310. Deputy Catherine Murphy asked the Minister for Education the progress that has been made in recent months in acquiring a permanent site for a school (details supplied) which will outgrow its currently temporary site in 2023; the plans to address this issue in the short-term; the proposed timeline for same; and if she will provide the location of the site owned by her Department that has now been identified [44701/22]

Amharc ar fhreagra

Freagraí scríofa

As the Deputy is aware, a Minister-owned site has been identified as an option for potential redevelopment to accommodate a second school. Representatives of the existing school have agreed to collaborate with my Department to carry out a master plan study to assess the potential of developing a second school on the Minister-owned site. The outcome of the master plan study will determine the next steps to be taken.

Once a permanent site has been confirmed, the project will progress to the architectural design & planning stages.

It is not possible to provide any further information, at this time.