Léim ar aghaidh chuig an bpríomhábhar
Gnáthamharc

Departmental Expenditure

Dáil Éireann Debate, Tuesday - 23 January 2024

Tuesday, 23 January 2024

Ceisteanna (106)

Alan Kelly

Ceist:

106. Deputy Alan Kelly asked the Tánaiste and Minister for Foreign Affairs the running costs of the Irish Embassy in Washington DC, Paris and London in the years of 2022 and 2023, in tabular form. [2485/24]

Amharc ar fhreagra

Freagraí scríofa

The running costs for the Embassies of Ireland in London, Paris and Washington DC for 2022 and 2023 are provided in tabular form below.

Embassy

2022

2023

London

€4.5m

€5.5m

Paris

€2.6m

€2.7m

Washington DC

€1.8m

€2.4m

Barr
Roinn