIDS BNS
|
TOILET FACILITIES
|
138,187.95
|
SCOIL NEASAIN
|
EXTERNAL ENVIRONMENT PROJECTS
|
20,201.24
|
BALALLY GIRL’S NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
71,549.19
|
OUR LADY OF GOOD COUNSEL GNS
|
ELECTRICAL WORKS
|
100,000.00
|
SCOIL na nAINGEAL COIMHDEACHTA
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
31,412.50
|
MHUIRE IOSEF JUNIOR
|
OTHER STRUCTURAL IMPROVEMENTS
|
18,458.50
|
SCOIL NA MAIGHDINE MUIRE
|
ROOF WORKS
|
162,516.93
|
HOLY TRINITY SEN NS
|
ELECTRICAL WORKS
|
189,910.98
|
CASA CATERINA SPECIAL
|
ROOF WORKS
|
7,588.54
|
SCOIL AN TSEACHTAR LAOCH
|
EXTERNAL ENVIRONMENT PROJECTS
|
43,222.57
|
SCOIL COLMCILLE SNR
|
ELECTRICAL WORKS
|
221,151.91
|
SCOIL MHUIRE BOYS
|
EXTERNAL ENVIRONMENT PROJECTS
|
83,252.71
|
DARNDALE JNR
|
WINDOW PROJECTS
|
133,944.50
|
ST CRONAN’S JNS
|
TOILET FACILITIES
|
150,035.75
|
ST MAELRUANS JUNIOR NS
|
ROOF WORKS
|
31,106.52
|
NAOMH MAOLRUAIN SNR
|
WINDOW PROJECTS
|
178,235.48
|
ST KEVINS BOYS & GIRLS NS
|
MECHANICAL WORKS
|
518,458.75
|
ST KEVINS GIRLS NS
|
MECHANICAL WORKS
|
—
|
ST PAULS JUNIOR NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
72,217.62
|
SCOIL BHRIDE
|
ROOF WORKS
|
191,052.51
|
BISHOP GALVIN NS
|
MECHANICAL WORKS
|
72,997.26
|
SCOIL FIACHRA
|
WINDOW PROJECTS
|
168,379.53
|
SCOIL MUIRE NS SHANKILL
|
WINDOW PROJECTS
|
108,190.98
|
SCOIL AENGHUSA JUN NS
|
TOILET FACILITIES
|
104,021.15
|
S N OILIBHEIR
|
WINDOW PROJECTS
|
64,260.00
|
S N MUIRE AGUS IOSEF
|
OTHER STRUCTURAL IMPROVEMENTS
|
18,458.50
|
ST KEVIN’S JUNIOR SCHOOL
|
MECHANICAL WORKS
|
62,668.77
|
SCOIL TREASA
|
OTHER STRUCTURAL IMPROVEMENTS
|
152,567.72
|
OUR LADY QUEEN OF APOSTLES
|
WINDOW PROJECTS
|
100,000.00
|
DIVINE WORD NATIONAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
54,472.00
|
S N AENGHUSA
|
ROOF WORKS
|
204,449.96
|
ST HELENS JUNIOR NATIONAL SCHOOL
|
TOILET FACILITIES
|
161,200.00
|
ST. JOSEPH’S SENIOR NS
|
MECHANICAL WORKS
|
123,184.87
|
GAELSCOIL INSE COR
|
ELECTRICAL WORKS
|
7,485.82
|
PHYSIC HANDICAPPED S SC
|
MECHANICAL WORKS
|
49,187.78
|
ST PHILIPS JNR
|
WINDOW PROJECTS
|
203,383.58
|
SCOIL CHOLMCILLE
|
TOILET FACILITIES
|
64,200.73
|
DALKEY SCHOOL PROJECT
|
WINDOW PROJECTS
|
277,765.00
|
ST MARTIN DE PORRES NS
|
MECHANICAL WORKS
|
283,406.00
|
ST PAULS SEN NS
|
TOILET FACILITIES
|
74,836.72
|
ST PAULS JNR NS
|
MECHANICAL WORKS
|
34,825.06
|
POPE JOHN PAUL 2 SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
18,235.00
|
ST COLMCILLE JUN NS
|
ELECTRICAL WORKS
|
263,199.19
|
ST PETER APOSTLE SEN NS
|
MECHANICAL WORKS
|
176,025.10
|
BISHOP SHANAHAN NS
|
ELECTRICAL WORKS
|
107,675.57
|
ST GABRIELS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
107,819.21
|
ST MICHAELS PRIMARY SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
99,614.96
|
ST RAPHAELS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
99,614.96
|
LADY OF GOOD COUNSEL NS
|
MECHANICAL WORKS
|
57,383.00
|
ST. THOMAS JUNIOR
|
ELECTRICAL WORKS
|
318,101.30
|
ST ATTRACTAS SNR NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
19,255.29
|
HOLY FAMILY JUNIOR NS
|
MECHANICAL WORKS
|
264,145.60
|
SCOIL AN CHROI RO NAOFA IOSA
|
TOILET FACILITIES
|
107,627.00
|
ST HELENS SENIOR NS
|
ROOF WORKS
|
63,903.50
|
OUR LADY OF WAYSIDE NS
|
WINDOW PROJECTS
|
83,426.00
|
ST THOMAS SCHOOL
|
MECHANICAL WORKS
|
73,700.74
|
SCOIL IOSAGAIN/MHUIRE
|
MECHANICAL WORKS
|
106,239.64
|
ST JOSEPHS MXD NS
|
TOILET FACILITIES
|
102,987.41
|
ST BRIGIDS NS
|
MECHANICAL WORKS
|
123,700.10
|
SACRED HEART NS
|
ROOF WORKS
|
47,735.76
|
ST BRIGIDS/ST AIDANS
|
MECHANICAL WORKS
|
130,047.00
|
HOLY FAMILY NS
|
ROOF WORKS
|
150,389.28
|
BALLYCRAGH NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
47,136.50
|
SCOIL CAITRIONA NA MBRAITHRE
|
ROOF WORKS
|
46,397.84
|
BOOTERSTOWN NS
|
WINDOW PROJECTS
|
74,423.62
|
HOLY CROSS NS
|
TOILET FACILITIES
|
33,839.49
|
GAELSCOIL MOLOGA
|
WINDOW PROJECTS
|
42,925.00
|
ST DAVIDS NS
|
WINDOW PROJECTS
|
503,988.99
|
OUR LADY NS
|
WINDOW PROJECTS
|
182,457.88
|
HAROLDS CROSS NS
|
TOILET FACILITIES
|
119,994.54
|
ST BRIGIDS SNR GNS
|
ELECTRICAL WORKS
|
147,295.00
|
ST JOSEPHS
|
OTHER STRUCTURAL IMPROVEMENTS
|
63,950.04
|
SCOIL NAISIUNTA AN DEA AOIRE
|
MECHANICAL WORKS
|
161,814.00
|
ST DOMINICS N S
|
EXTERNAL ENVIRONMENT PROJECTS
|
104,680.29
|
NORTH BAY NS
|
MECHANICAL WORKS
|
13,550.98
|
ST JOHNS NS BALLYBRACK
|
WINDOW PROJECTS
|
55,355.00
|
ST KEVINS NS
|
MECHANICAL WORKS
|
36,858.65
|
ST AGNES NS
|
ROOF WORKS
|
304,563.78
|
MOTHER OF DIVINE GRACE
|
TOILET FACILITIES
|
30,103.00
|
ST JOSEPHS ADOLESCENT AND FAMILY SERVICE SCHOOL
|
ELECTRICAL WORKS
|
97,329.57
|
ARCHBISHOP MCQUAID NS
|
WINDOW PROJECTS
|
93,580.17
|
GAELSCOIL UI HEARCAIN
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
126,671.89
|
ST BENEDICT’S & ST MARY’S NS
|
MECHANICAL WORKS
|
101,500.00
|
HOLY CHILD NATIONAL SCHOOL 20338C
|
MECHANICAL WORKS
|
146,876.96
|
TOTAL DUBLIN
|
|
21,541,230.25
|
GALWAY
|
|
|
SCOIL CROI IOSA
|
TOILET FACILITIES
|
12,460.00
|
ST JOSEPHS BNS
|
EXTERNAL ENVIRONMENT PROJECTS
|
97,976.53
|
SCOIL AN LINBH IOSA
|
EXTERNAL ENVIRONMENT PROJECTS
|
27,314.00
|
SN AN TSAILEAIN
|
WINDOW PROJECTS
|
15,750.59
|
BAWNMORE NS
|
WINDOW PROJECTS
|
18,400.52
|
SCOIL MHUIRE
|
WINDOW PROJECTS
|
34,500.00
|
SN MUIRE GAN SMAL
|
WINDOW PROJECTS
|
17,339.71
|
S N MHUIRE
|
OTHER STRUCTURAL IMPROVEMENTS
|
36,135.00
|
SCOIL MHUIRE
|
TOILET FACILITIES
|
91,417.28
|
S N EANNA
|
MECHANICAL WORKS
|
73,656.00
|
LURGA NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
74,806.00
|
S N MUIRE
|
WINDOW PROJECTS
|
63,289.95
|
SCOIL NAOMH SHEOSAIMH
|
EXTERNAL ENVIRONMENT PROJECTS
|
35,004.90
|
SCOIL NAISIUNTA LEITIR MUCU
|
OTHER STRUCTURAL IMPROVEMENTS
|
102,789.02
|
SCOIL NAISIUNTA CARNAIN BAILE ATHA ’N RI
|
EXTERNAL ENVIRONMENT PROJECTS
|
113,649.75
|
SCOIL NAISIUNTA PADRAIG NAOFA
|
TOILET FACILITIES
|
48,720.41
|
S N NAOMH PADRAIG
|
MECHANICAL WORKS
|
22,572.30
|
SN PADRAIG NAOFA
|
EXTERNAL ENVIRONMENT PROJECTS
|
20,163.00
|
KILBEACANTY NS
|
WINDOW PROJECTS
|
22,750.00
|
SN ARD
|
OTHER STRUCTURAL IMPROVEMENTS
|
61,198.49
|
AINBHTHIN NAOFA
|
WINDOW PROJECTS
|
15,746.40
|
SCOIL RONAIN
|
ROOF WORKS
|
50,792.18
|
ST BRENDANS CONVENT
|
WINDOW PROJECTS
|
30,240.00
|
SCOIL CHROI NAOFA
|
ROOF WORKS
|
88,600.00
|
PAROCHIAL N S
|
OTHER STRUCTURAL IMPROVEMENTS
|
59,602.98
|
CREGMORE NS
|
WINDOW PROJECTS
|
12,287.31
|
SCOIL FHURSA
|
WINDOW PROJECTS
|
52,652.00
|
SCOIL NAISIUNTA NA CEALL TRAIGHE
|
EXTERNAL ENVIRONMENT PROJECTS
|
21,675.00
|
S N AN LEATH BHAILE
|
EXTERNAL ENVIRONMENT PROJECTS
|
35,800.00
|
SN COLMCILLE NAOFA
|
EXTERNAL ENVIRONMENT PROJECTS
|
142,272.92
|
SCOIL NA MBRAITHRE
|
TOILET FACILITIES
|
36,200.00
|
SCOIL NAISIUNTA CAOMHAIN
|
MECHANICAL WORKS
|
10,000.00
|
LOUGH CUTRA NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
61,500.00
|
SCOIL PADRAIG NAOFA
|
TOILET FACILITIES
|
14,662.00
|
SN AN AILL BHREACH
|
WINDOW PROJECTS
|
41,166.50
|
SCOIL NAISIUNTA LORCAIN NAOFA
|
EXTERNAL ENVIRONMENT PROJECTS
|
77,332.00
|
S N NAOMH CIARAIN
|
EXTERNAL ENVIRONMENT PROJECTS
|
22,136.00
|
KILTIERNAN NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
15,500.00
|
S N TIR AN FHIAIDH
|
TOILET FACILITIES
|
22,796.20
|
SN BRIGHDE NAOFA
|
EXTERNAL ENVIRONMENT PROJECTS
|
39,000.00
|
S N CILL TARTAIN
|
ROOF WORKS
|
4,334.93
|
SN PADRAIG NAOFA
|
ROOF WORKS
|
47,975.44
|
GARBALLY NS
|
MECHANICAL WORKS
|
33,826.00
|
SCOIL BHRIDE
|
OTHER STRUCTURAL IMPROVEMENTS
|
9,752.00
|
BELCLARE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
67,306.67
|
PRESENTATION CONVENT
|
WINDOW PROJECTS
|
8,513.00
|
ST MARYS NS
|
ROOF WORKS
|
29,000.00
|
SN BAILE AN MHUILINN
|
WINDOW PROJECTS
|
36,320.00
|
SN CHOLMCILLE
|
ROOF WORKS
|
2,160.00
|
SCOIL IDE
|
MECHANICAL WORKS
|
42,000.00
|
SCOIL NAOMH EINDE
|
ELECTRICAL WORKS
|
110,000.00
|
ST JOSEPHS SPECIAL SCHOOL GALWAY
|
MECHANICAL WORKS
|
33,000.00
|
MERVUE BOYS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
169,000.00
|
MERVUE GIRLS NS
|
TOILET FACILITIES
|
200,000.00
|
DOMINICAN CONVENT
|
OTHER STRUCTURAL IMPROVEMENTS
|
127,494.64
|
CLONBERNE CENTRAL NS
|
ROOF WORKS
|
88,408.80
|
ST OLIVER PLUNKETT NS
|
ROOF WORKS
|
27,200.00
|
SCOIL CHAITRIONA SENIOR
|
EXTERNAL ENVIRONMENT PROJECTS
|
131,500.00
|
SCOIL SHEAMAIS NAOFA
|
CURRICULAR REQUIREMENTS
|
29,868.00
|
CREGG’S NS
|
CURRICULAR REQUIREMENTS
|
184,121.26
|
SCOIL MHUIRE
|
WINDOW PROJECTS
|
38,487.00
|
SCOIL MHUIRE
|
WINDOW PROJECTS
|
65,237.24
|
ST BRENDANS NS
|
TOILET FACILITIES
|
15,590.00
|
ROSEDALE SPECIAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
21,068.00
|
TOTAL GALWAY
|
|
3,362,017.92
|
KERRY
|
|
|
KENMARE BOYS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
CONVENT PRIMARY SCHOOL KERRY
|
ROOF WORKS
|
115,199.09
|
KILGOBNET NS
|
WINDOW PROJECTS
|
50,440.00
|
NAOMH CARTHACH
|
WINDOW PROJECTS
|
22,755.66
|
ST CLAIRS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
LAURAGH NS
|
WINDOW PROJECTS
|
21,878.58
|
CASTLEDRUM NATIONAL SCHOOL
|
TOILET FACILITIES
|
40,772.00
|
LISTELLICK NS
|
WINDOW PROJECTS
|
51,910.76
|
SCOIL MHUIRE
|
OTHER STRUCTURAL IMPROVEMENTS
|
31,200.00
|
CURRANES NS
|
WINDOW PROJECTS
|
39,674.63
|
LOUGHGUUITANE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
79,027.47
|
NOHOVAL NS
|
CURRICULAR REQUIREMENTS
|
72,584.45
|
KNOCKANURE NS
|
MECHANICAL WORKS
|
32,287.27
|
S N MHUIRE DE LOURDES
|
WINDOW PROJECTS
|
62,500.00
|
FAHA NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
12,900.00
|
FILEMORE NS
|
ROOF WORKS
|
5,447.50
|
SCOIL MHUIRE KILLORGLIN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
13,284.39
|
DOUGLAS NS
|
MECHANICAL WORKS
|
26,280.50
|
SN NAOMH IOSEPH
|
MECHANICAL WORKS
|
7,540.00
|
SCOIL MHUIRE
|
TOILET FACILITIES
|
56,581.65
|
MURHUR MXD N S
|
MECHANICAL WORKS
|
46,058.61
|
CAHIRCIVEEN CONVENT
|
ELECTRICAL WORKS
|
23,580.68
|
SCOIL EOIN
|
ROOF WORKS
|
81,279.90
|
SCOIL MHUIRE SCOIL AN CHROI RO NAOFA
|
WINDOW PROJECTS
|
196,300.00
|
S N BREANDAN NAOFA
|
ELECTRICAL WORKS
|
30,383.00
|
SCOIL NAOMH PADRAIG MEASC
|
MECHANICAL WORKS
|
44,703.95
|
SN AN LEANA MHOIR
|
MECHANICAL WORKS
|
35,763.16
|
CAHORREIGH NS
|
ROOF WORKS
|
33,004.00
|
SN TUAIRIN CATHAIL
|
EXTERNAL ENVIRONMENT PROJECTS
|
16,668.00
|
SCOIL NA SRONA
|
WINDOW PROJECTS
|
16,390.23
|
NA MINTEOGA NS
|
TOILET FACILITIES
|
67,668.10
|
MUIRE NA MAINISTREACH
|
MECHANICAL WORKS
|
110,600.00
|
SN GLEANN BEITHE
|
ROOF WORKS
|
19,903.00
|
SPA NATIONAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
21,043.00
|
SCOIL NAOMH IOSEF
|
MECHANICAL WORKS
|
16,039.23
|
ST ITAS & ST JOSEPHS
|
ROOF WORKS
|
120,000.00
|
ARDFERT CENTRAL NS
|
MECHANICAL WORKS
|
63,615.87
|
KILGARVAN CENTRAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
26,366.20
|
HOLY CROSS MERCY SCHOOL
|
MECHANICAL WORKS
|
231,200.00
|
HOLY FAMILY BALLOONAGH
|
WINDOW PROJECTS
|
125,000.00
|
ST. FRANCIS SPRCIAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
55,600.00
|
GAELSCOIL MHIC EASMAONN
|
WINDOW PROJECTS
|
49,693.45
|
SCARTAGLIN NEW CENT SC
|
WINDOW PROJECTS
|
48,400.00
|
BALLYDUFF CENTRAL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
103,614.31
|
REALT NA MAIDNE
|
TOILET FACILITIES
|
62,314.59
|
GAELSCOIL NAOMH AOGAIN
|
ELECTRICAL WORKS
|
184,128.78
|
GAELSCOIL FAITHLEANN
|
ROOF WORKS
|
65,023.92
|
SCOIL MHUIRE AGUS N. TREASA
|
ELECTRICAL WORKS
|
58,521.00
|
NAGLE RICE PRIMARY SCHOOL
|
WINDOW PROJECTS
|
35,278.35
|
TOTAL KERRY
|
|
2,730,405.28
|
KILDARE
|
|
|
SALLINS NATIONAL SCHOOL
|
ROOF WORKS
|
45,698.91
|
ST. PATRICK’S NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
33,467.80
|
SN NA CLOICHE MOIRE
|
MECHANICAL WORKS
|
28,372.85
|
MERCY CONVENT PRIMARY
|
ELECTRICAL WORKS
|
244,767.27
|
SCOIL CHONNLA PHADRAIG
|
TOILET FACILITIES
|
40,981.57
|
RATHANGAN BNS
|
EXTERNAL ENVIRONMENT PROJECTS
|
25,255.56
|
SN BRIGHDE
|
WINDOW PROJECTS
|
41,800.00
|
ST PETERS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
53,279.00
|
SCOIL NAOMH MHUIRE
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
ALLENWOOD BNS
|
EXTERNAL ENVIRONMENT PROJECTS
|
42,500.00
|
BRANNOXTOWN NS
|
WINDOW PROJECTS
|
25,237.10
|
RATHCOFFEY NS
|
MECHANICAL WORKS
|
61,297.00
|
SCOIL CHORBAIN
|
WINDOW PROJECTS
|
142,400.00
|
ST MARYS BOYS NATIONAL SCHOOL
|
MECHANICAL WORKS
|
158,566.34
|
ST CONLETH & MARYS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
98,745.00
|
TWO MILE HOUSE NS
|
WINDOW PROJECTS
|
95,190.00
|
SN OILBHEAR PLUNGLEAD
|
EXTERNAL ENVIRONMENT PROJECTS
|
43,091.20
|
SUNCROFT NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
46,440.00
|
COOLE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
60,173.43
|
SCOIL MHUIRE
|
MECHANICAL WORKS
|
72,692.98
|
SN MHUIRE C
|
OTHER STRUCTURAL IMPROVEMENTS
|
18,971.37
|
S N BAILE MHIC ADAIM
|
WINDOW PROJECTS
|
12,928.41
|
SN PADRAIG
|
WINDOW PROJECTS
|
84,188.51
|
SCOIL MHICIL NAOFA
|
WINDOW PROJECTS
|
112,640.00
|
ROBERTSTOWN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
42,101.00
|
S N SCOIL TREASA
|
EXTERNAL ENVIRONMENT PROJECTS
|
70,782.59
|
SN NAOMH CONNLAEDH MXD
|
WINDOW PROJECTS
|
133,380.00
|
STRAFFAN NS
|
ROOF WORKS
|
—
|
NEWTOWN NS
|
TOILET FACILITIES
|
42,106.00
|
KILDANGAN NS
|
WINDOW PROJECTS
|
—
|
ST MARKS SPECIAL SCH
|
EXTERNAL ENVIRONMENT PROJECTS
|
160,993.38
|
SCOIL MHUIRE SOISEARACH
|
TOILET FACILITIES
|
31,991.14
|
SCOIL AN LINBH IOSA, BALLYCANE NS
|
WINDOW PROJECTS
|
63,502.84
|
SAN CARLO JUNIOR NS
|
MECHANICAL WORKS
|
91,767.60
|
ST BRIGIDS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
105,909.73
|
CHEARBHAILL UI DHALAIGH
|
WINDOW PROJECTS
|
14,150.00
|
SCOIL EOIN PHOIL
|
ROOF WORKS
|
232,151.80
|
SCOIL MOCHUA
|
ROOF WORKS
|
251,485.00
|
SCOIL NAISIUNTA BHRIDE
|
ROOF WORKS
|
54,453.54
|
TOTAL KILDARE
|
|
2,883,458.92
|
KILKENNY
|
|
|
LISDOWNEY NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
39,968.66
|
BALLYRAGGET BOYS
|
WINDOW PROJECTS
|
27,535.98
|
MOONCOIN CONVENT
|
OTHER STRUCTURAL IMPROVEMENTS
|
4,184.00
|
SCOIL MHUIRE
|
TOILET FACILITIES
|
14,398.00
|
SKEAGHVASTEEN NS
|
WINDOW PROJECTS
|
45,900.00
|
SCOIL NAISIUNTA LISFUNCHIN
|
WINDOW PROJECTS
|
21,190.00
|
GRAIG NA MANAGH
|
OTHER STRUCTURAL IMPROVEMENTS
|
38,159.46
|
BENNETTSBRIDGE MIXED
|
ROOF WORKS
|
8,500.00
|
ST LEONARDS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
22,491.00
|
SN NAOMH PADRAIGH
|
ROOF WORKS
|
91,285.94
|
S N BHREANAIN NAOFA
|
WINDOW PROJECTS
|
18,450.00
|
ST. JOHNS JNR SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
20,318.00
|
SN BHRIGHDE
|
MECHANICAL WORKS
|
46,217.50
|
KILKENNY MIXED NS
|
WINDOW PROJECTS
|
30,756.90
|
SN MUIRE GAN SMAL
|
WINDOW PROJECTS
|
111,363.16
|
S N NAOMH CHIARAIN
|
ROOF WORKS
|
79,799.00
|
SN SHEAN BHOTH
|
ROOF WORKS
|
53,625.50
|
SN CHIARAIN NAOFA
|
WINDOW PROJECTS
|
25,309.00
|
ST BRIGIDS CONVENT NS
|
MECHANICAL WORKS
|
60,378.70
|
BURNCHURCH NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
40,774.85
|
SCOIL PADRAIG NAOFA
|
ELECTRICAL WORKS
|
43,912.60
|
SCOIL IOGNAID DE RIS
|
ELECTRICAL WORKS
|
190,074.00
|
COLMCILLE MIXED NS
|
WINDOW PROJECTS
|
16,261.17
|
GOWRAN NS
|
ROOF WORKS
|
62,628.87
|
SCOIL BHRIDE B7C
|
ROOF WORKS
|
29,909.00
|
GLENMORE NS
|
ROOF WORKS
|
67,673.57
|
SCOIL NAOMH IOSEPH
|
OTHER STRUCTURAL IMPROVEMENTS
|
2,596.39
|
SN SHAN NIOCLAS
|
ELECTRICAL WORKS
|
53,730.65
|
LISTERLIN NS
|
WINDOW PROJECTS
|
60,044.68
|
TEMPLEORUM NATIONAL SCHOOL
|
ELECTRICAL WORKS
|
38,235.43
|
ST AIDANS NS
|
WINDOW PROJECTS
|
105,645.00
|
ST PATRICKS SPECIAL SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
23,780.78
|
ST CANICES CO ED.
|
EXTERNAL ENVIRONMENT PROJECTS
|
150,830.00
|
GAELSCOIL OSRAI
|
TOILET FACILITIES
|
21,000.00
|
SCOIL MHUIRE
|
TOILET FACILITIES
|
43,905.16
|
URLINGFORD NS
|
ELECTRICAL WORKS
|
40,605.00
|
SCOIL BHRIDE
|
WINDOW PROJECTS
|
92,499.64
|
ST. JOHN’S SENIOR NS
|
TOILET FACILITIES
|
55,442.00
|
TOTAL KILKENNY
|
|
1,899,379.59
|
LAOIS
|
|
|
MOUNTMELLICK CONVENT NS
|
ELECTRICAL WORKS
|
136,230.14
|
COSBY NS
|
WINDOW PROJECTS
|
24,345.75
|
PIKE OF RUSHALL NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
33,210.97
|
KILADOOLEY MIXED NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
26,551.43
|
SCOIL BHRIDE
|
WINDOW PROJECTS
|
49,975.00
|
CAMROSS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
106,257.30
|
MOUNTMELLICK BNS
|
ELECTRICAL WORKS
|
136,230.14
|
SCOIL MHUIRE MAIGHEO
|
OTHER STRUCTURAL IMPROVEMENTS
|
79,775.00
|
ST ABBANS NS, MAGENEY
|
ROOF WORKS
|
44,515.00
|
RATHDOMHNAIGH NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
22,700.00
|
FRAOCH MOR NS
|
MECHANICAL WORKS
|
—
|
NAOMH PIUS X NATIONAL SCHOOL
|
WINDOW PROJECTS
|
9,174.83
|
SN NAOMH COLMCILLE
|
WINDOW PROJECTS
|
6,078.00
|
SCOIL MHUIRE
|
OTHER STRUCTURAL IMPROVEMENTS
|
20,200.00
|
ST PAULS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
20,263.05
|
SCOIL MHUIRE
|
WINDOW PROJECTS
|
81,780.00
|
CULLOHILL NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
103,642.00
|
TOTAL LAOIS
|
|
900,928.61
|
LEITRIM
|
|
|
MOHILL 2 NS
|
ROOF WORKS
|
9,403.46
|
NEWTOWNGORE NS
|
WINDOW PROJECTS
|
16,261.17
|
DRUMEELA NATIONAL SCHOOL
|
TOILET FACILITIES
|
39,624.25
|
MANORHAMILTON BNS
|
ROOF WORKS
|
24,095.82
|
SN CORR NA GAOITHE
|
TOILET FACILITIES
|
20,600.00
|
SN BEAL AN ATHA MHOIR
|
ELECTRICAL WORKS
|
95,314.27
|
DRUMSHAMBO CENTRAL
|
MECHANICAL WORKS
|
11,808.34
|
ST BRIDS
|
MECHANICAL WORKS
|
24,475.81
|
DRUMLEA
|
TOILET FACILITIES
|
27,503.00
|
SCOIL CHUIMSITHEACH NAOMH CLAR
|
TOILET FACILITIES
|
—
|
TOTAL LEITRIM
|
|
269,086.12
|
LIMERICK
|
|
|
ST SENANS NS
|
TOILET FACILITIES
|
42,691.58
|
KILDIMO NS
|
ROOF WORKS
|
82,775.00
|
S N AILBHE
|
EXTERNAL ENVIRONMENT PROJECTS
|
144,054.32
|
BALLYSTEEN NS
|
WINDOW PROJECTS
|
30,578.65
|
CROOM NATIONAL SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
137,140.06
|
SCOIL NAISIUNTA NAOMH PADRAIG
|
MECHANICAL WORKS
|
18,152.50
|
PALLASKENRY NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
12,629.40
|
ST JOSEPHS CONVENT
|
WINDOW PROJECTS
|
49,156.06
|
NICKER NATIONAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
28,160.27
|
BALLYLANDERS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
65,485.00
|
ST NESSANS NS
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
59,043.65
|
ST MICHAELS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
19,759.30
|
ST MARY’S BNS
|
ROOF WORKS
|
116,195.44
|
CONVENT OF MERCY NATIONAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
34,840.00
|
SCOIL NAIS
|
TOILET FACILITIES
|
12,517.10
|
SCOIL BAILE AN AIRD
|
TOILET FACILITIES
|
16,255.00
|
SHANAGOLDEN NS
|
TOILET FACILITIES
|
20,721.14
|
SCOIL LILE NAOFA
|
EXTERNAL ENVIRONMENT PROJECTS
|
52,776.01
|
MARIA AUXILIATRIX NS
|
WINDOW PROJECTS
|
25,981.64
|
QUEEN OF THE PEACE NS
|
TOILET FACILITIES
|
45,378.04
|
SCOIL TOBAR PADRAIG
|
MECHANICAL WORKS
|
45,380.36
|
S N GEAROID UI GHRIOBHTHA
|
EXTERNAL ENVIRONMENT PROJECTS
|
51,823.14
|
MONALEEN NATIONAL SCHOOL
|
WINDOW PROJECTS
|
93,447.81
|
ST MUNCHINS NS
|
TOILET FACILITIES
|
84,578.74
|
SCOIL MHAINCHIN BUACH
|
MECHANICAL WORKS
|
74,451.04
|
COURTENAY NS
|
TOILET FACILITIES
|
91,655.00
|
ST ANNE’S NS
|
ROOF WORKS
|
225,394.95
|
SCOIL IDE NAOFA RAHEENAGH
|
WINDOW PROJECTS
|
22,500.00
|
S N MA RUA
|
OTHER STRUCTURAL IMPROVEMENTS
|
26,925.00
|
SCOIL MHUIRE
|
MECHANICAL WORKS
|
37,589.80
|
ST. JOSEPH’S BOYS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
43,744.22
|
SCOIL IDE
|
WINDOW PROJECTS
|
239,112.96
|
CROI RO NAOFA IOSA
|
OTHER STRUCTURAL IMPROVEMENTS
|
69,276.25
|
SN NAOMH IOSEF
|
ROOF WORKS
|
141,597.43
|
SCOIL CHRIOSR RI B
|
EXTERNAL ENVIRONMENT PROJECTS
|
151,722.48
|
MARY QUEEN OF IRELAND GNS
|
OTHER STRUCTURAL IMPROVEMENTS
|
70,000.00
|
SOUTH HILL NS
|
ROOF WORKS
|
132,187.91
|
ST BRIGIDS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
43,050.00
|
OUR LADY OF LOURDES NS
|
TOILET FACILITIES
|
48,534.61
|
MILFORD NATIONAL SCHOOL
|
MECHANICAL WORKS
|
115,000.00
|
CORPUS CHRISTI NS
|
ELECTRICAL WORKS
|
184,200.00
|
AN MHODH SCOIL
|
EXTERNAL ENVIRONMENT PROJECTS
|
100,526.46
|
SCOIL NAOMH IOSEF
|
WINDOW PROJECTS
|
36,500.00
|
MARIA KING PRESENTATION SCHOOL
|
ELECTRICAL WORKS
|
236,696.48
|
BRUFF NS
|
ROOF WORKS
|
53,544.00
|
PRESENTATION SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
21,335.75
|
SCOIL MOCHEALLOG
|
TOILET FACILITIES
|
16,400.00
|
SCOIL CHAITRIONA
|
OTHER STRUCTURAL IMPROVEMENTS
|
87,999.04
|
TOTAL LIMERICK
|
|
3,559,463.59
|
LONGFORD
|
|
|
SCOIL NAOMH MICHAEL
|
EXTERNAL ENVIRONMENT PROJECTS
|
36,698.40
|
TASHINNY NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
6,500.00
|
ST COLUMBA’S
|
ROOF WORKS
|
36,118.00
|
ST BRIGIDS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
15,719.13
|
ST BERNARDS MIXED NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
31,200.00
|
SAMHTHANN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
24,000.00
|
SCOIL MHUIRE
|
OTHER STRUCTURAL IMPROVEMENTS
|
15,177.09
|
ST JOSEPHS CONVENT
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
42,988.04
|
ST TERESAS
|
EXTERNAL ENVIRONMENT PROJECTS
|
19,320.00
|
S N COLMCILLE
|
OTHER STRUCTURAL IMPROVEMENTS
|
93,271.65
|
ST PATRICKS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
23,700.00
|
ST MELS NS
|
WINDOW PROJECTS
|
41,340.00
|
TOTAL LONGFORD
|
|
386,032.31
|
LOUTH
|
|
|
PRESENTATION CONVENT
|
WINDOW PROJECTS
|
67,006.86
|
ST COLMCILLES NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
44,197.96
|
ST OLIVERS NS
|
WINDOW PROJECTS
|
93,509.05
|
TALLANSTOWN NS
|
ROOF WORKS
|
36,149.92
|
WALSHESTOWN NS
|
WINDOW PROJECTS
|
65,376.22
|
NEWTOWN NS
|
MECHANICAL WORKS
|
39,617.33
|
ST PETERS NS
|
MECHANICAL WORKS
|
19,580.63
|
DUN DEALGAN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
17,161.00
|
CALLYSTOWN MIXED NS
|
WINDOW PROJECTS
|
56,412.12
|
SCOIL NAOMH FAINCHE
|
MECHANICAL WORKS
|
156,889.76
|
ST MARYS NATIONAL SCHOOL
|
WINDOW PROJECTS
|
31,438.26
|
ST. OLIVER PLUNKETT’S NS
|
ROOF WORKS
|
64,045.09
|
TERMONFECKIN NS
|
MECHANICAL WORKS
|
53,526.20
|
BELLURGAN NS
|
WINDOW PROJECTS
|
31,918.00
|
ST NICHOLAS MONASTERY NS
|
ELECTRICAL WORKS
|
244,717.50
|
DROMISKIN MIXED NS
|
ROOF WORKS
|
20,870.00
|
ST JOSEPHS CBS
|
ELECTRICAL WORKS
|
12,304.29
|
CBS PRIMARY
|
MECHANICAL WORKS
|
106,823.31
|
ST FURSEYS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
14,785.27
|
ST PATRICKS SCHOOL
|
ROOF WORKS
|
61,792.45
|
SN NAOMH FHIONAIN
|
ROOF WORKS
|
45,516.74
|
SN BHRIDE
|
TOILET FACILITIES
|
12,934.93
|
SN MUIRE NA TROCAIRE
|
TOILET FACILITIES
|
95,467.52
|
SCOIL BHRIDE MXD NS
|
ELECTRICAL WORKS
|
198,570.00
|
ST NICHOLAS NS
|
MECHANICAL WORKS
|
44,013.83
|
SN BRIGHDE
|
WINDOW PROJECTS
|
33,836.78
|
SN N MAOLMHADAODHAGH B
|
TOILET FACILITIES
|
8,944.21
|
ST BUITE’S NS
|
WINDOW PROJECTS
|
46,000.00
|
ST BRIGHIDS SPECIAL SCHOOL
|
ROOF WORKS
|
384,431.33
|
ST MARYS SPECIAL SCHOOL
|
ELECTRICAL WORKS
|
104,500.00
|
S N PADRAIG
|
ELECTRICAL WORKS
|
53,258.20
|
REDEEMER BNS
|
WINDOW PROJECTS
|
85,887.11
|
REDEEMER GIRLS SCHOOL
|
WINDOW PROJECTS
|
85,887.11
|
SCOIL EOIN BAISTE
|
TOILET FACILITIES
|
116,644.62
|
REALT NA MARA
|
EXTERNAL ENVIRONMENT PROJECTS
|
63,581.00
|
TOTAL LOUTH
|
|
2,617,594.60
|
MAYO
|
|
|
SCOIL NAOMH BRID
|
WINDOW PROJECTS
|
44,928.84
|
SCOIL NAISIUNTA NAOMH FEICHIN
|
EXTERNAL ENVIRONMENT PROJECTS
|
8,901.90
|
GLENISLAND NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
120,284.71
|
BEHYMORE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
15,500.00
|
SN NAOMH PADRAIG
|
EXTERNAL ENVIRONMENT PROJECTS
|
36,000.00
|
S N NA HAILLE
|
WINDOW PROJECTS
|
40,332.17
|
AUGHLEAM NS
|
MECHANICAL WORKS
|
110,617.09
|
INVER NS
|
ROOF WORKS
|
97,354.00
|
SN GLEANN A CHAISIL
|
OTHER STRUCTURAL IMPROVEMENTS
|
5,118.77
|
CORMAIC NAOFA
|
ROOF WORKS
|
12,128.26
|
SCOIL NAISIUNTA AN TSRAITH
|
OTHER STRUCTURAL IMPROVEMENTS
|
7,214.15
|
ST. JOSEPH’S NS
|
MECHANICAL WORKS
|
80,478.80
|
BARNATRA NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
31,000.00
|
SN DUBH THUAMA
|
EXTERNAL ENVIRONMENT PROJECTS
|
34,679.00
|
AN GLEANNA MHOIR S N
|
MECHANICAL WORKS
|
410.40
|
S N NAOMH PADRAIG
|
OTHER STRUCTURAL IMPROVEMENTS
|
9,288.00
|
RICHMOND NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
25,380.00
|
BOFIELD MIXED NS
|
ROOF WORKS
|
45,338.40
|
BULLSMOUTH NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
29,463.96
|
SCOIL NAISIUNTA MUIRE GAN SMAL
|
OTHER STRUCTURAL IMPROVEMENTS
|
8,127.99
|
QUIGNAMANGER NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
12,000.00
|
KNOCK NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
113,765.85
|
CLOGHAN NS
|
WINDOW PROJECTS
|
8,000.00
|
KINAFFE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
45,500.00
|
KILLASSER NATIONAL SCHOOL
|
MECHANICAL WORKS
|
28,000.00
|
RATHLEE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
7,559.65
|
MYNA NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
58,968.44
|
CARRA NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
8,485.00
|
SN LAINN CILLE
|
OTHER STRUCTURAL IMPROVEMENTS
|
17,200.00
|
ST PATRICKS NS RATHNAMAGH
|
ROOF WORKS
|
29,160.00
|
SN REALT NA MARA
|
TOILET FACILITIES
|
22,663.38
|
COONEAL NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
41,233.33
|
CARROWHOLLY NS
|
MECHANICAL WORKS
|
6,480.00
|
ST. PAUL’S NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
70,386.00
|
S N BEAL CARADH
|
WINDOW PROJECTS
|
53,755.81
|
CLOGHANS HILL NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
20,000.00
|
SN ATHRACHT NFA BUACH
|
OTHER STRUCTURAL IMPROVEMENTS
|
28,177.03
|
MUIRE GAN SMAL CONVENT PRIMARY SCHOOL
|
WINDOW PROJECTS
|
130,250.00
|
ST PATRICKS NS CASTLEBAR
|
TOILET FACILITIES
|
101,437.32
|
ST JOSEPHS NS BALLINA
|
EXTERNAL ENVIRONMENT PROJECTS
|
56,000.00
|
SN ACHAIDH AN GHLAISIN
|
TOILET FACILITIES
|
28,177.00
|
SN NAOMH IOSAF
|
WINDOW PROJECTS
|
11,688.85
|
SN PEADAIR AGUS POL
|
MECHANICAL WORKS
|
57,670.00
|
ST ANTHONYS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
22,950.00
|
KILTIMAGH CENTRAL SCHOOL
|
ROOF WORKS
|
204,050.00
|
ST PATRICKS CENTRAL NS
|
WINDOW PROJECTS
|
64,385.86
|
SCOIL NAISIUNTA NAOMH TOLA
|
WINDOW PROJECTS
|
50,854.23
|
ST. PETERS NS
|
ELECTRICAL WORKS
|
6,242.50
|
SWINFORD NS
|
ROOF WORKS
|
193,038.16
|
GAELSCOIUL UILEOG DE BURCA
|
MECHANICAL WORKS
|
53,750.90
|
CROSSMOLINA NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
40,000.00
|
SCOIL PHADRAIG
|
MECHANICAL WORKS
|
25,535.48
|
TOTAL MAYO
|
|
2,379,911.23
|
MEATH
|
|
|
AINE NAOFA NS
|
ROOF WORKS
|
84,364.34
|
ST PATRICKS NS
|
ROOF WORKS
|
71,000.00
|
KILSKYRE MIXED NS
|
WINDOW PROJECTS
|
47,909.36
|
SCOIL MHICHIL NA BUACHAILLI
|
MECHANICAL WORKS
|
55,500.00
|
BALLINLOUGH NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
60,708.37
|
DRUMBARRAGH NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
127,000.00
|
SCOIL MHUIRE
|
EXTERNAL ENVIRONMENT PROJECTS
|
97,000.00
|
KELLS CONVENT
|
TOILET FACILITIES
|
37,942.73
|
OLDCASTLE MIXED NS
|
WINDOW PROJECTS
|
54,000.00
|
CARRICKLECK NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
55,900.00
|
RATHKENNY NATIONAL SCHOOL
|
ROOF WORKS
|
30,354.18
|
MERCY CONVENT
|
ROOF WORKS
|
30,348.53
|
S N PHEADAIR AGUS PHOIL
|
EXTERNAL ENVIRONMENT PROJECTS
|
89,900.00
|
KNOCKCOMMON NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
14,765.14
|
SCOIL CHOLMCILLE
|
WINDOW PROJECTS
|
113,828.19
|
KILBRIDE NS
|
CURRICULAR REQUIREMENTS
|
17,879.20
|
CARNAROSS NS
|
WINDOW PROJECTS
|
32,638.34
|
KILMAINHAMWOOD NS
|
ROOF WORKS
|
55,120.00
|
ST ULTAN’S
|
WINDOW PROJECTS
|
30,946.40
|
SN ULTAIN NAOFA
|
ROOF WORKS
|
59,500.00
|
SN BHRIGHDE, MEATH HILL
|
EXTERNAL ENVIRONMENT PROJECTS
|
107,500.00
|
S N CUL AN MHUILINN
|
WINDOW PROJECTS
|
38,166.00
|
KENTSTOWN NS
|
TOILET FACILITIES
|
105,728.34
|
SN CILL BHRIGHDE
|
OTHER STRUCTURAL IMPROVEMENTS
|
36,162.34
|
S N MHUIRE
|
TOILET FACILITIES
|
7,800.00
|
S N PADRAIG NAOFA
|
EXTERNAL ENVIRONMENT PROJECTS
|
21,000.00
|
SCOIL OILIBHEIR NAOFA
|
WINDOW PROJECTS
|
103,017.00
|
SCOIL NAISIUNTA MHUIRE NAOFA
|
ROOF WORKS
|
9,710.54
|
S N DUN UABHAIR
|
MECHANICAL WORKS
|
15,872.50
|
ST ANDREWS NS
|
MECHANICAL WORKS
|
8,925.21
|
SCOIL SEACHNALL
|
EXTERNAL ENVIRONMENT PROJECTS
|
43,921.80
|
SCOILNAIS NAOMH AINE
|
EXTERNAL ENVIRONMENT PROJECTS
|
7,800.00
|
S N NMH SHEOSAMH
|
WINDOW PROJECTS
|
78,345.32
|
SCOIL MHUIRE
|
EXTERNAL ENVIRONMENT PROJECTS
|
173,000.00
|
RATHREGAN NS
|
WINDOW PROJECTS
|
10,021.14
|
SCOIL CAITRIONA NAOFA
|
WINDOW PROJECTS
|
31,977.87
|
S N MHUIRE
|
EXTERNAL ENVIRONMENT PROJECTS
|
9,600.00
|
S N FIACH
|
WINDOW PROJECTS
|
23,500.00
|
SCOIL NAOMH TREASA BELLEWSTOWN
|
WINDOW PROJECTS
|
15,990.15
|
RATHBEGGAN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
42,185.52
|
SCOIL NAIS MAOL HOSAE
|
EXTERNAL ENVIRONMENT PROJECTS
|
75,777.50
|
DANGAN NS
|
ROOF WORKS
|
54,715.33
|
CASTLEJORDAN NS
|
TOILET FACILITIES
|
51,937.00
|
ST OLIVER PLUNKETT NS
|
TOILET FACILITIES
|
51,900.33
|
ST MARY’S N S
|
WINDOW PROJECTS
|
212,750.00
|
KILDALKEY NS
|
ROOF WORKS
|
37,000.00
|
DUNBOYNE SENIOR NS
|
ROOF WORKS
|
37,942.73
|
TOTAL MEATH
|
|
2,578,851.40
|
MONAGHAN
|
|
|
MONAGHAN CONVENT GIRLS
|
ELECTRICAL WORKS
|
51,826.29
|
DERAVOY NATIONAL SCHOOL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
20,023.38
|
DRUMCRUTTIN NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
5,650.00
|
CORCREAGH NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
21,261.00
|
DRUMGOSSETT NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
16,261.17
|
BUN SCOIL LOUIS NAOFA
|
ROOF WORKS
|
253,000.00
|
CASTLEBLANEY CON INFS
|
MECHANICAL WORKS
|
94,253.24
|
SCOIL MHICHIL
|
MECHANICAL WORKS
|
54,927.67
|
S N BLAITHIN IOSA
|
EXTERNAL ENVIRONMENT PROJECTS
|
8,672.00
|
ST JOSEPHS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
128,755.00
|
ST. MARY’S BOYS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
75,900.00
|
SCOIL MHUIRE B
|
ELECTRICAL WORKS
|
243,392.30
|
SCOIL MHUIRE
|
TOILET FACILITIES
|
32,504.00
|
CLOCHAR LUGHAIDH NAI
|
OTHER STRUCTURAL IMPROVEMENTS
|
46,414.00
|
SCOIL NAOMH MHUIRE
|
MECHANICAL WORKS
|
75,468.00
|
ST MARYS THREEMILEHOUSE
|
WINDOW PROJECTS
|
66,995.00
|
SCOIL NAOMH DEAGHA
|
TOILET FACILITIES
|
19,306.00
|
ST PATRICKS NS
|
MECHANICAL WORKS
|
173,439.00
|
KILEEVAN CENTRAL NATIONAL SCHOOL
|
WINDOW PROJECTS
|
72,052.00
|
LATTON NS
|
ELECTRICAL WORKS
|
90,000.00
|
NAOMH OLIVER PLUNKETT
|
MECHANICAL WORKS
|
94,333.00
|
SCOIL PHADRAIG
|
TOILET FACILITIES
|
67,212.84
|
SCOIL BHRIDE
|
TOILET FACILITIES
|
73,000.00
|
GAEL SCOIL ROIS CARRICKMACROSS
|
EXTERNAL ENVIRONMENT PROJECTS
|
76,150.00
|
SCOIL EANNA
|
ROOF WORKS
|
278,862.50
|
EDENMORE NATIONAL SCHOOL
|
WINDOW PROJECTS
|
4,397.00
|
TOTAL MONAGHAN
|
|
2,144,055.39
|
OFFALY
|
|
|
SCOIL NAOMH EOIN
|
MECHANICAL WORKS
|
93,821.94
|
KILCORMAC CONVENT NS
|
WINDOW PROJECTS
|
212,619.10
|
GEASHILL 1 NS
|
MECHANICAL WORKS
|
32,292.05
|
SHINRONE MXD NS
|
WINDOW PROJECTS
|
12,035.70
|
CLARA CONVENT NS
|
TOILET FACILITIES
|
67,996.25
|
HIGH ST MIXED N S
|
ROOF WORKS
|
112,466.25
|
CLONBULLOGUE NATIONAL SCHOOL
|
ROOF WORKS
|
59,180.00
|
S N NAOMH BROGAIN
|
ROOF WORKS
|
97,705.98
|
ST MARYS NS
|
TOILET FACILITIES
|
121,549.00
|
DAINGEAN NS
|
TOILET FACILITIES
|
39,075.27
|
S N NAOMH PHILOMENA
|
MECHANICAL WORKS
|
311,256.50
|
SHINCHILL NS
|
ROOF WORKS
|
39,650.00
|
POLLAGH NS
|
WINDOW PROJECTS
|
42,462.50
|
SN MHUIRE BAINRIOGHAN
|
MECHANICAL WORKS
|
105,618.32
|
SN NAOMH CHOLUMCHILLE
|
EXTERNAL ENVIRONMENT PROJECTS
|
49,655.20
|
NAOMH MHUIRE NS
|
WINDOW PROJECTS
|
80,980.00
|
ST COLMANS NS
|
WINDOW PROJECTS
|
63,429.92
|
ST PATRICKS BNS
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
SCOIL MHUIRE
|
ELECTRICAL WORKS
|
108,626.32
|
S N PEADAR AGUS POL
|
WINDOW PROJECTS
|
15,461.12
|
ST. RYANAGH’S NS
|
ROOF WORKS
|
71,055.14
|
SN MHUIRE NAOFA
|
MECHANICAL WORKS
|
260,466.01
|
S N MUIRE BAINRION
|
EXTERNAL ENVIRONMENT PROJECTS
|
49,860.00
|
ST FRANCIS BNS
|
EXTERNAL ENVIRONMENT PROJECTS
|
53,624.49
|
SCOIL BHRIDE
|
OTHER STRUCTURAL IMPROVEMENTS
|
21,483.15
|
GAELSCOIL EISICIR RIADA
|
EXTERNAL ENVIRONMENT PROJECTS
|
33,501.90
|
S N CHARTAIGH NAOFA
|
ROOF WORKS
|
31,932.05
|
TOTAL OFFALY
|
|
2,187,804.16
|
ROSCOMMON
|
|
|
CLOONFOUR NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
5,144.82
|
TARMON NATIONAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
3,640.00
|
BALLYFARNON NS
|
WINDOW PROJECTS
|
21,680.00
|
KILTEEVAN NS
|
TOILET FACILITIES
|
19,849.49
|
SCOIL PHÁDRAIG
|
ROOF WORKS
|
22,662.18
|
ST MARYS CONVENT NS
|
ROOF WORKS
|
15,850.00
|
TIBOHINE NS
|
WINDOW PROJECTS
|
14,750.00
|
ST JOSEPHS BNS
|
EXTERNAL ENVIRONMENT PROJECTS
|
94,774.00
|
CARRICK MIXED NATIONAL SCHOOL
|
ROOF WORKS
|
19,680.57
|
ABBEY NS
|
MECHANICAL WORKS
|
34,004.77
|
STROKESTOWN CON NS
|
WINDOW PROJECTS
|
23,835.00
|
BRUSNA NS
|
TOILET FACILITIES
|
4,860.00
|
NAOMH ATRACHTA
|
MECHANICAL WORKS
|
9,378.00
|
S N NAOMH EOIN
|
TOILET FACILITIES
|
17,792.25
|
S N NAOMH TREASA
|
ROOF WORKS
|
17,610.65
|
ST CIARANS NS
|
TOILET FACILITIES
|
21,663.98
|
ABBEYCARTON NS
|
ELECTRICAL WORKS
|
129,669.07
|
TOTAL ROSCOMMON
|
|
476,844.78
|
SLIGO
|
|
|
SCOIL NAOMH TREASA
|
WINDOW PROJECTS
|
39,500.00
|
SCOIL NAISIUNTA ABHAINN BHEAG
|
OTHER STRUCTURAL IMPROVEMENTS
|
16,386.00
|
CULLEENS NATIONAL SCHOOL
|
WINDOW PROJECTS
|
6,615.00
|
CORBALLA NS
|
WINDOW PROJECTS
|
50,580.00
|
MOYLOUGH NS
|
WINDOW PROJECTS
|
18,700.00
|
STOKANE NATIONAL SCHOOL
|
PROJECTS-SPECIAL NEEDS FACILITIES
|
14,782.00
|
CARRAROE NS
|
MECHANICAL WORKS
|
37,625.50
|
SCOIL ASICUS
|
OTHER STRUCTURAL IMPROVEMENTS
|
31,950.00
|
ARDKEERAN NS
|
TOILET FACILITIES
|
18,429.37
|
SCOIL NAISIUNTA NAOMH MHUIRE
|
WINDOW PROJECTS
|
41,565.75
|
KILROSS NS
|
TOILET FACILITIES
|
19,742.12
|
COOLOONEY CONVENT NATIONAL SCHOOL
|
ROOF WORKS
|
27,548.89
|
SN PADRAIG NAOFA
|
WINDOW PROJECTS
|
20,803.56
|
SN SEOSAMH NAOFA
|
ELECTRICAL WORKS
|
53,000.00
|
S N EOIN NAOFA
|
EXTERNAL ENVIRONMENT PROJECTS
|
26,862.50
|
SN MULLACH RUA
|
TOILET FACILITIES
|
11,685.50
|
ST CECILIAS SPECIAL SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
58,300.00
|
ST JOSEPHS SPEC SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
31,800.00
|
SN MUIRE GAN SMAL
|
TOILET FACILITIES
|
25,000.00
|
RATHCORMACK NS
|
ELECTRICAL WORKS
|
72,172.00
|
BANADA MXD NS
|
MECHANICAL WORKS
|
27,945.89
|
SCOIL MHUIRE GAN SMAL
|
EXTERNAL ENVIRONMENT PROJECTS
|
12,159.00
|
ST. JOHNS NS
|
ROOF WORKS
|
67,192.10
|
OUR LADY OF MERCY PRIMARY SCHOOL
|
ROOF WORKS
|
179,798.64
|
TOTAL SLIGO
|
|
910,143.82
|
TIPPERARY
|
|
|
BORRISOLEIGH NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
25,500.00
|
MONARD NS
|
MECHANICAL WORKS
|
45,833.97
|
TIPPERARY JNR BNS
|
WINDOW PROJECTS
|
46,952.79
|
BALLYCAHILL NS
|
WINDOW PROJECTS
|
16,420.00
|
ROSCREA BNS
|
WINDOW PROJECTS
|
70,466.81
|
TIPPERARY GIRLS NS
|
WINDOW PROJECTS
|
38,459.94
|
DUALLA NS
|
ROOF WORKS
|
57,577.43
|
CONVENT OF MERCY
|
MECHANICAL WORKS
|
101,360.15
|
CULLEN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
23,845.54
|
UPPER NEWTOWN NS
|
WINDOW PROJECTS
|
9,196.29
|
SN MHUIRE NA TROCAIRE
|
WINDOW PROJECTS
|
48,700.00
|
PRESENTATION PRIMARY SCHOOL
|
ROOF WORKS
|
102,696.20
|
CREHANA NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
26,983.00
|
REARCROSS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
59,507.64
|
PRESENTATION PRIMARY SCHOOL
|
ELECTRICAL WORKS
|
35,113.19
|
SN MUIRE NA NAINGEAL
|
ROOF WORKS
|
205,909.08
|
CLONOMORE NATIONAL SCHOOL TEMPLEMORE
|
EXTERNAL ENVIRONMENT PROJECTS
|
48,162.90
|
ROSCREA NO 2 NS
|
MECHANICAL WORKS
|
117,210.00
|
SN Bhride
|
WINDOW PROJECTS
|
43,890.00
|
KNOCKAVILLA NS
|
TOILET FACILITIES
|
43,890.00
|
KILLEA NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
51,325.30
|
SHRONELL NS
|
WINDOW PROJECTS
|
86,156.69
|
ST MARYS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
21,686.67
|
ST MARYS N S
|
EXTERNAL ENVIRONMENT PROJECTS
|
56,839.00
|
ARDFINNAN NS
|
ROOF WORKS
|
54,548.33
|
ST MARYS CONVENT PRIM
|
MECHANICAL WORKS
|
89,884.89
|
TWO MILE BORRIS
|
EXTERNAL ENVIRONMENT PROJECTS
|
40,950.00
|
TEMPLETUOHY NS
|
ELECTRICAL WORKS
|
63,977.00
|
CARRIG NS
|
WINDOW PROJECTS
|
37,330.00
|
CHRISTIAN BROTHERS NS
|
MECHANICAL WORKS
|
247,479.36
|
SCOIL NA MBRAITHRE
|
ROOF WORKS
|
140,155.55
|
ST MARYS NS
|
ROOF WORKS
|
47,500.00
|
EOCHAILLE ARA NS
|
MECHANICAL WORKS
|
21,195.80
|
SCOIL COLMCILLE
|
EXTERNAL ENVIRONMENT PROJECTS
|
47,330.00
|
GOLDEN NS
|
ROOF WORKS
|
75,429.72
|
SCOIL NA MBRAITHRE
|
MECHANICAL WORKS
|
179,295.10
|
S N CLEIREACHAIN
|
EXTERNAL ENVIRONMENT PROJECTS
|
10,566.39
|
S N NAOMH SHEOSAMH
|
MECHANICAL WORKS
|
164,262.71
|
RATHKEEVIN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
69,000.00
|
SN NA MAIGHNE
|
ELECTRICAL WORKS
|
18,784.00
|
S N IOSEF NAOFA
|
ELECTRICAL WORKS
|
260,628.00
|
POWERSTOWN NS
|
ROOF WORKS
|
40,300.00
|
SCOIL ANGELA
|
ROOF WORKS
|
67,875.46
|
SCOIL NAISIUNTA AN DROMA
|
EXTERNAL ENVIRONMENT PROJECTS
|
12,462.92
|
SN NAOMH PADRAIG
|
ROOF WORKS
|
26,700.00
|
ST KEVINS NS
|
MECHANICAL WORKS
|
24,980.00
|
SN IOSEF NAOFA
|
ROOF WORKS
|
36,950.00
|
S N RATH EILTE
|
WINDOW PROJECTS
|
42,661.93
|
SCOIL MHUIRE KILVEMNON
|
WINDOW PROJECTS
|
26,197.60
|
LISSENHALL NS
|
TOILET FACILITIES
|
41,181.82
|
GRANGEMOCKLER NS
|
WINDOW PROJECTS
|
42,360.00
|
S N TEAMPALL DOIRE
|
OTHER STRUCTURAL IMPROVEMENTS
|
7,044.00
|
SN CILL NA NAOMH
|
EXTERNAL ENVIRONMENT PROJECTS
|
56,556.50
|
BALLYLOOBY NS
|
ELECTRICAL WORKS
|
13,750.00
|
SN MICHAEL NAOFA
|
ROOF WORKS
|
35,289.00
|
KILLENAULE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
40,500.00
|
ST ANNES SPECIAL SCHOOL
|
WINDOW PROJECTS
|
68,865.36
|
CLOUGHJORDAN NO 1 NATIONAL SCHOOL
|
ELECTRICAL WORKS
|
158,772.32
|
SCOIL AONGHUSA SPECIAL SCHOOL
|
TOILET FACILITIES
|
32,000.00
|
SCOIL MHUIRE
|
TOILET FACILITIES
|
42,845.81
|
SCOIL IOSAGAIN
|
ELECTRICAL WORKS
|
76,631.23
|
CLONOULTY CENTRAL NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
38,849.00
|
ST JOHN THE BABTIST
|
ROOF WORKS
|
—
|
CASHEL DEANERY
|
ROOF WORKS
|
—
|
SCOIL MHUIRE
|
ROOF WORKS
|
86,599.96
|
NAOMH PADRAIG SENIOR
|
EXTERNAL ENVIRONMENT PROJECTS
|
10,630.50
|
ST JOHN THE BAPTIST BNS
|
ROOF WORKS
|
597,213.06
|
TOTAL TIPPERARY
|
|
4,579,215.91
|
WATERFORD
|
|
|
RINGVILLE MIXED NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
25,031.90
|
SN CILL ROSANTA
|
ROOF WORKS
|
40,300.00
|
SN NA CROISE NAOFA
|
MECHANICAL WORKS
|
15,950.00
|
VILLIERSTOWN NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
51,699.49
|
FERRYBANK CONVENT
|
WINDOW PROJECTS
|
106,310.00
|
SLIEVERUE MXD NS
|
MECHANICAL WORKS
|
27,630.50
|
SN URSULA NAOFA
|
MECHANICAL WORKS
|
254,000.00
|
STRADBALLY CONVENT
|
WINDOW PROJECTS
|
98,550.00
|
SN BAILE BUILEAR
|
ELECTRICAL WORKS
|
105,681.28
|
PASSAGE EAST NS
|
WINDOW PROJECTS
|
38,443.00
|
ST STEPHENS NATIONAL SCHOOL
|
OTHER STRUCTURAL IMPROVEMENTS
|
91,000.00
|
BALLYDUFF B2 NS
|
WINDOW PROJECTS
|
45,500.00
|
RATHGORMACK NS
|
ELECTRICAL WORKS
|
75,370.52
|
SCOIL NAISIUNTA MHUIRE LOURDES BUAC 16887N
|
EXTERNAL ENVIRONMENT PROJECTS
|
48,293.04
|
SCOIL NAOMH SEOSAMH
|
TOILET FACILITIES
|
156,995.00
|
S N DEAGLAN
|
WINDOW PROJECTS
|
135,000.00
|
S N AN GARRAIN BHAIN
|
WINDOW PROJECTS
|
10,600.00
|
BALLYGUNNER NS
|
WINDOW PROJECTS
|
140,090.00
|
S N NA BHFIODH
|
EXTERNAL ENVIRONMENT PROJECTS
|
36,397.25
|
ST MARYS NATIONAL SCHOOL
|
ROOF WORKS
|
44,447.20
|
S N CNOC MACHAN
|
ELECTRICAL WORKS
|
35,904.14
|
S N AINE NAOFA SEAFIELD
|
MECHANICAL WORKS
|
77,700.00
|
SN MUIRE MAGH DEILGE
|
ROOF WORKS
|
103,883.10
|
FAITHLEG NS
|
WINDOW PROJECTS
|
40,174.42
|
SCOIL NAOMH GOBNAIT
|
WINDOW PROJECTS
|
1,400.00
|
SCOIL MHUIRE
|
WINDOW PROJECTS
|
19,500.00
|
CHRIST CHURCH N S
|
ELECTRICAL WORKS
|
81,218.04
|
SCOIL MUIRE NA TROCAIRE
|
WINDOW PROJECTS
|
8,310.00
|
SC NAOMH EOIN LE DIA
|
EXTERNAL ENVIRONMENT PROJECTS
|
89,793.47
|
ST JOHNS SPECIAL SCHOOL
|
ROOF WORKS
|
179,793.25
|
BALLYMACARBERRY NATIONAL SCHOOL
|
ELECTRICAL WORKS
|
29,139.33
|
SCOIL CHRUIMIN NAOFA
|
EXTERNAL ENVIRONMENT PROJECTS
|
138,660.00
|
SCOIL GEARBHAIN
|
MECHANICAL WORKS
|
76,649.82
|
MOUNT SION PRIMARY SCHOOL
|
TOILET FACILITIES
|
150,000.00
|
SCOIL NAISIUMTA NA TOIRBHIRTE
|
EXTERNAL ENVIRONMENT PROJECTS
|
12,423.57
|
PORTLAW NS
|
WINDOW PROJECTS
|
64,132.25
|
KILMACTHOMAS NS
|
MECHANICAL WORKS
|
29,812.15
|
NEWTOWN JUNIOR SCHOOL
|
WINDOW PROJECTS
|
81,946.54
|
TOTAL WATERFORD
|
|
2,767,729.26
|
WESTMEATH
|
|
|
MULLINGAR CONVENT (JNR)
|
TOILET FACILITIES
|
65,470.75
|
BALLYNACARGY NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
12,500.00
|
BALLYNACARGY MXD NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
6,300.00
|
CROWENSTOWN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
98,112.00
|
CASTLEPOLLARD MIXED NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
27,181.70
|
ST PETERS NS SNR
|
ELECTRICAL WORKS
|
38,380.49
|
SN PHADRAIG
|
EXTERNAL ENVIRONMENT PROJECTS
|
39,447.11
|
ROCHFORTBRIDGE CONVENT NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
34,047.85
|
STREAMSTOWN MIXED NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
25,223.78
|
ST JOSEPHS NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
30,896.22
|
SCOIL NA NDUN
|
WINDOW PROJECTS
|
42,469.03
|
MHICHIL NAOFA NS
|
MECHANICAL WORKS
|
76,800.00
|
RATH EOGHAN
|
WINDOW PROJECTS
|
14,600.00
|
S N BRIGHDE BUACH
|
MECHANICAL WORKS
|
15,400.00
|
NAOMH MICHEAL NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
14,697.14
|
ST MARYS
|
TOILET FACILITIES
|
28,628.65
|
DIARMADA NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
27,950.00
|
S N NAOMH FIONTAN
|
ROOF WORKS
|
23,296.00
|
SCOIL NA MAIGHDINE MHUIRE
|
MECHANICAL WORKS
|
278,485.00
|
ST BAOITHINS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
59,109.58
|
SN PHOIL NAOFA
|
EXTERNAL ENVIRONMENT PROJECTS
|
31,845.00
|
NAOMH IOSEF NS
|
ELECTRICAL WORKS
|
63,925.20
|
AN GHRIANAN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
10,006.00
|
KILPATRICK NS
|
ELECTRICAL WORKS
|
116,694.31
|
CHOLMAIN NAOFA
|
ELECTRICAL WORKS
|
245,560.00
|
ST ETCHENS NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
21,146.25
|
KILBEGGAN NS
|
ROOF WORKS
|
79,591.45
|
TOTAL WESTMEATH
|
|
1,527,763.51
|
WEXFORD
|
|
|
ST CANICE’S NS
|
ROOF WORKS
|
121,697.63
|
BALLYMURN NATIONAL SCHOOL
|
MECHANICAL WORKS
|
116,222.04
|
CLONROCHE NS
|
WINDOW PROJECTS
|
35,000.00
|
ST. SENANS PRIMARY SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
105,074.26
|
CAIM NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
19,057.00
|
CONVENT OF MERCY
|
TOILET FACILITIES
|
115,616.63
|
MICHEAL STREET NS
|
ROOF WORKS
|
138,432.62
|
ST. PATRICKS NS
|
MECHANICAL WORKS
|
21,400.00
|
GLANBRIEN NATIONAL SCHOOL
|
MECHANICAL WORKS
|
5,845.20
|
COURT NS
|
MECHANICAL WORKS
|
27,305.00
|
KILMYSHALL NS
|
WINDOW PROJECTS
|
38,401.25
|
GUSSERANE NS
|
WINDOW PROJECTS
|
66,500.00
|
ST JOSEPHS NS
|
ROOF WORKS
|
78,594.20
|
ST LEONARD’S NS
|
ELECTRICAL WORKS
|
39,200.00
|
CAMOLIN NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
6,504.47
|
BALLYCANEW NS
|
WINDOW PROJECTS
|
39,550.00
|
KILLEGNEY NATIONAL SCHOOL
|
ROOF WORKS
|
56,453.36
|
TOMBRACK NS
|
WINDOW PROJECTS
|
17,327.38
|
CLOLOGUE NS
|
WINDOW PROJECTS
|
13,859.50
|
BALLINDAGGIN NS
|
WINDOW PROJECTS
|
34,200.00
|
NEWBAWN NS
|
MECHANICAL WORKS
|
14,099.00
|
BALLYGARRETT NS
|
ELECTRICAL WORKS
|
108,342.47
|
KILRANE NS
|
TOILET FACILITIES
|
16,000.00
|
SN BAILE CUISIN
|
MECHANICAL WORKS
|
16,684.39
|
S N CILL T-SILE
|
ROOF WORKS
|
25,410.79
|
S N NMH BRIGHDE
|
OTHER STRUCTURAL IMPROVEMENTS
|
37,500.00
|
GLYNN NATIONAL SCHOOL
|
WINDOW PROJECTS
|
50,069.75
|
SCOIL NAISIUNTA BAILE UI COILEAIN
|
WINDOW PROJECTS
|
34,766.60
|
SCOIL NA MBRAITHRE
|
OTHER STRUCTURAL IMPROVEMENTS
|
121,515.55
|
SN FIONNTAIN
|
TOILET FACILITIES
|
82,735.64
|
CASTLEDOCKNILL NS
|
WINDOW PROJECTS
|
20,431.00
|
S N ABBAIN
|
WINDOW PROJECTS
|
57,600.00
|
S N SEOSAIMH
|
ELECTRICAL WORKS
|
45,540.00
|
S N NMH SEOSAIMH
|
WINDOW PROJECTS
|
39,654.00
|
DUNCANNON NS
|
MECHANICAL WORKS
|
115,996.35
|
S N RATH AN IUBHAIR
|
OTHER STRUCTURAL IMPROVEMENTS
|
53,567.52
|
GALBALLY NS
|
ROOF WORKS
|
48,617.50
|
ST MARYS NS
|
WINDOW PROJECTS
|
57,264.00
|
KILANERIN NS
|
TOILET FACILITIES
|
40,713.60
|
BARNTOWN NS
|
ROOF WORKS
|
191,300.00
|
SN RAITHIN
|
WINDOW PROJECTS
|
19,740.50
|
SCOIL NAOMH IOSEPH
|
WINDOW PROJECTS
|
35,197.85
|
MONAGEER PRIMARY SCHOOL
|
ROOF WORKS
|
26,000.00
|
S N PADRAIG NFA
|
|
85,360.98
|
ST CATHERINES NS
|
WINDOW PROJECTS
|
44,005.00
|
S.N. BAILE AN PHIARSAIGH
|
MECHANICAL WORKS
|
181,799.98
|
ST. IBARS NS
|
WINDOW PROJECTS
|
223,944.86
|
ST IBERIUS N S
|
TOILET FACILITIES
|
52,785.38
|
ST JOSEPHS SCHOOL
|
ROOF WORKS
|
22,765.64
|
RATHANGAN NS
|
WINDOW PROJECTS
|
119,351.95
|
SCOIL REALT NA MARA
|
TOILET FACILITIES
|
50,000.00
|
HORESWOOD NS
|
ELECTRICAL WORKS
|
96,219.51
|
SCOIL MHUIRE
|
TOILET FACILITIES
|
97,512.82
|
TOTAL WEXFORD
|
|
3,328,733.17
|
WICKLOW
|
|
|
GRANGECON NS
|
TOILET FACILITIES
|
14,583.20
|
SISTERS OF CHARITY NS
|
WINDOW PROJECTS
|
100,000.00
|
ST ANDREWS NS
|
WINDOW PROJECTS
|
62,116.87
|
S N NAOMH MICHAEL
|
WINDOW PROJECTS
|
41,000.00
|
JONATHAN SWIFT NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
26,485.49
|
GLEBE NS
|
ROOF WORKS
|
25,268.86
|
SHILLELAGH NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
31,350.00
|
ST PETERS INFANTS
|
ROOF WORKS
|
69,000.00
|
SN MHUIRE
|
MECHANICAL WORKS
|
15,177.09
|
ST BRIGIDS SCHOOL
|
WINDOW PROJECTS
|
138,692.25
|
ST BRIGIDS CONVENT
|
EXTERNAL ENVIRONMENT PROJECTS
|
68,569.26
|
ST LAURENCES NS
|
WINDOW PROJECTS
|
79,350.34
|
SN NAOMH IOSAF
|
TOILET FACILITIES
|
19,500.00
|
SCOIL CHAOIMHIN NAOFA
|
ROOF WORKS
|
8,329.00
|
ST MARYS NS
|
ELECTRICAL WORKS
|
2,283.73
|
ST JOSEPHS NS
|
MECHANICAL WORKS
|
30,760.71
|
ST MARYS & ST GERARDS
|
MECHANICAL WORKS
|
235,971.59
|
CLOCHAR MUIRE NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
61,322.76
|
RATHDRUM BNS
|
ROOF WORKS
|
129,120.00
|
ANNACURRA NS
|
WINDOW PROJECTS
|
80,744.00
|
SN MUIRE MXD
|
WINDOW PROJECTS
|
50,470.00
|
SCOIL AN CHOROIN MHUIRE
|
WINDOW PROJECTS
|
99,617.00
|
SN NICOLAIS NAOFA
|
EXTERNAL ENVIRONMENT PROJECTS
|
9,966.47
|
NA COROINE MUIRE MXD
|
WINDOW PROJECTS
|
34,666.40
|
KILCOMMON NS
|
ROOF WORKS
|
105,600.00
|
PADRAIG NAOFA NS
|
ELECTRICAL WORKS
|
98,033.40
|
CARNEW NS
|
MECHANICAL WORKS
|
117,365.00
|
MARINO SCHOOL
|
EXTERNAL ENVIRONMENT PROJECTS
|
—
|
KILMACANOGUE NS
|
MECHANICAL WORKS
|
157,950.00
|
RATHCOYLE NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
38,937.00
|
NAOMH PEADAR N S
|
ROOF WORKS
|
93,650.84
|
AN CHROI RO NAOFA NS
|
ELECTRICAL WORKS
|
62,854.40
|
TINAHELY NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
50,181.84
|
SCOIL NAOMH BRID
|
WINDOW PROJECTS
|
20,200.00
|
ST ERNANS BNS
|
ROOF WORKS
|
51,246.22
|
STRATFORD LODGE NATIONAL SCHOOL
|
WINDOW PROJECTS
|
18,189.75
|
ST FERGALS JUNIOR NS
|
EXTERNAL ENVIRONMENT PROJECTS
|
12,762.28
|
GREYSTONES NS
|
ROOF WORKS
|
44,295.43
|
ST. FERGAL’S SENIOR NS
|
ROOF WORKS
|
16,392.40
|
ST FRANCIS NS
|
WINDOW PROJECTS
|
29,161.70
|
SCOIL MHUIRE NA NAIRD
|
WINDOW PROJECTS
|
40,668.00
|
BRAY SCHOOL PROJECT NS
|
OTHER STRUCTURAL IMPROVEMENTS
|
28,414.25
|
NEWTOWNMOUNTKENNEDY NS
|
MECHANICAL WORKS
|
85,796.89
|
TOTAL WICKLOW
|
|
2,506,044.42
|
TOTAL PRIMARY SCHOOLS
|
|
79,338,394.08
|