148. Deputy Christopher O'Sullivan asked the Minister for Education the status of progress under the School Building Programme, including sustainability measures; and if she will make a statement on the matter. [23666/22]

Amharc ar fhreagra

Freagraí scríofa

Under Project Ireland 2040, the education sector will receive a total of approximately €4.4 billion capital investment over the period 2021-2025. This significant investment allows us to move forward with certainty on our ambitious plans and deliver high quality building projects, with a real focus on sustainability, for school communities across Ireland.

This investment will build on the good progress being made on adding capacity to cater for demographic changes and provision for children with special educational needs. This investment will also facilitate an increased focus on the modernisation of existing school stock and help transition the school system for an era of net zero carbon by 2050.

My Department has a large pipeline of projects for delivery under the school building programme. The main elements of this pipeline currently involve in excess of 1,300 school building projects for delivery under the Department’s Large Scale and Additional Accommodation Scheme. These projects are currently in progress across the various stages of planning, design, tender and construction. Most of which are expected to be either under construction or completed in the period up to 2025 and are being progressed as quickly as possible

There are currently in excess of 250 school building projects at construction (on site) with a continuous stream of other projects at or near the tendering stage.

It is anticipated that 150 to 200 school building projects will be completed annually during the 2022 to 2025 period.

During the period 2018 to 2021 691 school building projects were completed under the Large Scale Capital Programme (LSCP) and the Additional School Accommodation Scheme (ASA). These projects delivered in excess of 64,000 school places.

My Department is at the forefront of design with respect to sustainable energy in school buildings and this performance has been recognised at both National and International level with sustainable energy awards for excellence in Design and Specification.

New renewable technologies and approaches are tested to ensure compatibility with school design and operational requirements under the research programme. Successful and repeatable results are then incorporated into all new school designs and refurbishments through my Department’s Technical Guidance Documents, which set the benchmark for sustainable design in school buildings with a clear focus on energy efficiency. The Department’s policy is supported by a strong research programme with fifty three research projects at various stages including the energy website www.energyineducation.ie. which is a joint partnership with the Sustainable Energy Authority of Ireland (SEAI).

Schools designed and built in accordance with the Department’s schools technical guidance documents have been achieving A3 Building Energy Ratings since 2009 with schools typically achieving up to 20% higher performance and 25% better carbon performance than required by the 2019 Building Regulations, along with 10% of primary energy provided via photovoltaics and infrastructure provision for electric vehicle charging.

The Department have been using test schools to evaluate the suitability of renewable energy options for schools over the past twenty plus years. Nearly 60 % of the research programme features renewable aspects. These renewables include wind generation, solar hot water heating, photovoltaics, rain water recovery, geothermal heat pumps, air source heat pumps and biomass heating systems. Results have varied with respect to their applicability in a school environment. Research continues in many areas.

My Department and the Department of Environment, Climate and Communications established a jointly funded pathfinder programme with the SEAI, testing and demonstrating energy efficiency and decarbonisation retrofit approaches. This pathfinder is a great example of collaboration ensuring the deployment of new design approaches and technologies are introduced to the educational environment on an evidence based approach.

This Pathfinder programme is paving the way for, and informing, a much larger national schools’ programme for the energy retrofit of schools built prior to 2008 as included in the National Development Plan. It is facilitating research on a range of typical retrofit options, which will have been tried and tested. It is providing valuable development information for a solution driven delivery strategy which will be founded on a solid evidence base that has proven the robustness and scalability of renewable solutions within the schools’ sector.

The longer-term outcome of the pathfinder will be to create an accurate and scalable model for energy efficient retrofits of schools across Ireland.

The pathfinder programme builds on significant investment by the Department of Education in energy efficiency through the 2009/10 Cavity and Attic Insulation/Water Conservation Scheme and ongoing Summer Works and refurbishment projects.

The upgrades target a Building Energy Rating of B, 50% energy efficiency improvement and 51% emissions reduction. The works typically involves upgrades to the building fabric including wall and roof insulation, doors and windows, air tightness improvements, LED lighting and heating upgrades as well as renewable technologies.