338. Deputy Darren O'Rourke asked the Minister for Housing, Local Government and Heritage the breakdown of the BER rating of social housing stock, in 2020, 2021, 2022 and 2023, in tabular form; and if he will make a statement on the matter. [56133/23]

Amharc ar fhreagra

Darren O'Rourke

Ceist:

339. Deputy Darren O'Rourke asked the Minister for Housing, Local Government and Heritage how many social houses were retrofitted in 2020, 2021, 2022 and 2023 to date per county; their post-BER rating, in tabular form; and if he will make a statement on the matter. [56134/23]

Amharc ar fhreagra

Darren O'Rourke

Ceist:

340. Deputy Darren O'Rourke asked the Minister for Housing, Local Government and Heritage if any assessment has been carried out by his Department concerning the installation of solar PV on the social housing stock; and if he will make a statement on the matter. [56135/23]

Amharc ar fhreagra

Freagraí scríofa

I propose to take Questions Nos. 338 to 340, inclusive, together.

Since 2013 my Departments has provided funding towards retrofit works on local authority housing. These works were carried out over two phases and consisted of cavity wall/attic insulation and fabric upgrade works to those dwellings with solid/hollow block wall construction and included the provision of heating upgrades.

An annualised breakdown of the funding and number of properties completed by each local authority is available at the following link:

www.gov.ie/en/publication/668c1-energy-efficiency-retrofitting-programme-expenditure-output/

A new enhanced ten year energy efficiency programme was launched in 2021 in response to a commitment made under the Programme for Government, which called for the 'retrofit' of 500,000 homes to a B2/Cost Optimal Equivalent BER standard by 2030, of which approximately 36,500 are expected to be local authority owned homes.

In 2023, my Department announced that funding of €87 million is available under the Energy Efficient Retrofit Programme for the retrofit of approximately 2,400 social homes.

Work in relation to the 2023 programme is nearing completion and current indicators show that the original target of 2,400 retrofits is expected to be completed this year. Full details in relation to delivery under the 2023 Energy Efficiency Programme will be available early in 2024.

Details in relation to an individual dwellings post works BER may be available from a relevant Local Authority.

In certain circumstances, my Department supports the installation of 1kWp solar PV for social housing with a floor area less than 55 m2, with a maximum HLI of 2.6 on a pilot basis. In such cases local authorities are required to cooperate with SEAI as part of research monitoring the performance in these dwellings.

Question No. 339 answered with Question No. 338.
Question No. 340 answered with Question No. 338.