I propose to take Questions Nos. 161 to 163, inclusive, together. The school building project referred to by the Deputy is included on the current 5 year construction programme announced in 2012. It is listed on the programme to proceed to tender and construction in 2015/16. The project is at an advanced stage of Architectural Planning. Stage 2(B) Detailed Design Stage which includes the applications for Planning permission, Fire Cert and Disability Access Cert and the preparation of Tender Documents. My Department officials and the design team have been working with the Local Authority to determine the full requirements for waste water and surface water infrastructure in advance of submitting the planning application. These infrastructural issues also involve engagement with Irish Water and the National Roads Authority. Further discussions will be required with each agency to address outstanding issues and to determine the most effective solutions possible. In the context of those ongoing discussions, it would be inappropriate to comment at this time on the cost elements of the required infrastructure.