Robert Troy
Ceist:247. Deputy Robert Troy asked the Minister for Transport, Tourism and Sport his plans for the N4 upgrade between Mullingar and Longford; and the timeframe for same. [30520/17]
Amharc ar fhreagraDáil Éireann Debate, Thursday - 29 June 2017
247. Deputy Robert Troy asked the Minister for Transport, Tourism and Sport his plans for the N4 upgrade between Mullingar and Longford; and the timeframe for same. [30520/17]
Amharc ar fhreagraAs Minister for Transport, Tourism & Sport, I have responsibility for overall policy and funding in relation to the national roads programme. The planning, design and operation of individual road projects (including the N4) is a matter for Transport Infrastructure Ireland (TII) under the Roads Acts 1993-2015 in conjunction with the local authorities concerned.
Noting the above position, I have referred the Deputy’s question to TII for direct reply. Please advise my private office if you don’t receive a reply within 10 working days.
The referred reply under Standing Order 42A was forwarded to the Deputy.