Road Projects

Dáil Éireann Debate, Thursday - 2 June 2022

Thursday, 2 June 2022

Ceisteanna (200)

Brendan Griffin

Ceist:

200. Deputy Brendan Griffin asked the Minister for Transport further to Parliamentary Question No. 20 of 25 May 2022, the date that was provided to his Department by Kerry County Council confirming that works were completed in respect of this project; if his Department will provide all documentation relating to the drawdown of funding for this project including any progress reports that may have been received from Kerry County Council; and if he will make a statement on the matter. [28664/22]

Amharc ar fhreagra

Freagraí scríofa

As indicated previously, it is the responsibility of the relevant local authority to implement grant aided schemes on the basis approved and in accordance with the terms of the Memorandum on Grants for Regional and Local Roads.  The Department’s Regional and Local Road Engineering Inspectorate visit each local authority approximately twice each year to visually inspect funded projects.  As also indicated,  due to the high number of projects carried out each year in all grant categories, this is a spot check prioritising the larger projects and a representative sample of the smaller projects and specific highlighted projects. 

In the case of projects under the Safety Improvement Programme, the basis for the drawdown of grants is the claims submitted to the Department via TII’s Payment Reporting System.  In this context local authorities are required to submit extracts from their Financial Management System (FMS) as support for claims and the information supplied by Kerry County Council in this instance is summarised in the table below. 

Given the scale of the projects generally funded under the Safety Improvement Programme and the number of projects involved across all local authorities, local authorities are not required to submit progress reports.  Local authorities are required to submit annual returns indicating the status of funded projects.   The Boolteens scheme was reported as complete in Kerry County Council’s return relating to 2021.  

Figures as provided to the  Deputy by Kerry County Council

2020 Extract from Kerry FMS Summary for claim

2021 Extract from Kerry FMS Summary for claim

Element

Cost

2020

Inclusive of

2021

Inclusive of

Labour Costs

€28,832

€0.00

N/A

€28,832.37

Wages, ER-PRSI, Overtime & Allowed Overhead

Minor Contracts

€12,448

€10,541.89

Road Markings

€1,905.99

Engineering, Minor Contacts 13.5% & Minor Contacts E1

Plant & Machinery

€9,415

€0.00

N/A

€9,415.01

Diesel, Mini Digger, Roller, Trucks, Low Loader, Tractor, Pick Up Truck, Traffic Lights, Tractor & Dump Trailer, Skip Hire, Health & Safety Wear & Small Hand Tools

Materials

€46,136

€27,040.96

10mm DBM, Ready Mix Concrete & Cl 804

€19,095.13

Tape, Timber,10mm DBM Patching, 600mm OG Pipe, Nuts & Bolts, Road Signs

Advertising

€420

€419.73

Advertising

€0.00

N/A

Total

€97,251

€38,002.58

€59,248.50