Léim ar aghaidh chuig an bpríomhábhar
Gnáthamharc

Dáil Éireann díospóireacht -
Wednesday, 24 Apr 2002

Vol. 552 No. 4

Written Answers. - Registration of Title.

Michael Ring

Ceist:

133 Mr. Ring asked the Minister for Justice, Equality and Law Reform the number of applications for folios or file plan and copy instruments pending in the Land Registry Office; and the details on a county and regional basis of the average delays in issuing same. [12695/02]

The information required by the Deputy is set out in the following tabular statement.

Table 1 below shows the total number of applications under the headings of Intake and Output for the year 2001 for the categories requested for the entire country:

Table 1

Application type

Intake for 2001

Output for 2001

Copy folio

19,104

19,400

Copy folio and filed plan

154,498

151,034

Copy instrument

6,460

6,216

Table 2 below shows the average daily output, the number on hands and the average delay for each category for the entire country as at 31 March 2002.
Table 2

Application type

Average daily output

Applications pending on 31/03/2002

Average delay

Copy folio

78

385*

5 working days

Copy folio and filed plan

604

9,010*

15 working days

Copy instrument

25

523

23 working days

*In addition to the numbers stated above for copy folios and copy folios and filed plans there are also applications in the Land Registry Office lodged as part of an application for registration, which is still pending, and the new folio has not yet been opened. However, as the folio does not yet exist they cannot yet be counted as cases on hands.
Table 3 below shows the average time taken for each category on a county-regional basis:
Table 3

Region

Copy folios

Copy folios and filed plans

Copy instruments

Dublin

1 working day

10 working days

10 working days

Kildare and Wicklow

2 working days

10 working days

18 working days

Cork and Waterford

8 working days

11 working days

22 working days

Kerry, Limerick and Tipperary

5 working days

10 working days

10 working days

Laois, Offaly, Carlow, Kilkenny and Wexford

5 working days

10 working days

10 working days

Galway, Mayo, Sligo, Clare and Roscommon

8 working days

24 working days

14 working days

Meath, Westmeath, Cavan, Louth, Monaghan, Leitrim and Longford

7 working days

28 working days

8 working days

The Land Registry Office is organised into the seven regions set out in Table 3. Within each region there is no difference in the turnaround times between counties. A number of factors contribute to the variations between regions. These include: (1) the ready availability of original documents for copying and certification. Circumstances that influence this include: the layout in the building from where a county or region is served. In some buildings it is possible to store the original documents adjacent to the area where they are required – this is not possible in others; the level of development of technology for the county; the demand for the service at a given time; the resources to meet that demand at any given time; (2) the quality of the original maps; (3) in the case of filed plans it is significant whether or not a filed plan map already exists. If it does not a copy has to be prepared manually, which delays the overall process; (4) in the case of copy instruments the size and nature of the original instrument is a factor. An instrument can vary in size from a few pages to many thousands of pages. Each page has to be individually copied before it can be certified and issued, which is a very labour-intensive activity; (5) whether the applications are made via the electronic access service or by another method.
The above table provides the "average" time taken for each of the above categories. The figures have been calculated by taking the total number of cases on hands for each category and dividing it by the average daily output in the county-region. It should be noted that, in many cases, the turnaround time is considerably faster and in some, for the reasons outlined above, it can be slower.
The Land Registry Office's electronic access service – EAS – is currently available for 20 counties and will be rolled out to the remaining counties on 29 April 2002. Where applications are made via this system it is much more efficient for the Land Registry Office to process them. The usage of the EAS system, which has been introduced on a gradual basis, is extremely good. Over 3,300 customers have now opened accounts. At present, for the counties where it is available, over 50% of applications are being made elec tronically. In the case of an application for a certified copy folio or a copy folio and filed plan where the folio is held in electronic format and a filed plan already exists, it issues within 48 hours when the application is made via the EAS system. At present, about 25% of the 1.8 million Land Registry Office folios are held in electronic format. It is intended to have all the folios and all the filed plan maps converted to electronic format by the end of 2004.
Barr
Roinn