Schools Building Projects Status

Dáil Éireann Debate, Tuesday - 3 October 2017

Tuesday, 3 October 2017

Ceisteanna (199)

Pat the Cope Gallagher

Ceist:

199. Deputy Pat The Cope Gallagher asked the Minister for Education and Skills if he will provide a progress report for a school (details supplied); the options being considered for the new school building; the timeframe for its delivery; and if he will make a statement on the matter. [41909/17]

Amharc ar fhreagra

Freagraí scríofa

The Design Team appointment for the major building project referred to by the Deputy has recently been completed and the project has now entered early architectural planning/design stages.

My Department has authorised the Design Team to commence Stage 1 of architectural planning as per the Department’s Design Team Procedures 2012. Stage 1 is the initial sketch design stage and includes an analysis of all the constraints of the site, developing a preferred option and ensuring that that preferred option is the most optimum for the delivery of the project brief.

The project is included in the Department's six-year construction programme and is scheduled therein for construction in 2019-2021.