Schools Building Projects Applications

Dáil Éireann Debate, Tuesday - 23 October 2018

Tuesday, 23 October 2018

Ceisteanna (282)

Pat the Cope Gallagher

Ceist:

282. Deputy Pat The Cope Gallagher asked the Minister for Education and Skills to outline his plans to provide a new school building for a school (details supplied) in Donegal town; if his attention has been drawn to the fact that the school is at maximum capacity and requires consideration for a new construction; and if he will make a statement on the matter. [43494/18]

Amharc ar fhreagra

Freagraí scríofa

I wish to advise the Deputy that the school in question submitted an application for major capital funding to my Department.

The Deputy will be aware that the National Development Plan (NDP) provides for an €8.4 billion investment in school buildings over the period 2018 to 2027 to deliver on NDP and National Planning Framework objectives through addressing the twin priorities of catering for demographics and ensuring a strengthened focus on refurbishment of existing school stock. This investment will result in an almost doubling of the capital budget for school buildings from €540 m in 2018 rising to an annual average of circa. €1 billion in the second half of the NDP period.

The strengthened focus on refurbishment of existing school stock will have different strands including prefab replacement, PE hall and school laboratory build and modernisation programmes as well as the commencement and progression of a deep energy retrofit of primary and post-primary schools built prior to 2008.

The application from the school referred to by the Deputy remains available to be considered in this context.