Dáil Éireann Debate, Thursday - 24 November 2022

Thursday, 24 November 2022

Ceisteanna (228)

Bernard Durkan

Ceist:

228. Deputy Bernard J. Durkan asked the Minister for Education the degree to which she and her Department continue to assess the educational needs at primary and second level in Kilcock, County Kildare with particular reference to the completion of promised or existing projects arising from the demographics in the area; if she is satisfied regarding the adequacy of school accommodation in the area; and if she will make a statement on the matter. [58666/22]

Amharc ar fhreagra

Freagraí scríofa

My Department utilises a Geographic Information System (GIS) to support its strategic planning for capital investment. Where the geo-spatial assessment of demand and capacity in an area indicates that additional provision is required my Department considers the options of extending the capacity of a school or schools, or of providing a new school or schools. The timing and duration of the accommodation need is also considered in determining the optimum accommodation solution – for example a short-term accommodation requirement does not require a long-term accommodation solution.

My Department has a large pipeline of projects for delivery under the school building programme. The main elements of this pipeline currently involve in excess of 1,300 school building projects for delivery under the Department’s Large Scale and Additional Accommodation Scheme. These projects are currently in progress across the various stages of planning, design, tender and construction. There are currently in excess of 250 school building projects at construction (on site) with a continuous stream of other projects at or near the tendering stage. Most of which are expected to be either under construction or completed in the period up to 2025 and are being progressed as quickly as possible.

It is anticipated that 150 to 200 school building projects will be completed annually during the 2022 to 2025 period.

There are currently no issues identified which will impact on progression of projects in Kilcock. Please see attached table showing details on all building projects ongoing in Kilcock. The current status of approved projects is listed on a county by county basis on www.gov.ie and is updated on a monthly basis to reflect their progress through the various stages. My Department will continue to review all School Planning Areas with regard to any demographic changes that may result in the need for further additional school accommodation.

Roll_Number

School_Planning_Area

School_Name

Project_No

Roll_Number

Total_Project_Brief

Programme_List

16706G

Kilcock

ST JOSEPHS NS

209

16706G

Brief for a 16 classroom school

Large Scale Capital Programme

18650P

Kilcock

NEWTOWN NS

A18-081

18650P

1x15m2 SET room + 4 MCR + 1 SET prefab replacement

Additional School Accommodation Scheme

18650P

Kilcock

NEWTOWN NS

A21-086

18650P

2 classroom SENB base @ 439m2 + 1 x 100m prefab (Sept'21) + 1 x 100m prefab (Sept'22)

Additional School Accommodation Scheme

18666H

Kilcock

S N TIR MOCHAIN

A19-136

18666H

3x80m2 Classroom inc en-suite toilets (Prefab replacement)

Additional School Accommodation Scheme

19897I

Kilcock

SCOIL UÍ RIADA

A19-138

19897I

7xMainstream classrooms inc ensuite, 3xSET room, 1x WC, 2X Staff toilets

Additional School Accommodation Scheme

61691B

Kilcock

Scoil Dara

A18-082

61691B

5x Mainstream classrooms & 5 x WC for assisted users, 2xScience labs &1xPrep area, 1xArt/craft room--- 4xMainstream classroom 4xWC for assisted users (Prefab replacement)

Additional School Accommodation Scheme

61691B

Kilcock

Scoil Dara

A20-271

61691B

Purchase of 3 x 49m2 prefabs

Additional School Accommodation Scheme

61691B

Kilcock

Scoil Dara

A21-276

61691B

SEN refurbishment works

Additional School Accommodation Scheme

Barr